|
---|
Category:Letter
MONTHYEARIR 05000458/20230402024-01-18018 January 2024 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML24011A1742024-01-11011 January 2024 Security Baseline Inspection Report (Cover Letter) ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection IR 05000458/20230102023-12-12012 December 2023 Biennial Problem Identification and Resolution Inspection Report 05000458/2023010 RBG-48267, Reply to a Notice of Violation, NRC Inspection Report 05000458/20230032023-12-0707 December 2023 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1432023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23310A0322023-11-13013 November 2023 Integrated Inspection Report 05000458/2023003 IR 05000458/20230032023-11-13013 November 2023 Integrated Inspection Report 05000458/2023003 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23311A4322023-11-0909 November 2023 Notification of NRC Supplemental Inspection (95001) and Request for Information RBG-48264, Core Operating Limits Report (COLR) - Cycle 23, Revision 12023-11-0606 November 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 1 RBG-48260, Notification of Readiness for Supplemental Inspection2023-10-12012 October 2023 Notification of Readiness for Supplemental Inspection ML23278A2402023-10-0606 October 2023 Regulatory Audit Plan in Support of License Amendment Requests to Revise TSs to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 RBG-48258, Notification of Readiness for Supplemental Inspection2023-10-0505 October 2023 Notification of Readiness for Supplemental Inspection RBG-48259, Revision to Reply to Notice of Violation; EA-23-0552023-10-0303 October 2023 Revision to Reply to Notice of Violation; EA-23-055 ML23270B9932023-09-29029 September 2023 Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000458/20234012023-09-26026 September 2023 Cyber Security Inspection Report 05000458/2023401 IR 05000458/20230012023-09-21021 September 2023 NRC Inspection Report 05000458/2023001, Disputed Non-Cited Violation Rescinded RBG-48254, Report of Changes and Errors to 10CFR50.462023-09-21021 September 2023 Report of Changes and Errors to 10CFR50.46 IR 05000458/20234032023-09-21021 September 2023 NRC Security Inspection Report 05000458/2023403 (Cover Letter) RBG-48249, Reply to a Notice of Violation, EA-23-0712023-09-14014 September 2023 Reply to a Notice of Violation, EA-23-071 RBG-48253, Submittal of Owner'S Activity Report Form for Cycle 222023-09-12012 September 2023 Submittal of Owner'S Activity Report Form for Cycle 22 IR 05000458/20230122023-09-0101 September 2023 Comprehensive Engineering Team Inspection Report 05000458/2023012 IR 05000458/20230052023-08-21021 August 2023 Updated Inspection Plan for River Bend Station (Report 05000458/2023005) - Mid Cycle Letter RBG-48247, Reply to Notice of Violation; EA-23-0552023-08-21021 August 2023 Reply to Notice of Violation; EA-23-055 IR 05000458/20230922023-08-15015 August 2023 Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023092 IR 05000458/20230022023-08-0909 August 2023 Integrated Inspection Report 05000458/2023002 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23195A0692023-07-24024 July 2023 2023 River Bend Station Notification of Biennial Problem Identification and Resolution Inspection and Request for Information IR 05000458/20230912023-07-20020 July 2023 Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023091 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23195A0222023-07-11011 July 2023 4-2022-012 Letter - OI Closure to Licensee IR 05000458/20234042023-07-11011 July 2023 NRC Security Inspection Report 05000458/2023404 (Cover Letter Only) IR 05000458/20230902023-06-26026 June 2023 NRC Inspection Report 05000458/2023090 and Preliminary White Finding ML23159A2302023-06-0808 June 2023 Response to Request for Additional Information Concerning Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RBG-48226, Core Operating Limits Report (COLR) - Cycle 23, Revision 02023-05-31031 May 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 0 RBG-48237, Response to NRC Integrated Inspection Report 05000458/20230012023-05-25025 May 2023 Response to NRC Integrated Inspection Report 05000458/2023001 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23116A2352023-05-0101 May 2023 Integrated Inspection Report 05000458/2023001 RBG-48220, Submittal of 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report 2024-01-18
[Table view] Category:Reference Safety Analysis Report
MONTHYEARML0506601622005-03-0101 March 2005 Unit 1, Revision 18 to the Updated Safety Analysis Report 2005-03-01
[Table view] Category:Amendment
MONTHYEARML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions CNRO-2022-00015, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process2022-05-26026 May 2022 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated ML21062A1982021-03-0303 March 2021 Supplement to License Amendment Request to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 RBG-47886, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-07-24024 July 2018 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47799, Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-02-28028 February 2018 Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47801, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2017-11-15015 November 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control RBG-47605, Application for Technical Specification Changes for Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation.2015-08-20020 August 2015 Application for Technical Specification Changes for Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation. RBG-46925, License Amendment Request, Technical Specification Change to Revise ASME Code Reference for Inservice Test Requirements2009-06-29029 June 2009 License Amendment Request, Technical Specification Change to Revise ASME Code Reference for Inservice Test Requirements RBG-46926, Unit 1 - Supplement to License Amendment Request (Lar), to Implement Changes Consistent with TSTF-163 on Diesel Generator Surveillance Requirements2009-06-22022 June 2009 Unit 1 - Supplement to License Amendment Request (Lar), to Implement Changes Consistent with TSTF-163 on Diesel Generator Surveillance Requirements ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions ML0835701922008-11-20020 November 2008 License Amendment Request (LAR) Changes to Technical Specification 5.6.5, Core Operating Limits Report (COLR) ML0812305252008-06-0202 June 2008 Tech Spec Pages for Amendment No. 160, Adoption of Technical Specification Task Force (TSTF)-2, Relocate the 10-Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control ML0730600062007-11-23023 November 2007 Corrected Page 3 of the Order, Appendix C RBG-46666, License Amendment Request - Adoption of TSTF-2, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control2007-11-15015 November 2007 License Amendment Request - Adoption of TSTF-2, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control RBG-46722, Supplemental Information for Licensing Amendment Request Pertaining to Control Room Envelope Habitability2007-08-0707 August 2007 Supplemental Information for Licensing Amendment Request Pertaining to Control Room Envelope Habitability RBG-46712, License Amendment Request 2007-06, Control Room Envelope Habitability (TSTF-448, Revision 3)2007-07-16016 July 2007 License Amendment Request 2007-06, Control Room Envelope Habitability (TSTF-448, Revision 3) RBG-46606, Application for Technical Specifications (TS) Change Regarding Mode Change Limitations (TSTF-359) Using the Consolidated Line Item Improvement Process (Cliip), and Correct Example 1.4-1 (TSTF-485)2007-07-0202 July 2007 Application for Technical Specifications (TS) Change Regarding Mode Change Limitations (TSTF-359) Using the Consolidated Line Item Improvement Process (Cliip), and Correct Example 1.4-1 (TSTF-485) RBG-46583, License Amendment Request, Changes to the Analytical Methods Referenced in Technical Specification 5.6.5, Core Operating Limits Report (Colr).2006-10-16016 October 2006 License Amendment Request, Changes to the Analytical Methods Referenced in Technical Specification 5.6.5, Core Operating Limits Report (Colr). RBG-46479, Supplement to Amendment Request Corrections to Loss of Power Instrumentation Requirements2005-09-13013 September 2005 Supplement to Amendment Request Corrections to Loss of Power Instrumentation Requirements ML0506601622005-03-0101 March 2005 Unit 1, Revision 18 to the Updated Safety Analysis Report RBG-46375, License Amendment Request, Amendment to Technical Specification 3.8.4 Actions for Inoperable Division 1 and 2 Battery Charger2004-12-17017 December 2004 License Amendment Request, Amendment to Technical Specification 3.8.4 Actions for Inoperable Division 1 and 2 Battery Charger RBG-46233, Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process, LAR 2004-042004-03-0404 March 2004 Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process, LAR 2004-04 RBG-46214, Application for Technical Specification Improvements to Revise Technical Specification 3.1.8, Scram Discharge Volume (SDV) Vent and Drain Valves, Using the Consolidated Line Item Improvement Process2004-02-0303 February 2004 Application for Technical Specification Improvements to Revise Technical Specification 3.1.8, Scram Discharge Volume (SDV) Vent and Drain Valves, Using the Consolidated Line Item Improvement Process RBG-46072, Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Division 1 & 2 Emergency Diesel Generator Load Reject Testing2003-03-14014 March 2003 Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Division 1 & 2 Emergency Diesel Generator Load Reject Testing ML0234700502002-12-12012 December 2002 Tech Spec Page for Amendment 126 Regarding Control Rod Testing Frequency ML0219302332002-07-11011 July 2002 Technical Specification Amend, Primary Containment and Drywell Isolation Instrumentation RBG-45982, License Amendment Request Control Rod Scram Time Testing Frequency (LAR 2001-35)2002-07-10010 July 2002 License Amendment Request Control Rod Scram Time Testing Frequency (LAR 2001-35) 2023-07-27
[Table view] |
Text
Entergy Operations, Inc.
River Bend Station 5485 U.S. Highway 61 P. 0. Box 220
'En erg St. Francisville, LA 70775 Tel 225 336 6225 Fax 225 635 5068 Rick J. King Director Nuclear Safety Assurance March 1, 2005 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
River Bend Station - Unit 1 Docket No. 50-45 8 License No. NPF-47 Revision 18 to the Updated Safety Analysis Report File Nos.: G9.5, G9.25.1.5, G9.41.1 RBG-46406 RBF1 0032 Gentlemen:
Pursuant to I OCFR50.71(e), Entergy Operations, Inc. (EOI) herein submits one CD containing a complete Adobe (.pdf) copy of the River Bend Station (RBS) Updated Safety Analysis Report (USAR) with the Revision 18 changes incorporated. The Revision 18 submittal depicts the effects of changes made in the facility as described in the USAR during the period November 11, 2003, through February 22, 2005. A list of effective pages is included on the CD identifying the current USAR pages after incorporation of Revision 18 changes.
Pursuant to I OCFR50.71 (e)(5), each page containing a Revision 18 change includes the verbiage "Revision 18" at the bottom of each revised page. In addition, each text and table page containing a Revision 18 change includes change bars.
A 50.59 Summary Report, pursuant to 10CFR50.59(b)(2), is included as Attachment 1 to this letter. The 50.59 Summary Report contains a copy of the safety evaluations performed for each change. The Summary Report is provided to meet the requirements of 10CFR50.71(e)(2)(ii) for identification of changes made under the provisions of IOCFR50.59 but not previously submitted to the Commission.
An FSAR Only Summary Report, pursuant to the reporting guidelines of Section A6 of Nuclear Energy Institute (NEI) 98-03, "Guidelines for Updating Final Safety Analysis Reports," is included as Attachment 2 to this letter.
1005)
RBG-46406 Page 2 of 3 Per the reporting guidelines of Section 5.1 of NEI 99-04, "Guidelines for Managing NRC Commitment Changes," Attachment 3 contains copies of recent changes to NRC commitments made in accordance with NEI 99-04. contains a listing of revised USAR pages. The Revised Pages List separates text pages, table pages, and figure pages containing Revision 18 changes.
Attachments 1, 2, 3, and 4 are included on a separate CD as searchable Adobe (.pdf) files.
This second CD contains a single file which includes a scanned copy of this transmittal letter as well as the four attachments.
As required by 10CFR50.7 1(e)(2)(i), the below affirmation certifies that the information in this submittal accurately reflects changes made since the previous submittal necessary to represent information and analyses submitted or prepared pursuant to NRC requirements.
Should you have any questions, please advise Mr. D. N. Lorfing at (225) 381-4157.
Affirmation: I declare under penalty of perjury that the foregoing is true and correct.
Executed on March 1, 2005.
Sincerely, Rick J. King Director, Nuclear Safety Assurance RJK/WJF
RBG-46406 Page 3 of 3 enclosures: 1) One CD with a single file containing:
a) A scanned & 'Captured' Adobe (.pdt) copy of this transmittal letter b) Attachment 1, the 50.59 Summary Report (scanned & 'Captured' Adobe - .pdf- copies of applicable 50.59 Safety Evaluations) c) Attachment 2, the FSAR Only Summary Report (scanned &
'Captured' Adobe - .pdf - copies of applicable FSAR Only Evaluations) d) Attachment 3, the Commitment Change Summary Report (scanned
& 'Captured' Adobe - .pdf- copies of applicable Commitment Change Evaluation Forms) e) Attachment 4, USAR Revision 18 list of revised pages ('Distilled' Adobe - .pdf- listing of revised USAR text, table, and figure pages)
- 2) One CD containing a complete copy of the RBS USAR with Revision 18 changes incorporated cc: U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 (1 USAR CD)
U.S. Nuclear Regulatory Commission Senior Resident Inspector P.O. Box 1050 St. Francisville, LA 70775 (1 USAR CD)
Michael K. Webb U.S. Nuclear Regulatory Commission M/S OWFN 7D1 11555 Rockville Pike Rockville, MD 20852-2738 (1 USAR CD)