Palisades Annual Assessment Meeting Reactor Oversight Program - CY 2004 Nuclear Regulatory Commission - Region III Lisle, Illinois March 31, 2005

Agenda z Introduction z Review of Reactor Oversight Process z National Summary of Plant Performance z Discussion of Plant Performance Results z Licensee Response and Remarks z NRC Closing Remarks z Break z NRC available to address public questions

NRC Representatives z Mark A. Satorius, Director, Division Reactor Projects

- (630) 829-9600 z Steven A. Reynolds, Deputy Division Director, DRP

- (630) 829-9601 z David H. Jaffe, Project Manager, NRR

- (301) 415-1439 z Jay Lennartz, Senior Resident Inspector (Outgoing)

- (269) 764-8971 z John Ellegood, Senior Resident Inspector (Incoming)

- (269) 764-8971 z Michelle Garza, Resident Inspector

- (269) 764-8971 z Robert M. Lerch, Senior Project Engineer (Acting Branch Chief)

- (630) 829-9759 z Eric R. Duncan, Branch Chief

- (630) 829-9628

Region III Organization James L. Caldwell Regional Administrator Geoffrey E. Grant Deputy Regional Administrator Mark A. Satorius Cynthia D. Pederson Director Division of Reactor Projects Director Division of Reactor Safety Steven A. Reynolds Roy J. Caniano Deputy Director Deputy Director Robert M. Lerch Regional Specialists Branch Chief Acting for Eric Duncan Palisades Resident Inspectors Project Engineer Jay Lennartz Robert M. Lerch John Ellegood Michelle Garza

NRC Performance Goals z Safety: Ensure protection of the public health and safety and the environment z Security: Ensure the secure use and management of radioactive materials z Openness: Ensure openness in our regulatory process z Effectiveness: Ensure that NRC actions are effective, efficient, realistic, and timely z Management: Ensure excellence in agency management to carry out the NRC strategic objective

Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response

Examples of Baseline Inspections z Equipment Alignment ~92 hrs/yr z Triennial Fire Protection ~200 hrs every 3 yrs z Operator Response ~125 hrs/yr z Emergency Preparedness ~80 hrs/yr z Rad Release Controls ~100 hrs every 2 yrs z Worker Radiation Protection ~100 hrs/yr z Corrective Action Program ~200 hrs every 2 yrs z Corrective Action Case Reviews ~60 hrs/yr

Significance Threshold Performance Indicators Green: Only Baseline Inspection White: May increase NRC oversight Yellow: Requires more NRC oversight Red: Requires more NRC oversight Inspection Findings Green: Very Low safety issue White: Low to moderate safety issue Yellow: Substantial safety issue Red: High safety issue

Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions

Purpose of Todays Meeting A public forum for discussion of the licensees performance NRC will address the licensee performance issues identified in the annual assessment letter Licensee will respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance

National Summary of Plant Performance Status at End of CY 2004 Licensee Response 78 Regulatory Response 21 Degraded Cornerstone 0 Multiple/Repetitive Degraded Cornerstone 3 Unacceptable 0 Total 102*

National Summary z Performance Indicator Results (at end of CY 2004)

Green 1834 White 6 Yellow 0 Red 0 z Total Inspection Findings (CY 2004)

Green 778 White 11 Yellow 0 Red 0

Palisades Assessment Results (Jan 1 - Dec 31, 2004) z Licensee Response Column: Based on all PIs and inspection findings being Green.

z Supplemental Inspection Procedure (IP) 95001 was conducted to review the circumstances surrounding one White finding, from the 2nd quarter of 2003, and determined that Palisades staff conducted an adequate root cause evaluation.

Palisades Inspection Activities (Jan 1 - Dec 31, 2004) 2106 Hours of Total Baseline Inspection by Resident and Regional Inspectors.

10 Green findings in the Reactor Safety Strategic Performance Area.

September 19 - November 17, 2004, refueling outage.

Palisades Inspection Activities (Jan 1 - Dec 31, 2004)

White Finding - Supplemental Inspection Biennial Safety System Design and Performance Capability Inspection Inservice Inspection and Radiation Protection Inspection performed during Refueling Outage Biennial Permanent Plant Modifications and 50.59 Inspection Emergency Preparedness Exercise Inspection

Safety Significant Findings or PIs All inspection findings and PIs indicate performance at a level requiring no additional NRC oversight (Green).

Palisades Annual Assessment Summary January 1 - December 31, 2004 z NMC operated Palisades in a manner that preserved public health and safety.

z NRC plans baseline inspections at Palisades for calendar year 2005.

Licensee Response and Remarks Paul A. Harden Site Director Palisades Nuclear Plant

Contacting the NRC z Report an emergency (301) 816-5100 (call collect) z Report a safety concern:

(800) 695-7403 Allegation@nrc.gov z General information or questions www.nrc.gov Select What We Do for Public Affairs

Reference Sources z Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html z Public Electronic Reading Room http://www.nrc.gov/reading-rm.html z Public Document Room 1-800-397-4209 (Toll Free)