TAC:MD6561, Clarify Application of Setpoint Methodology for LSSS Functions, MSSV Changes (Approved, Closed) TAC:MD6562, Clarify Application of Setpoint Methodology for LSSS Functions, MSSV Changes (Approved, Closed) |
|
MONTHYEARCPSES-200701238, Submittal of the CPSES Units 1 and 2 Large and Small Break LOCA Analyses2007-07-31031 July 2007 Submittal of the CPSES Units 1 and 2 Large and Small Break LOCA Analyses Project stage: Request CPSES-200701324, Supplement to License Amendment Request (LAR) 07-003 Revision to Technical Specification 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, and 5.6.5 B, Core Operating Limits2007-08-16016 August 2007 Supplement to License Amendment Request (LAR) 07-003 Revision to Technical Specification 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, and 5.6.5 B, Core Operating Limits Project stage: Supplement CPSES-200701323, License Amendment Request 07-006, Revision to Technical Specification 3.1.4, Rod Group Alignment Limits, Table 3.3.1-1, Reactor Trip System Instrumentation, Table 3.3.2-1, Engineered Safety Feature Actuation System..2007-08-16016 August 2007 License Amendment Request 07-006, Revision to Technical Specification 3.1.4, Rod Group Alignment Limits, Table 3.3.1-1, Reactor Trip System Instrumentation, Table 3.3.2-1, Engineered Safety Feature Actuation System.. Project stage: Request ML0731902862007-11-19019 November 2007 Request for Additional Information Re LAR 07-006 to Revise Technical Specifications to Reflect Cycle-Specific Safety Analysis Assumptions Regarding Adoption of W* Methodologies Project stage: RAI ML0801501112008-01-28028 January 2008 Units and 2 - Request for Withholding Proprietary Information, J. Gresham, Westinghouse Electric Company LLC Affidavit Dated 12/11/2007, Regarding LAR 07-006 Project stage: Other ML0805800052008-04-0303 April 2008 Tech Spec Pages for Amendment Nos. 145 and 145 Revise TSs 3.1.4, 3.4.10, and 3.7.1 to Reflect Cycle-Specific Safety Analysis Assumptions Re Adoption of Westinghouse Methodologies Project stage: Acceptance Review ML0805800042008-04-0303 April 2008 Issuance of Amendment Nos. 145 and 145 Revise TSs 3.1.4, 3.4.10, and 3.7.1 to Reflect Cycle-Specific Safety Analysis Assumptions Re Adoption of Westinghouse Methodologies Project stage: Approval 2007-08-16
[Table View] |
|
---|
Category:Letter
MONTHYEARCP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 12024-01-31031 January 2024 License Renewal Application Revision 0 - Supplement 3, Revision 1 IR 05000445/20230042024-01-29029 January 2024 Integrated Inspection Report 05000445/2023004 and 05000446/2023004 CP-202400034, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1)2024-01-29029 January 2024 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1) ML24024A2102024-01-29029 January 2024 Summary of Regulatory Audit Regarding a License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML24025A0052024-01-25025 January 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report ML24023A0242024-01-24024 January 2024 Correction to Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident Methodology ML24018A1072024-01-18018 January 2024 Notification of Commercial Grade Dedication Inspection (05000445/2024012 and 05000446/2024012) and Request for Information ML23159A2082023-12-20020 December 2023 Request for Withholding Information from Public Disclosure ML23319A3872023-12-20020 December 2023 Issuance of Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident (Fsloca) Methodology ML23348A2392023-12-19019 December 2023 Nonacceptance of License Amendment Request to Relocate Technical Specification 3.9.3, Nuclear Instrumentation, to the Technical Requirements Manual CP-202300575, (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 22023-12-13013 December 2023 (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 2 ML23333A0872023-12-13013 December 2023 Transmittal of Dam Safety Inspection Report - Public CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation2023-12-12012 December 2023 (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300494, License Renewal Application Revision 0, Supplement 32023-12-0606 December 2023 License Renewal Application Revision 0, Supplement 3 ML23313A0732023-12-0606 December 2023 Issuance of Amendment Nos. 184 and 184 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Rev. 1, Improved Roac and CAOC Fq Surveillance Technical Specifications ML23291A4382023-11-30030 November 2023 Notice of Availability of the Draft Plant-Specific Supplement 60, to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Comanche Peak Nuclear Power Plant, Unit Numbers 1 and 2, License Renewal Applica ML23325A0182023-11-30030 November 2023 Schedule Revision for the License Renewal Application Review IR 05000445/20234022023-11-30030 November 2023 NRC Security Inspection Report 05000445/2023402 and 05000446/2023402 CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation2023-11-20020 November 2023 License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation ML23308A0032023-11-17017 November 2023 Letter to R. Nelson, Executive Director; Achp; Re., Comanche Peak Draft Environmental Impact Statement ML23308A0022023-11-17017 November 2023 Letter to M. Wolfe, Executive Director; Shpo; Re., Comanche Peak Draft Environmental Impact Statement ML23317A3002023-11-13013 November 2023 Letter to R. Sylestine, Chairman, Alabama-Coushatta Tribe of Texas Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2972023-11-13013 November 2023 Letter to R. Martin, President, Tonkawa Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2872023-11-13013 November 2023 Letter to J. Garza, Chairman, Kickapoo Traditional Tribe of Texas Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2832023-11-13013 November 2023 Letter to D. Dotson, President, Delaware Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2852023-11-13013 November 2023 Letter to E. Martinez, President, Mescalero Apache Tribe Regarding Comanche Peak Draft Environmental Impact Statement ML23306A0302023-11-13013 November 2023 Letter to J. Cernek, Chairman; Coushatta Tribe of Louisiana Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2902023-11-13013 November 2023 Letter to M. Pierite, Chairman, Tunica Biloxi Tribe of Louisiana Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2982023-11-13013 November 2023 Letter to R. Morrow, Town King, Thlopthlocco Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2842023-11-13013 November 2023 Letter to D. Kaskaske, Chairman, Kickapoo Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2822023-11-13013 November 2023 Letter to D. Cooper, Chairman, Apache Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2962023-11-13013 November 2023 Letter to M. Woommavovah, Chairman, Comanche Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2812023-11-13013 November 2023 Letter to C. Hoskin, Principal Chief, Cherokee Nation; Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2862023-11-13013 November 2023 Letter to J. Bunch, Chief, United Keetoowah Band of Cherokee Indians Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3032023-11-13013 November 2023 Letter to W. Yargee, Chief, Alabama-Quassarte Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2882023-11-13013 November 2023 Letter to L. Johnson, Chief, Seminole Nation of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3012023-11-13013 November 2023 Letter to S. Yahola, Mekko, Kialegee Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2792023-11-13013 November 2023 Letter to B. Gonzalez, Chairman, Caddo Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3022023-11-13013 November 2023 Letter to T. Parton, President, Wichita and Affiliated Tribes Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2892023-11-13013 November 2023 Letter to L. Spottedbird, Chairman, Kiowa Indian Tribe Regarding Comanche Peak Draft Environmental Impact Statement ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23360A6312023-10-26026 October 2023 FEMA, Submittal of Radiological Emergency Preparedness Final Report for the Comanche Peak Nuclear Power Plant Medical Services Drill Evaluated on August 23, 2023 CP-202300416, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-10-12012 October 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300432, Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 42023-10-0404 October 2023 Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 4 ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23263A0242023-09-21021 September 2023 Revision of Schedule for the Environmental Review of the Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal Application 2024-01-31
[Table view] Category:Proprietary Information Review
MONTHYEARML23023A0012023-02-0202 February 2023 Request for Withholding Information from Public Disclosure ML16085A1482016-04-0606 April 2016 Request for Withholding Information from Public Disclosure - 3/14/16 Affidavit Executed by T. Mccool, Luminant Generation Company LLC Balance Sheets (Proprietary) ML16053A4462016-03-10010 March 2016 Request for Withholding Information from Public Disclosure, 2/10/16 Affidavit Executed by J. Gresham, Westinghouse Electric Company LLC LTR-PAFM-16-8 and LTR-PAFM-16-2-P, Revision 0, Relief Request 1B3-3 ML15351A0572016-01-19019 January 2016 Request for Withholding Information from Public Disclosure, Affidavit Dated 12/9/15 Executed by T. Mccool, Luminant Generation Company LLC Balance Sheets (CAC MF7075-MF7076) ML14192B0422014-08-21021 August 2014 Denial, Request for Withholding from Public Disclosure - 4/2/14 Affidavit Executed by J. Gresham, Westinghouse Enclosures 1 Through 3 Provided on Cds in Response to Request for Additional Information (TAC MF1099-1100) ML14150A1422014-06-30030 June 2014 Request for Withholding Information from Public Disclosure - 4/17/14 Affidavit Executed by J. Gresham, Westinghouse; Responses to Request for Additional Information SFP Configuration Interfaces (TAC MF1365-MF1366) ML14150A1382014-06-30030 June 2014 Request for Withholding Information from Public Disclosure - 7/12/13 Affidavit Executed by B. Maurer, Westinghouse; Supplemental Information Supporting Amendment Request Question 1, 2, and 4 (TAC MF1365-MF1366) ML14022A0462014-03-19019 March 2014 Request for Withholding Proprietary Information from Public Disclosure ML13318A0292014-03-19019 March 2014 Request for Withholding Information from Public Disclosure, 10/14/13 Affidavit Executed by J. Gresham, Westinghouse Regarding WCAP-17728-P, Revision 1 ML14007A0392014-02-0606 February 2014 Request for Withholding Information from Public Disclosure - 11/22/13 Affidavit Executed by J. Gresham, Westinghouse Responses to 11/5/13 NRC Requests for Additional Information ML13253A0062013-09-26026 September 2013 Request for Withholding Information from Public Disclosure, 3/18/13 Affidavit Executed by J. Gresham, Westinghouse Regarding WCAP-17728-P, Revision 0 ML12361A3462013-01-22022 January 2013 Request for Withholding Information from Public Disclosure, 11/26/12 Affidavit Executed by Fred Madden, Luminant Generation Co. LLC, Balance Sheets Included as Enclosure 1 ML12361A3542013-01-22022 January 2013 Request for Withholding Information from Public Disclosure, 12/5/12 Affidavit Executed by Fred Madden, Luminant Generation Co. LLC, Balance Sheets Included as Enclosure 1 ML12347A0842012-12-21021 December 2012 Request for Withholding Information from Public Disclosure, 10/11/12 Affidavit Executed by Fred Madden, Luminant Generation Co. LLC Balance Sheets Included as Enclosure 1, Exhibit D ML1034705962011-01-10010 January 2011 Request for Withholding Information from Public Disclosure, 12/5/2010 Affidavit Executed by J. Gresham, Westinghouse, WCAP-17330-P ML0926703042009-10-16016 October 2009 Request for Withholding Information from Public Disclosure, 5/21/2009 Affidavit Executed by J. Gresham, Westinghouse ML0925103102009-09-25025 September 2009 Request for Withholding Information from Public Disclosure ML0921201322009-08-13013 August 2009 Request for Clarification on Request for Withholding Information from Public Disclosure, 5/21/2009 Affidavit Executed by J. Gresham, Westinghouse ML0903707802009-03-27027 March 2009 Request for Withholding Information from Public Disclosure ML0821305092008-08-25025 August 2008 Request for Withholding Information from Public Disclosure, Affidavit Dated 6/26/08, Executed by R. Sisk, Westinghouse ML0806602512008-03-12012 March 2008 Request for Withholding Information from Public Disclosure (Re 2/20/08 Affidavit Executed by J. Gresham, Westinghouse) (Tac Nos. MD6615 and MD6616) ML0801501112008-01-28028 January 2008 Units and 2 - Request for Withholding Proprietary Information, J. Gresham, Westinghouse Electric Company LLC Affidavit Dated 12/11/2007, Regarding LAR 07-006 ML0731300292007-11-20020 November 2007 Request for Withholding Information from Public Disclosure Power Stretch Uprate (C. Savage, Westinghouse 10/23/07 Affidavit) ML0728200252007-11-0606 November 2007 Request for Withholding Information from Public Disclosure WCAP-16827-P (Tac Nos. MD6615 and MD6616) ML0728200122007-11-0606 November 2007 Request for Withholding Information from Public Disclosure Proprietary Request for Stretch Power Uprate Information (Tac Nos. MD6615 and MD6616) ML0716300022007-06-19019 June 2007 Request for Withholding Information from Public Disclosure - Txu Generation Company LP and Tx Energy Future Holdings LP Affidavits ML0412110232004-04-27027 April 2004 Withholding from Public Disclosure, Attachment 6A to TXX-03187, Topical Report Applicability Determination ML0329404712003-10-20020 October 2003 Request for Withholding Information from Public Disclosure Concerning Westinghouse Proprietary Letter WPT-16357 and Drawing 1061E26, Sheet 1, Rev. B and Sheet 2, Rev -, MB7684 ML0315702862003-06-0404 June 2003 Txu Energy, Comanche Peak, Unit 1, Withholding from Public Disclosure, Westinghouse Report SG-SGDA-02-43-P & Westinghouse Report SG-SGDA-03-03-P, MB8456 ML0312802562003-05-0808 May 2003 Withholding from Public Disclosure Proprietary Westinghouse Letter WPT-16357 & Westinghouse Proprietary Drawing 1061E26, Sheet 1, Revision B, and Sheet 2, Revision, MB7984 & MB7985 ML0128404092002-01-16016 January 2002 Withholding from Public Disclosure, Proprietary Topical Report ERX-2001-005-P, Zirlo Cladding & Boron Coating Models for Txu Electric'S Loss of Coolant Accident Analysis Methodologies. 2023-02-02
[Table view] |
Text
January 28, 2008 Mr. M. R. Blevins Senior Vice President
& Chief Nuclear Officer Luminant Generation Company, LLC ATTN: Regulatory Affairs P.O. Box 1002 Glen Rose, TX 76043
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NOS. MD6561 AND MD6562)
Dear Mr. Blevins:
By letter dated December 13, 2007, Mr. Fred W. Madden, Director, Oversight and Regulatory Affairs, Luminant Generation Company LLC (the licensee), submitted an affidavit, executed by Mr. J. A. Gresham, Manager, Regulatory Compliance and Plant Licensing, for Westinghouse Electric Company LLC (Westinghouse), dated December 11, 2007, requesting that the information designated as proprietary in the response to request for additional information associated with the Technical Specifications revision to reflect cycle-specific safety analysis assumptions regarding adoption of Westinghouse methodologies, be withheld from the public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 390. The response to request for additional information and the Westinghouse letter were Attachment 1 and Enclosure, respectively, to the licensees letter dated December 13, 2007.
The December 11, 2007, affidavit by Mr. J. A. Gresham stated that the submitted information should be considered exempt from the mandatory public disclosure for the following reasons:
(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
M. R. Blevins A non-proprietary copy of the document, provided as Attachment 3 to the letter dated December 13, 2007, has been placed in the Nuclear Regulatory Commissions (NRCs) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at (301) 415-3016.
Sincerely,
/RA/
Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-445 and 50-446 cc: See next page
M. R. Blevins A non-proprietary copy of the document, provided as Attachment 3 to the letter dated December 13, 2007, has been placed in the Nuclear Regulatory Commissions (NRCs) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at (301) 415-3016.
Sincerely,
/RA/
Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-445 and 50-446 cc: See next page DISTRIBUTION:
PUBLIC RidsNrrDorlLpl4 RidsOgcRp LPLIV Reading RidsNrrDeEicb (Kemper) RidsRgn4MailCenter RidsAcrsAcnwMailCenter RidsNrrPMBSingal BMarcus, DE/EICB RidsNrrDorlDpr RidsNrrLAJBurkhardt ADAMS Accession No. ML080150111 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/DE/EICB NRR/LPL4/BC NAME BSingal JBurkhardt WKemper MCThadani for THiltz DATE 1-22-08 1/22/08 1-25-08 1/28/2008 OFFICIAL AGENCY RECORD
Comanche Peak Steam Electric Station (10/2007) cc:
Senior Resident Inspector Mr. Richard A. Ratliff, Chief U.S. Nuclear Regulatory Commission Bureau of Radiation Control P.O. Box 2159 Texas Department of Health Glen Rose, TX 76403-2159 1100 West 49th Street Austin, TX 78756-3189 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Mr. Brian Almon 611 Ryan Plaza Drive, Suite 400 Public Utility Commission Arlington, TX 76011 William B. Travis Building P.O. Box 13326 Mr. Fred W. Madden, Director 1701 North Congress Avenue Regulatory Affairs Austin, TX 78701-3326 Luminant Generation Company LLC P.O. Box 1002 Ms. Susan M. Jablonski Glen Rose, TX 76043 Office of Permitting, Remediation and Registration Timothy P. Matthews, Esq. Texas Commission on Environmental Morgan Lewis Quality 1111 Pennsylvania Avenue, NW MC-122 Washington, DC 20004 P.O. Box 13087 Austin, TX 78711-3087 County Judge P.O. Box 851 Anthony P. Jones Glen Rose, TX 76043 Chief Boiler Inspector Texas Department of Licensing Environmental and Natural and Regulation Resources Policy Director Boiler Division Office of the Governor E.O. Thompson State Office Building P.O. Box 12428 P.O. Box 12157 Austin, TX 78711-3189 Austin, TX 78711