BVY 09-055, Revision of Technical Specifications Bases Page

From kanterella
Jump to navigation Jump to search
Revision of Technical Specifications Bases Page
ML092750339
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 09/28/2009
From: Mannai D
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BVY 09-055
Download: ML092750339 (4)


Text

Entergy Nuclear Operations, Inc.

Vermont Yankee P.0- Box 0250 w-Entergy 320 Governor Hunt Rd Vernon, VT 05354 Tel 802 257 7711 David J. Manna!

Licensing Manager BVY 09-055 September 28, 2009 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555

SUBJECT:

Revision of Technical Specifications Bases Page Vermont Yankee Nuclear Power Station Docket No. 50-271 License No. DPR-28

Dear Sir or Madam:

This letter provides a revised Vermont Yankee Technical Specification (TS) Bases page. The Vermont Yankee TS Bases were revised to update the diesel fuel oil testing standard contained in TS Bases 4.10.C from ASTM D975-02 to the current testing standard, ASTM D975-09.

These changes, processed in accordance with our Technical Specification Bases Control Program (TS 6.7.E), were determined not to require prior NRC approval. The revised Bases page is provided for your information and for updating and inclusion with your copy of Vermont Yankee Technical Specifications. No NRC action is required in conjunction with this submittal.

There are no new regulatory commitments being made in this submittal.

Should you have any questions concerning this submittal, please contact me at 802-451-3304.

Sincerely, DJM/PLC A0of

BVY 09-055 / Page 2 of 2

Attachment:

1. Revised Technical Specifications Bases Page cc: Mr. Samuel J. Collins Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. James S. Kim, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 08C2A Washington, DC 20555 USNRC Resident Inspector Entergy Nuclear Vermont Yankee, LLC 320 Governor Hunt Rd.

Vernon, Vermont 05354 Mr. David O'Brien, Commissioner VT Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05620-2601

t.

BVY 09-055 Docket No. 50-271 Attachment 1 Vermont Yankee Nuclear Power Station Revised Technical Specifications Bases Page

VYNPS BASES: 4.10 (Cont'd) for the associated batteries. The results of these tests will be logged and compared with the manufacturer's recommendations of acceptability.

/

The Service Discharge Test (4.10.A.2.c) is a test of the batteries ability to satisfy the design requirements of the associated dc system. This test will be performed using simulated or actual loads at the rates and for the durations specified in the design load profile (battery duty cycle).

Assurance that the diesels will meet their intended function is obtained by periodic surveillance testing and the results obtained from the pump and valve testing performed in accordance with the requirements of Specification 4.6.E. Specification 4.10.B.l.a provides an allowance to avoid unnecessary testing of the operable emergency diesel generator (EDG). If it can be determined that the cause of the inoperable EDG (e.g., removal from service to perform routine maintenance or testing) does not exist on the operable EDG, demonstration of operability of the remaining EDG does not have to be performed. If the cause of inoperability exists on the remaining EDG, it is declared inoperable upon discovery, and Limiting Condition for Operation 3.10.B.1 requires reactor shutdown within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Once the failure is repaired, and the common cause failure no longer exists, Specification 4.10.B.l.a is satisfied. If the cause of the initial inoperable EDG cannot be confirmed not to exist on the remaining EDG, performance of Surveillance Requirement (SR) 4.10.B.l.b suffices to provide assurance of continued operability of that EDG.

In the event the inoperable EDG is restored to operable status prior to completing either SR 4.10.B.l.a or SR 4.10.B.l.b, the plant corrective action program will continue to evaluate the common cause possibility. This continued evaluation, however, is no longer under the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> constraint imposed while in the condition of SR 4.10.B.1 or SR 4.10.B.3.b.2.

According to NRC Generic Letter 84-15, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is a reasonable time to confirm that the operable EDG is not affected by the same problem as the inoperable EDG.

Verification of operability of an off-site power source within one hour and once per eight hours thereafter as required by 4.10.B.3.b.l may be performed as an administrative check by examining logs and other information to determine that required equipment is available and not out of service for maintenance or other reasons. It does not require performing the surveillance needed to demonstrate the operability of the equipment.

C. Logging the diesel fuel supply weekly and after each operation assures that the minimum fuel supply requirements will be maintained.

During the monthly test for quality of the diesel fuel oil, a viscosity test and water and sediment test will be performed as described in ASTM D975-09. The quality of the diesel fuel oil will be acceptable if the results of the tests are within the limiting requirements for diesel fuel oils shown on Table 1 of ASTM D975-09.

Amendment No. 472-&, 4-54, .V... 01 40, 2-04, 2-14, 2--4, -, BVY 06 086, 2-34, 223 BVY 09-055