BVY 14-049, Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 3 | 11 June 2014 | Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 3 | Shutdown Margin |
BVY 12-018, Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change | 17 April 2012 | Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change | Reactor Vessel Water Level |
BVY 10-059, Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool | 8 November 2010 | Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool | Reactor Vessel Water Level |
BVY 09-052, Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves | 16 September 2009 | Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves | |
BVY 09-051, Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls | 26 August 2009 | Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls | High Radiation Area Locked High Radiation Area Process Control Program Fire Protection Program |
BVY 09-029, Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test | 5 May 2009 | Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test | Probabilistic Risk Assessment |
BVY 09-012, Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements | 24 February 2009 | Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements | |
BVY 08-059, Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications | 22 September 2008 | Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications | Probabilistic Risk Assessment Spiral reload |
BVY 08-066, Submittal of Corrected Technical Specification Page | 26 August 2008 | Submittal of Corrected Technical Specification Page | |
BVY 08-001, Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications | 12 February 2008 | Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications | Shutdown Margin Reactor Vessel Water Level Post Accident Monitoring Probabilistic Risk Assessment Abnormal operational transient Scram Discharge Volume MELLLA Fuel cladding Power change |
ML053530180 | 12 December 2005 | Technical Specification Proposed Change No. 266, Revision to Control Rod Operability, Scram Time Testing and Control Rod Accumulators - Response to Request for Additional Information | Shutdown Margin Anticipated operational occurrence |
BVY 05-101, Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 263 - Supplement No. 41 Re Extended Power Uprate - Condensate and Feedwater Transient Response Engineering Analysis | 2 November 2005 | Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 263 - Supplement No. 41 Re Extended Power Uprate - Condensate and Feedwater Transient Response Engineering Analysis | Flow Induced Vibration |
BVY 05-088, Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 35 Extended Power Uprate - Response to Request for Additional Information | 28 September 2005 | Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 35 Extended Power Uprate - Response to Request for Additional Information | Anticipated operational occurrence Minimum Critical Power Ratio |
BVY 05-086, Vermont Yankee - Technical Specifications Proposed Change No. 263 - Supplement No. 34 Extended Power Uprate - Additional Information | 18 September 2005 | Vermont Yankee - Technical Specifications Proposed Change No. 263 - Supplement No. 34 Extended Power Uprate - Additional Information | Shutdown Margin Anticipated operational occurrence Minimum Critical Power Ratio |
ML052440213 | 31 August 2005 | Technical Specification Page, Revision to One-Time Extension of Integrated Leak Rate Test Interval | |
ML050840253 | 22 March 2005 | Tech Spec Pages for Amendment 222 Regarding Elimination of Requirements to Provide Monthly Operating Reports and Annual Occupational Radiation Exposure Reports | High Radiation Area |
ML050540149 | 18 February 2005 | Corrected Page 7 to License DPR-28 and Page 97 to Technical Specifications for Vermont Yankee | Safe Shutdown Shutdown Margin Fire Protection Program |
BVY 04-098, Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 14 Extended Power Uprate - Response to Request for Additional Information | 15 September 2004 | Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 14 Extended Power Uprate - Response to Request for Additional Information | |
ML040860266 | 22 March 2004 | Technical Specification, Safety Limit Minimum Critical Power Ratio Values in Technical Specification 1.1.A.1 to Incorporate Results in cycle-specific Core Reload Analysis for Cycle 24 Operation | Minimum Critical Power Ratio Fuel cladding |
ML032930143 | 10 October 2003 | Technical Specification Proposed Change No. 262, Supplement No. 1 Regarding Alternative Source Term | |
ML032810447 | 1 October 2003 | Vermont Yankee - Technical Specification Proposed Change No. 263, Supplemental No. 1 Regarding Extended Power Uprate, Technical Review Guidance | Safety Limit Minimum Critical Power Ratio Ultimate heat sink Fuel cladding Fire Protection Program Power Uprate |
ML032190646 | 31 July 2003 | TS Proposed Change No. 262, Alternative Source Term | Ultimate heat sink Offsite Dose Calculation Manual Safe Shutdown Earthquake Probabilistic Risk Assessment Seismically rugged Large early release frequency MELLLA Earthquake Fuel cladding GOTHIC Power Uprate Affidavit |
ML022630284 | 18 September 2002 | Technical Specifications, Remove Existing Scram Function & Group 1 Isolation Valve Closure Functions of Main Steam Line Radiation Monitors | Reactor Vessel Water Level Scram Discharge Volume |
ML17037B779 | 7 February 1974 | Letter Regarding Petition for Derating of Certain Boiling Water Reactors and Enclosed Before the Atomic Safety and Licensing Appeal Board in the Matter of Vermont Yankee Nuclear Power Corporation - Vermont Yankee Nuclear ... |