www.holtec.com Pre-Submittal Meeting Palisades Nuclear Plant License Amendment Request to Support Resumption of Power Operations December 5, 2023
www.holtec.comlPage2 Meeting Agenda
Introductions
Purpose&Outcome
Background
LicenseAmendmentRequest(LAR)Content ReasonforProposedChanges PowerOperationsLicensingBasis(POLB)Reinstatement RenewedFacilityOperatingLicense(RFOL)Reinstatement TechnicalSpecifications(TS)Reinstatement EnvironmentalProtectionPlan(EPP)AdministrativeChanges RegulatoryBasis EnvironmentalAssessment LicenseeActionstoSupportPOLB Schedule Questions
www.holtec.comlPage3
Introductions
U.SNuclearRegulatoryCommittee(NRC)Staff HoltecDecommissioningInternational,LLC(HDI)
JeanFleming-HoltecInternational,VicePresidentofLicensing, RegulatoryAffairs&PSA MichaelSchultheis-HDI,ManagerofRegulatoryAssurancefor Palisades JimMiksa-HDI,RegulatoryAssuranceEngineerforPalisades
www.holtec.comlPage4 Purpose & Outcome
Purpose:
- PresentproposedchangestothePalisadesNuclearPlant(PNP) operatinglicense:
- RenewedFacilityOperatingLicense(RFOL)
- TechnicalSpecifications(TS)- AppendixA
- EnvironmentalProtectionPlan(EPP)- AppendixB Outcome:
- SolicitNRCStaffquestionsandcommentsaheadofsubmittal
- ProvidescheduleinformationtosupportNRCresourceallocation
www.holtec.comlPage5
Background
TheGovernoroftheStateofMichiganvoicessupportforpoweroperationsatPalisades NuclearPlant(PNP)(April20,2022,andSeptember9,2022)
PNPDocketed10CFR50.82(a)(1)Certifications,PermanentCessationPowerOperations, PermanentRemovalofFuelfromReactorVessel(June13,2022)
PermanentlyDefueledTechnicalSpecificationsimplementedatPNP(June15,2022)
PNPownershipandlicensetransferredfromEntergytoHoltec(June28,2022)
HoltecholdsapublicmeetingtopresentaproposedregulatorypathforreturnofPNPto poweroperations(March20.2023)
HoltecholdsapublicmeetingtopresentaproposedregulatoryframeworkforreturnofPNP topoweroperationswithemphasisonexemptionrequestto10CFR50.82(a)(2)(May24, 2023)
www.holtec.comlPage6
Background
TheStateofMichiganlegislatureexpressedtheirsupportfortherestartofPNPbyapprovinga 2024budgetthatincludes150milliondollarsforthereturnofPNPtopoweroperations(June 28,2023)
HDIsubmittedExemptionto10CFR50.82(a)(2)onSeptember28,2023(ADAMSAccession NumberML23271A140)
PNPRenewedFacilityOperatingLicense(RFOL)remainsactive(i.e.,ithasnotbeen terminated)
ThePNPLicenseRenewal20yeartermendsonMarch24,2031(i.e.,PNPreturntopower operationsiscurrentlywithintheLicenseRenewalterm)
www.holtec.comlPage7 LAR Content ReasonforProposedChanges UseofpreviouslydocketedPowerOperations UpdatedFinalSafety AnalysisReport(UFSAR)Revision35.
DesignBasisAccidents(DBAs)
DescriptionofEachChangewithBasis ApplicableRegulatoryRequirements Precedent NoSignificantHazardsConsideration EnvironmentalEvaluation MarkupsandCleanRFOL,TS,andEPPPages MarkupsoftheTSBases(forinformationonly)
www.holtec.comlPage8 Reason for Proposed Change SupportsStateofMichigancleanenergyinitiative
GovernoroftheStateofMichiganLetterstoUSSecretaryofEnergy
LegislatureStateofMichigan2024BudgetApproval150Milliondollarsforreturnof PalisadesNuclearPlant(PNP)topoweroperations SupportsreinstatementofPNPPOLB Oneoffivekeylicensingactions
10CFR50.82(a)(2)exemptiontoremoveoperationalrestrictions
Licensetransferapplicationforoperationalauthority
LicenseamendmentforPowerOperationsTechnicalSpecifications(Thisproposed change)
Licenseamendmentfortechnicalspecificationsadministrativechanges
Licenseamendmentforapoweroperationsemergencyplan
www.holtec.comlPage9 POLB Reinstatement UFSARtoreflectpoweroperationsplant RestoredtoRevision35
LastdocketedpoweroperationsversionoftheUFSARthatwasineffectprior tothe10CFR50.82(a)(1)decommissioning certifications
ChangesmadetotheUFSARafterRevision35thatareappropriatefor retentionwillbeevaluatedagainstthereinstatedPNPPOLBinaccordance with10CFR50.59,Changes,testsandexperiments.
UFSARChapter14DBAandtransientscenarios
RestoredtotheUFSARRevision35version
NochangestotheRevision35neededtorestorethePNPPOLB Implementedinaccordancewith10CFR50.59
Implementedcoincidentwiththereinstatementkeylicensingactions
www.holtec.comlPage10 POLB Reinstatement DefueledSafetyAnalysisReport(DSAR)DBAsretainedinthe poweroperationsUFSAR Postulated Cask Drop Accidents
No analysis needed to restore POLB Fuel Handling Incident (FHA)
DSAR added analysis to FHA for Spent Fuel Pool (SFP) cases to support removal of mitigating ventilation systems from PDTS
FHAisreinstatedtoUFSARRevision35versionwithreinstatementof mitigatingventilationsystemsinthepoweroperationstechnical specifications(POTS) SupportedbyrestoredmitigatingsystemTSs
TS 3.7.10, Control Room Ventilation CRV Filtration
TS 3.7.11, Control Room Ventilation (CRV) Cooling
TS 3.7.12, Fuel Handling Area Ventilation System
ReinstatestheFHAincontainment
www.holtec.comlPage11 POLB Reinstatement
Liquid Waste Incident
No analysis needed to restore POLB
Waste Gas Incident
No analysis needed to restore POLB
www.holtec.comlPage12 RFOL Reinstatement
RestorestheLicenseConditionsremovedormodifiedbyPDTS Amendment272,withthebelowexceptions
SupersededLicenseCondition1.Bnotreinstated
HistoricalLicenseConditions2.C.(4),2.C.(7),2.H,and2.Inotreinstated
LicenseCondition2.C.(5)whichwasaddedtorestrictmovementofafuelcaskin oroverthespentfuelinAmendment272willbedeletedwithreinstatementof mitigatingventilationsystemTS
NonewLicenseConditionsareadded
PlaceholdersaddedtoidentifyoccurrencesoftextmodifiedbytheLicense TransferApplication,suchasproposedauthorizedoperator
Textisbracketedandshowninbolditalics(e.g.,[PalisadesEnergy])
www.holtec.comlPage13 RFOL Reinstatement
FireProtectionLicenseCondition(2.C.(3))
NFPA805TransitionLicenseCondition2.C.(3)isrestoredtotheversionremoved bythePDTSAmendment272
LicenseConditionrequirescompliancewith10CFR50.48(a)and10CFR50.48(c) foranoperatingplant
TransitionLicenseConditionsactionsareplannedforcompletionpriortoreactor startup.
www.holtec.comlPage14 TS Reinstatement
TechnicalSpecification(TS)TableofContents
ContainedinthePDTS
NotretainedinthePOTS
TableofContentsdoesnotincludeinformationrequiredtobeintheTSby 10CFR50.36
Thisisanadministrativechange
Mostrecentprecedent
SouthernNuclearOperatingCompanyfleet-approved9/29/2021
www.holtec.comlPage15 TS Reinstatement
TSSection1.0,UseandApplication:
TS1.1Definitions
RestoresAmendment271definitionsremovedbythePDTSAmendment
TS1.2LogicalConnectors
RestoresAmendment271Purpose,Background,andExampleschangedbythe PDTSAmendment
TS1.3CompletionTimes
RestoresAmendment271Background,Description,andExampleschangedby thePDTSAmendment
TS1.4Frequency
RestoresAmendment271DescriptionandExampleschangedbythePDTS Amendment
www.holtec.comlPage16 TS Reinstatement TSSection2.0,SafetyLimits
RestoresAmendment271SafetyLimitsremovedbythePDTS Amendment
TS3.0LimitingConditionforOperation(LCO)Applicability
RestoresAmendment271TSLCO3.0.1andLCO3.0.2thatwerechanged bythePDTSAmendment
RestoresAmendment271TSLCO3.0.3throughLCO3.0.9removedby thePDTSAmendment
TS3.0SurveillanceRequirement(SR)Applicability
RestoresAmendment271TSSR3.0.1throughSR3.0.4thatwerechanged bythePDTSAmendment
www.holtec.comlPage17 TS Reinstatement
RestoreTSSections3.1through3.9removedormodifiedbyPDTS Amendment272withthebelowexceptions
SR3.1.4.3(ControlRodMovement)hadanobsoletecyclespecificNote thatwillnotbereinstated
TS3.7.14,SpentFuelPool(SFP)WaterLevel,TS3.7.15,SpentFuelPool (SFP)BoronConcentration, andTS3.7.16,SpentFuelPoolStoragewhich areincluded inthePDTS
ChangedtorestoretheNOTEintheAcons(LCO3.0.3isnot applicable)toconformtothereinstatementofTSLCO3.0.3
SR3.7.14and3.7.15frequenciesarechangedtoreferencethe SurveillanceFrequencyControlProgram(SFCP)asapprovedin Amendment271
www.holtec.comlPage18 TS Reinstatement TSSection4.0,DesignFeatures
TS4.2ReactorCore
RestoresAmendment271sections4.2.1FuelAssembliesand 4.2.2ControlRodAssembliesremovedbythePDTSAmendment
TS4.3FuelStorage
RestoresAmendment271sections4.3.1Criticalityand4.3.3Capacity(for newfuelstorage)changedbythePDTSAmendment
www.holtec.comlPage19 TS Reinstatement
TSSection5.0AdministrativeControls,5.5ProgramsandManuals
RestoresAmendment271sectionsremovedbythePDTSAmendment
TS5.5.2,PrimaryCoolantSourcesOutsideContainment
TS5.5.5,ContainmentStructuralIntegritySurveillanceProgram
TS5.5.6,PrimaryCoolantPumpFlywheelSurveillanceProgram
TS5.5.8,SteamGenerator(SG)Program
TS5.5.9,SecondaryWaterChemistryProgram
TS5.5.10,VentilationFilterTestingProgram
TS5.5.11,FuelOilTestingProgram
TS5.5.13,SafetyFunctionsDeterminationProgram(SFDP)
TS5.5.14,ContainmentLeakRateTestingProgram
TS5.5.16,ControlRoomEnvelopeHabitabilityProgram
TS5.5.17,SurveillanceFrequencyControlProgram
www.holtec.comlPage20 TS Reinstatement
Restores5.6ReportingRequirements sectionsthatweremodifiedby PDTSAmendment272
Sectionsrevisedtochangetermfacilitytoplant
TS5.6.2,RadiologicalEnvironmentalOperatingReport
TS5.6.3,RadioactiveEffluentReleaseReport
Restores5.6ReportingRequirements sectionsthatwereremovedby PDTSAmendment272
TS5.6.5,CoreOperatingLimitsReport(COLR)
TS5.6.6,PostAccidentMonitoringReport
TS5.6.7,ContainmentStructuralIntegritySurveillanceReport
TS5.6.8,SteamGeneratorTubeInspectionReport
www.holtec.comlPage21 EPP Administrative Changes EnvironmentalProtectionPlan(EPP)changes:
RestoreoperationaltermschangedbyPDTSAmendment271 Examples
handlingandstorageofspentfuelwithconstructionandoperation
facilityismaintainedwithplantisoperated
facilitywithPlantorStation
powerleveltermreinstated
TerminologychangesareAdministrativeonly
www.holtec.comlPage22 Regulatory Basis ApplicableRegulations:
10CFR50.36,TechnicalSpecifications
10CFR50.36b,EnvironmentalConditions
10CFR50.48(a)and(c),FireProtection
10CFR50.51,Continuationoflicense
10CFR50,AppendixA,GeneralDesignCriteriaforNuclearPowerPlants
10CFR50,AppendixH,ReactorVesselMaterialSurveillanceProgram Requirements
10CFR50,AppendixJ,PrimaryReactorContainmentLeakageTestingforWater CooledPowerReactors
www.holtec.comlPage23 Environmental Assessment
10CFR51.22(c)(9)CategoricalExclusion
NoSignificantHazardsConsideration
Nochangesproposedtothepoweroperationsdesignbasisconfigurationor operationoftheplantasoriginallydesigned/constructed/operated
Norelaxationsincriteriausedtoestablishsafetylimitsorsafetysystemsettings orTSLCOsthatwereineffectduringpoweroperationspriortothe decommissioningcertifications
Nosignificantchangeinthetypesorsignificantincreaseintheamountsof anyeffluentsthatmaybereleasedoffsite
Nophysicalplantchanges
RestorationofSSCstomonitorandlimittheamountsofeffluentsreleased ensuresthe1972FinalEnvironmentalStatement(FES),the1978finaladdendum, andthe2006licenserenewalSupplementalEnvironmentalimpactStatement (SEIS)environmentalimpactsarenotsignificantlychanged
Resumedpoweroperationsconductedunderexistingenvironmentalpermits
www.holtec.comlPage24 Environmental Assessment
Nosignificantincreaseinindividualorcumulativepublicoroccupationaldose
Plantprogramsandprocessestosupportanoperatingplantwillberestoredto ensure10CFR20limitsarenotexceeded.Thepreviousradiologicalimpactsto thepublic,asevaluatedintheFESand1978Addendumfortheoriginal40years andtheSEISfortheadditional20yearsisstillbounding.
References10CFR50.82(a)(2)ExemptionsubmittedonSeptember28,2023 (ADAMSAccessionNumberML23271A140)whichincludedanindependent environmentalreviewagainstrevisedGenericEnvironmentalImpactStatement (GEIS).
The independentenvironmentalreviewvalidatedthattheproposedlicensing actionsareboundedbythe environmentalimpactfindingsofthePNPFinal EnvironmentalStatement(FES,NUREG0343)with1978Addendum,andthePNP RFOLSupplementalEnvironmentalImpactStatement(SEIS,NUREG1427,Supp 27).
www.holtec.comlPage25 Licensee Actions to Support POLB
- Restorecommitmentsclosedbasedondecommissioning certification
- RestoreUpdatedFinalSafetyAnalysisReport(UFSAR)toreflect poweroperationsplant
- RestorecompliancetoNRCOrdersandindustryinitiatives
- DevelopReturntoServicePlansforSafetyRelatedandImportant toSafetySSCs
- RestoreRegulatoryProgramsandOperatingProcedures(e.g.)
- QualityAssuranceProgram
- InserviceInspectionProgram
- EmergencyOperatingProcedures
www.holtec.comlPage26 Schedule Effective Request Approval Submit Title Aug2025 December31,2024 September28, 2023 Exemption Aug2025 Jan2025 Dec2023 LicenseTransfer Aug2025 Jan2025 Dec2023 PowerOpsTechSpecs Aug2025 Feb2025 Jan2024 PowerOpsAdminTechSpecs Aug2025 Feb Apr2025 Jan Mar2024 EmergencyPlan-PowerOps N/A N/A Mar2023 10CFR50.82(a)(7) PSDAR N/A N/A Aug2025 NotificationofTransition-POLB EffectiveDate-TransitionDate,PalisadesTransitionsfromFacilityin DecommissioningtoPowerOperationsPlant
www.holtec.comlPage27 Questions NRCStaffQuestionsorComments?
www.holtec.comlPage28 Thank You KrishnaP.SinghTechnologyCampus 1HoltecBoulevard Camden,NJ08104 Tel:(856)7970900 www.holtec.com