Letter Sequence Supplement |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: BVY 06-014, E-mail, Meyer, Entergy, to Ennis, NRR, VY EPU, BVY 06-019, Vermont Yankee, Extended Power Uprate - Regulatory Commitment Information Regarding Steam Dryer Monitoring and Fiv Effects, BVY 06-031, Revision 1 to Steam Dryer Monitoring Plan, BVY 06-039, Vermont Yankee Nuclear Power Station Revision 2 to Steam Dryer Monitoring Plan, BVY 06-051, Vermont Yankee - Summary of Reactor Feedwater Pump Trip Analysis, BVY 06-056, Submittal of Vermont Yankee Report on the Results of Steam Dryer Monitoring, BVY 06-080, Vermont Yankee, Extended Power Uprate - License Amendment No. 229 Clarifications to Nrc'S Final Safety Evaluation, BVY 06-087, Update to Information Related to 10CFR50.63 Licensing Basis, ML033140025, ML033160187, ML040080573, ML040090411, ML041810022, ML041810433, ML042180463, ML042650265, ML042680087, ML043020494, ML050060086, ML050280310, ML050450423, ML050940230, ML050940242, ML052080154, ML053490030, ML053530148, ML060330490, ML060410119, ML061290566, ML061870277
|
MONTHYEARML0323403792003-08-31031 August 2003 Technical Assessment of Quad Cities Unit 2, Steam Dryer Failure - Determination of Root Cause & Extent of Condition Project stage: Request ML0328104472003-10-0101 October 2003 Vermont Yankee - Technical Specification Proposed Change No. 263, Supplemental No. 1 Regarding Extended Power Uprate, Technical Review Guidance Project stage: Request ML0330403972003-10-30030 October 2003 Meeting Handouts for Meeting with Entergy Re Issues for Alternate Source Term, Power Uprate & Acts/Mellla Application Project stage: Meeting ML0331000472003-10-30030 October 2003 Sign-in Sheet for 10/30/2003 Meeting with ENVY and ENO Re to Discuss Arts/Mellla, Alternate Source Term, and Extended Power Uprate Aplications Project stage: Meeting ML0331000232003-11-19019 November 2003 10/30/2003 Meeting with Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc Regarding Arts/Mellla, Alternate Source Term, and Extended Power Uprate Applications Project stage: Meeting ML0334403992003-12-0808 December 2003 Technical Specification Proposed Change No. 263 Regarding Extended Power Uprate - State of Vermont Questions Project stage: Request ML0331800882003-12-15015 December 2003 Vermont Yankee Nuclear Power Station - Extended Power Uprate Acceptance Review Project stage: Acceptance Review ML0331601872003-12-16016 December 2003 Vermont Yankee Nuclear Power Station, Withholding from Public Disclosure, NEDC-33090P, Revision 0, Project stage: Other ML0430204942003-12-24024 December 2003 NRR Work Request to IEPB-A Project stage: Other ML0336401382003-12-30030 December 2003 Vermont Yankee, Draft Request for Additional Information Project stage: Draft RAI ML0400805732004-01-0707 January 2004 NPSH for BWR Extended Power Upgrades (EPU) Project stage: Other ML0400904112004-01-0909 January 2004 NPSH for BWR Extended Power Upgrades (EPU) Project stage: Other BVY 04-009, Vermont Yankee - Technical Specification Proposed Change No. 263, Supplement No. 4 Regarding Extended Power Uprate, NRC Acceptance Review2004-01-31031 January 2004 Vermont Yankee - Technical Specification Proposed Change No. 263, Supplement No. 4 Regarding Extended Power Uprate, NRC Acceptance Review Project stage: Supplement ML0404001612004-02-19019 February 2004 Vermont Yankee Nuclear Power Station, Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0405003022004-02-20020 February 2004 Vermont Yankee Nuclear Power Station - Extended Power Uprate Acceptance Review Project stage: Acceptance Review ML0406306032004-02-27027 February 2004 G20040138/LTR-04-0107 - Sen. James Jeffords & Patrick Leahy Ltr Proposed Power Uprate at Vermont Yankee Project stage: Request ML0408500762004-03-15015 March 2004 G20040206/LTR-04-0168 - Ltr. Rep. Michael Dworkin Independent Safety Asessment of Vermont Yankee Project stage: Request ML0404100222004-03-19019 March 2004 Vermont Yankee Nuclear Power Station, Withholding from Public Disclosure, Responses to Request for Additional Information (Attachment 1 to Letter Bvy 04-008) Project stage: RAI ML0411007042004-03-31031 March 2004 Enclosure 1, March 31, 2004, Vermont Yankee Annual Assessment Meeting Power Up-Rate Public Meeting Attendance List Project stage: Meeting ML0411203582004-03-31031 March 2004 Transcription Meeting Summary, 03/31/2004 Category 3 Meeting with Public to Discuss Proposed Power Uprate, Pages 1-124. Project stage: Meeting ML0410603312004-05-17017 May 2004 Enclosures 3 - 13, 03/31/2004 Meeting Summary for Vermont Yankee Project stage: Meeting ML0411201272004-05-17017 May 2004 Category 3 Public Meeting Summary with Entergy Nuclear Operations Inc. to Discuss Proposed Power Uprate for Vermont Yankee Nuclear Power Station Project stage: Meeting ML0411203682004-05-17017 May 2004 Enclosure 14, 03/31/2004 Meeting Summary for Vermont Yankee. Slides Presentation Proposed Power Uprate Project stage: Meeting ML0414500202004-05-28028 May 2004 Vermont Yankee - Request for Additional Information - Extended Power Uprate Project stage: RAI ML0418100222004-06-25025 June 2004 Compliance with NRC Regulatory Compliance Project stage: Other ML0331400252004-06-25025 June 2004 Vermont, Notice of Consideration of Issuance of Amendment to Facility Operating License for Extended Power Uprate and Opportunity for Hearing Project stage: Other ML0418104332004-06-29029 June 2004 Vermont Yankee, 06/29/04 E-mail - Compliance with NRC Regulatory Compliance Project stage: Other ML0417400392004-07-0606 July 2004 Vermont Nuclear Power Station, Request for Additional Information, Extended Power Uprate. TAC No. MC0761 Project stage: RAI BVY 04-081, Vermont Yankee Nuclear Power Station, Technical Specification Proposed Change No. 263 - Supplement No. 11 Extended Power Uprate - Response to Request for Additional Information2004-08-12012 August 2004 Vermont Yankee Nuclear Power Station, Technical Specification Proposed Change No. 263 - Supplement No. 11 Extended Power Uprate - Response to Request for Additional Information Project stage: Supplement ML0421804632004-08-31031 August 2004 Vermont Yankee Nuclear Power Station, Withholding from Public Disclosure, Project stage: Other ML0424405372004-09-0101 September 2004 Vermont Yankee Nuclear Power Station, Request for Additional Information - Extended Power Uprate Project stage: RAI ML0425103952004-09-0202 September 2004 Attachments 1 Through 4 of 07/21/2004 & 07/22/2004 Summary of Meeting with Entergy Nuclear Operations, Inc., on Steam Dryer Analysis Project stage: Meeting ML0422200222004-09-0202 September 2004 07/21/2004 & 07/22/2004 Summary of Meeting with Entergy Nuclear Operations, Inc., on Steam Dryer Analysis Project stage: Meeting BVY 04-097, Vermont Yankee Nuclear Power Station - Technical Specification Proposed Change No. 263 - Supplement No. 13 Extended Power Uprate - Response to Steam Dryer Action Items2004-09-14014 September 2004 Vermont Yankee Nuclear Power Station - Technical Specification Proposed Change No. 263 - Supplement No. 13 Extended Power Uprate - Response to Steam Dryer Action Items Project stage: Supplement BVY 04-098, Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 14 Extended Power Uprate - Response to Request for Additional Information2004-09-15015 September 2004 Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 14 Extended Power Uprate - Response to Request for Additional Information Project stage: Supplement BVY 04-100, Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263 - Supplement No. 15 Extended Power Uprate - Response to Steam Dryer Action Item No. 22004-09-23023 September 2004 Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263 - Supplement No. 15 Extended Power Uprate - Response to Steam Dryer Action Item No. 2 Project stage: Supplement ML0505901452004-09-29029 September 2004 Vermont Yankee Attendance List for Sept. 29, 2004 Meeting Steam Dryer Analysis Project stage: Meeting BVY 04-113, Vermont Yankee Nuclear Power Station - Proposed Technical Specification Change No. 263 - Supplement No. 20 Extended Power Uprate - Meeting on Steam Dryer Analysis Meeting Presentation Slides2004-09-29029 September 2004 Vermont Yankee Nuclear Power Station - Proposed Technical Specification Change No. 263 - Supplement No. 20 Extended Power Uprate - Meeting on Steam Dryer Analysis Meeting Presentation Slides Project stage: Supplement BVY 04-101, Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263 - Supplement No. 16 Extended Power Uprate - Additional Information Related to Request for Additional Information EMEB-B-52004-09-30030 September 2004 Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263 - Supplement No. 16 Extended Power Uprate - Additional Information Related to Request for Additional Information EMEB-B-5 Project stage: Supplement BVY 04-107, Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 17 Extended Power Uprate - Response to Request for Additional Information Related to the 10 CFR 50 Appendix R Timeline2004-09-30030 September 2004 Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 17 Extended Power Uprate - Response to Request for Additional Information Related to the 10 CFR 50 Appendix R Timeline Project stage: Supplement BVY 04-106, Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 18 Extended Power Uprate - ECCS Pump Net Positive Suction Head Margin2004-10-0505 October 2004 Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 18 Extended Power Uprate - ECCS Pump Net Positive Suction Head Margin Project stage: Supplement BVY 04-109, Vermont Yankee Nuclear Power Station - Technical Specification Proposed Change No. 263 - Supplement No. 19 Extended Power Uprate - Initial Plant Test Program2004-10-0707 October 2004 Vermont Yankee Nuclear Power Station - Technical Specification Proposed Change No. 263 - Supplement No. 19 Extended Power Uprate - Initial Plant Test Program Project stage: Supplement ML0426800872004-10-13013 October 2004 Vermont Yankee Nuclear Power Station- Technical Audit of Steam Dryer Analysis in Support of Extended Power Uprate Request Project stage: Other ML0426502652004-10-15015 October 2004 Vermont Yankee Nuclear Power Station - Extended Power Uprate Review Schedule Project stage: Other ML0500600862004-11-12012 November 2004 Content of VY Steam Dryer Audit Report, Non-Proprietary Project stage: Other ML0431303472004-12-0101 December 2004 Request for Withholding Information from Public Disclosure, Vermont Yankee Project stage: Withholding Request Acceptance ML0431303182004-12-0101 December 2004 Request for Withholding Information from Public Disclosure, Vermont Yankee Project stage: Withholding Request Acceptance BVY 04-131, Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263 - Supplement No. 22 Extended Power Uprate - 10 CFR 50 Appendix R Timeline Verification2004-12-0808 December 2004 Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263 - Supplement No. 22 Extended Power Uprate - 10 CFR 50 Appendix R Timeline Verification Project stage: Supplement BVY 04-129, Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 21 Extended Power Uprate - Steam Dryer Power Ascension Testing2004-12-0909 December 2004 Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 21 Extended Power Uprate - Steam Dryer Power Ascension Testing Project stage: Supplement ML0433700492004-12-21021 December 2004 Vermont Yankee, Request for Additional Information, Extended Power Uprate, Project stage: RAI 2004-12-09
[Table View] |
|
---|
Category:Letter type:BVY
MONTHYEARBVY 24-005, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-30030 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-004, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-23023 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-003, Nuclear Onsite Property Damage Insurance2024-01-0404 January 2024 Nuclear Onsite Property Damage Insurance BVY 24-001, Pre-Notice of Disbursement from Decommissioning Trust2024-01-0202 January 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-030, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-12-20020 December 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-029, Proof of Financial Protection2023-12-12012 December 2023 Proof of Financial Protection BVY 23-028, Pre-Notice of Disbursement from Decommissioning Trust2023-11-28028 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-21021 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-026, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-13013 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-025, Pre-Notice of Disbursement from Decommissioning Trust2023-11-0202 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-023, License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 3172023-10-10010 October 2023 License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 BVY 23-022, Pre-Notice of Disbursement from Decommissioning Trust2023-08-23023 August 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-020, Pre-Notice of Disbursement from Decommissioning Trust2023-08-0202 August 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-08-0202 August 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-019, Update to 2022 Radiological Effluent Release Report2023-07-24024 July 2023 Update to 2022 Radiological Effluent Release Report BVY 23-018, Update to Nuclear Onsite Property Damage Insurance2023-07-12012 July 2023 Update to Nuclear Onsite Property Damage Insurance BVY 23-017, Pre-Notice of Disbursement from Decommissioning Trust2023-06-29029 June 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-016, 10 CFR 72.48 Report2023-06-0505 June 2023 10 CFR 72.48 Report BVY 23-015, Report of Investigation Pursuant to 1O CFR 20, Appendix G2023-06-0505 June 2023 Report of Investigation Pursuant to 1O CFR 20, Appendix G BVY 23-014, Pre-Notice of Disbursement from Decommissioning Trust2023-05-31031 May 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-013, 2022 Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Radiological Environmental Operating Report BVY 23-011, 2022 Radiological Effluent Release Report2023-05-10010 May 2023 2022 Radiological Effluent Release Report BVY 23-012, Pre-Notice of Disbursement from Decommissioning Trust2023-05-0202 May 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-009, 2022 Individual Monitoring NRC Form 5 Report2023-04-24024 April 2023 2022 Individual Monitoring NRC Form 5 Report BVY 23-008, Pre-Notice of Disbursement from Decommissioning Trust2023-04-0606 April 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-006, Status of Decommissioning and Spent Fuel Management Fund for Year Ending 20222023-03-29029 March 2023 Status of Decommissioning and Spent Fuel Management Fund for Year Ending 2022 BVY 23-007, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-03-29029 March 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-005, Nuclear Onsite Property Damage Insurance2023-03-13013 March 2023 Nuclear Onsite Property Damage Insurance BVY 23-004, Pre-Notice of Disbursement from Decommissioning Trust2023-03-0202 March 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-003, Pre-Notice of Disbursement from Decommissioning Trust2023-01-31031 January 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-030, Documentary Evidence of Performance Bond2022-12-30030 December 2022 Documentary Evidence of Performance Bond BVY 22-028, Re Proof of Financial Protection2022-11-28028 November 2022 Re Proof of Financial Protection BVY 22-027, Bvy 22-027; Pre-Notice of Disbursement from Decommissioning Trust for Vermont Yankee Nuclear Power Station2022-11-11011 November 2022 Bvy 22-027; Pre-Notice of Disbursement from Decommissioning Trust for Vermont Yankee Nuclear Power Station BVY 22-026, Pre-Notice of Disbursement from Decommissioning Trust2022-10-31031 October 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-025, Pre-Notice of Disbursement from Decommissioning Trust2022-10-0404 October 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-023, Pre-Notice of Disbursement from Decommissioning Trust2022-09-0101 September 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-022, Report of Investigation Pursuant to 10 CFR 20, Appendix G2022-08-22022 August 2022 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 22-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2022-08-16016 August 2022 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 22-020, Pre-Notice of Disbursement from Decommissioning Trust2022-08-0101 August 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-019, Pre-Notice of Disbursement from Decommissioning Trust2022-07-0606 July 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-013, Notification of Revised Decommissioning Cost Estimate2022-06-17017 June 2022 Notification of Revised Decommissioning Cost Estimate BVY 22-018, Pre-Notice of Disbursement from Decommissioning Trust2022-06-0808 June 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-015, 2021 Radiological Environmental Operating Report2022-05-0505 May 2022 2021 Radiological Environmental Operating Report BVY 22-017, Pre-Notice of Disbursement from Decommissioning Trust2022-05-0505 May 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-014, 2021 Radiological Effluent Release Report2022-04-28028 April 2022 2021 Radiological Effluent Release Report BVY 22-012, Biennial Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d)2022-04-12012 April 2022 Biennial Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) BVY 22-011, Pre-Notice of Disbursement from Decommissioning Trust2022-04-0404 April 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-009, Status of Decommissioning and Spent Fuel Management Fund for the Year Ending 20212022-03-23023 March 2022 Status of Decommissioning and Spent Fuel Management Fund for the Year Ending 2021 BVY 22-008, Pre-Notice of Disbursement from Decommissioning Trust2022-02-24024 February 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-005, ISFSI Decommissioning Funding Plan2022-02-24024 February 2022 ISFSI Decommissioning Funding Plan 2024-01-04
[Table view] Category:Technical Specification
MONTHYEARBVY 15-055, Revision of Technical Specifications Bases Pages2015-11-16016 November 2015 Revision of Technical Specifications Bases Pages BVY 15-024, Revision of Technical Specifications Bases Pages2015-03-25025 March 2015 Revision of Technical Specifications Bases Pages ML14231A0172014-08-13013 August 2014 Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 4 ML14202A2062014-07-16016 July 2014 Technical Specifications Proposed Change No. 307, Revision to Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 2 BVY 14-049, Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 32014-06-11011 June 2014 Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 3 ML13323A5182013-11-14014 November 2013 Technical Specifications Proposed Change No. 306 Eliminate Certain ESF Requirements During Movement of Irradiated Fuel BVY 13-084, Revision of Technical Specification Bases Page2013-09-0909 September 2013 Revision of Technical Specification Bases Page BVY 13-053, Revision of Technical Specifications Bases Pages2013-07-24024 July 2013 Revision of Technical Specifications Bases Pages BVY 13-062, Revised of Technical Specification Bases Pages2013-06-26026 June 2013 Revised of Technical Specification Bases Pages BVY 13-043, Technical Specifications Proposed Change No. 304, Revision to Low Pressure Safety Limit2013-05-14014 May 2013 Technical Specifications Proposed Change No. 304, Revision to Low Pressure Safety Limit BVY 13-023, License Amendment Request; Changes to 10 CFR 50.63 Licensing Basis, Supplement 22013-04-29029 April 2013 License Amendment Request; Changes to 10 CFR 50.63 Licensing Basis, Supplement 2 BVY 13-022, Revision of Technical Specification Bases Pages2013-03-26026 March 2013 Revision of Technical Specification Bases Pages BVY 12-078, Technical Specifications Proposed Change 297, Supplement 2 Response to Request for Additional Information2012-11-20020 November 2012 Technical Specifications Proposed Change 297, Supplement 2 Response to Request for Additional Information BVY 12-055, Technical Specifications Proposed Change 297, Supplement 1, Response to Request for Additional Information2012-08-0707 August 2012 Technical Specifications Proposed Change 297, Supplement 1, Response to Request for Additional Information BVY 12-018, Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change2012-04-17017 April 2012 Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change BVY 12-006, Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance2012-02-0101 February 2012 Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance BVY 12-005, Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change2012-02-0101 February 2012 Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change BVY 11-068, Revision of Technical Specification Bases Pages Due to License Amendment 2482011-09-30030 September 2011 Revision of Technical Specification Bases Pages Due to License Amendment 248 BVY 11-042, Technical Specifications Proposed Change No. 293, Supplement 1 Revised Reactor Vessel Pressure-Temperature Limitation Curves2011-05-16016 May 2011 Technical Specifications Proposed Change No. 293, Supplement 1 Revised Reactor Vessel Pressure-Temperature Limitation Curves BVY 11-037, Revision of Technical Specification Bases Pages Due to License Amendment 2462011-04-21021 April 2011 Revision of Technical Specification Bases Pages Due to License Amendment 246 BVY 10-059, Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool2010-11-0808 November 2010 Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool BVY 10-056, Submittal of Revision of Technical Specification Bases Pages2010-10-0606 October 2010 Submittal of Revision of Technical Specification Bases Pages BVY 10-047, Revision of Technical Specifications Bases Page2010-08-18018 August 2010 Revision of Technical Specifications Bases Page BVY 10-027, Revision of Technical Specification Bases Pages2010-05-21021 May 2010 Revision of Technical Specification Bases Pages BVY 10-017, Technical Specifications Proposed Change No. 290 Administrative Changes2010-04-13013 April 2010 Technical Specifications Proposed Change No. 290 Administrative Changes BVY 10-021, Revision of Technical Specification Bases Pages2010-03-31031 March 2010 Revision of Technical Specification Bases Pages BVY 09-074, Revision of Technical Specifications Bases Pages2009-12-0909 December 2009 Revision of Technical Specifications Bases Pages BVY 09-072, Technical Specification Bases Pages Associated with License Amendment 2362009-12-0909 December 2009 Technical Specification Bases Pages Associated with License Amendment 236 BVY 09-068, Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves2009-12-0303 December 2009 Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves BVY 09-055, Revision of Technical Specifications Bases Page2009-09-28028 September 2009 Revision of Technical Specifications Bases Page BVY 09-052, Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves2009-09-16016 September 2009 Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves BVY 09-051, Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls2009-08-26026 August 2009 Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls BVY 09-044, Revision of Technical Specifications Bases Pages2009-07-28028 July 2009 Revision of Technical Specifications Bases Pages BVY 09-029, Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test2009-05-0505 May 2009 Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test BVY 09-021, Submittal of Revision of Technical Specification Bases Pages2009-03-31031 March 2009 Submittal of Revision of Technical Specification Bases Pages BVY 09-014, Submittal of Revised Technical Specification Bases Pages2009-02-24024 February 2009 Submittal of Revised Technical Specification Bases Pages BVY 09-012, Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements2009-02-24024 February 2009 Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements ML0836500072008-12-18018 December 2008 Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 6 BVY 08-087, Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 62008-12-18018 December 2008 Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 6 BVY 08-087, Attachment 2, Technical Specification Proposed Change No. 273, Supplement 6, Sample Set-Point Calculations2008-12-18018 December 2008 Attachment 2, Technical Specification Proposed Change No. 273, Supplement 6, Sample Set-Point Calculations BVY 08-081, Submittal of Revision of Technical Specification Bases Page 292008-11-17017 November 2008 Submittal of Revision of Technical Specification Bases Page 29 BVY 08-076, Revision of Technical Specification Bases Pages2008-10-14014 October 2008 Revision of Technical Specification Bases Pages BVY 08-052, Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements2008-09-22022 September 2008 Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements BVY 08-059, Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications2008-09-22022 September 2008 Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications BVY 08-069, Transmittal of Technical Specifications Proposed Change No. 281, Revision to Battery Systems2008-09-22022 September 2008 Transmittal of Technical Specifications Proposed Change No. 281, Revision to Battery Systems BVY 08-066, Submittal of Corrected Technical Specification Page2008-08-26026 August 2008 Submittal of Corrected Technical Specification Page BVY 08-060, Submittal of Revision of Technical Specification Bases Page 2202008-08-25025 August 2008 Submittal of Revision of Technical Specification Bases Page 220 BVY 08-046, Revision of Technical Specification Bases Page 972008-07-28028 July 2008 Revision of Technical Specification Bases Page 97 BVY 08-031, Revision of Technical Specification Bases Page2008-05-29029 May 2008 Revision of Technical Specification Bases Page BVY 08-001, Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications2008-02-12012 February 2008 Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications 2015-03-25
[Table view] Category:Amendment
MONTHYEARBVY 14-049, Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 32014-06-11011 June 2014 Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 3 BVY 12-018, Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change2012-04-17017 April 2012 Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change BVY 10-059, Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool2010-11-0808 November 2010 Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool BVY 09-052, Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves2009-09-16016 September 2009 Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves BVY 09-051, Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls2009-08-26026 August 2009 Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls BVY 09-029, Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test2009-05-0505 May 2009 Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test BVY 09-012, Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements2009-02-24024 February 2009 Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements BVY 08-059, Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications2008-09-22022 September 2008 Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications BVY 08-066, Submittal of Corrected Technical Specification Page2008-08-26026 August 2008 Submittal of Corrected Technical Specification Page BVY 08-001, Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications2008-02-12012 February 2008 Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications ML0535301802005-12-12012 December 2005 Technical Specification Proposed Change No. 266, Revision to Control Rod Operability, Scram Time Testing and Control Rod Accumulators - Response to Request for Additional Information BVY 05-101, Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 263 - Supplement No. 41 Re Extended Power Uprate - Condensate and Feedwater Transient Response Engineering Analysis2005-11-0202 November 2005 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 263 - Supplement No. 41 Re Extended Power Uprate - Condensate and Feedwater Transient Response Engineering Analysis BVY 05-088, Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 35 Extended Power Uprate - Response to Request for Additional Information2005-09-28028 September 2005 Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 35 Extended Power Uprate - Response to Request for Additional Information BVY 05-086, Vermont Yankee - Technical Specifications Proposed Change No. 263 - Supplement No. 34 Extended Power Uprate - Additional Information2005-09-18018 September 2005 Vermont Yankee - Technical Specifications Proposed Change No. 263 - Supplement No. 34 Extended Power Uprate - Additional Information ML0524402132005-08-31031 August 2005 Technical Specification Page, Revision to One-Time Extension of Integrated Leak Rate Test Interval ML0508402532005-03-22022 March 2005 Tech Spec Pages for Amendment 222 Regarding Elimination of Requirements to Provide Monthly Operating Reports and Annual Occupational Radiation Exposure Reports ML0505401492005-02-18018 February 2005 Corrected Page 7 to License DPR-28 and Page 97 to Technical Specifications for Vermont Yankee BVY 04-098, Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 14 Extended Power Uprate - Response to Request for Additional Information2004-09-15015 September 2004 Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 14 Extended Power Uprate - Response to Request for Additional Information ML0408602662004-03-22022 March 2004 Technical Specification, Safety Limit Minimum Critical Power Ratio Values in Technical Specification 1.1.A.1 to Incorporate Results in cycle-specific Core Reload Analysis for Cycle 24 Operation ML0329301432003-10-10010 October 2003 Technical Specification Proposed Change No. 262, Supplement No. 1 Regarding Alternative Source Term ML0328104472003-10-0101 October 2003 Vermont Yankee - Technical Specification Proposed Change No. 263, Supplemental No. 1 Regarding Extended Power Uprate, Technical Review Guidance ML0321906462003-07-31031 July 2003 TS Proposed Change No. 262, Alternative Source Term ML0226302842002-09-18018 September 2002 Technical Specifications, Remove Existing Scram Function & Group 1 Isolation Valve Closure Functions of Main Steam Line Radiation Monitors ML17037B7791974-02-0707 February 1974 Letter Regarding Petition for Derating of Certain Boiling Water Reactors and Enclosed Before the Atomic Safety and Licensing Appeal Board in the Matter of Vermont Yankee Nuclear Power Corporation - Vermont Yankee Nuclear ... 2014-06-11
[Table view] |
Text
Entergy Nuclear Vermont Yankee, LLC En tergy Entergy Nuclear Operations, Inc.
185 Old Ferry Road Brattleboro, VT 05302-0500 September 28, 2005 Docket No. 50-271 BVY 05-088 TAC No. MC0761 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263 - Supplement No. 35 Extended Power Uprate - Response to Request for Additional Information
References:
- 1) Entergy letter to U.S. Nuclear Regulatory Commission, "Vermont Yankee Nuclear Power Station, License No. DPR-28 (Docket No. 50-271), Technical Specification Proposed Change No. 263, Extended Power Uprate," BVY 03-80, September 10, 2003
- 2) U.S. Nuclear Regulatory Commission (Richard B. Ennis) letter to Entergy Nuclear Operations, Inc. (Michael Kansler), "Request for Additional Information - Extended Power Uprate, Vermont Yankee Nuclear Power Station (TAC No. MC0761 )," September 7, 2005
- 3) Entergy letter to U.S. Nuclear Regulatory Commission, "Vermont Yankee Nuclear Power Station, Technical Specification Proposed Change No. 263 - Supplement No. 30, Extended Power Uprate -
Response to Request for Additional Information," BVY 05-071, August 1, 2005 This letter provides additional information regarding the application by Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (Entergy) for a license amendment (Reference 1) to increase the maximum authorized power level of the Vermont Yankee Nuclear Power Station (VYNPS) from 1593 megawatts thermal (MWt) to 1912 MWt.
The attachments to this letter provide supplemental information in response to a request for additional information (RAI) from the NRC staff (Reference 2). Entergy previously responded to all but one of the individual RAls in Reference 2 (i.e., NRC Reactor Systems Branch RAI SRXB-A-68). Attachment I provides Entergy's response to the remaining RAI. This RAI and the response thereto contain Proprietary Information as defined by 10CFR2.390 and should be handled in accordance with the provisions of that regulation. Attachment 1 is considered to be Proprietary Information in its entirety. Attachment 2 is a non-proprietary version of Attachment 1 and is suitable for public disclosure. An affidavit provided by General Electric Company (GE),
supporting the proprietary nature of the document, is provided as Attachment 3.
BVY 05-088 Docket No. 50-271 Page 2 of 3 In response to NRC staff requests for information regarding GE's analytical methodologies for establishing fuel thermal limits, Entergy provided a VYNPS-specific approach to address postulated uncertainties in GE's methodologies in Reference 3. To provide additional conservatism and margin, Entergy also put forward the concept of an interim license condition that would impose an increase in the safety limit minimum critical power ratio for extended power uprate. Attachment 4 provides a re-statement of the proposed license condition.
There are no new regulatory commitments contained in this submittal.
This supplement to the license amendment request provides additional information to clarify Entergy's application for a license amendment and does not change the scope or conclusions in the original application, nor does it change Entergy's determination of no significant hazards consideration.
Entergy stands ready to support the NRC staff's review of this submittal and suggests meetings at your earliest convenience to resolve any remaining issues. If you have any questions or require additional information, please contact Mr. James DeVincentis at (802) 258-4236.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on September 28, 2005.
Sincerely, eayvlt.iayer e Vice President Vermont Yankee Nuclear Power Station Attachments (4) cc: (see next page)
BVY 05-088 Docket No. 50-271 Page 3 of 3 cc: Mr. Richard B. Ennis, Project Manager Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0 8 B1 Washington, DC 20555 Mr. Samuel J. Collins (w/o attachments)
Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 USNRC Resident Inspector (w/o attachments)
Entergy Nuclear Vermont Yankee, LLC P.O. Box 157 Vernon, Vermont 05354 Mr. David O'Brien, Commissioner (w/o proprietary information)
VT Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05620-2601
BVY 05-088 Docket No. 50-271 Attachment 2 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 263 - Supplement No. 35 Extended Power Uprate - Additional Information Response to RAI SRXB-A-68 NON-PROPRIETARY VERSION Total number of pages in Attachment 1 I (excludina this cover sheet) is 17. l
Attachment 2 to BVY 05-088 Docket No. 50-271 Page 1 of 17 NON-PROPRIETARY VERSION RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING APPLICATION FOR EXTENDED POWER UPRATE LICENSE AMENDMENT VERMONT YANKEE NUCLEAR POWER STATION PREFACE This attachment provides a response to the NRC Reactor Systems Branch's (SRXB) request for additional information (RAI) SRXB-A-68 in NRC's letter dated September 7, 2005.1 Upon receipt of the RAI, discussions were held with the NRC staff to further clarify the RAI. The intent of the RAI was clarified during these discussions, and the information provided herein is consistent with those clarifications.
The RAI is re-stated as provided in NRC's letter of September 7, 2005.
RAI SRXB-A-68 RAI SRXB-A-51 asked that Entergy provide an evaluation that demonstrates that the void reactivity coefficients are applicable and are developed for the range of core thermal-hydraulic conditions expected for the transient and accident conditions, including anticipated transients without scram (ATWS). The RAI response did not explicitly address the NRC staff question.
The response instead discussed the conservative axial power distribution that is assumed (HBB and UB) that minimizes the scram reactivity worth. However, the staff RAI was focused on assessing ODYN's capability to simulate the change in core reactivity with the change in voids for the current EPU fuel and core designs. In addition, the objective of the RAI is also to determine if the void reactivity coefficient bias and uncertainty derived in the original ODYN licensing topical report remains valid and applicable for the EPU core and fuel designs.
The RAI response also referred to a sensitivity study performed during the initial ODYN licensing (NEDO-24154P-A, Volume Ill, page Q12) based on the Peach Bottom turbine trip transient simulation. The void coefficient was changed by (( D. The sensitivity studies determined the impact changes in the void coefficient would have on the ACPR/ICPR response.
The document concludes that a model uncertainty due to void reactivity response of ((
)) is assumed. This sensitivity study ((
)) It is also not clear that the void reactivity coefficients for the current fuel and core design are ((
1 U.S. Nuclear Regulatory Commission (Richard B. Ennis) letter to Entergy Nuclear Operations, Inc.
(Michael Kansler), 'Request for Additional Information - Extended Power Uprate, Vermont Yankee Nuclear Power Station (TAC No. MC0761)," September 7, 2005
Attachment 2 to BVY 05-088 Docket No. 50-271 Page 2 of 17 NON-PROPRIETARY VERSION As stated in the RAI response, it is true that ODYN AOO response is (( )) than TRACG. While TRACG applies a ((
D Therefore, for the current EPU high energy core designs and the associated core thermal-hydraulic conditions, an uncertainty analyses is necessary in order to access the code's capability to model the changes in the core reactivity changes with changes in the void fractions.
The response to the staff's RAI 38 of the initial ODYN licensing topical report (NEDO-241 154P-A, Volume 1) provides a void reactivity coefficient uncertainty analysis. The lattice kit values at the three void fractions of ((
)) The following questions relate to the appropriateness of ((
)) used in deriving the uncertainties and biases associated with the void reactivity coefficients.
a) Provide an uncertainty analyses of the changes in the core reactivity with changes in the void fractions. Include in the uncertainty analyses how the adequacy of ODYN's predications of the reactivity coefficients can be assessed for the current EPU fuel/ core designs and operating strategy.
b) The lattice void reactivity coefficient is ((
)) Justify the use of (( D for the derivation of the uncertainties for high void conditions.
c) Provide plots showing the linear void reactivity coefficient function extended to the higher void conditions for limiting lattices in your uncertainty analysis. Include plots providing the void coefficient changes with depletion at different void conditions for the full range of instantaneous void fractions. Evaluate the changes seen in the void coefficient values with the historical void fractions for the range of the instantaneous void fractions, using limiting GE14 lattices. Based on these plots, explain the void coefficient uncertainties that would be associated with the higher void conditions for the different historical void fraction cases.
Attachment 2 to BVY 05-088 Docket No. 50-271 Page 3 of 17 NON-PROPRIETARY VERSION d) The response to the staff's RAI 12 of NEDE-24154P-A (page Q12-4) Volume II states that a void coefficient uncertainty of (( )) is applied as presented in RAI 38 (Volume I).
However, the response to question 38 (page 038-4) states that, ((
)) Explain this statement and state if any uncertainty is applied to the void coefficient in ODYN. If so, justify why the void coefficient calculational method currently employed in ODYN, if any, is (( )) for the core thermal-hydraulic conditions EPU boiling water reactors (BWRs) would experience and justify the uncertainties currently used in ODYN.
e) Provide a discussion of how the changes in the void coefficient uncertainties as seen from the lattice data would affect the different transient events, instability and ATWS response.
Response to RAI SRXB-A-68 Part (a)
See the response to part (d) below.
Part (b)
A void reactivity coefficient is not input as a linear function into ODYN. ODYN uses cross sections that are fit as a quadratic function of moderator density for each control state at each axial height as described in NEDO-24154-A, Vol. I, p. 5-11. The kinetics model diffusion parameters (E) are provided as quadratic functions of relative water density (u) as shown below for each control state at each axial node.
- = 2£o(1+a(u-uo)+b(u-uo_))
- 0 = basestate diffusion cross section a = linear coefficient b = quadratic coefficient u = average relative water density = PlPw U0 = basestate relative water density The fitting process utilizes the cross section parameter at the basestate (steady-state) relative water density and the parameter at several other relative water densities chosen to cover the
Attachment 2 to BVY 05-088 Docket No. 50-271 Page 4 of 17 NON-PROPRIETARY VERSION expected range of u variation. The raw cross section data is defined by the TGBLNPANACEA database. The nodal diffusion parameters will change as the relative water density varies during the transient. The resultant change in reactivity versus the water density (or void fraction) change can be interpreted as the ODYN void coefficient.
To further define high void fraction, the VYNPS (Vermont Yankee Nuclear Power Station) Cycle 25 transient results were reviewed to determine the time=O ODYN predicted 1D axial void fraction. The maximum exit void fraction considering the variation in axial power shapes and core flow was (( )). An exit void fraction of (( )) occurs for both CLTP/minimum core flow and EPU/minimum core flow since the void fraction is relatively constant along a rod line.
The ODYN predicted axial void fraction remains essentially unchanged at EPU conditions.
Part (c)
VYNPS is applying TGBLA06 methodology in core design, transient analysis, stability analysis, and monitoring. Figure SRXB-A-68-1 provides TGBLA06 void coefficient data and Figure SRXB-A-68-2 provides the corresponding MCNP data for 5 representative 10x1 0 lattices for the full range of instantaneous void (IV) conditions. The calculations are based on a 40% void history (VH) depletion followed by branch calculations at 0, 40, and 70% IV. The results are extrapolated above 70% IV. In Table SRXB-A-68-1, the average bias over the full exposure range is approximately (( )) at 70% IV. The average bias at 40% IV is approximately (( B].
Over this IV range, the magnitude of the bias is considered ((
)). Table SRXB-A-68-1 shows the TGBLA06 vs. MCNP data at 70% IV. Table SRXB-A-68-2 provides the 5 lattice details for selected exposures (selection discussed later). The average uncertainty at 70% IV in Table SRXB-A-68-1 is (( )). This uncertainty is representative of the 40% void fraction range (also (( ))). The value assumed in the Revised Supplementary Information Regarding Amendment 11 to GESTAR (Reference 68-1) is
(( ]B.
The bias and uncertainty above 70% IV has two potential issues:
- 3. The void coefficient data in Figure SRXB-A-68-1 and SRXB-68-2 is ((
11
- 4. The data that is utilized to develop the cross section parameters is based on instantaneous void branch cases from a (( )). Upper axial nodes are operating at ((
))
The following additional analyses have been performed for Vermont Yankee lattice 7009.
MCNP calculations have been performed from 40% void history, 70% void history, and 90%
Attachment 2 to BVY 05-088 Docket No. 50-271 Page 5 of 17 NON-PROPRIETARY VERSION void history. MCNP branch cases have been performed to instantaneous voids of 70%, 80%
and 90%. These analyses were performed for lattice exposures of ((
Attachment 2 to BVY 05-088 Docket No. 50-271 Page 6 of 17 NON-PROPRIETARY VERSION
))
In summary, for transient applications that utilize TGBLA06 based modeling (PANACI 1, ODYN, and ODYSY) the evaluation discussed above for (( )) void fraction (Table SRXB-A-68-1) is applicable to the consideration of both the TGBLA06 cross section extrapolation process and the TGBLA06 void history assumption. An assumption of (( )) bias and a 2a uncertainty of
)) is justified and is applied in the response to part (d) below.
Part (d)
As documented in Reference 68-1, the uncertainty in the ACPR/ICPR calculated by ODYN is determined by comparison of predictions with reactor data. The basis is the same as that used in NEDO-241 54-A. The reactor data used for determining the uncertainty are the ((
]J. To verify this model uncertainty is reasonable, a (( l] was performed on key parameters at a bounding value judged to be at the 2a level including the void coefficient. The results from this study documented in Reference 68-1 showed that the model uncertainty based on the model perturbation analysis supports the model uncertainty determined from the comparison to plant data. It was concluded that the approved model uncertainty process is sufficient to account for void coefficient uncertainty along with the uncertainty in other nuclear and model parameters.
The model uncertainty (( )) was also updated with the latest TGBLA06 / PANAC1 1 methods following the approved process. With the updated model uncertainty the statistical adders were also updated. These were provided to the NRC in Reference 68-2.
An analysis was performed for VYNPS Cycle 25 to quantify the sensitivity of this core to void coefficient. The ACPR/ICPR uncertainty based on perturbations with a 2a uncertainty of
[] is approximately (( )). This sensitivity is consistent with the sensitivity provided in Reference 68-1 ((
Attachment 2 to BVY 05-088 Docket No. 50-271 Page 7 of 17 NON-PROPRIETARY VERSION
)) (see Reference 68-1 Table 3-2). When combined with the other uncertainties in Reference 68-1 Table 3-2, the total uncertainty from the analytical perturbation analysis is negligibly impacted ((
Part (e)
These results indicate that the void coefficient uncertainty is not substantially different at the void fractions expected for EPU conditions. The data shows no evidence of new uncertainties that would invalidate the qualification basis for models applied to transient, ATWS, or stability analysis. The void reactivity coefficient bias and uncertainty derived in the original ODYN licensing topical report remains valid and applicable for the EPU core and fuel designs. The void reactivity coefficients are applicable for the range of core thermal-hydraulic conditions expected for the transient and accident conditions, including ATWS.
References:
68-1 "Revised Supplementary Information Regarding Amendment 11 to GE Licensing Topical Report NEDE-2401 1-P-A," MFN-003-86, January 1986 68-4 TODYN Statistical Adders Update," FLN-2000-014, September 22, 2000 68-5 "TRACG Application for Anticipated Operational Occurrence Transient Analysis," NEDE-32906P-A, Revision 1, April 2003
Attachment 2 to BVY 05-088 Docket No. 50-271 Page 8 of 17 NON-PROPRIETARY VERSION (3}]
Figure SRXB-A-68-1 Void Coefficient Averaged for 5 lOxlO Lattices at Exposures of 0,5,10,15,20,25,30,50,70GWdlST - TGBLA06
Attachment 2 to BVY 05-088 Docket No. 50-271 Page 9 of 17 NON-PROPRIETARY VERSION 1[
Figure SRXB-A-68-2 Void Coefficient Averaged for 5 lOxi0 Lattices at Exposures of 0,5,10,15,20,25,30,50,70GWdlST - MCNP
Attachment 2 to BVY 05-088 Docket No. 50-271 Page 10 of 17 NON-PROPRIETARY VERSION Table SRXB-A-68-1 Void Coefficient Comparison between TGBLA06 and MCNP for 5 10xlO Lattices at 70% IV
[I
Attachment 2 to BVY 05-088 Docket No. 50-271 Page 11 of 17 NON-PROPRIETARY VERSION Table SRXB-A-68-2 Void Coefficient Comparison between TGBLA06 and MCNP for 5 lOx10 Lattices Details at 70% IV (10, 15, & 25 GWd/ST)
II
Attachment 2 to BVY 05-088 Docket No. 50-271 Page 12 of 17 NON-PROPRIETARY VERSION Table SRSB-A-68-3 Void Coefficient Comparison between TGBLA06 and MCNP for Lattice 7009 at 2 70% IV
(( I I I I I 4 4 I -t I 4 4 I 4 4 I
tI
& 4 +
1 4 4-4 4- 4 4 4- I 1- I t 1]
Attachment 2 to BVY 05-088 Docket No. 50-271 Page 13 of 17 NON-PROPRIETARY VERSION Table SRSB-A-68-3 Void Coefficient Comparison between TGBLA06 and MCNP for Lattice 7009 at 2 70% IV I.
-t 1*
4 t 1 l l l 4 4 4-
))
Attachment 2 to BVY 05-088 Docket No. 50-271 Page 14 of 17 NON-PROPRIETARY VERSION
[E 1]
Figure SRXB-A-68-3
[H n1
Attachment 2 to BVY 05-088 Docket No. 50-271 Page 15 of 17 NON-PROPRIETARY VERSION
((
1]
Figure SRXB-A-68-4
[1
))
Attachment 2 to BVY 05-088 Docket No. 50-271 Page 16 of 17 NON-PROPRIETARY VERSION Table SRXB-A-68-4 TRACG Impact of High Exposure Void Coefficient Bias High Exposure %
Parameter (*) Base Biased Difference II
- LRNBP is Generator Load Rejection without Bypass MSIVF is MSIV Closure with Flux Scram
- % Difference is defined as ((High Exp Biased - Base) / (High Exp Biased)) X 100
((
Attachment 2 to BVY 05-088 Docket No. 50-271 Page 17 of 17 NON-PROPRIETARY VERSION
))
BVY 05-088 Docket No. 50-271 Attachment 3 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 263 - Supplement No. 35 Extended Power Uprate - Additional Information General Electric Affidavit l Total number of pages in Attachment 3 l (excludina this cover sheet) is 3. l
General Electric Company AFFIDAVIT I, Glen Watford, state as follows:
(1) I am General Manager, Performance Services, General Electric Company ("GE"), have been delegated the function of reviewing the information described in paragraph (2) which is sought to be withheld, and have been authorized to apply for its withholding.
(2) The information sought to be withheld is contained in Enclosure 2 of GE letter, GE-VYNPS-AEP-406, Response to NRC RAI SRXB-68, dated September 27, 2005. The proprietary information in Enclosure 2, Responses to NRC RAI SRXB-68, is delineated by a double underline inside double square brackets. Figures and large equation objects are identified with double square brackets before and after the object In each case, the 3 refers to Paragraph (3) of this affidavit, which provides the basis superscript notation&
for the proprietary determination.
(3) In making this application for withholding of proprietary information of which it is the owner, GE relies upon the exemption from disclosure set forth in the Freedom of Information Act ("FOIA"), 5 USC Sec. 552(b)(4), and the Trade Secrets Act, 18 USC Sec. 1905, and NRC regulations 10 CFR 9.17(a)(4), and 2.390(a)(4) for "trade secrets" (Exemption 4). The material for which exemption from disclosure is here sought also qualify under the narrower definition of "trade secret", within the meanings assigned to those terms for purposes of FOIA Exemption 4 in, respectively, Critical Mass Enery Project v. Nuclear Regulatory Commission, 975F2d871 (DC Cir. 1992), and Public Citizen Health Research Group v. FDA, 704F2dl280 (DC Cir. 1983).
(4) Some examples of categories of information which fit into the definition of proprietary information are:
- a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over other companies;
- b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product;
- c. Information which reveals aspects of past, present, or future General Electric customer-funded development plans and programs, resulting in potential products to General Electric;
- d. Information which discloses patentable subject matter for which it may be desirable to obtain patent protection.
The information sought to be withheld is considered to be proprietary for the reasons set forth in paragraphs (4)a., and (4)b, above.
(5) To address 10 CFR 2.390 (b) (4), the information sought to be withheld is being submitted to NRC in confidence. The information is of a sort customarily held in confidence by GE, and is in fact so held. The information sought to be withheld has, to the best of my knowledge and belief, consistently been held in confidence by GE, no public disclosure has been made, and it is not available in public sources. All disclosures to third parties including any required transmittals to NRC, have been made, or must be made, pursuant to regulatory provisions or proprietary agreements which provide for maintenance of the information in confidence. Its initial designation as proprietary information, and the subsequent steps taken to prevent its unauthorized disclosure, are as set forth in paragraphs (6) and (7) following.
(6) Initial approval of proprietary treatment of a document is made by the manager of the originating component, the person most likely to be acquainted with the value and sensitivity of the information in relation to industry knowledge. Access to such documents within GE is limited on a "need to know" basis.
(7) The procedure for approval of external release of such a document typically requires review by the staff manager, project manager, principal scientist or other equivalent authority, by the manager of the cognizant marketing function (or his delegate), and by the Legal Operation, for technical content, competitive effect, and determination of the accuracy of the proprietary designation. Disclosures outside GE are limited to regulatory bodies, customers, and potential customers, and their agents, suppliers, and licensees, and others with a legitimate need for the information, and then only in accordance with appropriate regulatory provisions or proprietary agreements.
(8) The information identified in paragraph (2), above, is classified as proprietary because it contains detailed results and conclusions from analyses supporting the extended power uprate of the Vermont Yankee Power Station utilizing analytical models and methods including computer codes and methods of applying these for safety analyses, which GE has developed. The development of these models and computer codes and methods was achieved at a significant cost to GE, on the order of several million dollars.
The development of the analytical methods and evaluation process along with the interpretation and application of the analytical results is derived from the extensive experience database that constitutes a major GE asset.
(9) Public disclosure of the information sought to be withheld is likely to cause substantial harm to GE's competitive position and foreclose or reduce the availability of profit-making opportunities. The information is part of GEs comprehensive BWR safety and technology base, and its commercial value extends beyond the original development cost.
The value of the technology base goes beyond the extensive physical database and analytical methodology and includes development of the expertise to determine and apply the appropriate evaluation process. In addition, the technology base includes the value derived from providing analyses done with NRC-approved methods.
The research, development, engineering, analytical and NRC review costs comprise a substantial investment of time and money by GE.
The precise value of the expertise to devise an evaluation process and apply the correct analytical methodology is difficult to quantify, but it clearly is substantial.
GE's competitive advantage will be lost if its competitors are able to use the results of the GE experience to normalize or verify their own process or if they are able to claim an equivalent understanding by demonstrating that they can arrive at the same or similar conclusions.
The value of this information to GE would be lost if the information were disclosed to the public. Making such information available to competitors without their having been required to undertake a similar expenditure of resources would unfairly provide competitors with a windfall, and deprive GE of the opportunity to exercise its competitive advantage to seek an adequate return on its large investment in developing these very valuable analytical tools.
I declare under penalty of perjury that the foregoing affidavit and the matters stated therein are true and correct to the best of my knowledge, information, and belief.
Executed on this 27"' of September 2005 aenatford General Elcoric
BVY 05-088 Docket No. 50-271 Attachment 4 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 263 - Supplement No. 35 Extended Power Uprate - Additional Information Proposed License Condition - Minimum Critical Power Ratio Total number of pages in Attachment 4 (excludina this cover sheet) is 1.
Attachment 4 to BVY 05-088 Docket No. 50-271 Page 1 of 1 Vermont Yankee Nuclear Power Station PROPOSED LICENSE CONDITION - MINIMUM CRITICAL POWER RATIO In response to NRC staff requests for information regarding General Electric's (GE) analytical methodologies for establishing fuel thermal limits, and in support of its license application for extended power uprate (EPU), Entergy provided' a Vermont Yankee Nuclear Power Station (WNPS-specific approach to address postulated uncertainties in GE's methodologies. To provide additional conservatism and margin, Entergy has proposed an interim license condition that imposes an increase in the safety limit minimum critical power ratio. The proposed license condition is stated as follows:
When operating at thermal power greater than 1593 MWt, the margin between the safety limit minimum critical power ratio (SLMCPR) specified in Technical Specification 1.1.A.1 and the operating limit minimum critical power ratio (OLMCPR) shall be increased by 0.02. This additional margin in the minimum critical power ratio shall be implemented by adding 0.02 ?CPR to the OLMCPR determined consistent with the NRC-approved methodologies documented in General Electric Licensing Topical Report (LTR), NEDE-24011-P-A, 'General Electric Standard Application for Reactor Fuel,' as amended, and documented in the Core Operating Limits Report.
This license condition shall expire without the need for a license amendment upon:
a) The issuance of an NRC safety evaluation accepting General Electric's LTR, NEDC-331 73-P, Applicability of General Electric's Methodologies to Expanded Operating Ranges," and b) The implementation of a reload licensing analysis that incorporates the methodologies specified in LTR NEDC-331 73-P and accepted by the NRC.
1 Entergy letter to U.S. Nuclear Regulatory Commission, "Vermont Yankee Nuclear Power Station, Technical Specification Proposed Change No. 263 - Supplement No. 30, Extended Power Uprate -
Response to Request for Additional Information," BVY 05-071, August 1,2005