May 3, 2007 LICENSEE:

FIRST ENERGY NUCLEAR OPERATING COMPANY (FENOC)

FACILITY:

BEAVER VALLEY UNITS 1 AND 2

SUBJECT:

SUMMARY

OF THE APRIL 2007 ANNUAL ASSESSMENT MEETING WITH FENOC On April 25, 2007, at 2:30 p.m., the NRC conducted an Annual Assessment Meeting with First Energy Nuclear Operating Company (FENOC) at the Emergency Response Facility in Shippingport, PA. The NRC requested the meeting with FENOC management to present NRCs assessment of the safety performance of the Beaver Valley Units 1 and 2 for the calendar year 2006.

A notice of licensee meeting was issued on April 9, 2007, and was posted on the NRCs external (public) web page (ADAMS Accession No. ML070851215).

The NRC presented and discussed its assessment of the safety performance of Beaver Valley Units 1 and 2 for the period of January 1 through December 31, 2006, as documented in our letter dated March 2, 2007 (ADAMS Accession No. ML070610477). The NRC presentation included background on the Reactor Oversight Process (ROP), Beaver Valleys assessment results, and an overview of planned inspections for the remainder of the year. The NRCs overall assessment was that FENOC operated Beaver Valley Units 1 and 2 in a manner that preserved public health and safety. During the meeting, FENOC stated they were in general agreement with NRCs assessment and discussed planned areas for improvement.

A number of local officials and FENOC employees observed this meeting and were offered the opportunity to question the NRC regarding FENOCs performance and the role of the agency in ensuring safe plant operations at the end of the meeting. The question and answer period accommodated all individuals who desired to speak or ask questions after the business portion of the meeting had been completed.

Sincerely,

/RA/

Ronald R. Bellamy, Chief Projects Branch 6 Division of Reactor Projects Attachments:

List of Attendees NRC Assessment Presentation - Final Slides

ML070851215).

The NRC presented and discussed its assessment of the safety performance of Beaver Valley Units 1 and 2 for the period of January 1 through December 31, 2006, as documented in our letter dated March 2, 2007 (ADAMS Accession No. ML070610477).

The NRC presentation included background on the Reactor Oversight Process (ROP), Beaver Valleys assessment results, and an overview of planned inspections for the remainder of the year. The NRCs overall assessment was that FENOC operated Beaver Valley Units 1 and 2 in a manner that preserved public health and safety. During the meeting, FENOC stated they were in general agreement with NRCs assessment and discussed planned areas for improvement.

A number of local officials and FENOC employees observed this meeting and were offered the opportunity to question the NRC regarding FENOCs performance and the role of the agency in ensuring safe plant operations at the end of the meeting. The question and answer period accommodated all individuals who desired to speak or ask questions after the business portion of the meeting had been completed.

Sincerely,

/RA/

Ronald R. Bellamy, Chief Projects Branch 6 Division of Reactor Projects Attachments:

List of Attendees NRC Assessment Presentation - Final Slides Distribution:

S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP R. Bellamy, DRP G. Barber, DRP P. Cataldo, DRP, Senior Resident Inspector D. Werkheiser, DRP, Resident Inspector P. Garrett - Resident OA J. Lamb, RI OEDO J. Lubinski, NRR N. Morgan, NRR R. Guzman, NRR M. Satorius, DRS-RIII (Only Inspection Reports)

ROPreports@nrc.gov (All Inspection Reports)

Region I Docket Room (with concurrences)

ML071370188 DOCUMENT NAME: D:DRP\\:Branch 6a\\ROP Assessment Folders\\ROP-7\\BV 2006 AA Meeting Summary_1.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME SBarber /AAR for RBellamy DATE 05/01/07 05/03 /07