MONTHYEARML20342A0882020-12-0707 December 2020 Pre-submittal Teleconference with Entergy Nuclear Operations, Inc. (Entergy) and Holtecinternational (Holtec) Regarding the Planned License Transfer Application for Palisades Nuclear Plant (Palisades) Project stage: Meeting ML20342A0022020-12-0808 December 2020 NRC License Transfer Application Pre-Submittal Meeting Project stage: Meeting ML21012A0382021-01-14014 January 2021 December 8, 2020, Summary of Public Teleconference with Entergy Nuclear Operations Inc. Regarding Pre-submittal of a License Transfer Application to Holtec International for Palisades Nuclear Plant Project stage: Meeting 2020-12-08
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24036A1082024-02-0606 February 2024 Pre-submittal Meeting for Palisades Nuclear Plant Power Operations Technical Specifications Administrative Controls and Quality Assurance Program (Presentation) ML23334A1322023-12-0505 December 2023 Pre-submittal Meeting with Holtec for Palisades Nuclear Plant Power Operations Technical Specifications (Presentation) PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations ML23235A1802023-08-29029 August 2023 Public Meeting 08/29/23 - Palisades Nuclear Plant - Return to Power Operations - Exemption to CFR 50.82(a)(2) ML23139A1922023-05-24024 May 2023 Slides for Public Meeting on 5/24/23 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML22262A3032022-09-22022 September 2022 Post-Shutdown Decommissioning Activities Report Public Meeting Slides - September 22, 2022 ML21196A0872021-07-15015 July 2021 Slideshow for the July 1, 2021 Public End of Cycle Meeting for Palisades Nuclear Plant ML21124A0062021-05-12012 May 2021 Pre-Application PDTS Meeting Slides (L-2021-LRM-xxxx) ML20342A0022020-12-0808 December 2020 NRC License Transfer Application Pre-Submittal Meeting ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML19231A2852019-08-19019 August 2019 NEIMA Meeting Slides - August 21 Palisades Meeting ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML17150A0012017-06-20020 June 2017 6/20/2017 Meeting Slides - Entergy Nuclear Operations, Inc. - Licensing Action Submittal Plan - Decommissioning (CAC Nos. MF9624, MF9625, MF9626, MF9627, and MF9628) ML17166A2892017-06-20020 June 2017 Entergy Slides for 06/20/2017 Public Meeting, Licensing Action Submittal Plan - Decommissioning. ML17080A1782017-03-20020 March 2017 3/20/2017, Meeting Slide Re. Palisades Nuclear Plant License Amendment Request; Application Meeting Cyber Security Plan Milestone 8 Implementation Schedule Change ML16344A0882016-12-0707 December 2016 December 7, 2016, Summary of Public Meeting with Entergy Nuclear Operations, Inc.- Meeting Slides ML16277A6212016-09-28028 September 2016 GSI-191 Closure Plan: September 28, 2016 - Meeting Slides ML16167A3722016-06-23023 June 2016 Nrc'S Annual Performance Assessment of Palisades for 2015 ML15107A3062015-04-14014 April 2015 April 14, 2015, Public Meeting Slides for Primary Coolant System Branch Connection Weld Volumetric Examination Status - Palisades Nuclear Plant ML15107A3072015-04-14014 April 2015 April 14, 2015, Corrected Public Meeting Slides for Primary Coolant System Branch Connection Weld Volumetric Examination Status - Palisades Nuclear Plant ML15093A2902015-04-0303 April 2015 Licensee End-of-Cycle Meeting Slides ML15093A2942015-04-0303 April 2015 NRC Meeting Slides ML14175A2992014-06-24024 June 2014 Licensee Presentation for Palisades 2013 Annual Assessment Public Meeting ML13193A3302013-07-16016 July 2013 NRC Internet Event Briefing - Palisades Safety Injection Refueling Water Tank (SIRWT) Leak Repair and Inspections ML13190A2552013-07-16016 July 2013 NRC Internet Event Briefing - Palisades Safety Injection Refueling Water Tank (SIRWT) Leak Repair and Inspections ML13140A3582013-05-20020 May 2013 May 23, 2013 NRC Presentation ML13091A1172013-04-0101 April 2013 EOC Licensee Slides for April 2, 2013 Meeting ML13080A3852013-03-21021 March 2013 NRC Slides for EOC Meeting 4/2/13 ML13010A2822013-01-10010 January 2013 January 12, 2013 Webinar Presentation Slides ML12338A1072012-12-11011 December 2012 NRC Public Meeting Slides for 12-11-12 PNP 2012-109, Public Meeting Slides for December 11, 2012 Meeting2012-12-0707 December 2012 Public Meeting Slides for December 11, 2012 Meeting ML12314A3712012-11-13013 November 2012 NFPA 805 Presubmittal Meeting 11 9 12 Rev 8 ML12255A0092012-09-11011 September 2012 Licensee Slides for Public Meeting September 12, 2012 ML12074A0692012-03-14014 March 2012 NRC EOC Slide Presentation for Public Meeting ML12058A4912012-02-27027 February 2012 Public Meeting Slides, Palisades Nuclear Plant ML1201000572012-01-11011 January 2012 Swp Presentation for Meeting January 11, 2012 at 9am ML1117906392011-06-28028 June 2011 Summary of Meeting with Entergy Operations Inc ML1111605022011-05-0505 May 2011 EOC NRC Slides Presentation for Public Meeting ML1110401532011-04-13013 April 2011 Licensee Slides from 4/13/11 Meeting with Entergy Operations, Inc., to Discuss Proposed National Fire Protection Programs Standards 805 License Amendment Submittal for Arkansas Nuclear One, Units 1 & 2 ML1020206332010-07-21021 July 2010 July 21, 2010, Areva Meeting Slides ML1017400612010-06-22022 June 2010 Palisades NRC Planning Meeting TLAA 10 CFR 54.21(c)(1)(iii) Pressurized Thermal Shock 10CFR50.61 (Slides) ML1012602072010-05-11011 May 2010 Slides, Presentation for Palisades Annual Assessment Meeting - Reactor Oversight Program - 2009 ML1013002252010-05-0707 May 2010 Draft Responses to NRC RAI in Preparation for Meeting on May 12 and 13, 2010 - GL 2004-02 ML1008407632010-03-29029 March 2010 Meeting Presentation Palisades 2009 Nuclear Safety Cultural Assessment: Entergy Presentation to NRC Region Iii. ML0914606542009-05-26026 May 2009 EOC Slides for 5/26/09 Meeting ML0909100632009-03-31031 March 2009 Entergy Operations, Inc., Project Planning Slides for March 31, 2009, Nrc/Entergy Pre-Application Meeting - Power Uprates ML0907207082009-03-12012 March 2009 Meeting Handouts for Pre-Application Meeting with Entergy Operations, Inc. (Eno), to Discuss Spent Fuel Criticality Amendment for Palisades Nuclear Plant ML0826102372008-09-16016 September 2008 Spent Fuel Pool Storage Interim Criticality Analysis ML0812807962008-05-12012 May 2008 EOC Meeting Slides 2024-02-06
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24036A1082024-02-0606 February 2024 Pre-submittal Meeting for Palisades Nuclear Plant Power Operations Technical Specifications Administrative Controls and Quality Assurance Program (Presentation) ML23334A1322023-12-0505 December 2023 Pre-submittal Meeting with Holtec for Palisades Nuclear Plant Power Operations Technical Specifications (Presentation) PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations ML23235A1802023-08-29029 August 2023 Public Meeting 08/29/23 - Palisades Nuclear Plant - Return to Power Operations - Exemption to CFR 50.82(a)(2) ML23139A1922023-05-24024 May 2023 Slides for Public Meeting on 5/24/23 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML23075A3352023-03-16016 March 2023 KM-KT Session Presentation Disputed Violations ML23075A3332023-03-16016 March 2023 Ts/Rg 1.33 V. Appendix B, Criterion V ML23075A3312023-03-16016 March 2023 KM Session OL Process February 9, 2023 ML23075A3322023-03-16016 March 2023 Containment 2008 ML22262A3032022-09-22022 September 2022 Post-Shutdown Decommissioning Activities Report Public Meeting Slides - September 22, 2022 ML22153A1702022-06-16016 June 2022 Public Presentation Slides for Palisades Webinar June 16, 2022 ML21196A0872021-07-15015 July 2021 Slideshow for the July 1, 2021 Public End of Cycle Meeting for Palisades Nuclear Plant ML21124A0062021-05-12012 May 2021 Pre-Application PDTS Meeting Slides (L-2021-LRM-xxxx) ML20342A0022020-12-0808 December 2020 NRC License Transfer Application Pre-Submittal Meeting ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML20231A2312020-08-17017 August 2020 2019 Palisades - EOC Presentation ML19231A2852019-08-19019 August 2019 NEIMA Meeting Slides - August 21 Palisades Meeting ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML18075A1232018-03-20020 March 2018 Entergy Nuclear Operations - March 20, 2018, Presentation Slides for Surveillance Frequency Control Program, UFSAR Change Considerations ML17335A0332017-11-28028 November 2017 Meeting Slides for November 27, 2017 Public Meeting with Entergy Nuclear Operations, Inc. Regarding Request to Extend Enforcement Discretion for Tornado Missle Non-Conformances ML17160A1952017-06-12012 June 2017 Meeting Slides for Pre-Submittal Meeting with Entergy Regarding the Plan for Decommissioning Licensing Actions PNP 2017-017, Notification in Response to Confirmatory Order, EA-15-0392017-05-0404 May 2017 Notification in Response to Confirmatory Order, EA-15-039 ML17080A1782017-03-20020 March 2017 3/20/2017, Meeting Slide Re. Palisades Nuclear Plant License Amendment Request; Application Meeting Cyber Security Plan Milestone 8 Implementation Schedule Change ML16344A0882016-12-0707 December 2016 December 7, 2016, Summary of Public Meeting with Entergy Nuclear Operations, Inc.- Meeting Slides ML16277A6212016-09-28028 September 2016 GSI-191 Closure Plan: September 28, 2016 - Meeting Slides ML16167A3722016-06-23023 June 2016 Nrc'S Annual Performance Assessment of Palisades for 2015 ML15107A3062015-04-14014 April 2015 April 14, 2015, Public Meeting Slides for Primary Coolant System Branch Connection Weld Volumetric Examination Status - Palisades Nuclear Plant ML15107A3072015-04-14014 April 2015 April 14, 2015, Corrected Public Meeting Slides for Primary Coolant System Branch Connection Weld Volumetric Examination Status - Palisades Nuclear Plant ML15093A2902015-04-0303 April 2015 Licensee End-of-Cycle Meeting Slides ML15093A2942015-04-0303 April 2015 NRC Meeting Slides ML15012A3682015-01-12012 January 2015 EA-14-168; Palisades Nuclear Plant Conference Slides ML14175A2842014-06-24024 June 2014 NRC Presentation for Palisades 2013 Annual Assessment Public Meeting ML14175A2992014-06-24024 June 2014 Licensee Presentation for Palisades 2013 Annual Assessment Public Meeting ML13316C4722013-11-14014 November 2013 Palisades Independent Spent Fuel Storage Installation (ISFSI) at Nuclear Power Plants ML13262A4492013-09-23023 September 2013 October 9, 2013, EMA Presentation Slides for Conference Call with Entergy Nuclear Operations ML13227A1102013-08-13013 August 2013 8/13/13 Michael F. Weber, Deputy Executive Director for Materials, Waste, Research, State, Tribal, and Compliance Programs Testimony on: the U.S. Nrc'S Power Reactor Decommissioning Process ML13193A3302013-07-16016 July 2013 NRC Internet Event Briefing - Palisades Safety Injection Refueling Water Tank (SIRWT) Leak Repair and Inspections ML13190A2552013-07-16016 July 2013 NRC Internet Event Briefing - Palisades Safety Injection Refueling Water Tank (SIRWT) Leak Repair and Inspections ML13140A3582013-05-20020 May 2013 May 23, 2013 NRC Presentation ML13093A1912013-04-0303 April 2013 EOC Public NRC Meeting Slides Final ML13091A1172013-04-0101 April 2013 EOC Licensee Slides for April 2, 2013 Meeting ML13091A2202013-03-29029 March 2013 Public Meeting Slides ML13080A3852013-03-21021 March 2013 NRC Slides for EOC Meeting 4/2/13 ML13010A2822013-01-10010 January 2013 January 12, 2013 Webinar Presentation Slides ML12338A1072012-12-11011 December 2012 NRC Public Meeting Slides for 12-11-12 PNP 2012-109, Public Meeting Slides for December 11, 2012 Meeting2012-12-0707 December 2012 Public Meeting Slides for December 11, 2012 Meeting ML12314A3712012-11-13013 November 2012 NFPA 805 Presubmittal Meeting 11 9 12 Rev 8 ML12255A0092012-09-11011 September 2012 Licensee Slides for Public Meeting September 12, 2012 PNP 2012-084, Transmittal of Public Meeting Slides for 09/12/2012 Meeting2012-09-10010 September 2012 Transmittal of Public Meeting Slides for 09/12/2012 Meeting 2024-02-06
[Table view] |
Text
Palisades and Big Rock Point NRC License Transfer Application PreSubmittal Meeting 08 December 2020
Palisades Status Current staffing level: ~610 utility and security employees Last refueling completed October 2020 Permanently cease operations by May 31, 2022 Anticipate permanently defueling reactor within 30 days postshutdown Entergy expects to select approximately 260 Decommissioning Organization employees from incumbent staff and transition prior to transaction closing Ongoing commitment to open and transparent communications with:
State of Michigan Local stakeholders Employees 2
Big Rock Point ISFSI Status Permanently shut down in 1997 under previous ownership All spent fuel was transferred to Independent Spent Fuel Storage Installation (ISFSI) in 2003 (7 spent fuel and 1 Greater than Class C)
Licensed portion of site consists of ~30 acres on which ISFSI resides and a
~75 acre nonimpacted parcel adjacent to ISFSI Current staffing level: ~20 staff members 3
Transaction Overview Membership Interest Purchase and Sale Agreement executed for the sale of the subsidiary that owns Palisades and Big Rock Point to Holtec subsidiary Nuclear Asset Management Company, LLC Postsale, the subsidiary will be renamed Holtec Palisades, LLC (Holtec Palisades)
Holtec Decommissioning International, LLC (HDI) will become licensed operator HDI will contract with Comprehensive Decommissioning International, LLC (CDI) to serve as the Decommissioning General Contractor Holtec Palisades will own:
- Palisades and Big Rock Point sites, including associated assets (primarily the Palisades Nuclear Decommissioning Trust (NDT)) and liabilities (primarily the decommissioning obligation)
- Title to spent nuclear fuel and DOE Standard Contract Palisades onsite Decommissioning Organization employees at the time of transaction closing will be offered positions with CDI (a few will transition to HDI)
Big Rock Point onsite employees at the time of transaction closing will be offered positions with CDI or HDI Transaction closing dependent upon several conditions, including NRC license transfer approval and docketing of certifications of permanent cessation of operations and permanent removal of fuel from the reactor 4
Holtec Nuclear Stewardship Nuclear Manufacturing Facility Owner Key Industry Partnerships Investing in Nuclear is an integral part of Holtec's longterm strategy 5
Holtec Decommissioning Fleet Implement & advance industry decommissioning Focused on safety, quality & compliance Fleetbased approach Oyster Creek Qualified and experienced personnel Procedures & processes Pilgrim By accelerating movement of spent fuel into dry cask storage and deploying state oftheart technologies, Holtec is well equipped to decommission nuclear plants Indian Point decades sooner than if utility owned Note: Indian Point and Palisades expected to close transaction in 2021 and 2022, respectively Palisades 6
Holtec Financial Strength
- Operating profit in every fiscal year in its decades of operation.
- No long-term debt; the Company has had no long-term debt in its entire corporate history despite making major capital investments such as building a 52-acre Technology Campus for 310+ million dollars in Camden NJ, completed in 2017.
- Continued advancement of applied R&D, which the company expenses every year, is entirely funded from the operating budget and detracts from the EBIDTA.
- Despite the voluntary R&D activities, the balance sheet has remained strong with over half a billion dollars in assets and 9-digit annual EBIDTA.
- Large base of clients - over 100; no client accounts for more than 10% of the companys sales. Clients are mainly multi-billion dollar publicly held enterprises.
Holtecs stability is underpinned by its portfolio of old and new product lines which are aligned to provide a continuous spectrum of growth and rising profitability founded on a solid bedrock of long-term stability.
7
Holtec Team Holtec International Holtec Power, Inc.
Nuclear Asset Holtec Management Decommissioning Company, LLC International, LLC Comprehensive Holtec Palisades, Decommissioning LLC International, LLC*
8
Holtecs Planned DECON vs. Potential SAFSTOR Potential SAFSTOR Timeline Fuel Transfer SAFSTOR D&D/LT 2022 2025 2077 2082 Holtecs Planned DECON Timeline Fuel Final Transfer LT 2022 2025 2035 2041*
Holtec Ownership D&D, Site Restoration Decommissioning Complete/
NRC License Terminated Accelerates License Termination, Enabling Site RePurposing from 2082 to 2041
- Assumes DOE Fuel PickUp Complete in 2040 Note: Dates subject to change 9
Financial Qualifications Palisades nuclear decommissioning trust (NDT) satisfies 10 CFR 50.75(e)(1)(i) as a prepayment method of providing decommissioning financial assurance for Palisades NDT will be owned by Holtec Palisades, LLC NDT balance was approximately $552 million total as of December 2, 2020 Projected NDT values at transaction closing will be sufficient to fund the costs of radiological decommissioning, spent fuel management, and site restoration under the Holtec plan Application will include financial data supporting the adequacy of the NDT funds including the following:
- Decommissioning, spent fuel management and site restoration costs by category
- Annualized decommissioning cost estimate with reasonable contingency assumptions
- Cash flow analysis
- Big Rock Point spent fuel management to be funded by Holtec and ISFSI decommissioning costs to be funded by an NRCapproved financial protection mechanism 10
Technical Qualifications HDI will integrate existing Palisades knowledge and incumbent staff to support HDI site organization HDI Management Model supports safe, compliant and efficient decommissioning operations Existing Palisades site organization at the time of license transfer will be integrated into the site organization including:
- Security HDI will have full control and oversight over CDI, including the site organization HDI/CDI team will jointly conduct transition readiness assessments with Entergy prior to license transfer 11
Technical Qualifications HDI/CDI team possesses extensive experience in nuclear operating, decommissioning, and spent fuel management Ability to draw from Holtecs technical resources (R&D, engineering, manufacturing facilities) and experienced personnel to support decommissioning Oyster Creek and Pilgrim experience HDI managed by senior Holtec personnel Draw from existing corporate nuclear programs (e.g., QA, project management)
Holtec Decommissioning Model Unified Corporate QA, security and IT Fleetbased programs, processes and procedures Innovations developed through Oyster Creek and Pilgrim projects Staggered fleet execution plans 12
Other License Transfer Requirements Spent Fuel Management Holtec Palisades, under Holtec ownership, will own Palisades and Big Rock Point spent fuel rights and obligations pursuant to the DOE standard contract Holtec will be responsible for ISFSI decommissioning (Palisades and Big Rock Point)
No foreign ownership, control, and domination Holtec Board of Directors are all U.S. Citizens Holtec and the licensee entities are not owned, controlled or dominated by any foreign person Nuclear Insurance Holtec will obtain onsite property damage insurance coverage and offsite nuclear liability coverage as required Proof of the coverage will be provided to the NRC prior to license transfer 13
Next Steps: Regulatory Plan Activity Target Date License Transfer Application (joint submittal with Entergy) December 2020 DECON PSDAR including sitespecific DCE December 2020 Exemption request to use NDT funds for SFM and Site December 2020 Restoration Request License Transfer Application approval December 2021 14