MONTHYEARIR 05000352/20240122024-10-17017 October 2024 Commercial Grade Dedication Inspection Report 05000352/2024012 and 05000353/2024012 IR 05000352/20244202024-09-16016 September 2024 – Security Baseline Inspection Report 05000352/2024420 and 05000353/2024420 IR 05000352/20250102024-09-10010 September 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000352/2025010 and 05000353/2025010 IR 05000352/20230022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000352/2023002 and 05000353/2023002 IR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) IR 05000352/20240022024-08-12012 August 2024 Integrated Inspection Report 05000352/2024002 and 05000353/2024002 IR 05000352/20243022024-05-20020 May 2024 Revised Initial Operator Licensing Examination Report 05000352/2024302 and 05000353/2024302 IR 05000352/20240012024-05-0707 May 2024 Integrated Inspection Report 05000352/2024001 and 05000353/2024001 IR 05000352/20244012024-03-19019 March 2024 Security Baseline Inspection Report 05000352/2024401 and 05000353/2024401 IR 05000352/20240102024-03-18018 March 2024 Biennial Problem Identification and Resolution Inspection Report 05000352/2024010 and 05000353/2024010 IR 05000352/20230062024-02-28028 February 2024 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2023006 and 05000353/2023006) IR 05000352/20243012024-02-0202 February 2024 Initial Operator Licensing Examination Report 05000352/2024301 and 05000353/2024301 IR 05000352/20240112024-01-31031 January 2024 Information Request to Support Post-Approval Site Inspection for License Renewal; Inspection Report 05000352/2024011 IR 05000352/20230042024-01-31031 January 2024 Integrated Inspection Report 05000352/2023004 and 05000353/2023004 IR 05000352/20230102024-01-11011 January 2024 Age-Related Degradation Report 05000352/2023010 and 05000353/2023010 IR 05000352/20234012023-12-21021 December 2023 Cybersecurity Inspection Report 05000352/2023401 and 05000353/2023401 IR 05000352/20230032023-10-27027 October 2023 Integrated Inspection Report 05000352/2023003 and 05000353/2023003 and Independent Spent Fuel Storage Installation Inspection 07200065/2023001 ML23297A1722023-10-24024 October 2023 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000352/2024010 and 05000353/2024010 IR 05000352/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000352/2023501 and 05000353/2023501 IR 05000352/20230052023-08-31031 August 2023 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2023005 and 05000353/2023005) IR 05000352/20230012023-04-28028 April 2023 Integrated Inspection Report 05000352/2023001 and 05000353/2023001 IR 05000352/20220062023-03-0101 March 2023 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2022006 and 05000353/2022006) IR 05000352/20220042023-02-13013 February 2023 Integrated Inspection Report 05000352/2022004 and 05000353/2022004 IR 05000352/20234022023-02-0707 February 2023 Security Baseline Inspection Report 05000352/2023402 and 05000353/2023402 IR 05000352/20233012023-01-26026 January 2023 Initial Operator Licensing Examination Report 05000352/2023301 and 05000353/2023301 IR 05000352/20220032022-11-0707 November 2022 Integrated Inspection Report 05000352/2022003 and 05000353/2022003 IR 05000352/20224022022-10-18018 October 2022 Security Baseline Inspection Report 05000352/2022402 and 05000353/2022402 IR 05000352/20220052022-08-31031 August 2022 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2022005 and 05000353/2022005) IR 05000352/20224012022-08-0303 August 2022 Material Control and Accounting Inspection Report 05000352/2022401 and 05000353/2022401 (Cover Letter Only) IR 05000352/20220022022-08-0101 August 2022 Integrated Inspection Report 05000352/2022002 and 05000353/2022002 IR 05000352/20220112022-06-30030 June 2022 Triennial Fire Protection Inspection Report 05000352/2022011 and 05000353/2022011 IR 07200065/20210012022-06-0909 June 2022 Independent Spent Fuel Storage Installation (ISFSI) NRC Inspection Report No. 07200065/2021001 and Exercise of Enforcement Discretion IR 05000352/20220012022-05-0404 May 2022 Integrated Inspection Report 05000352/2022001 and 05000353/2022001 IR 05000352/20220102022-03-0909 March 2022 Biennial Problem Identification and Resolution Inspection Report 05000352/2022010 and 05000353/2022010 IR 05000352/20210062022-03-0202 March 2022 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2021006 and 05000353/2021006) IR 05000352/20214012022-02-15015 February 2022 Security Baseline Inspection Report 05000352/2021401 and 05000353/2021401 IR 05000352/20210042022-02-0909 February 2022 Integrated Inspection Report 05000352/2021004 and 05000353/2021004 IR 05000352/20215012021-11-29029 November 2021 Emergency Preparedness Biennial Exercise Inspection Report 05000352/2021501 and 05000353/2021501 IR 05000352/20210032021-11-0404 November 2021 Integrated Inspection Report 05000352/2021003 and 05000353/2021003 IR 05000352/20214202021-10-0404 October 2021 NRC Inspection Report 05000352/2021420 and 05000353/2021420 IR 05000352/20213012021-09-16016 September 2021 Initial Operator Licensing Examination Report 05000352/2021301 and 05000353/2021301 IR 05000352/20210052021-09-0101 September 2021 Updated Inspection Plan for the Limerick Generating Station, Units 1 and 2 (Report 05000352/2021005 and 05000353/2021005) IR 05000352/20214022021-08-24024 August 2021 Security Baseline Inspection Report 05000352/2021402 and 05000353/2021402 IR 05000352/20210022021-08-10010 August 2021 Integrated Inspection Report 05000352/2021002 and 05000353/2021002 IR 05000352/20210012021-04-30030 April 2021 Integrated Inspection Report 05000352/2021001 and 05000353/2021001 IR 05000352/20210102021-03-0909 March 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000352/2021010 and 05000353/2021010 IR 05000352/20200062021-03-0303 March 2021 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2020006 and 05000353/2020006) IR 05000352/20200042021-02-0202 February 2021 Integrated Inspection Report 05000352/2020004 and 05000353/2020004 and Independent Spent Fuel Storage Installation Inspection Report 07200065/2020002 IR 05000352/20200152021-01-0404 January 2021 Temporary Instruction 2515/194 Inspection Report 05000352/2020015 and 05000353/2020015 IR 05000352/20200032020-11-0404 November 2020 Integrated Inspection Report 05000352/2020003 and 05000353/2020003 2024-09-04
[Table view] Category:Letter
MONTHYEARML24303A0902024-10-29029 October 2024 Operator Licensing Examination Approval IR 05000352/20240122024-10-17017 October 2024 Commercial Grade Dedication Inspection Report 05000352/2024012 and 05000353/2024012 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24274A2372024-10-0707 October 2024 – Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications ML24278A3022024-10-0404 October 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation - Rev Unit 2 Technical Spec ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A0032024-09-27027 September 2024 Generation Station, Units 1 and 2 – Regulatory Audit Plan Supporting Review of the Component Interface Module System of the Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) (Redacted) ML24243A0482024-09-19019 September 2024 Generation Station, Unit Nos. 1 and 2 - Schedule Update for License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24215A4042024-09-18018 September 2024 Request for Withholding Information from Public Disclosure IR 05000352/20244202024-09-16016 September 2024 – Security Baseline Inspection Report 05000352/2024420 and 05000353/2024420 RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds IR 05000352/20250102024-09-10010 September 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000352/2025010 and 05000353/2025010 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000352/20230022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000352/2023002 and 05000353/2023002 IR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) ML24241A1952024-08-28028 August 2024 License Amendment Request for Modification to Technical Specification 3.6.1.2 and Main Steam Isolation Valve Leakage Rate Requirements ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24163A3902024-08-14014 August 2024 Request for Withholding Information from Public Disclosure IR 05000352/20240022024-08-12012 August 2024 Integrated Inspection Report 05000352/2024002 and 05000353/2024002 ML24220A2392024-08-12012 August 2024 Correction to Technical Specification Page 3/4 3-11 in Amendment No. 225 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24204A0712024-07-29029 July 2024 Issuance of Amendment Nos. 263 and 225 Technical Specifications for Main Steam Line Tunnel Temperature ML24208A1592024-07-25025 July 2024 Regulatory Audit Plan Supporting Review of the System Development Portion of Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) - Non-Proprietary ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24201A1662024-07-19019 July 2024 Response to Request for Additional Information for License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam L ML24199A1842024-07-15015 July 2024 RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24180A1572024-06-28028 June 2024 Request to Return and Replace WEC Documents (EQ-EV-386-GLIM, EQ-QR- 433-GLIM, and APP-GW-GLR-611), to Meet 10CFR2.390 Request to Withdraw from Public Disclosure Requirements ML24170A7702024-06-20020 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, Opportunity for Hearing(Epid L-2024-LLA-0079) LTR 05000352/LER-2024-003, Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK1232024-06-18018 June 2024 Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK123 ML24166A1142024-06-14014 June 2024 Response to Requests for Additional Information (RAIs 15 Through 23) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24165A2642024-06-13013 June 2024 License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam Line Tunnel Temperature TS 3/4.7.9 05000352/LER-2024-001, Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit2024-06-10010 June 2024 Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit 05000352/LER-2024-002, Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker2024-06-10010 June 2024 Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker ML24151A2012024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24151A2882024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24150A0242024-05-29029 May 2024 Notification of Commercial Grade Dedication Inspection (05000352/2024012 and 05000353/2024012) and Request for Information ML24149A2112024-05-28028 May 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 IR 05000352/20243022024-05-20020 May 2024 Revised Initial Operator Licensing Examination Report 05000352/2024302 and 05000353/2024302 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000352/20240012024-05-0707 May 2024 Integrated Inspection Report 05000352/2024001 and 05000353/2024001 ML24124A0432024-05-0303 May 2024 Response to Requests for Additional Information (RAIs 9 Through 14) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24114A3222024-04-23023 April 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) - Pivot to Unit ML24109A0702024-04-18018 April 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFRC50.52 ATWS Rule to Support the Digital Modernization Project Installation . ML24093A0912024-04-17017 April 2024 Revised Estimated Review Completion Date Concerning License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24106A1832024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases 2024-09-06
[Table view] |
Text
ber 6, 2006
SUBJECT:
LIMERICK GENERATING STATION - OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION REPORT NO. 05000352 AND 05000353/2006-301
Dear Mr. DeGregorio:
This report transmits the results of the Reactor Operator (RO) and Senior Reactor Operator (SRO) licensing examinations conducted by the Nuclear Regulatory Commission (NRC) during the period of October 23 to November 3, 2006. This examination addressed areas important to public health and safety and was developed and administered using the guidelines of the Examination Standards for Power Reactors (NUREG-1021, Revision 9).
Based on the results of the examination, all 12 applicants passed all portions of the examination. The applicants included 4 ROs, 7 instant SROs and 1 upgrade SRO.
Examination results indicated that the applicants were well prepared for the examination.
Mr. T. Fish, Chief Examiner, discussed performance insights observed during the examination with Mr. Carl Rich on October 30, 2006. On November 16, 2006, final examination results, including individual license numbers, were given during a telephone call between Mr. Fish and Mr. R. Rhode of your training staff.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). These records include the final examination and are available in ADAMS (Master File - Accession Number ML060800070; RO and SRO Written - Accession Number ML063240233; RO and SRO Operating Section A - Accession Number ML063240333; RO and SRO Operating Section B - Accession Number ML063240336; and RO and SRO Operating Section C - Accession Number ML063240343). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
R. Should you have any questions regarding this examination, please contact me at (610) 337-5046, or by E-mail at MDS1@NRC.GOV.
Sincerely,
/RA/
Marvin D. Sykes, Chief Operations Branch Division of Reactor Safety Docket Nos: 50-352, 50-353 License Nos: NPF-39, NPF-85 Enclosure: Initial Examination Report No. 05000352&353/2006-301 cc w/encl:
Chief Operating Officer, Exelon Generation Company, LLC Site Vice President - Limerick Generating Station Plant Manager, Limerick Generating Station Regulatory Assurance Manager - Limerick Senior Vice President - Nuclear Services Vice President - Mid-Atlantic Operations Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs, Exelon Generation Company, LLC Manager, Licensing - Limerick Generating Station Vice President, General Counsel and Secretary Associate General Counsel, Exelon Generation Company Correspondence Control Desk Director, Bureau of Radiation Protection, PA Department of Environmental Protection J. Johnsrud, National Energy Committee, Sierra Club Chairman, Board of Supervisors of Limerick Township J. Bradley Fewell, Assistant General Counsel, Exelon Nuclear C. Rich, Director of Training
SUMMARY OF FINDINGS
ER 05000352&353/2006-301; 10/23-30/2006 and 11/03/2006; Limerick Generating Station,
Units 1 and 2; Initial Operator Licensing Examinations. Twelve of twelve applicants passed the examination (4 ROs, 7 SRO instants, and 1 SRO upgrade).
The written examinations were administered by the facility on November 3, 2006 and the operating tests were administered by two NRC region-based examiners and one Headquarters-based examiner during the period of October 23 - 30, 2006.
A. Inspector Identified Findings No findings of significance were identified.
B. Licensee Identified Findings No findings of significance were identified.
ii
REPORT DETAILS
REACTOR SAFETY
Mitigating Systems - Reactor Operator (RO) and Senior Reactor Operator (SRO) Initial License Examinations
a. Scope
of Review The NRC examination team developed the written and operating initial examination and together with Limerick training and operations personnel verified or ensured, as applicable, the following:
- The examination was prepared and developed in accordance with the guidelines of Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors. A review was conducted both in the Region I office and at the Limerick plant and training facility. Final resolution of comments and incorporation of test revisions were conducted during and following the onsite preparation week.
- Simulation facility operation was proper.
- A test item analysis was completed on the written examination for feedback into the systems approach to training program.
- Examination security requirements were met.
The NRC examiners administered the operating portion of the examination to all applicants from October 23 to 30, 2006. Limerick training staff administered the written examination on November 3, 2006.
b. Findings
Grading and Results All twelve applicants (4 RO, 7 SRO instant, and 1 SRO upgrade,) passed all portions of the initial licensing examination.
The facility had no post-examination comments.
Examination Administration and Performance No findings of significance were identified.
4OA6 Exit Meeting Summary
On November 16, 2006, the NRC provided conclusions and examination results to Limerick training staff via the telephone. License numbers for all applicants were also provided during this time.
The NRC expressed appreciation for the cooperation and assistance that was provided during the preparation and administration of the examination by the licensees training staff.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
ATTACHMENT
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
J. Hunter Operations Training Manager
R. Rhode Operations Training Instructor
W. Ward Operations Training Instructor
D. Monihan Operations Training Instructor
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
ITEM NUMBER TYPE DESCRIPTION
None
Attachment