BVY 15-055, Revision of Technical Specifications Bases Pages | 16 November 2015 | Revision of Technical Specifications Bases Pages | Missed surveillance |
BVY 15-024, Revision of Technical Specifications Bases Pages | 25 March 2015 | Revision of Technical Specifications Bases Pages | Reactor Vessel Water Level Stroke time Fuel cladding Recently irradiated fuel |
ML14231A017 | 13 August 2014 | Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 4 | Time to boil Aging Management |
ML14202A206 | 16 July 2014 | Technical Specifications Proposed Change No. 307, Revision to Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 2 | High Radiation Area Process Control Program Fire Protection Program |
BVY 14-049, Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 3 | 11 June 2014 | Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 3 | Shutdown Margin |
ML13323A518 | 14 November 2013 | Technical Specifications Proposed Change No. 306 Eliminate Certain ESF Requirements During Movement of Irradiated Fuel | Safe Shutdown Reactor Vessel Water Level Non-Destructive Examination Stroke time Control of Heavy Loads Fuel cladding Recently irradiated fuel |
BVY 13-084, Revision of Technical Specification Bases Page | 9 September 2013 | Revision of Technical Specification Bases Page | |
BVY 13-053, Revision of Technical Specifications Bases Pages | 24 July 2013 | Revision of Technical Specifications Bases Pages | |
BVY 13-062, Revised of Technical Specification Bases Pages | 26 June 2013 | Revised of Technical Specification Bases Pages | Reactor Vessel Water Level |
BVY 13-043, Technical Specifications Proposed Change No. 304, Revision to Low Pressure Safety Limit | 14 May 2013 | Technical Specifications Proposed Change No. 304, Revision to Low Pressure Safety Limit | Unanalyzed Condition Reactor Vessel Water Level Anticipated operational occurrence Fuel cladding |
BVY 13-023, License Amendment Request; Changes to 10 CFR 50.63 Licensing Basis, Supplement 2 | 29 April 2013 | License Amendment Request; Changes to 10 CFR 50.63 Licensing Basis, Supplement 2 | |
BVY 13-022, Revision of Technical Specification Bases Pages | 26 March 2013 | Revision of Technical Specification Bases Pages | |
BVY 12-078, Technical Specifications Proposed Change 297, Supplement 2 Response to Request for Additional Information | 20 November 2012 | Technical Specifications Proposed Change 297, Supplement 2 Response to Request for Additional Information | |
BVY 12-055, Technical Specifications Proposed Change 297, Supplement 1, Response to Request for Additional Information | 7 August 2012 | Technical Specifications Proposed Change 297, Supplement 1, Response to Request for Additional Information | |
BVY 12-018, Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change | 17 April 2012 | Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change | Reactor Vessel Water Level |
BVY 12-006, Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance | 1 February 2012 | Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance | |
BVY 12-005, Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change | 1 February 2012 | Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change | |
BVY 11-068, Revision of Technical Specification Bases Pages Due to License Amendment 248 | 30 September 2011 | Revision of Technical Specification Bases Pages Due to License Amendment 248 | Reactor Vessel Water Level |
BVY 11-042, Technical Specifications Proposed Change No. 293, Supplement 1 Revised Reactor Vessel Pressure-Temperature Limitation Curves | 16 May 2011 | Technical Specifications Proposed Change No. 293, Supplement 1 Revised Reactor Vessel Pressure-Temperature Limitation Curves | |
BVY 11-037, Revision of Technical Specification Bases Pages Due to License Amendment 246 | 21 April 2011 | Revision of Technical Specification Bases Pages Due to License Amendment 246 | Shutdown Margin |
BVY 10-059, Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool | 8 November 2010 | Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool | Reactor Vessel Water Level |
BVY 10-056, Submittal of Revision of Technical Specification Bases Pages | 6 October 2010 | Submittal of Revision of Technical Specification Bases Pages | |
BVY 10-047, Revision of Technical Specifications Bases Page | 18 August 2010 | Revision of Technical Specifications Bases Page | |
BVY 10-027, Revision of Technical Specification Bases Pages | 21 May 2010 | Revision of Technical Specification Bases Pages | |
BVY 10-017, Technical Specifications Proposed Change No. 290 Administrative Changes | 13 April 2010 | Technical Specifications Proposed Change No. 290 Administrative Changes | High Radiation Area |
BVY 10-021, Revision of Technical Specification Bases Pages | 31 March 2010 | Revision of Technical Specification Bases Pages | |
BVY 09-074, Revision of Technical Specifications Bases Pages | 9 December 2009 | Revision of Technical Specifications Bases Pages | Spiral reload |
BVY 09-072, Technical Specification Bases Pages Associated with License Amendment 236 | 9 December 2009 | Technical Specification Bases Pages Associated with License Amendment 236 | Shutdown Margin Reactor Vessel Water Level Abnormal operational transient Scram Discharge Volume MELLLA Fuel cladding Power change |
BVY 09-068, Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves | 3 December 2009 | Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves | Abnormal operational transient Scram Discharge Volume Fuel cladding |
BVY 09-055, Revision of Technical Specifications Bases Page | 28 September 2009 | Revision of Technical Specifications Bases Page | |
BVY 09-052, Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves | 16 September 2009 | Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves | |
BVY 09-051, Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls | 26 August 2009 | Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls | High Radiation Area Locked High Radiation Area Process Control Program Fire Protection Program |
BVY 09-044, Revision of Technical Specifications Bases Pages | 28 July 2009 | Revision of Technical Specifications Bases Pages | Spiral reload |
BVY 09-029, Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test | 5 May 2009 | Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test | Probabilistic Risk Assessment |
BVY 09-021, Submittal of Revision of Technical Specification Bases Pages | 31 March 2009 | Submittal of Revision of Technical Specification Bases Pages | |
BVY 09-014, Submittal of Revised Technical Specification Bases Pages | 24 February 2009 | Submittal of Revised Technical Specification Bases Pages | Shutdown Margin Hydrostatic Abnormal operational transient Scram Discharge Volume |
BVY 09-012, Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements | 24 February 2009 | Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements | |
ML083650007 | 18 December 2008 | Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 6 | Post Accident Monitoring Fuel cladding |
BVY 08-087, Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 6 | 18 December 2008 | Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 6 | Post Accident Monitoring Fuel cladding |
BVY 08-087, Attachment 2, Technical Specification Proposed Change No. 273, Supplement 6, Sample Set-Point Calculations | 18 December 2008 | Attachment 2, Technical Specification Proposed Change No. 273, Supplement 6, Sample Set-Point Calculations | Safe Shutdown High Radiation Area Post Accident Monitoring Coatings |
BVY 08-081, Submittal of Revision of Technical Specification Bases Page 29 | 17 November 2008 | Submittal of Revision of Technical Specification Bases Page 29 | |
BVY 08-076, Revision of Technical Specification Bases Pages | 14 October 2008 | Revision of Technical Specification Bases Pages | |
BVY 08-052, Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements | 22 September 2008 | Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements | |
BVY 08-059, Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications | 22 September 2008 | Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications | Probabilistic Risk Assessment Spiral reload |
BVY 08-069, Transmittal of Technical Specifications Proposed Change No. 281, Revision to Battery Systems | 22 September 2008 | Transmittal of Technical Specifications Proposed Change No. 281, Revision to Battery Systems | Probabilistic Risk Assessment |
BVY 08-066, Submittal of Corrected Technical Specification Page | 26 August 2008 | Submittal of Corrected Technical Specification Page | |
BVY 08-060, Submittal of Revision of Technical Specification Bases Page 220 | 25 August 2008 | Submittal of Revision of Technical Specification Bases Page 220 | |
BVY 08-046, Revision of Technical Specification Bases Page 97 | 28 July 2008 | Revision of Technical Specification Bases Page 97 | Shutdown Margin |
BVY 08-031, Revision of Technical Specification Bases Page | 29 May 2008 | Revision of Technical Specification Bases Page | Spiral reload Control of Heavy Loads |
BVY 08-001, Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications | 12 February 2008 | Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications | Shutdown Margin Reactor Vessel Water Level Post Accident Monitoring Probabilistic Risk Assessment Abnormal operational transient Scram Discharge Volume MELLLA Fuel cladding Power change |