Category:Letter
MONTHYEARIR 05000458/20213012024-11-14014 November 2024 NRC Initial Operator Licensing Examination Approval 05000458/2021301 ML24289A0312024-11-0808 November 2024 – Issuance of Amendments Related to the Removal of License Condition 2.F as Part of the Consolidated Line-Item Improvement Process (CLIIP) IR 05000458/20240102024-10-31031 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000458/2024010 IR 05000458/20240032024-10-31031 October 2024 Integrated Inspection Report 05000458/2024003 RBG-48315, Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement2024-09-24024 September 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement RBG-48306, Report of Changes and Errors to 10CFR50.462024-09-24024 September 2024 Report of Changes and Errors to 10CFR50.46 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24255A1192024-09-16016 September 2024 Notification of NRC Follow Up Inspection for One Severity Level (SL) III and Two SL IV or Three or More SL IV Violations and Request for Additional Information RBG-48311, Reply to a Notice of Violation, NRC Inspection Report 05000458/20240022024-08-28028 August 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2024002 IR 05000458/20240052024-08-22022 August 2024 Updated Inspection Plan for River Bend Station (Report 05000458/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24214A2752024-08-0202 August 2024 Acknowledgement of Readiness for Supplemental Inspection RBG-48308, Notification of Readiness for Supplemental Inspection2024-07-31031 July 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20240022024-07-30030 July 2024 Integrated Inspection Report 05000458/2024002 and Notice of Violation ML24164A0862024-06-12012 June 2024 Notification of Commercial Grade Dedication Inspection (05000458/2024010) and Request for Information 05000458/LER-2023-005-01, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-06-0404 June 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24093A0892024-05-16016 May 2024 Issuance of Amendment No. 214 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML24081A0072024-05-16016 May 2024 Issuance of Amendment No. 213 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b IR 05000458/20240012024-05-14014 May 2024 Integrated Inspection Report 05000458/2024001 ML24102A2842024-05-0707 May 2024 Summary of Regulatory Audit in Support of LARs to Revise Technical Specifications to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions RBG-48276, 2023 Annual Radioactive Effluent Release Report2024-04-23023 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000458/20244022024-04-15015 April 2024 Security Baseline Inspection Report 05000458/2024402 (Full Report) RBG-48288, Louisiana Pollutant Discharge Elimination System Permit Renewal2024-04-15015 April 2024 Louisiana Pollutant Discharge Elimination System Permit Renewal ML24106A0432024-04-11011 April 2024 June 2024 Emergency Preparedness Exercise Inspection Request for Information ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair RBG-48277, 2023 Annual Radiological Environmental Operating Report2024-04-10010 April 2024 2023 Annual Radiological Environmental Operating Report IR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams IR 05000458/20240402024-03-15015 March 2024 – 95001 Supplemental Inspection Report 05000458/2024040 and Follow-Up Assessment ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24066A1802024-03-0707 March 2024 Notification of NRC Follow-Up Inspection for Any Severity Level I or II Traditional Enforcement Violation IR 05000458/20230062024-02-28028 February 2024 Annual Assessment Letter for River Bend Station - Report 05000458/2023006 RBG-48286, Revision to Owners Activity Report Form (OAR) for Cycle 222024-02-27027 February 2024 Revision to Owners Activity Report Form (OAR) for Cycle 22 RBG-48278, 2023 Spent Fuel Storage Radioactive Effluent Release Report2024-02-27027 February 2024 2023 Spent Fuel Storage Radioactive Effluent Release Report ML24031A0042024-02-21021 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0052 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000458/LER-2023-006, Automatic Reactor Scram Due to a Turbine Trip Following a Disconnect Failure at Switchyard2024-02-0808 February 2024 Automatic Reactor Scram Due to a Turbine Trip Following a Disconnect Failure at Switchyard RBG-48274, Notification of Readiness for Supplemental Inspection2024-02-0505 February 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20230042024-01-30030 January 2024 Integrated Inspection Report 05000458/2023004 IR 05000458/20230402024-01-18018 January 2024 – 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter 05000458/LER-2023-005, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-01-16016 January 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk ML24011A1742024-01-11011 January 2024 Security Baseline Inspection Report (Cover Letter) 05000458/LER-2023-004, Drywall Post Accident Radiation Monitor Inoperable Due to Unrecognized Surveillance Failure2023-12-28028 December 2023 Drywall Post Accident Radiation Monitor Inoperable Due to Unrecognized Surveillance Failure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting 2024-09-24
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML24081A0072024-05-16016 May 2024 Issuance of Amendment No. 213 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions RBG-48143, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-02-27027 February 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated RBG-48083, Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials2021-06-15015 June 2021 Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials ML21062A1982021-03-0303 March 2021 Supplement to License Amendment Request to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 RBG-48033, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-09-0404 September 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 12020-02-26026 February 2020 Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 CNRO-2020-00008, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process2020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process CNRO-2020-00006, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 22020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 2 RBG-47983, Application to Revise Technical Specification 3.3.5.2, RPV Water Inventory Control Instrumentation to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b.2019-11-18018 November 2019 Application to Revise Technical Specification 3.3.5.2, RPV Water Inventory Control Instrumentation to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b. CNRO-2019-00009, Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 22019-03-0707 March 2019 Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 2 CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 RBG-47925, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-12-20020 December 2018 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47918, Removal of the Table of Contents from the Technical Specifications2018-11-29029 November 2018 Removal of the Table of Contents from the Technical Specifications RBG-47906, Response to Request for Additional Information for License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 62018-10-18018 October 2018 Response to Request for Additional Information for License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 RBG-47883, Amendment 1 to License Renewal Application2018-08-0202 August 2018 Amendment 1 to License Renewal Application RBG-47886, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-07-24024 July 2018 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47882, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-07-10010 July 2018 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47850, Response to License Renewal Application NRC Request for Additional Information Set 5 Supplement2018-04-0404 April 2018 Response to License Renewal Application NRC Request for Additional Information Set 5 Supplement RBG-47824, License Amendment Request to Correct a Non-Conservative Technical Specification Figure 3.4.11-1 Minimum Temperature Required Vs. RCS Pressure by Replacing with 54 Effective Full Power Years (EFPY) Curves2018-04-0202 April 2018 License Amendment Request to Correct a Non-Conservative Technical Specification Figure 3.4.11-1 Minimum Temperature Required Vs. RCS Pressure by Replacing with 54 Effective Full Power Years (EFPY) Curves RBG-47848, License Renewal Application Update - Neutron Absorbing Material Monitoring Program - Supplement2018-03-22022 March 2018 License Renewal Application Update - Neutron Absorbing Material Monitoring Program - Supplement RBG-47799, Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-02-28028 February 2018 Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47830, License Renewal Application Update - Neutron Absorbing Material Monitoring Program2018-02-15015 February 2018 License Renewal Application Update - Neutron Absorbing Material Monitoring Program RBG-47823, Request for Review and Approval of Relocation of the Reactor Core Isolation Cooling (RCIC) Injection Point from the Reactor Vessel Head Spray Nozzle to the 'A' Feedwater Line Via the 'A' Residual Heat Removal (RHR) Shutdown Cooling2018-01-29029 January 2018 Request for Review and Approval of Relocation of the Reactor Core Isolation Cooling (RCIC) Injection Point from the Reactor Vessel Head Spray Nozzle to the 'A' Feedwater Line Via the 'A' Residual Heat Removal (RHR) Shutdown Cooling ML17268A2132017-09-21021 September 2017 ISFSI, River Bend Station Unit 1 & ISFSI, Waterford 3 Steam Electric Station & ISFSI, Grand Gulf Nuclear Station & ISFSI, Application for Order Approving Transfers of Licenses and Conforming License Amendments ML17153A2862017-05-31031 May 2017 River Bend Station, Unit 1, License Renewal Application RBG-47735, License Renewal Application - Appendices a Through D2017-05-31031 May 2017 License Renewal Application - Appendices a Through D ML17153A2852017-05-25025 May 2017 License Renewal Application RBG-47630, Resubmittal of License Amendment Request - Cyber Security Plan Implementation Schedule, River Bend Station - Unit 12015-12-0303 December 2015 Resubmittal of License Amendment Request - Cyber Security Plan Implementation Schedule, River Bend Station - Unit 1 RBG-47620, License Amendment Request for Change to Technical Specification; 5.5.13, to Be Extended to 15 Years, Drywell Bypass Test Frequency to 15 Years and Type C Test Frequency to 75 Months2015-10-29029 October 2015 License Amendment Request for Change to Technical Specification; 5.5.13, to Be Extended to 15 Years, Drywell Bypass Test Frequency to 15 Years and Type C Test Frequency to 75 Months RBG-47461, Application for Change to Technical Specification 3.8.1, AC Sources - Operating2014-07-0909 July 2014 Application for Change to Technical Specification 3.8.1, AC Sources - Operating CNRO-2014-00007, ISFSI, Waterford 3 and ISFSI - Application for Order Approving Transfers of Licenses and Conforming License Amendments2014-06-10010 June 2014 ISFSI, Waterford 3 and ISFSI - Application for Order Approving Transfers of Licenses and Conforming License Amendments RBG-47432, License Amendment Request 2013-18 Re Revision of Ultimate Heat Sink Design Capacity2014-02-10010 February 2014 License Amendment Request 2013-18 Re Revision of Ultimate Heat Sink Design Capacity RBG-47382, Heavy Load Movement Over Fuel Assemblies, License Amendment Request 2013-132013-07-29029 July 2013 Heavy Load Movement Over Fuel Assemblies, License Amendment Request 2013-13 RBG-47361, Application for Technical Specification Changes Technical Specification Task Force Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs.2013-07-16016 July 2013 Application for Technical Specification Changes Technical Specification Task Force Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs. RBG-47322, Submittal of Request for Amendment to the Technical Specifications2013-06-13013 June 2013 Submittal of Request for Amendment to the Technical Specifications CNRO-2013-00008, Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments2013-04-16016 April 2013 Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments RBG-47332, Unit 1 - License Amendment Request 2013-01, Battery Surveillance Requirement Acceptance Criteria2013-02-0707 February 2013 Unit 1 - License Amendment Request 2013-01, Battery Surveillance Requirement Acceptance Criteria ML12191A1222012-06-20020 June 2012 License Amendment Request - Cyber Security Plan Implementation Schedule Milestones RBG-47191, Changes to Technical Specification 3.8.1; AC Sources - Operating.2011-12-0808 December 2011 Changes to Technical Specification 3.8.1; AC Sources - Operating. RBG-47072, License Amendment Request 2010-04, Heavy Load Movement Over Fuel Assemblies2010-09-0909 September 2010 License Amendment Request 2010-04, Heavy Load Movement Over Fuel Assemblies RBG-47048, License Amendment Request, Application for Technical Specification Changes Technical Specification Task Force Improvement Standard Technical Specification Change Traveler, TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities2010-07-22022 July 2010 License Amendment Request, Application for Technical Specification Changes Technical Specification Task Force Improvement Standard Technical Specification Change Traveler, TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities ML0934801612009-12-0909 December 2009 Submittal of License Amendment Request - Cyber Security Plan RBG-46932, License Amendment Request 2009-05 to Support Operation with 24-Month Fuel Cycles2009-08-10010 August 2009 License Amendment Request 2009-05 to Support Operation with 24-Month Fuel Cycles RBG-46925, License Amendment Request, Technical Specification Change to Revise ASME Code Reference for Inservice Test Requirements2009-06-29029 June 2009 License Amendment Request, Technical Specification Change to Revise ASME Code Reference for Inservice Test Requirements RBG-46926, Unit 1 - Supplement to License Amendment Request (Lar), to Implement Changes Consistent with TSTF-163 on Diesel Generator Surveillance Requirements2009-06-22022 June 2009 Unit 1 - Supplement to License Amendment Request (Lar), to Implement Changes Consistent with TSTF-163 on Diesel Generator Surveillance Requirements ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions 2024-05-07
[Table view] Category:Technical Specification
MONTHYEARML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions CNRO-2022-00015, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process2022-05-26026 May 2022 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated ML21062A1982021-03-0303 March 2021 Supplement to License Amendment Request to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 ML20262H2252020-09-18018 September 2020 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program Using the Consolidated Line Item Improvement CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 12020-02-26026 February 2020 Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 RBG-47886, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-07-24024 July 2018 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) ML18128A0522018-04-30030 April 2018 License Amendment Request Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 - Evaluation of Proposed Changes ML18128A0532018-04-25025 April 2018 License Amendment Request Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 - Radiological Effluent EAL Threshold Values, EP-CALC-RBS-1801, Rev. 0 RBG-47799, Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-02-28028 February 2018 Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47801, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2017-11-15015 November 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control RBG-47775, Revisions to the Technical Requirements Manual and the Technical Specification Bases2017-07-20020 July 2017 Revisions to the Technical Requirements Manual and the Technical Specification Bases RBG-47605, Application for Technical Specification Changes for Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation.2015-08-20020 August 2015 Application for Technical Specification Changes for Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation. RBG-47603, Revisions to the Technical Requirements Manual and the Technical Specifications Bases2015-08-11011 August 2015 Revisions to the Technical Requirements Manual and the Technical Specifications Bases RBG-47461, Application for Change to Technical Specification 3.8.1, AC Sources - Operating2014-07-0909 July 2014 Application for Change to Technical Specification 3.8.1, AC Sources - Operating RBG-47380, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases2013-07-25025 July 2013 Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases RBG-47361, Application for Technical Specification Changes Technical Specification Task Force Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs.2013-07-16016 July 2013 Application for Technical Specification Changes Technical Specification Task Force Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs. RBG-47300, Changes to Technical Specification 3.8.1; AC Sources - Operating2012-10-26026 October 2012 Changes to Technical Specification 3.8.1; AC Sources - Operating RBG-47191, Changes to Technical Specification 3.8.1; AC Sources - Operating.2011-12-0808 December 2011 Changes to Technical Specification 3.8.1; AC Sources - Operating. RBG-47169, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases2011-08-0303 August 2011 Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases RBG-47163, Supplement to License Amendment Request Application for Technical Specification Changes Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-427, Allowance For....2011-07-27027 July 2011 Supplement to License Amendment Request Application for Technical Specification Changes Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-427, Allowance For.... RBG-47146, Application for Technical Specification Changes Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-427, Allowance for Non Technical Specification Barrier Degradation.2011-06-10010 June 2011 Application for Technical Specification Changes Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-427, Allowance for Non Technical Specification Barrier Degradation. ML1019301002010-07-12012 July 2010 Bases Markups Related to License Amendment Request to Modify Technical Specification Surveillance Requirement Frequencies from 18- to 24-Month Fuel Cycle Intervals RBG-46985, Unit 1, Supplement to License Amendment Request (LAR) LAR 2009-05, Dated August 10, 2009 Regarding 24-Month Fuel Cycles2009-12-0808 December 2009 Unit 1, Supplement to License Amendment Request (LAR) LAR 2009-05, Dated August 10, 2009 Regarding 24-Month Fuel Cycles RBG-46925, License Amendment Request, Technical Specification Change to Revise ASME Code Reference for Inservice Test Requirements2009-06-29029 June 2009 License Amendment Request, Technical Specification Change to Revise ASME Code Reference for Inservice Test Requirements RBG-46926, Unit 1 - Supplement to License Amendment Request (Lar), to Implement Changes Consistent with TSTF-163 on Diesel Generator Surveillance Requirements2009-06-22022 June 2009 Unit 1 - Supplement to License Amendment Request (Lar), to Implement Changes Consistent with TSTF-163 on Diesel Generator Surveillance Requirements ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions ML0835701922008-11-20020 November 2008 License Amendment Request (LAR) Changes to Technical Specification 5.6.5, Core Operating Limits Report (COLR) RBG-46842, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases2008-08-28028 August 2008 Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases ML0812305252008-06-0202 June 2008 Tech Spec Pages for Amendment No. 160, Adoption of Technical Specification Task Force (TSTF)-2, Relocate the 10-Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control ML0730600062007-11-23023 November 2007 Corrected Page 3 of the Order, Appendix C RBG-46666, License Amendment Request - Adoption of TSTF-2, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control2007-11-15015 November 2007 License Amendment Request - Adoption of TSTF-2, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control RBG-46722, Supplemental Information for Licensing Amendment Request Pertaining to Control Room Envelope Habitability2007-08-0707 August 2007 Supplemental Information for Licensing Amendment Request Pertaining to Control Room Envelope Habitability RBG-46712, License Amendment Request 2007-06, Control Room Envelope Habitability (TSTF-448, Revision 3)2007-07-16016 July 2007 License Amendment Request 2007-06, Control Room Envelope Habitability (TSTF-448, Revision 3) RBG-46606, Application for Technical Specifications (TS) Change Regarding Mode Change Limitations (TSTF-359) Using the Consolidated Line Item Improvement Process (Cliip), and Correct Example 1.4-1 (TSTF-485)2007-07-0202 July 2007 Application for Technical Specifications (TS) Change Regarding Mode Change Limitations (TSTF-359) Using the Consolidated Line Item Improvement Process (Cliip), and Correct Example 1.4-1 (TSTF-485) RBG-46633, Submittals of Revisions to Technical Requirements Manual and Technical Specification Bases2006-11-13013 November 2006 Submittals of Revisions to Technical Requirements Manual and Technical Specification Bases RBG-46583, License Amendment Request, Changes to the Analytical Methods Referenced in Technical Specification 5.6.5, Core Operating Limits Report (Colr).2006-10-16016 October 2006 License Amendment Request, Changes to the Analytical Methods Referenced in Technical Specification 5.6.5, Core Operating Limits Report (Colr). RBG-46479, Supplement to Amendment Request Corrections to Loss of Power Instrumentation Requirements2005-09-13013 September 2005 Supplement to Amendment Request Corrections to Loss of Power Instrumentation Requirements RBG-46419, Revisions to the Technical Requirements Manual and the Technical Specifications Bases2005-04-0808 April 2005 Revisions to the Technical Requirements Manual and the Technical Specifications Bases RBG-46375, License Amendment Request, Amendment to Technical Specification 3.8.4 Actions for Inoperable Division 1 and 2 Battery Charger2004-12-17017 December 2004 License Amendment Request, Amendment to Technical Specification 3.8.4 Actions for Inoperable Division 1 and 2 Battery Charger RBG-46233, Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process, LAR 2004-042004-03-0404 March 2004 Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process, LAR 2004-04 RBG-46214, Application for Technical Specification Improvements to Revise Technical Specification 3.1.8, Scram Discharge Volume (SDV) Vent and Drain Valves, Using the Consolidated Line Item Improvement Process2004-02-0303 February 2004 Application for Technical Specification Improvements to Revise Technical Specification 3.1.8, Scram Discharge Volume (SDV) Vent and Drain Valves, Using the Consolidated Line Item Improvement Process RBG-46179, Revisions to the Technical Requirements Manual and the Technical Specification Bases2003-10-0101 October 2003 Revisions to the Technical Requirements Manual and the Technical Specification Bases RBG-46072, Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Division 1 & 2 Emergency Diesel Generator Load Reject Testing2003-03-14014 March 2003 Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Division 1 & 2 Emergency Diesel Generator Load Reject Testing ML0234700502002-12-12012 December 2002 Tech Spec Page for Amendment 126 Regarding Control Rod Testing Frequency ML0219302332002-07-11011 July 2002 Technical Specification Amend, Primary Containment and Drywell Isolation Instrumentation RBG-45982, License Amendment Request Control Rod Scram Time Testing Frequency (LAR 2001-35)2002-07-10010 July 2002 License Amendment Request Control Rod Scram Time Testing Frequency (LAR 2001-35) RBG-45952, One-time Extension of Integrated Leak Rate Test Interval, License Amendment Request, LAR 2002-162002-05-14014 May 2002 One-time Extension of Integrated Leak Rate Test Interval, License Amendment Request, LAR 2002-16 2024-09-19
[Table view] Category:Amendment
MONTHYEARML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions CNRO-2022-00015, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process2022-05-26026 May 2022 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated ML21062A1982021-03-0303 March 2021 Supplement to License Amendment Request to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 RBG-47886, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-07-24024 July 2018 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47799, Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-02-28028 February 2018 Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47801, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2017-11-15015 November 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control RBG-47605, Application for Technical Specification Changes for Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation.2015-08-20020 August 2015 Application for Technical Specification Changes for Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation. RBG-46925, License Amendment Request, Technical Specification Change to Revise ASME Code Reference for Inservice Test Requirements2009-06-29029 June 2009 License Amendment Request, Technical Specification Change to Revise ASME Code Reference for Inservice Test Requirements RBG-46926, Unit 1 - Supplement to License Amendment Request (Lar), to Implement Changes Consistent with TSTF-163 on Diesel Generator Surveillance Requirements2009-06-22022 June 2009 Unit 1 - Supplement to License Amendment Request (Lar), to Implement Changes Consistent with TSTF-163 on Diesel Generator Surveillance Requirements ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions ML0835701922008-11-20020 November 2008 License Amendment Request (LAR) Changes to Technical Specification 5.6.5, Core Operating Limits Report (COLR) ML0812305252008-06-0202 June 2008 Tech Spec Pages for Amendment No. 160, Adoption of Technical Specification Task Force (TSTF)-2, Relocate the 10-Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control ML0730600062007-11-23023 November 2007 Corrected Page 3 of the Order, Appendix C RBG-46666, License Amendment Request - Adoption of TSTF-2, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control2007-11-15015 November 2007 License Amendment Request - Adoption of TSTF-2, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control RBG-46722, Supplemental Information for Licensing Amendment Request Pertaining to Control Room Envelope Habitability2007-08-0707 August 2007 Supplemental Information for Licensing Amendment Request Pertaining to Control Room Envelope Habitability RBG-46712, License Amendment Request 2007-06, Control Room Envelope Habitability (TSTF-448, Revision 3)2007-07-16016 July 2007 License Amendment Request 2007-06, Control Room Envelope Habitability (TSTF-448, Revision 3) RBG-46606, Application for Technical Specifications (TS) Change Regarding Mode Change Limitations (TSTF-359) Using the Consolidated Line Item Improvement Process (Cliip), and Correct Example 1.4-1 (TSTF-485)2007-07-0202 July 2007 Application for Technical Specifications (TS) Change Regarding Mode Change Limitations (TSTF-359) Using the Consolidated Line Item Improvement Process (Cliip), and Correct Example 1.4-1 (TSTF-485) RBG-46583, License Amendment Request, Changes to the Analytical Methods Referenced in Technical Specification 5.6.5, Core Operating Limits Report (Colr).2006-10-16016 October 2006 License Amendment Request, Changes to the Analytical Methods Referenced in Technical Specification 5.6.5, Core Operating Limits Report (Colr). RBG-46479, Supplement to Amendment Request Corrections to Loss of Power Instrumentation Requirements2005-09-13013 September 2005 Supplement to Amendment Request Corrections to Loss of Power Instrumentation Requirements ML0506601622005-03-0101 March 2005 Unit 1, Revision 18 to the Updated Safety Analysis Report RBG-46375, License Amendment Request, Amendment to Technical Specification 3.8.4 Actions for Inoperable Division 1 and 2 Battery Charger2004-12-17017 December 2004 License Amendment Request, Amendment to Technical Specification 3.8.4 Actions for Inoperable Division 1 and 2 Battery Charger RBG-46233, Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process, LAR 2004-042004-03-0404 March 2004 Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process, LAR 2004-04 RBG-46214, Application for Technical Specification Improvements to Revise Technical Specification 3.1.8, Scram Discharge Volume (SDV) Vent and Drain Valves, Using the Consolidated Line Item Improvement Process2004-02-0303 February 2004 Application for Technical Specification Improvements to Revise Technical Specification 3.1.8, Scram Discharge Volume (SDV) Vent and Drain Valves, Using the Consolidated Line Item Improvement Process RBG-46072, Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Division 1 & 2 Emergency Diesel Generator Load Reject Testing2003-03-14014 March 2003 Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Division 1 & 2 Emergency Diesel Generator Load Reject Testing ML0234700502002-12-12012 December 2002 Tech Spec Page for Amendment 126 Regarding Control Rod Testing Frequency ML0219302332002-07-11011 July 2002 Technical Specification Amend, Primary Containment and Drywell Isolation Instrumentation RBG-45982, License Amendment Request Control Rod Scram Time Testing Frequency (LAR 2001-35)2002-07-10010 July 2002 License Amendment Request Control Rod Scram Time Testing Frequency (LAR 2001-35) 2024-09-19
[Table view] |
Text
ýzb Entergy Operations, Inc.
River Bend Station 5485 U.S. Highway 61 N d-EnbeWv St. Francisville, LA 70775 Tel 225-381-4149 Jerry C. Roberts Director, Nuclear Safety Assurance RBG-46863 November 20, 2008 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
License Amendment Request (LAR)
Changes to Technical Specification 5.6.5, "Core Operating Limits Report (COLR)"
River Bend Station, Unit 1 Docket No. 50-458 License No. NPF-47
REFERENCES:
- 1. Letter GNRO-2007/00071 from Entergy to USNRC, "License Amendment Request (LAR) Changes to Technical Specification 5.6.5, "Core Operating Limits Report (COLR)" dated December 5, 2007 (ADAMS Accession no. ML073440113).
- 2. Letter GNRO-2008/00053 from Entergy to USNRC, "Supplement to Amendment Request Changes to Technical Specification 5.6.5, "Core Operating Limits Report (COLR)" dated July 21, 2008.
Dear Sir or Madam:
Pursuant to 10 CFR 50.90, Entergy Operations, Inc. (Entergy) hereby requests a license amendment for River Bend Station, Unit 1 (RBS). A change is proposed to Technical Specification (TS) 5.6.5, "Core Operating Limits Report (COLR)" to add a reference to an analytical method that will be used to determine core operating limits. Attachment 1 contains the analysis of the proposed change and Attachment 2 contains the proposed changes to the Technical Specifications.
The proposed change is the result of a decision to insert GE14 fuel during refueling outage RF15 scheduled for fall 2009. RBS currently operates with a full core of ATRIUM-10 fuel.
The document reference, NEDC-33383P, "GEXL97 Correlation Applicable to ATRIUM-10 Fuel," will allow Entergy to use a Global Nuclear Fuel (GNF) method for the determination of fuel assembly critical power of AREVA ATRIUM-10 fuel. NEDC-33383P Rev. 1 was submitted for a similar request for Grand Gulf Nuclear Station (GGNS) under Reference 1.
The GGNS amendment request and associated supplemental information was submitted by the above referenced letters. NEDC-33383P Rev. 1 is the same document submitted for review and approval for application at GGNS and was developed for use by Entergy.
RBG-46863 Page 2 of 3 Some of the information in NEDC-33383P, "GEXL97 Correlation Applicable to ATRIUM-10 Fuel," Rev. 1 is proprietary to Global Nuclear Fuel - Americas (GNF). The proprietary information was requested to be withheld from public disclosure in accordance with 10 CFR 9.17(a)(4) and 10 CFR 2.390 (a)(4) in Reference 1. An affidavit attesting to the proprietary nature of the information was provided in the previous submittal. A non-proprietary version of the document was also included. is a report which provides information on the mixed core analysis. The report, GNF S-0000-0088-0271 Revision 0, "GEl4 Thermal Hydraulic Compatibility with River Bend Legacy Fuel" contains information that is proprietary to GNF. The proprietary information is requested to be withheld from public disclQsure in accordance with 10 CFR 9.17(a)(4) and 10 CFR 2.390 (a)(4). A non-proprietary version of the document is included as Attachment 5. An affidavit attesting to the proprietary nature of the information in Attachment 4 is provided in Attachment 6.
Entergy has not completed analyses to determine whether a change to the TS Minimum Critical Power Ratio (MCPR) safety limits will be required for the RBS reload. Entergy is submitting this request in advance of completed core reload analysis to provide sufficient review time. If analyses indicate that a change to the MCPR safety limit or other TS change is required, the TS change will be requested separately.
The proposed change has been evaluated in accordance with 10 CFR 50.91 (a)(1) using criteria in 10 CFR 50.92(c) and it has been determined that this change involves no significant hazards consideration. The bases for these determinations are included in the attached submittal.
The proposed change includes three new commitments which are listed in Attachment 3.
Entergy requests approval of the proposed amendment by September 18, 2009 to support the RF15 reload. Once approved, the amendment shall be implemented prior to Cycle 16 operation. Although this request is neither exigent nor emergency, your prompt review is requested.
If you have any questions or require additional information, please contact Barry Burmeister at (225)-381 -4148.
I declare under penalty of perjury that the foregoing is true and correct. Executed on November 20, 2008 Sincerely, Director, Nuclear Safety Assurance River Bend Station - Unit 1
RBG-46863 Page 3 of 3 JCR/DNL Attachments:
- 1. Analysis of Proposed Technical Specification Change
- 2. Proposed Technical Specification Changes (mark-up)
- 3. List of Regulatory Commitments
- 4. GNF S-0000-0088-0271 Revision 0, "GE14 Thermal Hydraulic Compatibility with River Bend Legacy Fuel," Proprietary Version
- 5. GNF S-0000-0088-0271 Revision 0, "GE14 Thermal Hydraulic Compatibility with River Bend Legacy Fuel," Non- Proprietary Version
- 6. Affidavits for'Requests to Withhold Information cc: Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 NRC Senior Resident Inspector P. 0. Box 1050 St. Francisville, LA 70775 U. S. Nuclear Regulatory Commission Attn: Mr. Carl F. Lyon OWFN 8 B1 Washington, DC 20555-0001 Mr. Jeffrey P. Meyers Louisiana Department of Environmental Quality Office of Environmental Compliance Attn. OEC - ERSD P. O. Box 4312 Baton Rouge, LA 70821-4312
RBG-46863 bcc e-mail: Standard Distribution LAR 2008-07 RBG-46863 RBF1-08-0103 File Codes; G 9.5, G 9.42
Attachment I RBG-46863 Analysis of Proposed Technical Specification Change to RBG-46863 Page 1 of 10
1.0 DESCRIPTION
This letter is a request to amend Operating License 47 for River Bend Station, Unit 1 (RBS).
A change is proposed to Technical Specification (TS) 5.6.5, "Core Operating Limits Report (COLR)" to add a reference to an analytical method that will be used to determine core operating limits. The new reference, NEDC-33383P, "GEXL97 Correlation Applicable to ATRIUM-10 Fuel," will allow Entergy to use a Global Nuclear Fuel (GNF)' method to determine fuel assembly critical power of AREVA ATRIUM-1 0 fuel. RBS currently operates with a full core of ATRIUM-1O fuel. Entergy plans to use the GEXL97 correlation for RBS Operating Cycle 16.
2.0 PROPOSED CHANGE
TS Section 5.6.5.b lists the analytical methods previously reviewed and approved by the NRC that are used to determine the core operating limits. The proposed change will add the following new reference to TS 5.6.5.b.
- 25. NEDC-33383P, "GEXL97 Correlation Applicable to ATRIUM-10 Fuel," Global Nuclear Fuel.
GEXL97 has been approved for use at LaSalle County Station, Units 1 and 2 (Reference 1), but has not been approved for generic application by licensees. Entergy is proposing that the NRC approve use of this methodology for determining RBS core operating limits. A similar amendment request (Reference 2) was recently approved for use at Entergy's Grand Gulf Nuclear Station (GGNS).
3.0 BACKGROUND
Core operating limits are established each operating cycle in accordance with TS 3.2, "Power Distribution" and TS 5.6.5, "Core Operating. Limits Report (COLR)." These operating limits ensure that the fuel design limits are not exceeded during any conditions of normal operation or in the event of any Anticipated Operational Occurrence (AOO).
The methods used to determine the operating limits are those previously found acceptable by the NRC and listed in TS section 5.6.5.b. The analytical methods currently listed support the determination of core operating limits by using those methods applicable to fuel supplied by General Electric (GE, currently known as Global Nuclear Fuel) or AREVA (formerly known as Framatome Advanced Nuclear Power (FRA-ANP), or Siemens). RBS has employed fuel supplied by GE or AREVA since it began commercial operation but is only using AREVA ATRIUM-1 0 fuel in the current operating cycle.
RBS has recently decided to load GE14 fuel during its upcoming refueling outage. RBS intends to use GE/GNF methodologies to determine overall core operating limits. This change will require the listing of an additional analytical method for analyzing the AREVA ATRIUM-10 fuel.
The requested TS change adds the reference needed to determine fuel assembly critical power of ATRIUM-10 fuel.
' Global Nuclear Fuel (GNF), is a joint venture of General Electric (GE), Hitachi and Toshiba to RBG-46863 Page 2 of 10
4.0 TECHNICAL ANALYSIS
4.1 GEXL97 Correlation for ATRIUM-10 Fuel TS Safety Limits (SLs) ensure that specified fuel design limits are not exceeded during steady state operation, normal operational transients, and anticipated operational occurrences (AOOs).
The Minimum Critical Power Ratio (MCPR) fuel cladding integrity Safety Limit (SL) ensures that during normal operation and AOOs, at least 99.9% of the fuel rods in the core do not experience transition boiling. The margin between calculated boiling transition and the MCPR SL is based on a detailed statistical procedure that considers the uncertainties in monitoring the core operating state. One specific uncertainty included in the SL is the uncertainty inherent in the critical power correlation. The fuel vendor's critical power correlations are based on data which provide a high degree of assurance that the critical power, as evaluated by the correlation, is within a small percentage of the actual critical power being estimated.
The GEXL correlation is an NRC approved GE method of accurately predicting the occurrence of boiling transition in Boiling Water Reactor (BWR) fuel. The GEXL correlation is necessary for determining the MCPR operating limits resulting from transient analysis, the MCPR safety limit analysis, and the core operating performance and design.
The RBS reactor core currently contains only AREVA ATRIUM-10 fuel. Entergy plans to insert GE14 fuel in the reactor during the upcoming refueling outage and will begin using GE/GNF's safety analysis methodologies, including GNF's critical power correlation methods. The RBS TS currently list NEDE-2401 1-P-A, "General Electric Standard Application for Reactor Fuel (GESTAR-Il)," as a method of determining core operating limits. GESTAR-Il describes the use of GEXL or GEXL-PLUS as approved methods for critical power correlations; however, it does not describe a specific approved method of performing critical power correlations for ATRIUM-10 fuel. Therefore, Entergy is proposing to add the GEXL97 reference to TS 5.6.5.b as a correlation method to be used for ATRIUM-10 fuel. In the Safety Analysis process, the GEXL97 correlation is to be applied to the ATRIUM-10 fuel in the mixed core while the appropriate approved GEXL correlation will be applied to the GNF fuel (including the determination of an acceptable MCPR safety limit for the mixed core).
Proprietary and non-proprietary versions of GEXL97 were proyided in Reference 1. GEXL97 was previously approved for use at LaSalle County Station, Units 1 and 2, but has not been approved generically for other BWRs. The GEXL97 topical report approved for LaSalle was NEDC-33106P, "GEXL97 Correlation for ATRIUM-10 Fuel."
The GEXL97 topical report was rewritten as NEDC-33383P, "GEXL97 Correlation Applicable to ATRIUM-10 fuel" for more generic application. The NRC recently approved a similar amendment request for the Grand Gulf Nuclear Station (GGNS). The GGNS amendment request and associated supplemental information were submitted by References 2 and 3.
The NEDC-33383P Rev. 0 version of GEXL97 was rewritten to incorporate resolution of NRC questions raised during the review of the LaSalle amendment request. ,The GEXL97 correlation described in NEDC-33383P Rev. 0 was based on the same set of critical power data used in NEDC-33106P and consequently was identical to that previously approved for LaSalle, including the correlation uncertainty. NEDC-33383P was subsequently revised (i.e., Revision 1) to reflect the correction of errors in the underlying SPCB correlation and to include expanded to RBG-46863 Page 3 of 10 pressure range data and low R-factor and low inlet sub-cooling data in the overall statistics.
The expanded pressure range is now consistent with GEXL14.
Entergy is proposing to use Revision 1 of GEXL97, NEDE-33383P, for the critical power correlation of ATRIUM-10 fuel at RBS.
Entergy's evaluation of the application of GEXL97 to RBS reloads considered the LaSalle precedent and specifically the following considerations:
- 1) Adequacy of the critical power database generated with the AREVA sub-channel code XCOBRA thermal hydraulic model in place of an experimental database;
- 2) Proper determination of the uncertainty in the GEXL97 correlation's predictions for the ATRIUM-10 fuel design; and,
- 3) Applicability of the proposed operating range of GEXL97 correlation to the ATRIUM-10 fuel supported by the range of the database.
Entergy has determined that the use of the GEXL97 correlation is appropriate for RBS and provides an equivalent level of protection as that currently provided.
Adequacy of the Critical Power Data Base and Associated Uncertainties The GEXL correlation was developed based on boiling transition data obtained from dryout tests at a GE test facility. However, specific experimental data for AREVA's ATRIUM-10 fuel is not available to the new fuel vendor, GNF. Therefore, a critical power database was generated by using the approved SPCB correlation encoded in the AREVA thermal hydraulic model XCOBRA. This database was then used by GNF to support the development of GEXL97.
The database used in the development of the GEXL97 correlation for the ATRIUM-1 0 fuel is provided in Table 2-1 of the referenced GEXL97 report. This table shows the number of calculated critical power data points obtained using the AREVA SPCB critical power correlation for various axial power distributions. It also shows the fuel pin dryout location that formed the basis of the different sets of AREVA calculated critical power data. Table 2-2 of the report, provides the same information but further divides the data collected into subgroups of pressure, mass flux, and inlet sub-cooling.
The database is treated as real data in the regression analysis to generate the correlation coefficients, which introduces unavoidable uncertainties in the correlation. Since the GEXL97 correlation is fitted to this data, the uncertainty in the critical power prediction of the GEXL97 correlation for a given set of conditions will have some additional uncertainty relative to the real critical power value for those conditions; over and above the uncertainty of the correlation's fit to the database. The GEXL97 correlation appropriately determines the overall Critical Power Ratio (CPR) uncertainty by accounting for both the uncertainty in its fit to the database and for the uncertainty of the critical power values in the database itself. A statistical analysis which demonstrates the ability of the final GEXL97 correlation to predict the ATRIUM-1 0 simulated critical power data is provided in the referenced GEXL97 report.
Generation of the GEXL97 Correlation and the Range of Applicability In developing the GEXL97 correlation, GNF took certain steps to optimize the GEXL97 critical power predictions for the ATRIUM-10 fuel design and to minimize the prediction uncertainty.
to RBG-46863 Page 4 of 10 This process is identical to that used by GNF when developing GEXL correlation coefficients for GNF/GE fuel designs using raw experimental test data and has been used in past development of GEXL correlations applicable to other co-resident fuel.
The RBS TS safety limit requires the core thermal power to be < 23.8% of rated when reactor steam dome pressure is < 785 psig (- 800 psia) or core flow is <,10% of rated. This safety limit is intended to provide fuel cladding integrity protection during start-up conditions since the GEXL correlation was not approved at the time as a licensing model for pressures below 785 psig. Entergy is aware that GE provided a 10 CFR Part 21 Notification, SC05-03 dated March
- 29, 2005, which reports that the GEXL correlation lower end of the pressure range (i.e., 800 psia) could temporarily be exceeded during a reactor depressurization transient caused by a Pressure Regulator Failure -Maximum Demand Open (PRFO). To address this issue for GE14 fuel, GNF requested and received NRC approval of a change to the GEXL14 correlation model for pressures down to 700 psia. The GEXL97 Rev. 1 application range for ATRIUM 10 fuel is provided in section 4.2 of the referenced report. The pressure range was extended in Rev. 1 to be consistent with the range for GEXL14 Which ensures that such reactor depressurization transients are adequately evaluated. This application range covers the range of expected operation of the ATRIUM-10 fuel during normal steady state and transient conditions in the RBS reload cores for pressures down to 700 psia. Entergy and GNF do not intend to use GEXL97 beyond the approval data base of both the GEXL14 and the SPCB NRC-approved ranges of applicability.
Entergy is following the industry effort to resolve the TS issues associated with the GE Part 21 and will request appropriate TS changes after a generic resolution is reached by the industry and NRC staff. Since the depressurization event does not threaten fuel cladding integrity, and has been adequately evaluated for the lower pressure range, Entergy believes that final resolution of the Part 21 issue is not necessary prior to the use of GEXL97.
4.2 Fuel Compatibility of the Mixed Core NEDC-33383-P does not provide a detailed mixed core analysis for the RBS transition cores.
During the NRC review of the GGNS request for use of GEXL97, the NRC determined that such information was needed to complete its review. GGNS provided similar information in Reference 3. A similar mixed core thermal hydraulic analysis for RBS is provided by Attachment 4, GNF S-0000-0088-0271 Revision 0, "GE 14 Thermal Hydraulic Compatibility with River Bend Legacy Fuel." This report provides evaluations performed to demonstrate acceptable thermal hydraulic compatibility of the GE14 fuel assembly with the RBS legacy fuel assemblies. Analyses cover the transition from a core loaded completely with ATRIUM - 10 fuel to one loaded completely with GE14 fuel. The results of these evaluations support the conclusion that GE14 fuel and the legacy fuel can be safely and acceptably operated together at RBS.
Some of the information in GNF S-0000-0088-0271 Revision 0, is proprietary to Global Nuclear Fuel - Americas (GNF-A). The proprietary information is requested to be withheld from public disclosure in accordance with 10 CFR 9.17(a)(4) and 10 CFR 2.390 (a)(4). An affidavit attesting to the proprietary nature of the information is provided in Attachment 6. Attachment 5 provides a non-proprietary version of the report.
to RBG-46863 Page 5 of 10 4.3 Impact of the Fuel Transition on the Safety Analyses During the NRC review of the GGNS request for use of GEXL97, the NRC requested additional information regarding the impact of the fuel transition on the plant's safety analyses.
Specifically, the NRC requested information on the impact to the loss-of-coolant accident (LOCA), anticipated transient without scram (ATWS), abnormal operation occurrence (AOO),
American Society of Mechanical Engineers (ASME) Code overpressure, and stability analyses.
As discussed with the NRC and in the GGNS response letter (Reference 3), this type of information is not available until late in the process. Entergy will provide this information to the NRC in a supplemental letter. The expected date for submittal of this information is August 12, 2009.
4.4 Applicability of Existingq TS 5.6.5 Analytical Methods RBS TS 5.6.5.b requires the analytical methods used to determine the core operating limits to be those previously reviewed and approved by the NRC and listed in TS 5.6.5.b. The documents provided in Technical Specification 5.6.5 b include the NRC approved methodologies for both GNF and AREVA. Although GNF is the fuel vendor for Cycle 16, the Cycle 16 core will contain fuel from both fuel vendors. Several of the AREVA documents explicitly support generation of thermal limits for Cycle 16 while some do not. However, the use of the methods not supporting Cycle 16 thermal limits could be necessary at some point in the future and maintaining these documents in the RBS Technical Specification would preclude the need for a Technical Specification change in the event the documents were needed. The principle of GL 88-16 and the Standard TS NUREGs is to reduce unnecessary burden on both licensee and NRC staff by minimizing the need for TS amendments involving cycle specific information. Since some of the AREVA documents will continue to apply to the upcoming cycle and others may be used in the future, leaving the AREVA references in the TS is consistent with this principle.
The current documents listed in TS 5.6.5.b are all fuel vendor generic Topical Reports (TRs) that have been approved by the NRC. NEDC-33383P, "GEXL97 Correlation Applicable to ATRIUM-10 Fuel," will be the first document listed in TS 5.6.5.b approved by the NRC for RBS on a plant-specific basis. The RBS Core Operating Limits Report (COLR) provides the complete identification of all of the analytical documents, including the revision number. Entergy procedure EN-LI-100, "Process Applicability Determination," identifies the COLR as a licensing basis document for which changes must be reviewed in accordance with the 50.59 process.
Thus, any changes to NEDC-33383P must be reviewed in accordance with the criteria of 10 CFR 50.59.
5.0 Applicable Regulatory Requirements/Criteria The proposed changes have been evaluated to determine whether applicable regulations and requirements continue to be met.
Entergy has determined that the proposed changes do not require any exemptions or relief from regulatory requirements, other than the TS, and do not affect conformance with any General Design Criterion (GDC) differently than described in the Updated Final Safety Analysis Report (UFSAR).
to RBG-46863 Page 6 of 10 10 CFR 50.36, paragraph d(5), states that the TS will include administrative controls that address the provisions relating to organization and management, procedures, record keeping, review and audit, and reporting necessary to assure operation of the facility in a safe manner.
The COLR is required as a part of the reporting requirements specified in the RBS TS Administrative Controls section. The TS requires the core operating limits to be established prior to each reload cycle, or prior to any remaining portion of a reload cycle, and to be documented in the COLR. In addition, it requires the analytical methods used to determine the core operating limits to be approved by the NRC and described in the Administrative Controls section of the TS. The proposed TS changes ensure that these requirements are met.
10 CFR 50.34, "Contents of Applications; Technical Information," requires that Safety Analysis Reports be submitted that analyze the design and performance of structures, systems, and components provided for the prevention of accidents and the mitigation of the consequences of accidents. As part of the core reload design process, reload safety evaluations are performed to ensure that the safety analyses remain bounding for the design cycle. To confirm that the analyses remain bounding, key inputs to the safety analyses such as the Critical Power Ratio (CPR) are confirmed to be conservative with respect to the current design cycle. If key safety analysis parameters are not bounded, a re-analysis or re-evaluation of the affected transients or accidents is performed to ensure that the applicable acceptance criteria are satisfied. The proposed TS change is needed to perform reload safety analysis for the next cycle core reload consisting of fuels from two different fuel vendors.
5.1 No Siqnificant Hazards Consideration Entergy proposes to use a Global Nuclear Fuels (GNF) analysis method to determine core operating limits for River Bend Station (RBS) beginning with operating Cycle 16. The GNF method of analysis, NEDC-33383P, "GEXL97 Correlation Applicable to ATRIUM-10 Fuel," will be used to determine fuel assembly critical power of AREVA ATRIUM-10 fuel. TS section 5.6.5.b must be revised to include a reference to the GEXL97 topical report prior to the method being used to establish the core operating limits.
Entergy Operations, Inc. has evaluated whether or not a significant hazards consideration is involved with the proposed amendment(s) by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below:
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
Core operating limits are established each operating cycle in accordance with TS 3.2, "Power Distribution" and TS 5.6.5, "Core Operating Limits Report (COLR)". These core operating limits ensure that the fuel design limits are not exceeded during any conditions of normal operation or in the event of any Anticipated Operational Occurrence (AOO).
The methods used to determine the operating limits are those previously found acceptable by the NRC and listed in TS section 5.6.5.b.
A change to TS 5.6.5.b is requested to include an additional reference to the list of analytical methods. RBS currently operates with a full core of AREVA ATRIUM-10 fuel but is scheduled to load GE14 fuel during the next refueling outage. RBS plans to use to RBG-46863 Page 7 of 10 the analysis methods of the new fuel vendor, GNF, for the analysis of the mixed core.
The GEXL97 correlation accurately models predicted core behavior and appropriately determines the overall critical power uncertainty of this method. In addition, the GEXL97 application range covers the range of expected operation of the ATRIUM-1 0 fuel during normal steady state and transient conditions in the RBS reload cores.
The requested TS changes concern the use of analytical methods and do not involve any plant modifications or operational changes that could affect any postulated accident precursors or accident mitigation systems and do not introduce any new accident initiation mechanisms. The proposed changes have no effect on the type or amount of radiation released and has no effect on predicted offsite doses in the event of an accident. Thus, the proposed change does not affect the probability of an accident previously evaluated nor does it increase the radiological consequences of any accident previously evaluated.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
The proposed TS changes will not change the design function, reliability, performance, or operation of any plant systems, components, or structures. It does not create the possibility of a new failure mechanism, malfunction, or accident initiators not considered in the design and licensing bases. Plant operation will continue to be within the core operating limits that are established using NRC approved methods that are applicable to the RBS design and the RBS fuel.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No.
The proposed change adds GEXL97 to the list of-analytical methods in TS 5.6.5.b that can be used to determine core operating limits. Use of the GEXL97 correlation analytical method provides an equivalent level of protection as that currently provided.
The change does not alter any method of analysis as described in the NRC approved versions of GESTAR-Il. The proposed change does not modify the safety limits or setpoints at which protective actions are initiated, and do not change the requirements governing operation or availability of safety equipment assumed to operate to preserve the margin of safety.
Therefore, the proposed change does not involve a significant reduction in a margin of safety.
to RBG-46863 Page 8 of 10 Based on the above, Entergy concludes that the proposed amendment presents no significant hazards consideration under the standards set forth in 10 CFR 50.92.
5.2 Environmental Considerations The proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22 (9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
6.0 PRECEDENCE The NRC previously approved use of GEXL97 for LaSalle County Stations, Units 1 and 2. The LaSalle application requested that two methods be added to TS 5.6.5.b. One of the methods, GEXL96 is for ATRIUM-9B fuel which RBS does not use. The other method was for ATRIUM-10 fuel and was listed as NEDC-33106P, "GEXL97 Correlation for ATRIUM-10 Fuel." The version of GEXL97 that will be referenced in the RBS TS is NEDC-33383P, "GEXL97 Correlation Applicable to ATRIUM-10 Fuel." NEDC-33383P is an updated version of NEDC-33106P which incorporates resolution of NRC questions that arose during the review of the LaSalle amendment request and makes the correlation more generically applicable to ATRIUM-10 fuel. The GEXL97 correlation described in NEDC-33383P Rev. 0 was based on the same set of critical power data used in NEDC-33106P and consequently was identical to that previously approved for LaSalle, including the correlation uncertainty. NEDC-33383P was subsequently revised (i.e., Revision 1) to reflect the correction of errors in the underlying SPCB correlation and to include expanded pressure range data, low R-factor, and low inlet sub-cooling data in the overall statistics.
The NRC staff has approved a similar request for use of NEDC-33383P, Rev. 1 at GGNS.
During the review of the GGNS amendment request, the NRC asked Entergy to provide additional information regarding NEDC-33383P and the impact of the fuel transition on safety analyses. Specifically the NRC requested that the following items be addressed. The questions have been addressed for RBS as described below.
- 1. It appears that NEDC-33383-P does not provide a detailed mixed core analysis for the transitioncores. Provide this mixed core analysis.
- This subject isaddressed in section 4.2 of this attachment.
- 2. Discuss if the licensee/GNF intends to use GEXL97 beyond the approval data base of
- both the GEXL14 and the SPCB NRC-approved ranges of applicability.
As stated in section 4.1 of this attachment, Entergy and GNF do not intend to use GEXL97 beyond the approval data base of both the GEXL14 and the SPCB NRC-approved ranges of applicability.
to RBG-46863 Page 9 of 10
- 3. Figure 4-1, "GEXL97 R-Factor Trends, in NEDC-33383P provides predictedcritical power versus R-factor behavior for a range of R-factors. Yet the R-factor range depicted in the table above the figure shows a longer range of R-factors than that given in the figure.
a) Is there R-factor raw data beyond the highest R-factor in the figure?
a) Also, the data provided is for only one pressure. Do the GEXL97 trends behave differently at different pressures? If so, explain.
Figure 4-1 was revised in NEDC-33383-P Rev. 1 to show the longer R-factor range. The observed R-factor trends extend over the entire pressure application range.
- 4. The NRC-approved documents listed in TS 5.6.5.b are the only documents to be used to determine the core operating limits listed in TS 5.6.5.a prior to each reload. Discuss if there are documents listed in TS 5.6.5.b, other than the changes in documents submitted in the December 5, 2007, application,that would not be used to calculate the operating limits in TS 5.6.5.a for the next reload.
This subject is addressed in section 4.4 of this attachment.
- 5. Discuss if there are any plant-specific documents listed in TS 5.6.5.b that have been revised since the NRC staff approved their use and what is the requirement that the document revisions are reviewed in accordancewith the change criteriain 10 CFR 50.59.
This subject is addressed in section 4.4 of this attachment.
- 6. In the application letter dated December 5, 2007, on the top of page 2, there are the following two statements: (1) AREVA identified an errorin its SPCB criticalpower correlationaffecting the A TRIUM-IC fuel and is currently evaluatingthe impact of the error,and Entergy will provide a supplement to this LAR describing the impact of this error;and (2) Entergy has not completed analyses to determine whether a change to the minimum criticalpower ratio (MPCR) safety limits in the Technical Specifications (TSs) will be required. Address these two statements and provide the currentstatus of (1) the AREVA evaluation of the errorin the SPCB correlationincluding an explanation the impact of the erroron the GEXL97 topicalreport that was submitted with the application and (2) the analyses to determine whether a change in the TS MPCR safety limits is needed.
(1) As discussed in section 4.1 of this attachment, Revision 1 of NEDC-33383P reflects correction of the SPCB errors.
(2) As discussed in the cover letter, Entergy has not completed analyses to determine whether a change to the TS Minimum Critical Power Ratio (MCPR) safety limits will be required for the RBS reload. If analyses indicate that a change to the MCPR safety limit or other TS change is required, the TS change will be requested separately.
to RBG-46863 Page 10 of 10
- 7. The application describes a transitionfrom the current core with a full loading of A TRIUM- 10 to a full loading of GEl4 fuel This transition will start with the upcoming refueling outage and continue over several refueling outages. Once the NRC staff approves the inclusion of the GEXL97 correlation into the TS, the licensee calculates the core operatinglimits listed in TS 5.6.5a and performs the plant accident analyses without further review by the NRC staff. Therefore, the staff requests that the licensee provide additionalinformation to allow the staff to review the impact of the transitionon the safety analyses.
Specifically, for loss-of-coolant accident (LOCA), anticipatedtransient without scram (ATWS), abnormal operation occurrence (AO0), American Society of Mechanical Engineers (ASME) Code overpressure,and stability analyses performed for the initial transition core:
a state the approvedmethodology and/or the computer codes used and the.
reference (e.g. topical report)documenting the methodology/computercodes, b state if the analysis is in compliance with all applicable restrictionsin the staff safety evaluation(s)approving the methodology, and c provide the quantitativeresults of the figure(s) of merit (FOM) compared against the acceptance criteria.
This subject is addressed in section 4.3 of the report. As discussed with the NRC and in the GGNS response letter, this type of information is not available until late in the reload core design process. Entergy will provide this information to the NRC in a supplemental letter.
7.0 REFERENCES
- 1. Letter from USNRC to Exelon Nuclear, "LaSalle County Station Units 1 and 2, Issuance of Amendments RE: Core Operating Limits Report (TAC NOS. MB9888 AND MB9889)," dated July 9, 2004 (ADAMS Accession No. ML033430391)
- 2. Letter GNRO-2007/00071 from Entergy to USNRC, "License Amendment Request (LAR)
Changes to Technical Specification 5.6.5, "Core Operating Limits Report (COLR)" dated December 5, 2007 (ADAMS Accession no. ML07344011,3).
- 3. Letter GNRO-2008/00053 from Entergy to USNRC, "Supplement to Amendment Request Changes to Technical Specification 5.6.5, "Core Operating Limits Report (COLR)" dated July 21, 2008.
- 4. Letter from Mr. Jason S. Post of General Electric Company, "10CFR21 Reportable Condition Notification: Potential to Exceed Low Pressure Technical Specification Safety Limit," dated March 29,2005 (ADAMS Accession No. ML050950428)
Attachment 2 RBG-46863 Proposed Technical Specification Changes (mark-up) to RBG- 46863 Page 1 of 3 (3) EOI, pursuant to the Act and 10 CFR Part 70, to receive, possess and to use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the F inal Safety Analysis Report, as supplemented and amended; (4) EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct. source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive.
possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I an d is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level EOI is authorized to operate the facility at reactor core power levels not in excess of 3091 megawatts thermal (100% rated power) in accordance with the conditions specified herein. The items identified in Attachment 1 to this license shall be completed as specified.
Attachment 1 is hereby incorporated into this license.
(2) Technical S ecifications and Environmental Proatcion Plan The Technical Specification contained inAppendix A, as revised through Amendment No. and the Environmental Protection Plan contained in Appendix B, are hereby incorporated inthe license. EQI shall operate the facility in accordance with the Technical Specifications and the Environmental ProtectionP lan.
Amendment No.
to RBG- 46863 Page 2 of 3 Reporting Requirements 5,6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued) ,
- 24) NEDE-2401 i-P-A, 'General Electric Standard Application for Reactor Fuel (GESTAR-Il)".
- 0. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.
- d. 'The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.
r-
?'
?A5~ 1-- )C - Z 183 P 64P-6.T-RIVER BEND 5,0-19 Amendment No. 84, 96, gO 400, 406, 408, 122
Attachment 3 RBG-46863 List of Regulatory Commitments to RBG-46863 Page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
TYPE (Check one) SCHEDULED ONE- CONTINUING COMPLETION COMMITMENT TIME COMPLIANCE DATE (If ACTION Required)
Entergy has not completed analyses to determine X 4/2/2009 whether a change to the TS Minimum Critical Power Ratio (MCPR) safety limits will be required for the RBS reload. If analyses indicate that a change to the MCPR safety limit is required, the TS change will be requested separately.
Entergy is following the industry effort to resolve the X After TS issues associated with the GE Part 21 and will industry request appropriate TS changes after a generic resolution of resolution is reached by the industry and NRC staff. GE part 21 report, SC05-03 Entergy will provide information regarding the X 8/12/2009 impact of the fuel transition on the plant's safety analyses in a supplemental letter.