Letter Sequence Other |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance
- Supplement, Supplement
Results
Other: ML062960009, ML063040075, ML063050355, ML063050363, ML063050370, ML063050590, ML063050595, ML063050608, ML063100474, ML063470607, ML070320537, ML070320542, ML070320564, ML070320567, ML070320592, ML070320601, ML070320605, ML070320657, ML070320662, ML070320667, ML070320671, ML070320676, ML070320680, ML070320719, ML070320721, ML070320728, ML070320733, ML070320740, ML070320745, ML070320756, ML070320784, ML070320787, ML070320791, ML070320802, ML070320803, ML070320806, ML070570480, ML070590453, ML070590456, ML070610479, ML070710153, ML070710154, ML070710155, ML070710159, ML070710161, ML070720347, ML070800414, ML070800420, ML070800423, ML070800434... further results
|
MONTHYEARML0802302892002-12-31031 December 2002 Pennsylvania Bureau of Radiation Protection, Environmental Radiation in Pennsylvania: 2001-2002 Annual Report Project stage: Other ML0802804772002-12-31031 December 2002 Information on Haliaeetus Leucocephalus - Bald Eagle Project stage: Other ML0802303352003-05-31031 May 2003 Lackawanna-Luzerne Counties, Long Range Transportation Plan for the Lackawanna-Luzeme Transportation Study Area (2003-2025). Project stage: Other ML0802303182004-02-24024 February 2004 Pennsylvania Game Commission, C. Fergus, Wood Warblers. Project stage: Other ML0802204462004-07-22022 July 2004 U.S. Census Bureau. Pennsylvania Quickfacts: Columbia County Project stage: Other ML0802204452004-07-22022 July 2004 U.S. Census Bureau - Pennsylvania Quickfacts Luzerne County Project stage: Other ML0802303142004-07-26026 July 2004 Pennsylvania Department of Transportation, Traffic Volume Maps, Luzerne and Columbia Counties, 2002 Project stage: Other ML0802303242004-07-27027 July 2004 U.S. Environmental Protection Agency, Local Drinking Water Information - Pennsylvania Drinking Water Project stage: Other ML0802204562004-08-18018 August 2004 Riverlands Environmental Preserve - General Information Project stage: Other ML0802302562004-11-10010 November 2004 King'S College, the Pennsylvania Marketing and Planning Center, Excerpts Project stage: Other ML0802303322005-03-31031 March 2005 U.S. Environmental Protection Agency, Brownfields Cleanup and Redevelopment: Brownfields Cleanup Revolving Loan Fund Pilot Fact Sheet on Luzerne County, PA Project stage: Other ML0802303262005-10-12012 October 2005 Centers for Disease Control & Prevention, Legionellosis: Legionnaires' Disease (Ld) and Pontiac Fever. Project stage: Other ML0802303172005-12-0606 December 2005 Pennsylvania Department of Environmental Protection, Standards for Cleanup, Reuse of Hazleton Mine Reclamation Project Project stage: Other ML0802303342005-12-31031 December 2005 River Basin Commission, Susquehanna River Basin Commission Gis Program., Excerpt, Middle Susquehanna Subbasin. Project stage: Other ML0623501472006-08-15015 August 2006 Monthly Operating Reports Project stage: Request ML0626201572006-09-13013 September 2006 Application for Renewed Operating Licenses Project stage: Request ML0626904702006-09-14014 September 2006 August 2006 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 and 2 Project stage: Request ML0703206572006-10-0303 October 2006 Email from Allison Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703208032006-10-0303 October 2006 Email from Nash Regarding Consultation Letters on American Shad in the Susquehanna River Project stage: Other ML0703206012006-10-0505 October 2006 E-mail from Metz Regarding the Susquehanna Steam Electric Station Data Assessment Project stage: Other ML0703206052006-10-0505 October 2006 Email from Moret Regarding the Susquehanna Steam Electric Station Category 1 & 2 Issues Project stage: Other ML0703207982006-10-0505 October 2006 Email from Klementowicz Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Acceptance Review ML0703206672006-10-0606 October 2006 E-mail from O'Rourke Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703206802006-10-0606 October 2006 Email from Avci Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703208002006-10-0606 October 2006 Email from Davis Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Acceptance Review ML0703205672006-10-0707 October 2006 E-mail from Vinikour Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703205922006-10-0909 October 2006 E-mail from Monette Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703206622006-10-0909 October 2006 E-Mail from Lazaro Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703206762006-10-0909 October 2006 E-mail from Lagory Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703208022006-10-0909 October 2006 Email from Monette to Mullins Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703205642006-10-0909 October 2006 Email from Wescott Regarding the Environmental Report (Er) Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other PLA-0061, September 2006 Monthly Operating Report for Susquehanna Steam Electric Station Units 1 and 22006-10-13013 October 2006 September 2006 Monthly Operating Report for Susquehanna Steam Electric Station Units 1 and 2 Project stage: Request ML0703208062006-10-16016 October 2006 Acceptance Review Checklist from Mullins Regarding the Susquehanna Steam Electric Station Environmental Report Project stage: Other ML0629600792006-10-24024 October 2006 Maintenance of Reference Materials at the Mill Memorial Library, Related to the Review of the Susquehanna Steam Electric Station License Renewal Application Project stage: Approval ML0629600602006-10-26026 October 2006 Maintenance of Reference Materials at the Berwick Public Library, Related to the Review of the Susquehanna Steam Electric Station License Renewal Application Project stage: Approval ML0703206712006-10-31031 October 2006 E-mail from Quinn Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0629600492006-11-0101 November 2006 50 Mile Vicinity Map Project stage: Request ML0629600092006-11-0101 November 2006 License Renewal Application Review (Shpo No. 05-1588-079-A) Project stage: Other PLA-6133, Acceptability and Sufficiency for Docketing - Application for Renewed Operating Licenses Numbers NPF-14 and NPF-222006-11-0202 November 2006 Acceptability and Sufficiency for Docketing - Application for Renewed Operating Licenses Numbers NPF-14 and NPF-22 Project stage: Request ML0703207842006-11-0606 November 2006 Email from Franovich Regarding Questions on Consultation Letters Project stage: Other ML0630503632006-11-14014 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Oneida Nation Wisconsin Project stage: Other ML0630503552006-11-14014 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Eastern Shawnee Tribe Oklahoma Project stage: Other ML0630505952006-11-14014 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Shawnee Tribe Project stage: Other ML0630505902006-11-14014 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Onondaga Nation - Gonyea Project stage: Other ML0630506082006-11-14014 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Mohican Nation Project stage: Other ML0630503702006-11-14014 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Shawnee Tribe Oklahoma Project stage: Other ML0633302792006-11-15015 November 2006 (Units 1 & 2) Afternoon Public Meeting Project stage: Meeting ML0633302812006-11-15015 November 2006 Transcript of Susquehanna Steam Electric Station (Units 1 and 2) Evening Public Meeting on November 15, 2006, Pages 1-46 Project stage: Meeting ML0632401502006-11-15015 November 2006 11/15/06 Environmental Scoping Meeting Slide Handouts Project stage: Request ML0630400752006-11-15015 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Tonawanda Band of Seneca Project stage: Other 2006-10-24
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23345A0682023-11-28028 November 2023 Technical Specification Bases, Manual PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) IR 05000387/20230032023-11-0303 November 2023 Integrated Inspection Report 05000387/2023003 and 05000388/2023003 PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML23291A1132023-10-12012 October 2023 Submittal of Revision 71 to Updated Final Safety Analysis Report and Revision 25 to Fire Protection Review Report ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23277A0412023-10-0505 October 2023 Notification of Commercial Grade Dedication Inspection (05000387/2024011 and 05000388/2024011) and Request for Information IR 05000387/20233012023-09-20020 September 2023 Initial Operator Licensing Examination Report 05000387/2023301 and 05000388/2023301 ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) IR 05000387/20230052023-08-31031 August 2023 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2023005 and 05000388/2023005) ML23228A1952023-08-21021 August 2023 Summary of August 10, 2023, Public Observation Meeting Re. Proposed Alternative PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval IR 05000387/20230022023-08-0101 August 2023 Integrated Inspection Report 05000387/2023002 and 05000388/2023002 ML23195A1852023-07-27027 July 2023 Correction to Technical Specifications Page 3.3-73 in Amendment No. 265 PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) ML23201A0152023-07-20020 July 2023 Operator Licensing Examination Approval ML23200A1012023-07-19019 July 2023 Notification of Conduct of a Fire Protection Team Inspection ML23193A0062023-07-12012 July 2023 Requalification Program Inspection PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 ML23163A1012023-06-12012 June 2023 10 CFR 50.46 Annual Report (Pla 8065) PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence IR 05000387/20234012023-06-0707 June 2023 Security Baseline Inspection Report 05000387/2023401 and 05000388/2023401 PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) ML23132A3212023-05-17017 May 2023 Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 285 and 269 Related to Order Approving Transfer of Licenses PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) IR 05000387/20230012023-05-12012 May 2023 Integrated Inspection Report 05000387/2023001 and 05000388/2023001 PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 ML23090A2302023-03-31031 March 2023 NRC Decommissioning Funding Status Report PLA-8049 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) ML23095A0572023-03-29029 March 2023 NRC Decommissioning Funding Status Report December 31, 2022 PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 ML23065A1962023-03-0202 March 2023 EN 56387 Paragon - Part 21 Report Re Defect Identified in Automatic Transfer Switch Pn: NLI-ATS480A400X1 IR 05000387/20220062023-03-0101 March 2023 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2022006 and 05000388/2022006) PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums IR 05000387/20220042023-02-0808 February 2023 Integrated Inspection Report 05000387/2022004 and 05000388/2022004 ML23010A0882023-01-15015 January 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Control Rod Technical Specifications 2024-02-07
[Table view] |
Text
July 12, 2007 Mr. Britt T. McKinney Sr. Vice President & Chief Nuclear Officer
PPL Susquehanna, LLC
769 Salem Boulevard
Berwick, PA 18603-0467
SUBJECT:
PROJECT MANAGER CHANGE FOR THE LICENSE RENEWAL SAFETY REVIEW FOR SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2, (TAC NOS. MD3021 AND MD3022)
Dear Mr. McKinney:
This letter is to inform you that effective i mmediately, NRC Safety Project Manager responsibility for the Susquehanna Steam Electric Station, Units 1 and 2, license renewal safety review is
transferred from Ms. Yoira K. Diaz-Sanabria to Ms. Evelyn Gettys.
All correspondence for the Project Manager should be sent to:
Ms. Evelyn Gettys, Project Manager License Renewal Branch A
Division of License Renewal
Office of Nuclear Reactor Regulation
U.S. Nuclear Regulatory Commission
Mail Stop O-11F1
Washington, DC 20555 Ms. Gettys may be reached at 301-415-4029 or via e-mail at ehg2@nrc.gov
.Sincerely,/RA/Louise Lund, Branch Chief License Renewal Branch A
Division of License Renewal
Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388
cc: See next page July 12, 2007
G:\ADRO\DLR\RLRA\Gettys\SSES Units 1 and 2OFFICEPM:RLRALA:DLRBC:RLRANAMEE. GettysS. FigueroaL. Lund DATE07/12/0707/11/ 0707/12/07
SUBJECT:
PROJECT MANAGER CHANGE FOR THE LICENSE RENEWAL SAFETY REVIEW FOR SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2, (TAC NOS. MD3021 AND MD3022)
DISTRIBUTION
- HARD COPY: DLR RF E-MAIL: PUBLIC SSmith (srs3)
SDuraiswamy
RidsNrrDlr
RidsNrrDlrRlra
RidsNrrDlrRlrb
RidsNrrDlrRlrc
RidsNrrDlrReba
RidsNrrDlrRebb
RidsNrrDci
RidsNrrDra
RidsNrrDe RidsNrrDeEemb
RidsNrrDeEeeb
RidsNrrDss
RidsOgcMailCenter
RidsNrrAdes
YDiaz RGuzman BRogers EGettys Susquehanna Steam Electric Station, Units 1 and 2 cc: Robert A. Saccone Vice President - Nuclear Operations
PPL Susquehanna, LLC
769 Salem Blvd., NUCSB3
Berwick, PA 18603-0467 Terry L. Harpster General Manager - Plant Support
PPL Susquehanna, LLC
769 Salem Blvd., NUCSA4
Berwick, PA 18603-0467 Rocco R. Sgarro Manager - Nuclear Regulatory Affairs
PPL Susquehanna, LLC
Two North Ninth Street, GENPL4
Allentown, PA 18101-1179 Walter E. Morrissey Supervising Engineer
Nuclear Regulatory Affairs
PPL Susquehanna, LLC
769 Salem Blvd., NUCSA4
Berwick, PA 18603-0467 Michael H. Crowthers Supervising Engineer
Nuclear Regulatory Affairs
PPL Susquehanna, LLC
Two North Ninth Street, GENPL4
Allentown, PA 18101-1179 Steven M. Cook Manager - Quality Assurance
PPL Susquehanna, LLC
769 Salem Blvd., NUCSB2
Berwick, PA 18603-0467 Luis A. Ramos Community Relations Manager,
Susquehanna
PPL Susquehanna, LLC
634 Salem Blvd., SSO
Berwick, PA 18603-0467 Bryan A. Snapp, Esq.
Associate General Counsel
PPL Services Corporation
Two North Ninth Street, GENTW3
Allentown, PA 18101-1179 Supervisor - Document Control Services PPL Susquehanna, LLC
Two North Ninth Street, GENPL4
Allentown, PA 18101-1179 Richard W. Osborne Allegheny Electric Cooperative, Inc.
212 Locust Street
P.O. Box 1266
Harrisburg, PA 17108-1266 Director, Bureau of Radiation Protection Pennsylvania Department of
Environmental Protection
Rachel Carson State Office Building
P.O. Box 8469
Harrisburg, PA 17105-8469 Senior Resident Inspector U.S. Nuclear Regulatory Commission
P.O. Box 35, NUCSA4
Berwick, PA 18603-0035 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission
475 Allendale Road
King of Prussia, PA 19406 Board of Supervisors Salem Township
P.O. Box 405
Berwick, PA 18603-0035 Susquehanna Steam Electric Station, Units 1 and 2 cc:-2-Dr. Judith Johnsrud National Energy Committee
Sierra Club
443 Orlando Avenue
State College, PA 16803 Ms. Julie Keys Nuclear Energy Institute
1776 I Street, NW, Suite 400
Washington, DC 20006-3708