NRC Public Meeting Slides for 12-11-12
ML12338A107
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/11/2012
From:
NRC/RGN-III
To:
References
Download: ML12338A107 (16)


Text

NRC Public Meeting Regulatory Performance Meeting D

b 11 2012 1

December 11, 2012

Welcome Welcome Charles Casto Regional Administrator NRC R i

III NRC Region III 2

Introductions - NRC

  • Charles Casto, Regional Administrator, Region III
  • Tom Taylor, Senior Resident Inspector, Palisades
  • April Scarbeary, Resident Inspector, Palisades

Meeting Agenda

  • Meeting Purpose
  • Licensee Presentation
  • Summary and Meeting Closure y

g

  • Break
  • Public Questions and Comments 4

Meeting Purpose

  • Discussion of Entergys corrective actions and NRC oversight and NRC oversight.
  • Answer questions from the public regarding the NRC oversight at Palisades 5

Service Water Pump Coupling Failure, August 2011 1 of 3 service water pumps failed Failure was Failure was caused by stress corrosion cracking cracking Type of steel used was not d

t l adequately evaluated Plant was not 6

shutdown

Electrical Panel Issue, September 2011 A reactor scram occurred when A reactor scram occurred when a worker was performing maintenance activities on an electrical panel The electrical panel. The highlighted metal pieces have opposite charge, when they came into contact they caused came into contact, they caused an electrical arc and loss of the bus.

7

Cornerstones Mission Strategic Performance Areas Cornerstones SW pump failure 8

DC bus failure

Action Matrix Concept Licensee

Response

Regulatory

Response

Degraded Multiple/Rep Degraded Unacceptable Performance

Response

I

Response

II Degraded Cornerstone III Degraded Cornerstone IV Performance V

Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions 9

Increasing Regulatory Actions

Follow-up Inspection

  • The objectives of this follow-up inspection were to provide assurance that:

were to provide assurance that:

- the root causes and the contributing causes for the risk-significant issues were understood; th t

t f

diti d

t t

f f th i

- the extent of condition and extent of cause of the issues were identified; and

- corrective actions were or will be sufficient to address d

l d titi f th t

and preclude repetition of the root cause.

10

Follow-up Inspection

  • The inspection also included an independent NRC review of the extent of condition and extent of cause.
  • Team concluded there were no significant weaknesses.
  • In addition, the inspectors independently assessed whether any safety culture component caused or significantly contributed to the performance issue.

11

Safety Culture

  • 120 individuals were interviewed.
  • The inspection team determined that, although there are still some challenges, the safety culture was adequate and is improving safety culture was adequate and is improving.
  • Employees at all levels of the organization p

y g

stated they felt comfortable raising nuclear safety concerns through multiple avenues.

12

Future Actions

  • The NRC approved a Deviation from the Action Matrix for Palisades for an additional 1000 h f i ti t

1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> of inspection to:

- Ensure that the licensee is implementing appropriate corrective actions to improve the organization and sustain performance on site.

- Ensure that planned corrective and maintenance actions on a number of recent technical issues for which initial on a number of recent technical issues for which initial NRC review identified no immediate safety concerns, are effective such that these issues will not lead to more significant safety issues.

13

Entergy Nuclear Entergy Nuclear Operations p

Palisades Nuclear Plant P

t ti Presentation 14

S

/M ti Summary/Meeting Closure Closure Charles Casto Regional Administrator NRC R i

III NRC Region III 15

Meeting Contacts g

  • Followup Questions - Contact the NRC Region III Offi f P bli Aff i III Office of Public Affairs Viktoria Mitlyng / Prema Chandrathil T l (630) 829 9500 Tel: (630) 829-9500 OPA3@nrc.gov 16