BVY 08-046, Revision of Technical Specification Bases Page 97

From kanterella
Jump to navigation Jump to search

Revision of Technical Specification Bases Page 97
ML082130095
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 07/28/2008
From: Ted Sullivan
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BVY 08-046, TAC MB8727
Download: ML082130095 (4)


Text

Entergy Nuclear Operations, Inc.

Vermont Yankee P.O. Box 0250 Entergy 320 Governor Hunt Road Vernon, VT 05354 Tel 802 257 7711 July 28, 2008 BVY 08-046 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Reference:

(1) Letter, Entergy to USNRC, "Revision of Technical Specification Bases Page," BVY 03-38, dated April 16, 2003 (2) Letter, USNRC to Entergy, "Revision of Technical Specification Bases Page (TAC No. MB8727)," NVY 03-38, dated May 15, 2003

Subject:

Vermont Yankee Nuclear Power Station License No. DPR-28 (Docket No. 50-271)

Revision of Technical Specification Bases Page 97

Dear Sir or Madam,

This letter provides a revised Vermont Yankee Technical Specification (TS) Bases page 97.

Bases page 97 was previously revised in accordance with 10CFR50.59 and provided to the NRC by Reference (1) to delete the Standby Liquid Control System 5% delta k shutdown margin wording specified in the TS Bases.

In processing a subsequent license amendment that affected TS Bases page 97, an administrative error resulted in the deleted information being placed back on the page.

This submittal is for your information and to supply a corrected page to restore the proper wording. A marked up copy of the page is also provided to clearly show the change.

There are no new regulatory commitments being made in this submittal.

Should you have any questions concerning this submittal, please contact Mr. David J.

Mannai at (802) 451-3304.

Sincerely, Vermont Yankee Nuclear Power Station Attachment (2 pages) cc listing (next page) 7 4

BVY 08-046 Docket No. 50-271 Page 2 of 2 cc: Mr. Samuel J. Collins, Regional Administrator U.S. Nuclear Regulatory Commission, Region 1 475 Allendale Road King of Prussia, PA 19406-1415 Mr. James S. Kim, Project Manager U.S. Nuclear Regulatory Commission Mail Stop 0 8 C2A Washington, DC 20555 USNRC Resident Inspector Entergy Nuclear Vermont Yankee P.O. Box 157 320 Governor Hunt Road Vernon, Vermont 05354 Mr. David O'Brien, Commissioner VT Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05620

VYNPS BASES:

3.4 & 4.4 REACTOR STANDBY LIQUID CONTROL SYSTEM A. Normal Operation The design objective of the Reactor Standby Liquid Control System (SLCS) is to provide the capability of bringing the reactor from full power to a cold, xenon-free shutdown assuming that none of the withdrawn control rods can be inserted. To meet this objective, the Standby Liquid Control System is designed to inject a quantity of boron which produces a concentration of 800 ppm of natural boron in the reactor core in less than 138 minutes. An 800 ppm natural boron concentration in the reactor core is required to bring the reactor from full power to aC5Y7E subcritical condition. An additional margin (25%

of boron) is adde-or possible imperfect mixing of the chemical solution in the reactor water. A minimum quantity of 3850 gallons of solution having a 10.i% natural sodium pentaborate concentration is required to meet this shutdown requirement.

The time requirement (138 minutes) for insertion of the boron solution was selected to override the rate of reactivity insertion due to cooldown of the reactor following the xenon poison peak. For a required minimum pumping rate of 35 gallons per minute, the maximum net storage volume of the boron solution is established as 4830 gallons.

In addition to its original design basis, the Standby Liquid Control System also satisfies the requirements of I0CFR50.62(c) (4) on anticipated transients without scram (ATWS) by using enriched boron.

The ATWS rule adds hot shutdown and neutron absorber (i.e., boron-10) injection rate requirements that exceed the original Standby Liquid Control System design basis. However, changes to the Standby Liquid Control System as a result of the ATWS rule have not invalidated the original design basis.

With the reactor mode switch in the "Run" or "Startup/Hot Standby" position, shutdown capability is required. With the mode switch in "Shutdown," control rods are not able to be withdrawn since a control rod block is applied. This provides adequate controls to ensure that the reactor remains subcritical. With the mode switch in "Refuel,"

only a single control rod can be withdrawn from a core cell containing fuel assemblies. Determination of adequate shutdown margin by Specification 3.3.A ensures that the reactor will not become critical.

Therefore, the Standby Liquid Control System is not required to be operable when only a single control rod can be withdrawn.

Pump operability testing (by recirculating demineralized water to the test tank)in accordance with Specification 4.6.E is adequate to detect if failures have occurred. Flow, circuitry, and trigger assembly testing at the prescribed intervals assures a high reliability of system operation capability. The maximum SLCS pump discharge pressure during the limiting ATWS event is 1325 psig. This value is based on a reactor vessel lower plenum pressure of 1292 psia that occurs during the limiting ATWS event at the time of SLCS initiation, i.e., 120 seconds into the event. There is adequate margin to prevent the SLCS relief valve from lifting. Recirculation of the borated solution is done during each operating cycle to ensure one suction line from the boron tank is clear. in addition, at least once duriný each operating cycle, one of the standby liquid control loops will be initiated to verify that a flow path from a pump to the reactor vessel is available by pumping demineralized water into the reactor vessel.

Amendment No. 4-Gs, -4 4-,24, 4-7, , B, , 2i-4 L4, 229 97

VYNPS BASES:

3.4 & 4.4 REACTOR STANDBY LIQUID CONTROL SYSTEM A. Normal Operation The design objective of the Reactor Standby Liquid Control System (SLCS) is to provide the capability of bringing the reactor from full power to a cold, xenon-free shutdown assuming that none of the withdrawn control rods can be inserted. To meet this objective, the Standby Liquid Control System is designed to inject a quantity of boron which produces a concentration of 800 ppm of natural boron in the reactor core in less than 138 minutes. An 800 ppm natural boron concentration in the reactor core is required to bring the reactor from full power to a subcritical condition. An additional margin (25% of boron) is added for possible imperfect mixing of the chemical solution in the reactor water. A minimum quantity of 3850 gallons of solution having a 10.1% natural sodium pentaborate concentration is required to meet this shutdown requirement.

The time requirement (138 minutes) for insertion of the boron solution was selected to override the rate of reactivity insertion due to cooldown of the reactor following the xenon poison peak. For a required minimum pumping rate of 35 gallons per minute, the maximum net storage volume of the boron solution is established as 4830 gallons.

In addition to its original design basis, the Standby Liquid Control System also satisfies the requirements of I0CFR50.62(c) (4) on anticipated transients without scram (ATWS) by using enriched boron.

The ATWS rule adds hot shutdown and neutron absorber (i.e., boron-10)

,injection rate requirements that exceed the original Standby Liquid Control System design basis. However, changes to the Standby Liquid Control System as a result of the ATWS rule have not invalidated the original design basis.

With the reactor mode switch in the "Run" or "Startup/Hot Standby" position, shutdown capability is required. With the mode switch in "Shutdown," control rods'are not able to be withdrawn since a control rod block is applied. This provides adequate controls to ensure that the reactor remains subcritical. With the mode switch in "Refuel,"

only a single control rod can be withdrawn from a core cell containing fuel assemblies. Determination of adequate shutdown margin'by Specification 3.3.A ensures that the reactor will not become critical.

Therefore, the Standby Liquid Control System is not required to be operable when only a single control rod can be withdrawn.

Pump operability testing (by recirculating demineralized water to the test tank)in accordance with Specification 4.6.E is adequate to detect if failures have occurred. Flow, circuitry, and trigger assembly testing at the prescribed intervals assures a high reliability of system operation capability. The maximum SLCS pump discharge pressure during the limiting ATWS event is 1325 psig. This value is based on a reactor vessel lower plenum pressure of 1292 psia that occurs during the limiting ATWS event at the time of SLCS initiation, i.e., 120 seconds into the event. There is adequate margin to prevent the SLCS relief valve from lifting. Recirculation of the borated solution is done during each operating cycle to ensure one suction line from the boron tank is clear. In addition, at least once during each operating cycle, one of the standby liquid control loops will be initiated to verify that a flow path from a pump to the reactor vessel is available by pumping demineralized water into the reactor vessel.

Amendment No. -*, 4--4, --24., --44, -V*3 38, , 2-2-4, 229 97