Letter Sequence Acceptance Review |
|---|
TAC:ME0219, Control Room Habitability, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation (Open) TAC:ME0220, Control Room Habitability, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
|
MONTHYEARML0835703382008-12-0808 December 2008 Transmittal of ARCON96 and Radtrad Cds Supporting Alternative Source Term License Amendment Request 241 Project stage: Request NRC 2008-0085, Transmittal of ARCON96 and Radtrad Cds Supporting Alternative Source Term License Amendment Request 2412008-12-0808 December 2008 Transmittal of ARCON96 and Radtrad Cds Supporting Alternative Source Term License Amendment Request 241 Project stage: Request NRC 2008-0081, Submittal of License Amendment Request 241, Alternative Source Term2008-12-0808 December 2008 Submittal of License Amendment Request 241, Alternative Source Term Project stage: Request NRC 2009-0002, Supplement to License Amendment Request 241, Summary of Pbnp Sump Ph Calculation Inputs, Assumptions, Methodology and Results2009-01-16016 January 2009 Supplement to License Amendment Request 241, Summary of Pbnp Sump Ph Calculation Inputs, Assumptions, Methodology and Results Project stage: Supplement NRC 2009-0006, Supplement to License Amendment Request 241 Transmittal of Proposed License Conditions2009-01-27027 January 2009 Supplement to License Amendment Request 241 Transmittal of Proposed License Conditions Project stage: Supplement ML0903707702009-01-28028 January 2009 Email Regarding Need Supplemental Information for AST Acceptance Review from Containment and Ventilation Branch Project stage: Acceptance Review NRC 2009-0023, Supplement to License Amendment Request 241 Alternative Source Term2009-02-20020 February 2009 Supplement to License Amendment Request 241 Alternative Source Term Project stage: Supplement NRC 2009-0001, Calculation Project Schedule Update2009-02-20020 February 2009 Calculation Project Schedule Update Project stage: Request ML0905501512009-02-27027 February 2009 Acceptance Review for License Amendment Request 241 Alternate Source Term Project stage: Acceptance Review ML0907110612009-03-20020 March 2009 Request for Additional Information from Csgb Branch Related to License Amendment Request No. 241 Alternate Source Term Project stage: RAI ML0835309302009-03-25025 March 2009 FPL Energy Point Beach, LLC - Request for Withholding of Proprietary Information from Public Disclosure for Point Beach Nuclear Plant, Units 1 and 2 Project stage: Withholding Request Acceptance NRC 2009-0039, Response to Request for Additional Information License Amendment Request 241, Alternative Source Term2009-04-17017 April 2009 Response to Request for Additional Information License Amendment Request 241, Alternative Source Term Project stage: Response to RAI NRC 2009-0045, Supplement to License Amendment Request 241, Proposed Technical Specifications for Primary Auxiliary Building Ventilation (Vnpab)2009-04-17017 April 2009 Supplement to License Amendment Request 241, Proposed Technical Specifications for Primary Auxiliary Building Ventilation (Vnpab) Project stage: Supplement NRC 2009-0032, License Amendment Request 250, Corporation Name Change2009-04-17017 April 2009 License Amendment Request 250, Corporation Name Change Project stage: Request ML0909007222009-04-22022 April 2009 Request for Additional Information from Emcb Regarding License Amendment Request No. 241 Alternate Source Term Project stage: RAI NRC 2009-0026, Transmittal of Supplement to License Amendment Request 241 Regulatory Guide 1.183 Compliance Matrix2009-05-0808 May 2009 Transmittal of Supplement to License Amendment Request 241 Regulatory Guide 1.183 Compliance Matrix Project stage: Supplement ML0911105842009-05-13013 May 2009 Request for Additional Information from Reactor Systems Branch Regarding License Amendment Request No. 241 Alternate Source Term Project stage: RAI NRC 2009-0054, Response to Request for Additional Information License Amendment Request 241 Alternative Source Term2009-05-15015 May 2009 Response to Request for Additional Information License Amendment Request 241 Alternative Source Term Project stage: Response to RAI ML0916205602009-06-25025 June 2009 Request for Additional Information from the Human Performance Branch Regarding License Amendment Request 241 Alternate Source Term Project stage: RAI L-2009-134, Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 42009-06-29029 June 2009 Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 4 Project stage: Request NRC 2009-0075, License Amendment Request 241 Alternative Source Term Response to Request for Additional Information2009-07-24024 July 2009 License Amendment Request 241 Alternative Source Term Response to Request for Additional Information Project stage: Response to RAI ML0919700422009-07-24024 July 2009 Notice of Meeting with FPL Energy Point Beach, LLC, to Discuss Epu/Setpoint Submittal and Relationship Between EPU and AST Project stage: Meeting ML0919500722009-07-24024 July 2009 Request for Additional Information (RAI) from the Containment and Ventilation Branch Regarding License Amendment Request No. 241 Alternate Source Term Project stage: RAI ML0921905632009-08-0606 August 2009 Extended Power Uprate and Alternate Source Term Review Planning Meeting Presentation Project stage: Request ML0922402982009-08-0606 August 2009 Extended Power Uprate and Alternate Source Term Review Planning Meeting Presentation (Handout 2) Project stage: Request ML0921500922009-08-0707 August 2009 Request for Additional Information (RAI) from Electrical Engineering Branch Alternate Source Term Project stage: RAI ML0921511232009-08-13013 August 2009 Request for Additional Information from Accident Dose Branch Alternate Source Term Project stage: RAI ML0922507682009-08-13013 August 2009 Draft - Request for Additional Information from Containment and Ventilation Branch on Alternate Source Term Project stage: Draft RAI NRC 2009-0080, License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information2009-08-20020 August 2009 License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information Project stage: Response to RAI ML0923605352009-08-26026 August 2009 Request for Additional Information, Round 2, from Containment and Ventilation Branch, on the Proposed Amendment Re. Alternative Source Term Project stage: RAI NRC 2009-0085, License Amendment Request 241 Alternative Source Term Response to Request for Additional Information2009-09-0404 September 2009 License Amendment Request 241 Alternative Source Term Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0086, License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information2009-09-0404 September 2009 License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0090, License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information2009-09-10010 September 2009 License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0076, Units I & 2, License Amendment Request 241, Alternative Source Term Commitment for Seismic Evaluation2009-09-10010 September 2009 Units I & 2, License Amendment Request 241, Alternative Source Term Commitment for Seismic Evaluation Project stage: Request ML0923211842009-09-14014 September 2009 Meeting Summary, Meeting with FPL Energy Point Beach, LLC, on the Extended Power Uprate and Alternate Source Term Amendments Project stage: Meeting NRC 2009-0105, License Amendment Request 241, Alternative Source Term, Response Clarification Request2009-10-0202 October 2009 License Amendment Request 241, Alternative Source Term, Response Clarification Request Project stage: Request ML0931307642009-11-16016 November 2009 Individual Notice of Consideration of Issuance of Amendments to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing Project stage: Other ML0917006072009-11-16016 November 2009 FRN: Point Beach, Units 1 & 2 - Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing for AST Additional TS Project stage: Other NRC 2009-0109, License Amendment Request 241 Re Alternative Source Term, Response to Request for Additional Information2009-11-25025 November 2009 License Amendment Request 241 Re Alternative Source Term, Response to Request for Additional Information Project stage: Response to RAI ML0936302462010-01-0505 January 2010 Request for Additional Information Regarding Alternative Source Term Project stage: RAI ML1008905132010-05-20020 May 2010 Summary of Meeting with FPL Energy Point Beach, LLC, on Outstanding Issues and Schedule Changes to the Alternate Source Term, Extended Power Uprate, and Auxiliary Feedwater Amendment Reviews Project stage: Meeting NRC-2010-0089, Supplement to License Amendment Requests 241 Alternative Source Term, Revised Proposed Technical Specifications for Control Room Envelope Habitability Program2010-07-0808 July 2010 Supplement to License Amendment Requests 241 Alternative Source Term, Revised Proposed Technical Specifications for Control Room Envelope Habitability Program Project stage: Supplement ML1022302882010-07-27027 July 2010 E-mail: Point Beach Nuclear Plant, Units 1 and 2 - Draft RAIs AST License Amendment Request Project stage: Draft RAI ML1022302952010-07-27027 July 2010 E-mail Attachment: RAI - Point Beach Nuclear Plant, Units 1 and 2 Alternate Source Term (AST) License Amendment Request (LAR) Project stage: RAI ML1021800302010-08-11011 August 2010 Meeting Summary Point Beach Nuclear Power Plant, Units 1 and 2 - Discussion of AST, AFW, Non-Conservative Setpoint Methodology, and EPU License Amendment Requests Project stage: Meeting ML1023712882010-08-19019 August 2010 Followup to August 16, 2010, Phone Call Wgdt Release Project stage: Other ML1102400542011-04-14014 April 2011 Issuance of License Amendments Regarding Use of Alternative Source Term Project stage: Approval ML1112200782011-05-0404 May 2011 Correction Letter for License Amendment Nos. 240 and 244 for Renewed Facility Operating Licenses DPR-24 and DPR-27, Alternate Source Term (AST) Project stage: Other NRC 2016-0029, Response to Request for Additional Information Regarding License Amendment Request 280 - Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program2016-07-11011 July 2016 Response to Request for Additional Information Regarding License Amendment Request 280 - Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program Project stage: Response to RAI 2009-06-29
[Table View] |
Text
From:
Peter Tam Sent:
Wednesday, January 28, 2009 12:12 PM To:
Fritzie.Flentje@fpl.com Cc:
Nageswara Karipineni; Lois James; Justin Poole
Subject:
Point Beach - need supplemental information for AST acceptance review (TAC ME0219, ME0220)
Fritzie:
Following is what our reviewer Nageswara Karipineni wrote. He requested a conference call with you on Thursday (1/29), but I am on leave 1/29 - 2/3. Since both I and Justine Poole will not be around, you probably should contact Lois James (301-415-3306) if this phone call is to take place during this period. If it can wait unti 2/4, both Justine and I will be back.
There are two issues that we want the licensee to address in regards to the Point Beach AST:
The licensee is crediting the Control Room Ventilation System (VNCR) and the Primary Auxiliary Building Ventilation (VNPAB) System for implementing the AST. However, the licnesee submittal did not make any mention of adding these systems to the scope of the Maintenance Rule program in accordance with 10 CFR 50.65, and to the scope of the license renewal in accordance with 10 CFR 54.37(b).
The above equipment should also be added to the Technical Specifications (TS) with appropriate Limiting Condition for Operation (LCO) and Surveillance Requirements (SR) because the equipment is required for safe operation of the facility as required by 10 CFR 50.36(d)(2)(ii)( C), Criteria 3, "A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design-basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier."
Peter S. Tam Senior Project Manager (for Kewaunee and Monticello)
Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Tel. 301-415-1451 E-mail Properties Mail Envelope Properties (C56E360E9D804F4B95BC673F886381E71D44FBABFE)
Subject:
Point Beach - need supplemental information for AST acceptance review (TAC ME0219, ME0220)
Sent Date: 1/28/2009 12:12:17 PM Received Date: 1/28/2009 12:12:17 PM
From: Peter Tam Created By: Peter.Tam@nrc.gov Recipients:
Fritzie.Flentje@fpl.com (Fritzie.Flentje@fpl.com)
Tracking Status: None Nageswara.Karipineni@nrc.gov (Nageswara Karipineni)
Tracking Status: None Lois.James@nrc.gov (Lois James)
Tracking Status: None Justin.Poole@nrc.gov (Justin Poole)
Tracking Status: None Post Office:
HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 16065 1/28/2009 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: