Construction Permit Application: Initial Environmental & Site Characterization
ML24086A582
Person / Time
Site: Palisades, 99902049  Entergy icon.png
Issue date: 04/03/2024
From:
Holtec, SMR
To:
Office of Nuclear Reactor Regulation
Shared Package
ML24086A580 List:
References
Download: ML24086A582 (1)


Text

www.holtec.com www.smrllc.com

Palisades Construction Permit Application:

Initial Environmental & Site Characterization

April 3, 2024

Holtecs SMR-300 Technology Safe, Secure, Reliable, Flexible,Economical Clean Energy to Support the Worlds Energy Needs

Holtec International Krishna P. Singh Technology Campus One Holtec Boulevard Camden, NJ 08104, USA

[Not Export Controlled]

Agenda Team Introductions Holtec and CPA Project Overview Site Characterization Activities Critical Dune Protection Cultural Resources Ecological Resources Surface Hydrology Subsurface Investigations Meteorology Site Characterization Schedule Permit and Agency Consultation Plan

holtec.com l smrllc.com lPage 2 Holtec International Overview

Holtec International is a global turnkey supplier of equipment and services for the Nuclear Energy Sector SMR-300 design and deployment Palisades Nuclear Plant repower Nuclear fuel waste management Holtecs Advanced Manufacturing Division (AMD)

Decommissioning of shuttered Designed and Constructed for Fabrication of SMR-300 nuclear power plants A generation ahead by design

holtec.com l smrllc.com lPage 3 CPA Project Overview

Submit CPA in mid 2026 for a dual-unit SMR-300 plant for approximately 600 MWe new generation to be collocated at the Palisades Nuclear Generating Station Holtec has engaged the NRC regarding the potential to submit a Limited Work Authorization for some construction activities ahead of CP approval

Submit an OLA to support facility commissioning and startup by early 2031

holtec.com l smrllc.com lPage 4 Stakeholder Engagement

Stakeholder engagement is important for the success of the CPA!

Outreach

  • Use multiple outreach methods to communicate proactively with key stakeholders to ensure meaningful engagement.
  • Listen to and welcome diverse perspectives and inputs.
  • Understand stakeholder concerns and inputs and address accordingly.
  • Early engagement with key regulatory agencies, including but not limited to:
  • Michigan State Historic Preservation Office (MSHPO)

holtec.com l smrllc.com lPage 5 CPA Characterization Activities: Critical Dune Protection

Holtec is partnering with ENERCON and BARR to complete a detailed delineation of critical dunes within the Palisades site.

Early engagement with Michigan EGLE has been initiated to develop updated dune boundaries and protective measures.

All efforts are being taken to minimize dune impacts to the extent possible.

Note: Critical dune areas illustrated on figure are based on historical data.

holtec.com l smrllc.com lPage 6 CPA Characterization Activities: Cultural Resources

Cultural resources are being reviewed.

A survey plan of the Palisades site has been developed and submitted to MSHPO.

Field crews mobilized on March 18, 2024, to begin archaeological survey, including shovel tests according to MSHPO recommended methodology.

The resulting report will be provided to MSHPO for concurrence of findings and incorporated into the CPA ER.

holtec.com l smrllc.com lPage 7 CPA Characterization Activities: Ecological Resources Ecological resources at Palisades are currently being evaluated to identify potential habitat for state and federally-listed species.

73 state-listed threatened and endangered (T&E) species 10 federally-listed T&E species Three birds One rattlesnake Two butterflies Three bats One plant Acoustic bat survey to be conducted Summer 2024.

holtec.com l smrllc.com lPage 8 CPA Characterization Activities: Surface Hydrology Holtec is completing a wetland delineation survey of the Palisades site in accordance with the US Army Corps of Engineers manual.

Onsite surface water bodies will be mapped.

Seeps, springs or other onsite surface hydrology will be identified.

holtec.com l smrllc.com lPage 9 CPA Characterization Activities: Subsurface Investigation Geotechnical Characterization Holtec will finalize the SMR-300 plot plan and build location after reviewing initial site characterization data.

NRC will be engaged prior to core borings (anticipated Summer 2024).

Groundwater Monitoring Additional groundwater monitoring wells will be installed to supplement the information from existing site groundwater monitoring wells.

holtec.com l smrllc.com lPage 10 CPA Characterization Activities: Meteorology Palisades has a meteorological tower that provides data for the existing plant.

Holtec intends to use data from this meteorological tower for SMR-300.

Validation of data applicability is planned after SMR-300 plot plan and build location are finalized.

holtec.com l smrllc.com lPage 11 Site Characterization Schedule

Critical Dune Delineation -April 2024 Cultural Resources -April 2024 Ecological Resources -Phased approach, complete Winter 2024 Surface Hydrology -April 2024 Subsurface Investigation Geotechnical Investigation -Summer through Fall 2024 Groundwater Monitoring -Fall 2024 through Fall 2025 Meteorology -Complete, pending validation

  • Dates represent completion of site work, reports documenting analysis and conclusions will follow.

holtec.com l smrllc.com lPage 12 CPA Characterization Activities:

Permit and Agency Consultation Plan Holtec has developed a Permit and Agency Consultation Plan Identifies the local, state, and federal permits required for the CPA.

Identifies key stakeholders and agencies that will be consulted as part of the CPA development process.

Engagement with key stakeholders and agencies will be conducted early to allow adequate time for input into the CPA development process.

Holtec has already started early engagement with Michigan EGLE, MSHPO, Covert Township, and County of Van Buren.

holtec.com l smrllc.com lPage 13 Adjourn