Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
BVY 15-055, Revision of Technical Specifications Bases Pages16 November 2015Revision of Technical Specifications Bases PagesMissed surveillance
BVY 15-024, Revision of Technical Specifications Bases Pages25 March 2015Revision of Technical Specifications Bases PagesReactor Vessel Water Level
Stroke time
Fuel cladding
Recently irradiated fuel
ML14231A01713 August 2014Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 4Time to boil
Aging Management
ML14202A20616 July 2014Technical Specifications Proposed Change No. 307, Revision to Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 2High Radiation Area
Process Control Program
Fire Protection Program
BVY 14-049, Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 311 June 2014Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 3Shutdown Margin
ML13323A51814 November 2013Technical Specifications Proposed Change No. 306 Eliminate Certain ESF Requirements During Movement of Irradiated FuelSafe Shutdown
Reactor Vessel Water Level
Non-Destructive Examination
Stroke time
Control of Heavy Loads
Fuel cladding
Recently irradiated fuel
BVY 13-084, Revision of Technical Specification Bases Page9 September 2013Revision of Technical Specification Bases Page
BVY 13-053, Revision of Technical Specifications Bases Pages24 July 2013Revision of Technical Specifications Bases Pages
BVY 13-062, Revised of Technical Specification Bases Pages26 June 2013Revised of Technical Specification Bases PagesReactor Vessel Water Level
BVY 13-043, Technical Specifications Proposed Change No. 304, Revision to Low Pressure Safety Limit14 May 2013Technical Specifications Proposed Change No. 304, Revision to Low Pressure Safety LimitUnanalyzed Condition
Reactor Vessel Water Level
Anticipated operational occurrence
Fuel cladding
BVY 13-023, License Amendment Request; Changes to 10 CFR 50.63 Licensing Basis, Supplement 229 April 2013License Amendment Request; Changes to 10 CFR 50.63 Licensing Basis, Supplement 2
BVY 13-022, Revision of Technical Specification Bases Pages26 March 2013Revision of Technical Specification Bases Pages
BVY 12-078, Technical Specifications Proposed Change 297, Supplement 2 Response to Request for Additional Information20 November 2012Technical Specifications Proposed Change 297, Supplement 2 Response to Request for Additional Information
BVY 12-055, Technical Specifications Proposed Change 297, Supplement 1, Response to Request for Additional Information7 August 2012Technical Specifications Proposed Change 297, Supplement 1, Response to Request for Additional Information
BVY 12-018, Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change17 April 2012Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve ChangeReactor Vessel Water Level
BVY 12-006, Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance1 February 2012Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance
BVY 12-005, Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change1 February 2012Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change
BVY 11-068, Revision of Technical Specification Bases Pages Due to License Amendment 24830 September 2011Revision of Technical Specification Bases Pages Due to License Amendment 248Reactor Vessel Water Level
BVY 11-042, Technical Specifications Proposed Change No. 293, Supplement 1 Revised Reactor Vessel Pressure-Temperature Limitation Curves16 May 2011Technical Specifications Proposed Change No. 293, Supplement 1 Revised Reactor Vessel Pressure-Temperature Limitation Curves
BVY 11-037, Revision of Technical Specification Bases Pages Due to License Amendment 24621 April 2011Revision of Technical Specification Bases Pages Due to License Amendment 246Shutdown Margin
BVY 10-059, Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool8 November 2010Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression PoolReactor Vessel Water Level
BVY 10-056, Submittal of Revision of Technical Specification Bases Pages6 October 2010Submittal of Revision of Technical Specification Bases Pages
BVY 10-047, Revision of Technical Specifications Bases Page18 August 2010Revision of Technical Specifications Bases Page
BVY 10-027, Revision of Technical Specification Bases Pages21 May 2010Revision of Technical Specification Bases Pages
BVY 10-017, Technical Specifications Proposed Change No. 290 Administrative Changes13 April 2010Technical Specifications Proposed Change No. 290 Administrative ChangesHigh Radiation Area
BVY 10-021, Revision of Technical Specification Bases Pages31 March 2010Revision of Technical Specification Bases Pages
BVY 09-074, Revision of Technical Specifications Bases Pages9 December 2009Revision of Technical Specifications Bases PagesSpiral reload
BVY 09-072, Technical Specification Bases Pages Associated with License Amendment 2369 December 2009Technical Specification Bases Pages Associated with License Amendment 236Shutdown Margin
Reactor Vessel Water Level
Abnormal operational transient
Scram Discharge Volume
MELLLA
Fuel cladding
Power change
BVY 09-068, Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves3 December 2009Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain ValvesAbnormal operational transient
Scram Discharge Volume
Fuel cladding
BVY 09-055, Revision of Technical Specifications Bases Page28 September 2009Revision of Technical Specifications Bases Page
BVY 09-052, Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves16 September 2009Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves
BVY 09-051, Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls26 August 2009Technical Specifications Proposed Change No. 285 Revision of High Radiation Area ControlsHigh Radiation Area
Locked High Radiation Area
Process Control Program
Fire Protection Program
BVY 09-044, Revision of Technical Specifications Bases Pages28 July 2009Revision of Technical Specifications Bases PagesSpiral reload
BVY 09-029, Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test5 May 2009Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a TestProbabilistic Risk Assessment
BVY 09-021, Submittal of Revision of Technical Specification Bases Pages31 March 2009Submittal of Revision of Technical Specification Bases Pages
BVY 09-014, Submittal of Revised Technical Specification Bases Pages24 February 2009Submittal of Revised Technical Specification Bases PagesShutdown Margin
Hydrostatic
Abnormal operational transient
Scram Discharge Volume
BVY 09-012, Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements24 February 2009Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements
ML08365000718 December 2008Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 6Post Accident Monitoring
Fuel cladding
BVY 08-087, Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 618 December 2008Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 6Post Accident Monitoring
Fuel cladding
BVY 08-087, Attachment 2, Technical Specification Proposed Change No. 273, Supplement 6, Sample Set-Point Calculations18 December 2008Attachment 2, Technical Specification Proposed Change No. 273, Supplement 6, Sample Set-Point CalculationsSafe Shutdown
High Radiation Area
Post Accident Monitoring
Coatings
BVY 08-081, Submittal of Revision of Technical Specification Bases Page 2917 November 2008Submittal of Revision of Technical Specification Bases Page 29
BVY 08-076, Revision of Technical Specification Bases Pages14 October 2008Revision of Technical Specification Bases Pages
BVY 08-052, Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements22 September 2008Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements
BVY 08-059, Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications22 September 2008Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical SpecificationsProbabilistic Risk Assessment
Spiral reload
BVY 08-069, Transmittal of Technical Specifications Proposed Change No. 281, Revision to Battery Systems22 September 2008Transmittal of Technical Specifications Proposed Change No. 281, Revision to Battery SystemsProbabilistic Risk Assessment
BVY 08-066, Submittal of Corrected Technical Specification Page26 August 2008Submittal of Corrected Technical Specification Page
BVY 08-060, Submittal of Revision of Technical Specification Bases Page 22025 August 2008Submittal of Revision of Technical Specification Bases Page 220
BVY 08-046, Revision of Technical Specification Bases Page 9728 July 2008Revision of Technical Specification Bases Page 97Shutdown Margin
BVY 08-031, Revision of Technical Specification Bases Page29 May 2008Revision of Technical Specification Bases PageSpiral reload
Control of Heavy Loads
BVY 08-001, Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications12 February 2008Technical Specifications Proposed Change No. 273 Instrumentation Technical SpecificationsShutdown Margin
Reactor Vessel Water Level
Post Accident Monitoring
Probabilistic Risk Assessment
Abnormal operational transient
Scram Discharge Volume
MELLLA
Fuel cladding
Power change