From:

Rick Ennis To:

Paul Blanch Date:

6/25/04 3:36PM

Subject:

Re: Compliance with NRC Regulatory compliance

Paul, A response has not yet been sent to the 12/8/03 letter from Bill Sherman. Heres a response to your other questions:
1) Did the VY SAR originally or at any time address compliance with regulatory criteria as required by RG 1.70 Chapter 1?

The VY UFSAR, Appendix F, addresses conformance to the 70 AEC General Design Criteria (proposed GDCs).

2) Where can I locate the latest requirements for the content of an SAR? (RG 1.70, NUREG 0800 or Harold Dentons letter to the Commission dated July 23, 1980)?

The requirements for the content of an SAR are contained in 10 CFR 50.34. RG 1.70 and NUREG 0800 do not contain requirements.

RGs are issued to describe and make available to the public such information as methods acceptable to the staff for implementing specific parts of the NRCs regulations, techniques used by the staff in evaluating specific problems or postulated accidents, and guidance to applicants. RGs are not substitutes for regulations, and compliance with RGs is not required.

RG 1.70, Revision 3, provides guidance on the format and content of SARs.

The Standard Review Plan (SRP), NUREG-0800, provides guidance to the NRR staff reviewers in performing its safety reviews. Compliance with the SRP is not required.

3) How can I locate a copy of the original SAR Chapter 1 for VY?

I was unable to find it. Suggest you contact the PDR at 301-415-4737.

4) Why have Sections 1 and 2 seemed to have vanished from NUREG 0800?

The sections still exist, however, Im not sure why they arent shown on the NRC webpage at:

http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr0800/

I asked the Project Manager who has been working on an office instruction related to the SRP process (Rob Kuntz) to look into this issue.

5) Where can I find the requirements for the SAR?

As stated above, the requirements for the content of an SAR are contained in 10 CFR 50.34.

The requirements for SAR updates are contained in 10 CFR 50.71.

6) What design basis documentation and regulations will be used by the Engineering Assessment team?

The guidance for the team is contained in Temporary Instruction 2515/158 which is available in ADAMS at Accession No. ML041730177.

Thanks, Rick 301-415-1420

>>> "Paul Blanch" <pmblanch@comcast.net> 06/15/04 12:58PM >>>

Rick:

First of all do you know if a response has been sent to Bill Shermans letter of December 8, 2003?

The second questions relates to the compliance with regulatory requirements.

I noted the update to the Prairie Island SAR dated 1999. In Section 1 of this update, Prairie Island specifically addresses (Section 1.5) all 70 GDCs in effect at the time of the issuance of the license. Because VY and PI were licensed about the same time I would expect to find the same type of information contained within the VY SAR. This is addressed in Section 1.5 of the PI SAR.

I reviewed the most recent VY Amendment 18 to the VY SAR and found no comparable section addressing compliance with regulatory criteria.

I also note that the requirements published in RG 1.70 required that compliance with GDCs and Regulatory Guides be addressed.

The following is from From Reg Guide 1.70 obtained from ADAMS.

TABLE OF CONTENTS Page INTRODUCTION i Chapter 1 INTRODUCTION AND GENERAL DESCRIPTION OF PLANT 1.1 Introduction 1-1 1.2 General Plant Description 1-1 1.3 Comparison Tables 1-2 1.3.1 Comparisons with Similar Facility Designs1-2 1.3.2 Comparison of Final and Preliminary Information... 1-2 1.4 Identification of Agent~s and Contractors 1-2 1.5 Requirements for Further Technical Information 1-2 1.6 Material Incorporated by Reference 1.7 Drawings and Other Detailed Information 1-4

  • 1.7.1 Electrical, Instrumentation, and Control

Drawings 1-4 1.7.2 Piping and Instrumentation Diagrams 1-4 1.7.3 Other Detailed Information 1-4 1.8 Conformance to NRC Regulatory Guides 1-4 1.9 Standard Designs 1-4 1.9.1 Interfaces 1.9.2Exceptions ~l~44 VYs SAR does not seem to have a comparable section. 1.8 is titled summary of radiation effects.

I realize that RG 1.70 has been superceded by NUREG 0800 but when I access this in ADAMS, Sections 1 and 2 of this document are missing for some reason.

Would you be so kind as to provide answers to the following:

Did the VY SAR originally or at any time address compliance with regulatory criteria as required by RG 1.70 Chapter 1?

Where can I locate the latest requirements for the content of an SAR? (RG 1.70, NUREG 0800 or Harold Dentons letter to the Commission dated July 23, 1980)

How can I locate a copy of the original SAR Chapter 1 for VY?

Why have Sections 1 and 2 seemed to have vanished from NUREG 0800?

Where can I find the requirements for the SAR?

What design basis documentation and regulations will be used by the Engineering Assessment team?

A response to these questions would be greatly appreciated before the NRCs meeting with the State of Vermont to be held on June 28, 2004.

CC:

Allen Howe; Anthony McMurtray; Arnie Gundersen; Brian Holian; Cliff Anderson; Cornelius Holden; Dave Lochbaum; David Pelton; Donna Skay; Mohammed Shuaibi; Raymond Shadis; Robert Kuntz; Stuart Richards; Tad Marsh; William Ruland

Mail Envelope Properties (40DC7ED0.65D : 15 : 20516)

Subject:

Re: Compliance with NRC Regulatory compliance Creation Date:

6/25/04 3:36PM From:

Rick Ennis Created By:

RXE@nrc.gov Recipients Action Date & Time owf4_po.OWFN_DO Delivered 06/25/04 03:36PM WHR CC (William Ruland) twf4_po.TWFN_DO Delivered 06/25/04 03:36PM RFK CC (Robert Kuntz)

Opened 06/25/04 03:37PM comcast.net Transferred 06/25/04 03:36PM pmblanch (Paul Blanch) ime.net Transferred 06/25/04 03:36PM shadis CC (Raymond Shadis) nrc.gov kp1_po.KP_DO Delivered 06/25/04 03:37PM BEH CC (Brian Holian)

CJA CC (Cliff Anderson)

DLP1 CC (David Pelton) nrc.gov owf2_po.OWFN_DO Delivered 06/25/04 03:36PM ACM2 CC (Anthony McMurtray)

DMS6 CC (Donna Skay)

Opened 06/25/04 03:42PM MAS4 CC (Mohammed Shuaibi) nrc.gov owf4_po.OWFN_DO Delivered 06/25/04 03:36PM AGH1 CC (Allen Howe)

CFH CC (Cornelius Holden)

LBM CC (Tad Marsh)

SAR CC (Stuart Richards) sailchamplain.net Transferred 06/25/04 03:36PM arniegundersen CC (Arnie Gundersen) ucsusa.org Transferred 06/25/04 03:36PM

dlochbaum CC (Dave Lochbaum)

Post Office Delivered Route owf4_po.OWFN_DO 06/25/04 03:36PM twf4_po.TWFN_DO 06/25/04 03:36PM comcast.net ime.net kp1_po.KP_DO 06/25/04 03:37PM nrc.gov owf2_po.OWFN_DO 06/25/04 03:36PM nrc.gov owf4_po.OWFN_DO 06/25/04 03:36PM nrc.gov sailchamplain.net ucsusa.org Files Size Date & Time MESSAGE 11221 06/25/04 03:36PM Options Auto Delete:

No Expiration Date:

None Notify Recipients:

Yes Priority:

Standard Reply Requested:

No Return Notification:

None Concealed

Subject:

No Security:

Standard To Be Delivered:

Immediate Status Tracking:

Delivered & Opened ADAMS Accession No.: ML041810022