ML060890179

From kanterella
Jump to navigation Jump to search

Forthcoming Meeting with Duane Arnold Energy Center - to Discuss Calculations Associated with the Submittal Pertaining to the Elimination of Main Steamline Radiation Monitor Trips
ML060890179
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 04/04/2006
From: Spaulding D
Plant Licensing Branch III-2
To: Raghavan L
Plant Licensing Branch III-2
spaulding, D W, NRR/DORL, 415-2928
References
Download: ML060890179 (7)


Text

April 4, 2006 MEMORANDUM TO: L. Raghavan, Branch Chief Plant Licensing Branch III-1 Division of Operating Reactor Licensing FROM:

Deirdre W. Spaulding, Project Manager /RA/

Plant Licensing Branch III-1 Division of Operating Reactor Licensing

SUBJECT:

FORTHCOMING MEETING WITH DUANE ARNOLD ENERGY CENTER DATE & TIME:

April 14, 2006 9:00 a.m. - 3:00 p.m.

LOCATION:

U.S. Nuclear Regulatory Commission (NRC)

One White Flint North Room O8B4 11555 Rockville Pike Rockville, Maryland 20852 PURPOSE:

To discuss calculations associated with the submittal pertaining to the elimination of main steamline radiation monitor trips CATEGORY 1:

  • This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

MEETING CONTACT: D. W. Spaulding, NRR 301-415-2928 dws@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"

(67 FR 36920), May 28, 2002 PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR)

NRC/NRR Duane Arnold L. Raghavan Steve Catron, et al.

D. Spaulding M. Kotzalas A. Drozd L. Brown Docket No. 50-331

Enclosure:

Agenda cc w/encl: See next page

ML060890179 OFFICE NRR/LPL3-1/PM NRR/LPL3-1/LA NRR/LPL3-1/BC NAME DSpaulding THarris LRaghavan DATE 4/4/06 3/31/06 4/4/06

ENCLOSURE MEETING WITH DUANE ARNOLD ENERGY CENTER TO DISCUSS CALCULATIONS ASSOCIATED WITH THE SUBMITTAL PERTAINING TO THE ELIMINATION OF MAIN STEAMLINE RADIATION MONITOR TRIPS April 14, 2006

1. Introductions
2. Duane Arnold Presentation
3. Discussion
4. Public Comments
5. Summary

Memorandum to L. Raghavan from D. Spaulding dated April 14, 2006

SUBJECT:

FORTHCOMING MEETING WITH DUANE ARNOLD ENERGY CENTER DISTRIBUTION:

PUBLIC LPLIII-1 R/F RidsNrrDorl (CHaney, EHackett)

RidsNrrDorlLple (LRaghavan)

RidsNrrPMDSpaulding RidsNrrLATHarris RidsNrrDraAadb (MKotazalas)

RidsOpaMailCenter RidsOgcMailCenter RidsAcrsAcnwMailCenter RidsNrrAdro RidsRgn3MailCenter JDixon-Herrity, RIII JStrasma,OPA RIII RJasinski, NRR DWeaver PMNS ADrozd LBrown Receptionist (OWFN and TWFN)

Duane Arnold Energy Center cc:

Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. Gary Van Middlesworth Vice President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785 Mr. M. S. Ross Managing Attorney Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. R. E. Helfrich Senior Attorney Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. W. E. Webster Vice President, Nuclear Operations Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 John Bjorseth Site Director Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324 Steven R. Catron Manager, Regulatory Affairs Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324 U. S. Nuclear Regulatory Commission Resident Inspectors Office Rural Route #1 Palo, IA 52324 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Suite 210 2443 Warrenville Road Lisle, IL 60532-4351 Mr. M. Warner Vice President, Nuclear Operations Support Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. D. A. Curtland Plant Manager Duane Arnold Energy Center 3277 DAEC Rd.

Palo, IA 52324-9785 Mr. R. S. Kundalkar Vice President, Nuclear Engineering Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 Daniel McGhee Utilities Division Iowa Department of Commerce Lucas Office Buildings, 5th Floor Des Moines, IA 50319 Chairman, Linn County Board of Supervisors 930 1st Street SW Cedar Rapids, IA 52404 Mr. Gary Van Middlesworth Vice President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785