Public Meeting Slides Palisades EOC Performance AssessmentML051150267 |
Person / Time |
---|
Site: |
Palisades |
---|
Issue date: |
03/31/2005 |
---|
From: |
NRC/RGN-III |
---|
To: |
|
---|
References |
---|
Download: ML051150267 (20) |
|
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24212A3452024-07-30030 July 2024 August 1, 2024 Holtec Public Meeting Presentation on Potential Palisades Nuclear Plant Restart ML24193A0252024-07-11011 July 2024 NRC Presentation on Palisades Nuclear Plant Potential Reauthorization Scoping Meeting PNP 2024-023, Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-0909 May 2024 Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis ML24116A2932024-04-29029 April 2024 Pre-Submittal Meeting on April 29, 2024 - Palisades Nuclear Plant Power Operations Quality Assurance Program Manual ML24086A5822024-04-0303 April 2024 Construction Permit Application: Initial Environmental & Site Characterization ML24074A3302024-03-18018 March 2024 March 18, 2024 Pre-submittal Meeting for Proposed Emergency Plan at the Palisades Nuclear Plant (Presentation) ML24036A1082024-02-0606 February 2024 Pre-submittal Meeting for Palisades Nuclear Plant Power Operations Technical Specifications Administrative Controls and Quality Assurance Program (Presentation) ML23334A1322023-12-0505 December 2023 Pre-submittal Meeting with Holtec for Palisades Nuclear Plant Power Operations Technical Specifications (Presentation) PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations ML23235A1802023-08-29029 August 2023 Public Meeting 08/29/23 - Palisades Nuclear Plant - Return to Power Operations - Exemption to CFR 50.82(a)(2) ML23139A1922023-05-24024 May 2023 Slides for Public Meeting on 5/24/23 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML22262A3032022-09-22022 September 2022 Post-Shutdown Decommissioning Activities Report Public Meeting Slides - September 22, 2022 ML21196A0872021-07-15015 July 2021 Slideshow for the July 1, 2021 Public End of Cycle Meeting for Palisades Nuclear Plant ML21124A0062021-05-12012 May 2021 Pre-Application PDTS Meeting Slides (L-2021-LRM-xxxx) ML20342A0022020-12-0808 December 2020 NRC License Transfer Application Pre-Submittal Meeting ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML19231A2852019-08-19019 August 2019 NEIMA Meeting Slides - August 21 Palisades Meeting ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML17150A0012017-06-20020 June 2017 6/20/2017 Meeting Slides - Entergy Nuclear Operations, Inc. - Licensing Action Submittal Plan - Decommissioning (CAC Nos. MF9624, MF9625, MF9626, MF9627, and MF9628) ML17166A2892017-06-20020 June 2017 Entergy Slides for 06/20/2017 Public Meeting, Licensing Action Submittal Plan - Decommissioning. ML17080A1782017-03-20020 March 2017 3/20/2017, Meeting Slide Re. Palisades Nuclear Plant License Amendment Request; Application Meeting Cyber Security Plan Milestone 8 Implementation Schedule Change ML16344A0882016-12-0707 December 2016 December 7, 2016, Summary of Public Meeting with Entergy Nuclear Operations, Inc.- Meeting Slides ML16277A6212016-09-28028 September 2016 GSI-191 Closure Plan: September 28, 2016 - Meeting Slides ML16167A3722016-06-23023 June 2016 Nrc'S Annual Performance Assessment of Palisades for 2015 ML15107A3062015-04-14014 April 2015 April 14, 2015, Public Meeting Slides for Primary Coolant System Branch Connection Weld Volumetric Examination Status - Palisades Nuclear Plant ML15107A3072015-04-14014 April 2015 April 14, 2015, Corrected Public Meeting Slides for Primary Coolant System Branch Connection Weld Volumetric Examination Status - Palisades Nuclear Plant ML15093A2902015-04-0303 April 2015 Licensee End-of-Cycle Meeting Slides ML15093A2942015-04-0303 April 2015 NRC Meeting Slides ML14175A2992014-06-24024 June 2014 Licensee Presentation for Palisades 2013 Annual Assessment Public Meeting ML13193A3302013-07-16016 July 2013 NRC Internet Event Briefing - Palisades Safety Injection Refueling Water Tank (SIRWT) Leak Repair and Inspections ML13190A2552013-07-16016 July 2013 NRC Internet Event Briefing - Palisades Safety Injection Refueling Water Tank (SIRWT) Leak Repair and Inspections ML13140A3582013-05-20020 May 2013 May 23, 2013 NRC Presentation ML13091A1172013-04-0101 April 2013 EOC Licensee Slides for April 2, 2013 Meeting ML13080A3852013-03-21021 March 2013 NRC Slides for EOC Meeting 4/2/13 ML13010A2822013-01-10010 January 2013 January 12, 2013 Webinar Presentation Slides ML12338A1072012-12-11011 December 2012 NRC Public Meeting Slides for 12-11-12 PNP 2012-109, Public Meeting Slides for December 11, 2012 Meeting2012-12-0707 December 2012 Public Meeting Slides for December 11, 2012 Meeting ML12314A3712012-11-13013 November 2012 NFPA 805 Presubmittal Meeting 11 9 12 Rev 8 ML12255A0092012-09-11011 September 2012 Licensee Slides for Public Meeting September 12, 2012 ML12074A0692012-03-14014 March 2012 NRC EOC Slide Presentation for Public Meeting ML12058A4912012-02-27027 February 2012 Public Meeting Slides, Palisades Nuclear Plant ML1201000572012-01-11011 January 2012 Swp Presentation for Meeting January 11, 2012 at 9am ML1117906392011-06-28028 June 2011 Summary of Meeting with Entergy Operations Inc ML1111605022011-05-0505 May 2011 EOC NRC Slides Presentation for Public Meeting ML1110401532011-04-13013 April 2011 Licensee Slides from 4/13/11 Meeting with Entergy Operations, Inc., to Discuss Proposed National Fire Protection Programs Standards 805 License Amendment Submittal for Arkansas Nuclear One, Units 1 & 2 ML1020206332010-07-21021 July 2010 July 21, 2010, Areva Meeting Slides ML1017400612010-06-22022 June 2010 Palisades NRC Planning Meeting TLAA 10 CFR 54.21(c)(1)(iii) Pressurized Thermal Shock 10CFR50.61 (Slides) ML1012602072010-05-11011 May 2010 Slides, Presentation for Palisades Annual Assessment Meeting - Reactor Oversight Program - 2009 ML1013002252010-05-0707 May 2010 Draft Responses to NRC RAI in Preparation for Meeting on May 12 and 13, 2010 - GL 2004-02 2024-07-30
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24296B1652024-10-22022 October 2024 Pre-Submittal Meeting Slides Oct 24 GSI191 ML24212A3452024-07-30030 July 2024 August 1, 2024 Holtec Public Meeting Presentation on Potential Palisades Nuclear Plant Restart ML24193A0252024-07-11011 July 2024 NRC Presentation on Palisades Nuclear Plant Potential Reauthorization Scoping Meeting PNP 2024-023, Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-0909 May 2024 Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis ML24116A2932024-04-29029 April 2024 Pre-Submittal Meeting on April 29, 2024 - Palisades Nuclear Plant Power Operations Quality Assurance Program Manual ML24086A5822024-04-0303 April 2024 Construction Permit Application: Initial Environmental & Site Characterization ML24074A3302024-03-18018 March 2024 March 18, 2024 Pre-submittal Meeting for Proposed Emergency Plan at the Palisades Nuclear Plant (Presentation) ML24036A1082024-02-0606 February 2024 Pre-submittal Meeting for Palisades Nuclear Plant Power Operations Technical Specifications Administrative Controls and Quality Assurance Program (Presentation) ML23334A1322023-12-0505 December 2023 Pre-submittal Meeting with Holtec for Palisades Nuclear Plant Power Operations Technical Specifications (Presentation) PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations ML23235A1802023-08-29029 August 2023 Public Meeting 08/29/23 - Palisades Nuclear Plant - Return to Power Operations - Exemption to CFR 50.82(a)(2) ML23139A1922023-05-24024 May 2023 Slides for Public Meeting on 5/24/23 ML23075A3312023-03-16016 March 2023 KM Session OL Process February 9, 2023 ML23075A3322023-03-16016 March 2023 Containment 2008 ML23075A3332023-03-16016 March 2023 Ts/Rg 1.33 V. Appendix B, Criterion V ML23075A3352023-03-16016 March 2023 KM-KT Session Presentation Disputed Violations PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML22262A3032022-09-22022 September 2022 Post-Shutdown Decommissioning Activities Report Public Meeting Slides - September 22, 2022 ML22153A1702022-06-16016 June 2022 Public Presentation Slides for Palisades Webinar June 16, 2022 ML21196A0872021-07-15015 July 2021 Slideshow for the July 1, 2021 Public End of Cycle Meeting for Palisades Nuclear Plant ML21124A0062021-05-12012 May 2021 Pre-Application PDTS Meeting Slides (L-2021-LRM-xxxx) ML20342A0022020-12-0808 December 2020 NRC License Transfer Application Pre-Submittal Meeting ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML20231A2312020-08-17017 August 2020 2019 Palisades - EOC Presentation ML19231A2852019-08-19019 August 2019 NEIMA Meeting Slides - August 21 Palisades Meeting ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML18075A1232018-03-20020 March 2018 Entergy Nuclear Operations - March 20, 2018, Presentation Slides for Surveillance Frequency Control Program, UFSAR Change Considerations ML17335A0332017-11-28028 November 2017 Meeting Slides for November 27, 2017 Public Meeting with Entergy Nuclear Operations, Inc. Regarding Request to Extend Enforcement Discretion for Tornado Missle Non-Conformances ML17160A1952017-06-12012 June 2017 Meeting Slides for Pre-Submittal Meeting with Entergy Regarding the Plan for Decommissioning Licensing Actions PNP 2017-017, Notification in Response to Confirmatory Order, EA-15-0392017-05-0404 May 2017 Notification in Response to Confirmatory Order, EA-15-039 ML17080A1782017-03-20020 March 2017 3/20/2017, Meeting Slide Re. Palisades Nuclear Plant License Amendment Request; Application Meeting Cyber Security Plan Milestone 8 Implementation Schedule Change ML16344A0882016-12-0707 December 2016 December 7, 2016, Summary of Public Meeting with Entergy Nuclear Operations, Inc.- Meeting Slides ML16277A6212016-09-28028 September 2016 GSI-191 Closure Plan: September 28, 2016 - Meeting Slides ML16167A3722016-06-23023 June 2016 Nrc'S Annual Performance Assessment of Palisades for 2015 ML15107A3062015-04-14014 April 2015 April 14, 2015, Public Meeting Slides for Primary Coolant System Branch Connection Weld Volumetric Examination Status - Palisades Nuclear Plant ML15107A3072015-04-14014 April 2015 April 14, 2015, Corrected Public Meeting Slides for Primary Coolant System Branch Connection Weld Volumetric Examination Status - Palisades Nuclear Plant ML15093A2902015-04-0303 April 2015 Licensee End-of-Cycle Meeting Slides ML15093A2942015-04-0303 April 2015 NRC Meeting Slides ML15012A3682015-01-12012 January 2015 EA-14-168; Palisades Nuclear Plant Conference Slides ML14175A2842014-06-24024 June 2014 NRC Presentation for Palisades 2013 Annual Assessment Public Meeting ML14175A2992014-06-24024 June 2014 Licensee Presentation for Palisades 2013 Annual Assessment Public Meeting ML13316C4722013-11-14014 November 2013 Palisades Independent Spent Fuel Storage Installation (ISFSI) at Nuclear Power Plants ML13262A4492013-09-23023 September 2013 October 9, 2013, EMA Presentation Slides for Conference Call with Entergy Nuclear Operations ML13193A3302013-07-16016 July 2013 NRC Internet Event Briefing - Palisades Safety Injection Refueling Water Tank (SIRWT) Leak Repair and Inspections ML13190A2552013-07-16016 July 2013 NRC Internet Event Briefing - Palisades Safety Injection Refueling Water Tank (SIRWT) Leak Repair and Inspections ML13140A3582013-05-20020 May 2013 May 23, 2013 NRC Presentation ML13093A1912013-04-0303 April 2013 EOC Public NRC Meeting Slides Final ML13091A1172013-04-0101 April 2013 EOC Licensee Slides for April 2, 2013 Meeting ML13091A2202013-03-29029 March 2013 Public Meeting Slides ML13080A3852013-03-21021 March 2013 NRC Slides for EOC Meeting 4/2/13 2024-07-30
[Table view] |
Text
Palisades Annual Assessment Meeting Reactor Oversight Program - CY 2004 Nuclear Regulatory Commission - Region III Lisle, Illinois March 31, 2005
Agenda z Introduction z Review of Reactor Oversight Process z National Summary of Plant Performance z Discussion of Plant Performance Results z Licensee Response and Remarks z NRC Closing Remarks z Break z NRC available to address public questions
NRC Representatives z Mark A. Satorius, Director, Division Reactor Projects
- (630) 829-9600 z Steven A. Reynolds, Deputy Division Director, DRP
- (630) 829-9601 z David H. Jaffe, Project Manager, NRR
- (301) 415-1439 z Jay Lennartz, Senior Resident Inspector (Outgoing)
- (269) 764-8971 z John Ellegood, Senior Resident Inspector (Incoming)
- (269) 764-8971 z Michelle Garza, Resident Inspector
- (269) 764-8971 z Robert M. Lerch, Senior Project Engineer (Acting Branch Chief)
- (630) 829-9759 z Eric R. Duncan, Branch Chief
- (630) 829-9628
Region III Organization James L. Caldwell Regional Administrator Geoffrey E. Grant Deputy Regional Administrator Mark A. Satorius Cynthia D. Pederson Director Division of Reactor Projects Director Division of Reactor Safety Steven A. Reynolds Roy J. Caniano Deputy Director Deputy Director Robert M. Lerch Regional Specialists Branch Chief Acting for Eric Duncan Palisades Resident Inspectors Project Engineer Jay Lennartz Robert M. Lerch John Ellegood Michelle Garza
NRC Performance Goals z Safety: Ensure protection of the public health and safety and the environment z Security: Ensure the secure use and management of radioactive materials z Openness: Ensure openness in our regulatory process z Effectiveness: Ensure that NRC actions are effective, efficient, realistic, and timely z Management: Ensure excellence in agency management to carry out the NRC strategic objective
Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response
Examples of Baseline Inspections z Equipment Alignment ~92 hrs/yr z Triennial Fire Protection ~200 hrs every 3 yrs z Operator Response ~125 hrs/yr z Emergency Preparedness ~80 hrs/yr z Rad Release Controls ~100 hrs every 2 yrs z Worker Radiation Protection ~100 hrs/yr z Corrective Action Program ~200 hrs every 2 yrs z Corrective Action Case Reviews ~60 hrs/yr
Significance Threshold Performance Indicators Green: Only Baseline Inspection White: May increase NRC oversight Yellow: Requires more NRC oversight Red: Requires more NRC oversight Inspection Findings Green: Very Low safety issue White: Low to moderate safety issue Yellow: Substantial safety issue Red: High safety issue
Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions
Purpose of Todays Meeting A public forum for discussion of the licensees performance NRC will address the licensee performance issues identified in the annual assessment letter Licensee will respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance
National Summary of Plant Performance Status at End of CY 2004 Licensee Response 78 Regulatory Response 21 Degraded Cornerstone 0 Multiple/Repetitive Degraded Cornerstone 3 Unacceptable 0 Total 102*
National Summary z Performance Indicator Results (at end of CY 2004)
Green 1834 White 6 Yellow 0 Red 0 z Total Inspection Findings (CY 2004)
Green 778 White 11 Yellow 0 Red 0
Palisades Assessment Results (Jan 1 - Dec 31, 2004) z Licensee Response Column: Based on all PIs and inspection findings being Green.
z Supplemental Inspection Procedure (IP) 95001 was conducted to review the circumstances surrounding one White finding, from the 2nd quarter of 2003, and determined that Palisades staff conducted an adequate root cause evaluation.
Palisades Inspection Activities (Jan 1 - Dec 31, 2004) 2106 Hours of Total Baseline Inspection by Resident and Regional Inspectors.
10 Green findings in the Reactor Safety Strategic Performance Area.
September 19 - November 17, 2004, refueling outage.
Palisades Inspection Activities (Jan 1 - Dec 31, 2004)
White Finding - Supplemental Inspection Biennial Safety System Design and Performance Capability Inspection Inservice Inspection and Radiation Protection Inspection performed during Refueling Outage Biennial Permanent Plant Modifications and 50.59 Inspection Emergency Preparedness Exercise Inspection
Safety Significant Findings or PIs All inspection findings and PIs indicate performance at a level requiring no additional NRC oversight (Green).
Palisades Annual Assessment Summary January 1 - December 31, 2004 z NMC operated Palisades in a manner that preserved public health and safety.
z NRC plans baseline inspections at Palisades for calendar year 2005.
Licensee Response and Remarks Paul A. Harden Site Director Palisades Nuclear Plant
Contacting the NRC z Report an emergency (301) 816-5100 (call collect) z Report a safety concern:
(800) 695-7403 Allegation@nrc.gov z General information or questions www.nrc.gov Select What We Do for Public Affairs
Reference Sources z Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html z Public Electronic Reading Room http://www.nrc.gov/reading-rm.html z Public Document Room 1-800-397-4209 (Toll Free)