d

.E i; L I NRR WORK REQUEST Application Date: 12/8/03 lActivity Typoe: Yellow Ticket Plant: Vermont Yankee Units:

TAC No(s):

MC1505 Proposed Action: Letter dated 12/8/03 from State of Vermont provides questions regarding the proposed Vermont Yankee Extended Power Uprate (EPU). The EPU review is being performed under TAC No. MC0761.

PM: Rick Ennis Phone: x1420 Email: RXE WMS: O-8B1 ASSISTANCE REQUESTED Technical Branch: IEPB-A (Thatcher)

Other TBs Providing InpuVConcurrence: SPSB-C (Dennig)

Scope of Review/Product Requested: Provide memo to DLPM with proposed response to question 3.

Possible Precedents: N/A Comment:

PM Signature:

I Date:

I 2Z l3 Prolects Request Tech Branch Agreed TO Target Date:

2/27/04 2/7101 Staff-Hour Estimate:

20 Intermediate Milestone (e.g., RAI)

Milestone: N/A Target Date Date:

Latest Possible Completion Date 3/31/04 II Schedule/Priority Considerations (e.g., transfer, uprate, outage)

Projects SC Signature/Date: DpigA I4(D3 TB SC Signature/Date:

TECHNICAL BRANCH RESPONSE 12131-103 TB Product:

Assigned Reviewer:

{iC.

SPhone:

x 7

/

1 Email: t?4g( 5 Comments:

Any change In target date, priority orstaff-hr estimate should be negotiated with the PM before revising.

In addition, please Inform the PM of any additional TBs required, that are not Identified above, for the review.

- Return to PM Within 5 Working Days of Receipt -