Letter Sequence Draft RAI |
|---|
TAC:ME0219, Control Room Habitability, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation (Open) TAC:ME0220, Control Room Habitability, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
|
MONTHYEARML0835703382008-12-0808 December 2008 Transmittal of ARCON96 and Radtrad Cds Supporting Alternative Source Term License Amendment Request 241 Project stage: Request NRC 2008-0085, Transmittal of ARCON96 and Radtrad Cds Supporting Alternative Source Term License Amendment Request 2412008-12-0808 December 2008 Transmittal of ARCON96 and Radtrad Cds Supporting Alternative Source Term License Amendment Request 241 Project stage: Request NRC 2008-0081, Submittal of License Amendment Request 241, Alternative Source Term2008-12-0808 December 2008 Submittal of License Amendment Request 241, Alternative Source Term Project stage: Request NRC 2009-0002, Supplement to License Amendment Request 241, Summary of Pbnp Sump Ph Calculation Inputs, Assumptions, Methodology and Results2009-01-16016 January 2009 Supplement to License Amendment Request 241, Summary of Pbnp Sump Ph Calculation Inputs, Assumptions, Methodology and Results Project stage: Supplement NRC 2009-0006, Supplement to License Amendment Request 241 Transmittal of Proposed License Conditions2009-01-27027 January 2009 Supplement to License Amendment Request 241 Transmittal of Proposed License Conditions Project stage: Supplement ML0903707702009-01-28028 January 2009 Email Regarding Need Supplemental Information for AST Acceptance Review from Containment and Ventilation Branch Project stage: Acceptance Review NRC 2009-0023, Supplement to License Amendment Request 241 Alternative Source Term2009-02-20020 February 2009 Supplement to License Amendment Request 241 Alternative Source Term Project stage: Supplement NRC 2009-0001, Calculation Project Schedule Update2009-02-20020 February 2009 Calculation Project Schedule Update Project stage: Request ML0905501512009-02-27027 February 2009 Acceptance Review for License Amendment Request 241 Alternate Source Term Project stage: Acceptance Review ML0907110612009-03-20020 March 2009 Request for Additional Information from Csgb Branch Related to License Amendment Request No. 241 Alternate Source Term Project stage: RAI ML0835309302009-03-25025 March 2009 FPL Energy Point Beach, LLC - Request for Withholding of Proprietary Information from Public Disclosure for Point Beach Nuclear Plant, Units 1 and 2 Project stage: Withholding Request Acceptance NRC 2009-0039, Response to Request for Additional Information License Amendment Request 241, Alternative Source Term2009-04-17017 April 2009 Response to Request for Additional Information License Amendment Request 241, Alternative Source Term Project stage: Response to RAI NRC 2009-0045, Supplement to License Amendment Request 241, Proposed Technical Specifications for Primary Auxiliary Building Ventilation (Vnpab)2009-04-17017 April 2009 Supplement to License Amendment Request 241, Proposed Technical Specifications for Primary Auxiliary Building Ventilation (Vnpab) Project stage: Supplement NRC 2009-0032, License Amendment Request 250, Corporation Name Change2009-04-17017 April 2009 License Amendment Request 250, Corporation Name Change Project stage: Request ML0909007222009-04-22022 April 2009 Request for Additional Information from Emcb Regarding License Amendment Request No. 241 Alternate Source Term Project stage: RAI NRC 2009-0026, Transmittal of Supplement to License Amendment Request 241 Regulatory Guide 1.183 Compliance Matrix2009-05-0808 May 2009 Transmittal of Supplement to License Amendment Request 241 Regulatory Guide 1.183 Compliance Matrix Project stage: Supplement ML0911105842009-05-13013 May 2009 Request for Additional Information from Reactor Systems Branch Regarding License Amendment Request No. 241 Alternate Source Term Project stage: RAI NRC 2009-0054, Response to Request for Additional Information License Amendment Request 241 Alternative Source Term2009-05-15015 May 2009 Response to Request for Additional Information License Amendment Request 241 Alternative Source Term Project stage: Response to RAI ML0916205602009-06-25025 June 2009 Request for Additional Information from the Human Performance Branch Regarding License Amendment Request 241 Alternate Source Term Project stage: RAI L-2009-134, Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 42009-06-29029 June 2009 Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 4 Project stage: Request NRC 2009-0075, License Amendment Request 241 Alternative Source Term Response to Request for Additional Information2009-07-24024 July 2009 License Amendment Request 241 Alternative Source Term Response to Request for Additional Information Project stage: Response to RAI ML0919700422009-07-24024 July 2009 Notice of Meeting with FPL Energy Point Beach, LLC, to Discuss Epu/Setpoint Submittal and Relationship Between EPU and AST Project stage: Meeting ML0919500722009-07-24024 July 2009 Request for Additional Information (RAI) from the Containment and Ventilation Branch Regarding License Amendment Request No. 241 Alternate Source Term Project stage: RAI ML0921905632009-08-0606 August 2009 Extended Power Uprate and Alternate Source Term Review Planning Meeting Presentation Project stage: Request ML0922402982009-08-0606 August 2009 Extended Power Uprate and Alternate Source Term Review Planning Meeting Presentation (Handout 2) Project stage: Request ML0921500922009-08-0707 August 2009 Request for Additional Information (RAI) from Electrical Engineering Branch Alternate Source Term Project stage: RAI ML0921511232009-08-13013 August 2009 Request for Additional Information from Accident Dose Branch Alternate Source Term Project stage: RAI ML0922507682009-08-13013 August 2009 Draft - Request for Additional Information from Containment and Ventilation Branch on Alternate Source Term Project stage: Draft RAI NRC 2009-0080, License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information2009-08-20020 August 2009 License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information Project stage: Response to RAI ML0923605352009-08-26026 August 2009 Request for Additional Information, Round 2, from Containment and Ventilation Branch, on the Proposed Amendment Re. Alternative Source Term Project stage: RAI NRC 2009-0085, License Amendment Request 241 Alternative Source Term Response to Request for Additional Information2009-09-0404 September 2009 License Amendment Request 241 Alternative Source Term Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0086, License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information2009-09-0404 September 2009 License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0090, License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information2009-09-10010 September 2009 License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0076, Units I & 2, License Amendment Request 241, Alternative Source Term Commitment for Seismic Evaluation2009-09-10010 September 2009 Units I & 2, License Amendment Request 241, Alternative Source Term Commitment for Seismic Evaluation Project stage: Request ML0923211842009-09-14014 September 2009 Meeting Summary, Meeting with FPL Energy Point Beach, LLC, on the Extended Power Uprate and Alternate Source Term Amendments Project stage: Meeting NRC 2009-0105, License Amendment Request 241, Alternative Source Term, Response Clarification Request2009-10-0202 October 2009 License Amendment Request 241, Alternative Source Term, Response Clarification Request Project stage: Request ML0931307642009-11-16016 November 2009 Individual Notice of Consideration of Issuance of Amendments to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing Project stage: Other ML0917006072009-11-16016 November 2009 FRN: Point Beach, Units 1 & 2 - Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing for AST Additional TS Project stage: Other NRC 2009-0109, License Amendment Request 241 Re Alternative Source Term, Response to Request for Additional Information2009-11-25025 November 2009 License Amendment Request 241 Re Alternative Source Term, Response to Request for Additional Information Project stage: Response to RAI ML0936302462010-01-0505 January 2010 Request for Additional Information Regarding Alternative Source Term Project stage: RAI ML1008905132010-05-20020 May 2010 Summary of Meeting with FPL Energy Point Beach, LLC, on Outstanding Issues and Schedule Changes to the Alternate Source Term, Extended Power Uprate, and Auxiliary Feedwater Amendment Reviews Project stage: Meeting NRC-2010-0089, Supplement to License Amendment Requests 241 Alternative Source Term, Revised Proposed Technical Specifications for Control Room Envelope Habitability Program2010-07-0808 July 2010 Supplement to License Amendment Requests 241 Alternative Source Term, Revised Proposed Technical Specifications for Control Room Envelope Habitability Program Project stage: Supplement ML1022302882010-07-27027 July 2010 E-mail: Point Beach Nuclear Plant, Units 1 and 2 - Draft RAIs AST License Amendment Request Project stage: Draft RAI ML1022302952010-07-27027 July 2010 E-mail Attachment: RAI - Point Beach Nuclear Plant, Units 1 and 2 Alternate Source Term (AST) License Amendment Request (LAR) Project stage: RAI ML1021800302010-08-11011 August 2010 Meeting Summary Point Beach Nuclear Power Plant, Units 1 and 2 - Discussion of AST, AFW, Non-Conservative Setpoint Methodology, and EPU License Amendment Requests Project stage: Meeting ML1023712882010-08-19019 August 2010 Followup to August 16, 2010, Phone Call Wgdt Release Project stage: Other ML1102400542011-04-14014 April 2011 Issuance of License Amendments Regarding Use of Alternative Source Term Project stage: Approval ML1112200782011-05-0404 May 2011 Correction Letter for License Amendment Nos. 240 and 244 for Renewed Facility Operating Licenses DPR-24 and DPR-27, Alternate Source Term (AST) Project stage: Other NRC 2016-0029, Response to Request for Additional Information Regarding License Amendment Request 280 - Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program2016-07-11011 July 2016 Response to Request for Additional Information Regarding License Amendment Request 280 - Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program Project stage: Response to RAI 2009-06-29
[Table View] |
Text
From:
Poole, Justin Sent:
Thursday, August 13, 2009 5:45 PM To:
'Hale, Steve'; COSTEDIO, JAMES
Subject:
Draft - Request for Additional information from Containment and Ventilation on AST Round 2
- Steve, By letter dated December 8, 2008, FPL Energy Point Beach, LLC, submitted a license amendment application for Point Beach Nuclear Plant Units 1 and 2 to revise the current licensing basis to implement the alternate source term through reanalysis of the radiological consequences of the FSAR Chapter 14 accidents.
The Containment and Ventilation Branch has reviewed the information provided and determined that in order to complete its evaluation, additional information is required. We would like to discuss the questions, in draft form below, with you in a conference call.
This e-mail aims solely to prepare you and others for the proposed conference call. It does not convey a formal NRC staff position, and it does not formally request for additional information.
Justin C. Poole Project Manager NRR/DORL/LPL3-1 U.S. Nuclear Regulatory Commission (301)415-2048 email: Justin.Poole@nrc.gov
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
DRAFT SCVB#1 Provide the extent of the control room emergency filtration system (CREFS) and the primary auxiliary building ventilation system (VNPAB) that would be required to be functional to support the alternate source term (AST) licensing amendment request (LAR) by providing drawings suitably marked with the system boundaries and a list of structures, systems, and components (SSCs) that would be upgraded to augmented quality status. Include in the response, all new equipment that will be added to modify the CREFS and VNPAB to provide redundancy along with a discussion of the quality status to which such equipment will be designed, procured, installed and tested.
SCVB#2 The CREFS consists of a single filter train with redundant fans. It was stated that four control room ventilation fans, which include the two CREFS fans, will auto-start on the emergency diesel generators (EDGs) upon receipt of a containment isolation signal or high radiation signal.
Provide the following information:
2a. When both the CREFS fans are operating in parallel, discuss the maximum air flow through the filter system and the performance of the emergency air filter with particular attention to residence time for the charcoal filter and the assumptions used in the accident analysis.
2b. When all the four control room ventilation fans (i.e. the two control building HVAC fans and the two CREFS fans) are auto-started, discuss the pressure changes that could occur through the ductwork on a four fan operation versus two fan operation (i.e. one control building HVAC fan and one CREFS fan) and the capability of the ductwork to withstand these conditions. Describe the construction and leakage characteristics of the ductwork, potential for unfiltered in-leakage of air that could occur, and its impact on the accident analysis using the AST.
2c. Describe, according to the emergency operation procedures, how long all four fans will operate until operator action secures one train of fans. Indicate if any other operator actions are also required by any of the emergency operation procedures and the priority of stopping one train of fans relative to the other operator actions.
SCVB#3 TS surveillance Requirement 3.7.9.6 requires verification that each CREFS emergency fan can maintain a positive pressure of 0.125 inches water gauge in the control room envelope (CRE),
relative to the adjacent turbine building during the emergency mode of operation. For the AST, is the CRE required to be pressurized with respect to any other adjacent spaces including spaces above and below the CRE? If not, provide justification.
SCVB#4 The LAR states that new control room actions are required to restore the VNPAB within 30 minutes following alignment of residual heat removal (RHR) to containment sump recirculation mode of operation. The LAR also states that if a LOCA occurs coincident with a loss of offsite power (LOOP), the VNPAB system will be manually restarted to ensure that the PAB vent stack is the source of the release associated with the ECCS leakage phase of the event. Provide the following additional information:
4a. Section 5.1.2 of RG 1.183 states that assumptions regarding the occurrence and timing of a loss of offsite power should be selected with the objective of maximizing the postulated radiological consequences. Provide a discussion on how this requirement is factored in the AST analysis and in the emergency operating procedures with respect to starting the VNPAB system.
4b. Your letter NRC 2009-0045, dated April 17, 2009, provided proposed technical specifications (TS) for VNPAB. This subject was briefly discussed in a phone call between the staff and the licensee on June 23, 2009. The staffs concern is that the surveillance requirement did not include a performance check of the VNPAB in terms of flow, pressure, etc. Please provide a discussion in how credit for VNPAB is taken in the AST dose analysis. Explain how the vent stack becomes the source of all releases during the ECCS leakage phase of the event by mere operation of the VNPAB fans, with no regard for any minimum amount of flow that the fans need to operate at.
4c. The LAR states that credit is not taken for the VNPAB air filters. However, performance readiness of the VNPAB fans depends on the filter loading conditions. Explain how PBNP verifies that filter plugging will not adversely affect the performance of the VNPAB fans.