CPSES-200701495, Withdrawal of License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits
ML073030536 | |
Person / Time | |
---|---|
Site: | Comanche Peak |
Issue date: | 10/22/2007 |
From: | Blevins M, Madden F Luminant Generation Co, Luminant Power |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
CPSES-200701495, LAR 06-007, TXX-07139 | |
Download: ML073030536 (2) | |
Similar Documents at Comanche Peak | |
---|---|
Category:Letter type:CPSES
MONTHYEARCPSES-201001000, Operator Licensing Examination Data, Form 5362010-07-28028 July 2010
[Table view]Operator Licensing Examination Data, Form 536 CPSES-200901377, Operator Licensing Examination Data2009-09-29029 September 2009 Operator Licensing Examination Data CPSES-200701127, Response to Request for Additional Information Related to License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times.2007-11-15015 November 2007 Response to Request for Additional Information Related to License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times. CPSES-200701495, Withdrawal of License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits2007-10-22022 October 2007 Withdrawal of License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits CPSES-200701530, Additional Information in Connection with the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments2007-10-0909 October 2007 Additional Information in Connection with the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments CPSES-200701496, Information Required by Order Approving the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments2007-10-0202 October 2007 Information Required by Order Approving the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments CPSES-200701351, Transmittal of First-Half 2007 Fitness-for-Duty Program Performance Data2007-08-29029 August 2007 Transmittal of First-Half 2007 Fitness-for-Duty Program Performance Data CPSES-200701076, Revision to the Operating License and Technical Specifications 1.0, Use and Application and 3.7.17, Spent Fuel Assembly Storage to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt2007-08-28028 August 2007 Revision to the Operating License and Technical Specifications 1.0, Use and Application and 3.7.17, Spent Fuel Assembly Storage to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt CPSES-200701302, Relief Request B-4 to the Unit 2 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date - August 03, 2004, Second Interval)2007-08-22022 August 2007 Relief Request B-4 to the Unit 2 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date - August 03, 2004, Second Interval) CPSES-200701324, Supplement to License Amendment Request (LAR) 07-003 Revision to Technical Specification 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, and 5.6.5 B, Core Operating Limits2007-08-16016 August 2007 Supplement to License Amendment Request (LAR) 07-003 Revision to Technical Specification 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, and 5.6.5 B, Core Operating Limits CPSES-200701323, License Amendment Request 07-006, Revision to Technical Specification 3.1.4, Rod Group Alignment Limits, Table 3.3.1-1, Reactor Trip System Instrumentation, Table 3.3.2-1, Engineered Safety Feature Actuation System..2007-08-16016 August 2007 License Amendment Request 07-006, Revision to Technical Specification 3.1.4, Rod Group Alignment Limits, Table 3.3.1-1, Reactor Trip System Instrumentation, Table 3.3.2-1, Engineered Safety Feature Actuation System.. CPSES-200701279, Mitigation of Alloy 82/182 Pressurizer Butt Welds in 20082007-08-0303 August 2007 Mitigation of Alloy 82/182 Pressurizer Butt Welds in 2008 CPSES-200701284, (Cpses), Operator Licensing Examination Data2007-08-0202 August 2007 (Cpses), Operator Licensing Examination Data CPSES-200701238, Submittal of the CPSES Units 1 and 2 Large and Small Break LOCA Analyses2007-07-31031 July 2007 Submittal of the CPSES Units 1 and 2 Large and Small Break LOCA Analyses CPSES-200701178, Supplement to Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change (TAC Nos. MD5289 and MD5280), Enclosures 1, 4, 5, 6 & 72007-07-20020 July 2007 Supplement to Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change (TAC Nos. MD5289 and MD5280), Enclosures 1, 4, 5, 6 & 7 CPSES-200701126, Response to Request for Additional Information to License Amendment Request (LAR) 06-007 Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits2007-07-18018 July 2007 Response to Request for Additional Information to License Amendment Request (LAR) 06-007 Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits CPSES-200701174, Submittal of Twelfth Refueling Outage (1RF12) Inservice Inspection Summary Report (1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - 08/03/2000, Second Interval)2007-07-17017 July 2007 Submittal of Twelfth Refueling Outage (1RF12) Inservice Inspection Summary Report (1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - 08/03/2000, Second Interval) CPSES-200701065, Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.2007-06-21021 June 2007 Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients. CPSES-200700951, (Cpses), Unit 1, Pressurizer Weld Overlay 60 Day Report and Update for Unit 1 Reactor Pressure Vessel Head Replacement Regarding Revised Order EA-03-0092007-06-19019 June 2007 (Cpses), Unit 1, Pressurizer Weld Overlay 60 Day Report and Update for Unit 1 Reactor Pressure Vessel Head Replacement Regarding Revised Order EA-03-009 CPSES-200701059, Submittal of Startup Report, Cycle 132007-06-13013 June 2007 Submittal of Startup Report, Cycle 13 CPSES-200700738, License Amendment Request (LAR) 07-001 Revision to Technical Requirements Surveillance 13.3.33.2 Frequency for the Turbine Stop and Control Valves2007-05-22022 May 2007 License Amendment Request (LAR) 07-001 Revision to Technical Requirements Surveillance 13.3.33.2 Frequency for the Turbine Stop and Control Valves CPSES-200700915, Supplemental Response to Request for Information on Generic Letter 2003-01, Control Room Habitability2007-05-0707 May 2007 Supplemental Response to Request for Information on Generic Letter 2003-01, Control Room Habitability CPSES-200700871, Transmittal of Year 2006 Radioactive Effluent Release Report2007-04-30030 April 2007 Transmittal of Year 2006 Radioactive Effluent Release Report CPSES-200700859, Submittal of the Annual Non-Radiological Environmental Operating Report for 20062007-04-27027 April 2007 Submittal of the Annual Non-Radiological Environmental Operating Report for 2006 CPSES-200700517, Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change2007-04-18018 April 2007 Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change CPSES-200700719, Nuclear Liability Insurance2007-04-10010 April 2007 Nuclear Liability Insurance CPSES-200700605, License Amendment Request (LAR) 07-003, Revision to Technical Specifications 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, & 5.6.5b, Core Operating Limits Report2007-04-10010 April 2007 License Amendment Request (LAR) 07-003, Revision to Technical Specifications 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, & 5.6.5b, Core Operating Limits Report CPSES-200700708, Evaluation of Pressurizer Weld Overlay Confirmatory Analyses2007-04-0505 April 2007 Evaluation of Pressurizer Weld Overlay Confirmatory Analyses CPSES-200700691, Core Operating Limits Report, Cycle 132007-04-0404 April 2007 Core Operating Limits Report, Cycle 13 CPSES-200700663, Transmittal of the Annual Radiological Environmental Operating Report for 20062007-03-30030 March 2007 Transmittal of the Annual Radiological Environmental Operating Report for 2006 CPSES-200700607, Property Damage Insurance2007-03-29029 March 2007 Property Damage Insurance CPSES-200700606, Decommissioning Report2007-03-29029 March 2007 Decommissioning Report CPSES-200700573, Request to Withdraw Relief Request A-72007-03-22022 March 2007 Request to Withdraw Relief Request A-7 CPSES-200700571, Supplement to License Amendment Request (LAR) 05-06; Revision to Technical Specification 5.6.5 Revise Listing of LOCA and Non-LOCA Analysis Methodologies (TAC Nos. MD0185/0186)2007-03-19019 March 2007 Supplement to License Amendment Request (LAR) 05-06; Revision to Technical Specification 5.6.5 Revise Listing of LOCA and Non-LOCA Analysis Methodologies (TAC Nos. MD0185/0186) CPSES-200700515, Day Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.2007-03-0909 March 2007 Day Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients. CPSES-200700454, Transmittal of Second-Half 2006 Fitness-For-Duty Program Performance Data2007-02-28028 February 2007 Transmittal of Second-Half 2006 Fitness-For-Duty Program Performance Data CPSES-200700451, Annual Operating Report for 20062007-02-28028 February 2007 Annual Operating Report for 2006 CPSES-200700422, Response to Request for Additional Information Related to Txu Power'S Request for Review of Previously Submitted Topical Reports2007-02-22022 February 2007 Response to Request for Additional Information Related to Txu Power'S Request for Review of Previously Submitted Topical Reports CPSES-200700414, Transmittal of Inservice Inspection Program Plan, Revision 5 (Unit 1: ASME Code Section XI 1998 Edition, 1999 and 2000 Addenda, Interval Start Date - 08/13/200, Second Interval)2007-02-22022 February 2007 Transmittal of Inservice Inspection Program Plan, Revision 5 (Unit 1: ASME Code Section XI 1998 Edition, 1999 and 2000 Addenda, Interval Start Date - 08/13/200, Second Interval) CPSES-200700391, Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds2007-02-20020 February 2007 Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds CPSES-200700346, Guarantees of Payment of Deferred Premiums, Submits Form 10-Q for the Period Ending September 30, 20062007-02-0808 February 2007 Guarantees of Payment of Deferred Premiums, Submits Form 10-Q for the Period Ending September 30, 2006 CPSES-200700229, Comanche, Response to Request for Additional Information, Relief Request B-6 for the Unit 1 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date..2007-02-0202 February 2007 Comanche, Response to Request for Additional Information, Relief Request B-6 for the Unit 1 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date.. CPSES-200700169, Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds2007-01-30030 January 2007 Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds CPSES-200700147, Response to Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power2007-01-29029 January 2007 Response to Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power CPSES-200700127, Submittal of Unit 2 Ninth Refueling Outage (2RF09) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI, Through 2000 Addenda, Interval Start Date - August 3, 2004, Second Interval)2007-01-24024 January 2007 Submittal of Unit 2 Ninth Refueling Outage (2RF09) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI, Through 2000 Addenda, Interval Start Date - August 3, 2004, Second Interval) CPSES-200700146, License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits2007-01-18018 January 2007 License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits CPSES-200700130, License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators2007-01-18018 January 2007 License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators CPSES-200700099, Annual Report of Changes in Peak Cladding Temperature2007-01-10010 January 2007 Annual Report of Changes in Peak Cladding Temperature CPSES-200602339, License Amendment Request (LAR) 06-010, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program.2006-12-19019 December 2006 License Amendment Request (LAR) 06-010, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program. CPSES-200602340, License Amendment Request (LAR) 06-012, Revision to Technical Specification 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources - Operating, & TS 3.8.9, Distribution Systems - Operating.2006-12-19019 December 2006 License Amendment Request (LAR) 06-012, Revision to Technical Specification 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources - Operating, & TS 3.8.9, Distribution Systems - Operating. 2010-07-28 Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50 MONTHYEARCP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 12024-01-31031 January 2024
[Table view]License Renewal Application Revision 0 - Supplement 3, Revision 1 ML24023A0242024-01-24024 January 2024 Correction to Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident Methodology CP-202300494, License Renewal Application Revision 0, Supplement 32023-12-0606 December 2023 License Renewal Application Revision 0, Supplement 3 CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation2023-11-20020 November 2023 License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation CP-202300293, (CPNPP) - License Amendment Request Proposing Changes to Technical Specifications to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days2023-09-14014 September 2023 (CPNPP) - License Amendment Request Proposing Changes to Technical Specifications to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300165, License Renewal Application Revision 0 - Supplement 22023-04-24024 April 2023 License Renewal Application Revision 0 - Supplement 2 CP-202300096, License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems Requirements2023-04-20020 April 2023 License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems Requirements CP-202300140, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors. LAR 23-0012023-04-19019 April 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors. LAR 23-001 CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-14014 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300135, License Renewal Application Revision 0 - Supplement 12023-04-0606 April 2023 License Renewal Application Revision 0 - Supplement 1 CP-202200380, (CPNPP) - Non-Voluntary License Amendment Request to Revise Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications2022-11-21021 November 2022 (CPNPP) - Non-Voluntary License Amendment Request to Revise Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications CP-202200355, Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-0022022-11-21021 November 2022 Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-002 CP-202200350, Facility Operating License Numbers NPF-87 and NPF-89 - License Renewal Application - Appendix E, Environmental Report2022-10-0303 October 2022 Facility Operating License Numbers NPF-87 and NPF-89 - License Renewal Application - Appendix E, Environmental Report ML22192A0072022-08-22022 August 2022 Issuance of Amendment Nos. 183 and 183 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2 CP-202200273, Third Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative2022-07-20020 July 2022 Third Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative CP-202200006, (CPNPP) - Second Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended.2022-02-17017 February 2022 (CPNPP) - Second Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended. CP-202200075, Third Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2022-02-15015 February 2022 Third Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections CP-202100575, (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2021-08-31031 August 2021 (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections CP-202100251, (CPNPP) - Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2021-07-27027 July 2021 (CPNPP) - Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections CP-202100394, Supplement to License Amendment Request (LAR) 20-0062021-07-13013 July 2021 Supplement to License Amendment Request (LAR) 20-006 CP-202100065, Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-05-11011 May 2021 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b CP-202000585, (CPNPP) - Supplement to License Amendment Request (LAR) 20-005, Revision to Technical Specification (TS) 3.6.8, Containment Sump2021-01-27027 January 2021 (CPNPP) - Supplement to License Amendment Request (LAR) 20-005, Revision to Technical Specification (TS) 3.6.8, Containment Sump CP-202000584, (CPNPP) - Supplement to License Amendment Request (LAR) 15-001, Revision to Technical Specification (TS) 3.8.l, AC SOURCES-OPERATING2020-12-0909 December 2020 (CPNPP) - Supplement to License Amendment Request (LAR) 15-001, Revision to Technical Specification (TS) 3.8.l, AC SOURCES-OPERATING CP-202000575, (CPNPP) - Exigent License Amendment Request (LAR) 20-007 Revision to Technical Specification (TS) 3.7.8, Station Service Water System and TS 3.8.1, AC Sources - Operating2020-11-19019 November 2020 (CPNPP) - Exigent License Amendment Request (LAR) 20-007 Revision to Technical Specification (TS) 3.7.8, Station Service Water System and TS 3.8.1, AC Sources - Operating CP-202000365, Luminant, Comamche Leak Nuclear Power Plant, License Amendment Request 20-005, New Technical Specification 3.6.8, Containment Sump2020-08-31031 August 2020 Luminant, Comamche Leak Nuclear Power Plant, License Amendment Request 20-005, New Technical Specification 3.6.8, Containment Sump CP-202000401, (CPNPP) - Supplement to Exigent License Amendment Request (LAR) 20-002, Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water2020-07-28028 July 2020 (CPNPP) - Supplement to Exigent License Amendment Request (LAR) 20-002, Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water CP-202000388, (CPNPP) - Supplement to Exigent License Amendment Request (LAR) 20-002, Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water2020-07-16016 July 2020 (CPNPP) - Supplement to Exigent License Amendment Request (LAR) 20-002, Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water CP-202000321, (CPNPP) - License Amendment Request (LAR) 20-001 Technical Specification (TS) 1.1, Definitions - ESP & RTS Response Time2020-07-0202 July 2020 (CPNPP) - License Amendment Request (LAR) 20-001 Technical Specification (TS) 1.1, Definitions - ESP & RTS Response Time CP-202000305, (CPNPP) - Exigent License Amendment Request (LAR) 20-002 Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water2020-06-24024 June 2020 (CPNPP) - Exigent License Amendment Request (LAR) 20-002 Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water TXX-2002, Exigent License Amendment Request (LAR) 20-003 Revision to Technical Specification (TS) 5.5.9, Unit 1 Model D76 and Unit 2 Model D5 Steam Generator Program2020-04-10010 April 2020 Exigent License Amendment Request (LAR) 20-003 Revision to Technical Specification (TS) 5.5.9, Unit 1 Model D76 and Unit 2 Model D5 Steam Generator Program CP-201900368, Revision to Technical Specifications 3.8.1, AC Sources - Operating2020-03-31031 March 2020 Revision to Technical Specifications 3.8.1, AC Sources - Operating CP-202000016, Editorial Correction to License Amendment Request (LAR) 19-002 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program.2020-01-16016 January 2020 Editorial Correction to License Amendment Request (LAR) 19-002 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. CP-201900393, License Amendment Request (LAR) 19-001, Application to Adopt TSTF-513-A, Revision 3, PWR Operability Requirements and Actions for RCS Leakage Instrumentation2019-11-0707 November 2019 License Amendment Request (LAR) 19-001, Application to Adopt TSTF-513-A, Revision 3, PWR Operability Requirements and Actions for RCS Leakage Instrumentation CP-201900415, License Amendment Request (LAR) 19-002, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-11-0707 November 2019 License Amendment Request (LAR) 19-002, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program CP-201800115, License Amendment Request 17-001 Revision to Technical Specification 3.3.2. ESFAS Instrumentation2018-03-29029 March 2018 License Amendment Request 17-001 Revision to Technical Specification 3.3.2. ESFAS Instrumentation ML17074A4942017-04-13013 April 2017 Issuance of Amendment Nos. 168 and 168 Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML16351A2002016-12-14014 December 2016 Submittal of License Amendment Request 16-003, Administrative Change to License Name CP-201600216, License Amendment Request 16-001, Application to Revise Technical Specifications to Adopt TSF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 Testing.2016-04-27027 April 2016 License Amendment Request 16-001, Application to Revise Technical Specifications to Adopt TSF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 Testing. CP-201501062, ISFSI - Application for Order Approving Transfer of Licenses and Conforming License Amendments2015-11-12012 November 2015 ISFSI - Application for Order Approving Transfer of Licenses and Conforming License Amendments CP-201400165, (CPNPP) - Redacted Version of License Amendment Request (LAR) 13-003, for Approval of the Revised CPNPP Cyber Security Plan Implementation Schedule2014-02-0404 February 2014 (CPNPP) - Redacted Version of License Amendment Request (LAR) 13-003, for Approval of the Revised CPNPP Cyber Security Plan Implementation Schedule CP-201301322, License Amendment Request (LAR) 13-003, for Approval of the Revised CPNPP Cyber Security Plan Implementation Schedule2013-11-21021 November 2013 License Amendment Request (LAR) 13-003, for Approval of the Revised CPNPP Cyber Security Plan Implementation Schedule CP-201301065, Revision to Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process2013-08-29029 August 2013 Revision to Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process CP-201300738, License Amendment Request 13-002, Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item..2013-07-10010 July 2013 License Amendment Request 13-002, Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item.. CP-201300257, License Amendment Request (LAR) 13-01, Revision to Technical Specifications 3.7.16, Fuel Storage Pool Boron Concentration, 3.7.17, Spent Fuel Assembly Storage, 4.3, Fuel Storage, and 5.5 Programs & Manuals.2013-03-28028 March 2013 License Amendment Request (LAR) 13-01, Revision to Technical Specifications 3.7.16, Fuel Storage Pool Boron Concentration, 3.7.17, Spent Fuel Assembly Storage, 4.3, Fuel Storage, and 5.5 Programs & Manuals. CP-201300083, License Amendment Request 12-06, Revision to Technical Specifications 3.7.16, Fuel Storage Pool Boron Concentration, 3.7.17, Spent Fuel Assembly Storage and 5.5 Programs and Manuals.2013-01-15015 January 2013 License Amendment Request 12-06, Revision to Technical Specifications 3.7.16, Fuel Storage Pool Boron Concentration, 3.7.17, Spent Fuel Assembly Storage and 5.5 Programs and Manuals. CP-201200518, License Amendment Request (LAR) 12-004, Revision to Technical Specification 3.8.1, Ac Sources - Operating, for Two, 14-Day Completion Times for Offsite Circuits2012-10-0202 October 2012 License Amendment Request (LAR) 12-004, Revision to Technical Specification 3.8.1, Ac Sources - Operating, for Two, 14-Day Completion Times for Offsite Circuits CP-201200552, License Amendment Request (LAR) 2012-001, Revision to Technical Specification 5.7, High Radiation Area and Technical Specifications Table 3.3.3-12012-07-12012 July 2012 License Amendment Request (LAR) 2012-001, Revision to Technical Specification 5.7, High Radiation Area and Technical Specifications Table 3.3.3-1 CP-201200012, (Cpnpp), Revision to Technical Specification (TS) 5.5.9, Unit 1 D76 and Unit 2 D5 Steam Generator (SG) Program, and TS 5.6.9, Unit 1 D76 and Unit 2 D5 Steam Generator Tube Inspection Report, for a Permanent ....2012-03-28028 March 2012 (Cpnpp), Revision to Technical Specification (TS) 5.5.9, Unit 1 D76 and Unit 2 D5 Steam Generator (SG) Program, and TS 5.6.9, Unit 1 D76 and Unit 2 D5 Steam Generator Tube Inspection Report, for a Permanent .... CP-201101038, License Amendment Request (LAR) 11-001, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled2011-08-0101 August 2011 License Amendment Request (LAR) 11-001, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled 2024-01-31 |
Text
Mike Blevins Luminant Power Senior Vice President P 0 Box 1002 u & Chief Nuclear Officer Mike. Blevins@Luminant.com 6322 North FM 56 Glen Rose, TX 76043 LuNminant T 254 897 5209 C 817 559 9085 F 254 897 6652 CPSES-200701495 Ref. # 10 CFR 50.90 Log # TXX-07139 October 22, 2007 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) DOCKET NOS. 50-445 AND 50-446, WITHDRAWAL OF LICENSE AMENDMENT REQUEST (LAR)06-007, REVISION TO TECHNICAL SPECIFICATION (TS) 3.8.1, "AC SOURCES -
OPERATING," EXTENSION OF COMPLETION TIMES FOR OFFSITE CIRCUITS
REFERENCE:
- 1. TXU Power letter, logged TXX-07012, from Mike Blevins to the NRC dated January 18, 2007
- 2. Email from Mohan Thadani (NRC) dated June 19, 2007.
- 3. Email from Mohan Thadani (NRC) dated July 3, 2007.
- 4. Luminant Power letter, logged TXX-07109, from Mike Blevins to the NRC dated July 18, 2007
- 5. Letter to Mike Blevins (Luminant Power) from John W. Lubinski (NRC) dated September 24, 2007, "Comanche Peak Steam Electric Station, Units 1 and 2 -
Supplemental Request for Additional Information Regarding License Amendment Request (LAR 06-07), Revision to Technical Specifications 3.8.1, "AC Sources - Operating," Extension of Completion Time for Offsite Circuits (TAC NOS. MD4068 and MD4069)
Dear Sir or Madam:
Reference I requested the Completion Time for offsite circuits be extended from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 30 days for Comanche Peak Steam Electric Station (CPSES). References 2 and 3 contained requests for addition information regarding Reference 1. Reference 4 is Luminant Generation Company LLC (Luminant Power, previously known as .TXU Power) combined response to the two NRC requests for additional information (RAI). In Reference 5, the NRC identified additional information needed for the staff's review. Further, the NRC staff requested CPSES to respond within 30 days in order for the NRC to complete the review and reach a final safety decision in a timely manner.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak - Diablo Canyon ' Palo Verde ' South Texas Project
- Wolf Creek
U. S. Nuclear Regulatory Commission TXX-07139 Page 2 10/18/2007 CPSES is currently evaluating alternatives to better utilize the spare startup transformer and for alternate AC power sources. Therefore, Luminant Power requests to withdraw LAR 06-007 until these evaluations are complete.
This communication contains no new or revised commitments.
Should you have any questions, please contact Ms. Tamera J. Ervin at (254) 897-6902.
I state under penalty of perjury that the foregoing is true and correct.
Executed on October 22, 2007 Sincerely, Luminant Generation Company LLC Mike Blevins By:
By re'~d W. Madden Director, Oversight & Regulatory Affairs c - E. E. Collins, Region IV B. K. Singal, NRR C. F. Lyon, NRR Resident Inspectors, CPSES Ms. Alice Rogers Environmental & Consumer Safety Section Texas Department of State Health Services 1100 West 49th Street Austin, Texas 78756-3189