MONTHYEARML24212A3452024-07-30030 July 2024 August 1, 2024 Holtec Public Meeting Presentation on Potential Palisades Nuclear Plant Restart ML24193A0252024-07-11011 July 2024 NRC Presentation on Palisades Nuclear Plant Potential Reauthorization Scoping Meeting PNP 2024-023, Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-0909 May 2024 Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis ML24116A2932024-04-29029 April 2024 Pre-Submittal Meeting on April 29, 2024 - Palisades Nuclear Plant Power Operations Quality Assurance Program Manual ML24086A5822024-04-0303 April 2024 Construction Permit Application: Initial Environmental & Site Characterization ML24074A3302024-03-18018 March 2024 March 18, 2024 Pre-submittal Meeting for Proposed Emergency Plan at the Palisades Nuclear Plant (Presentation) ML24036A1082024-02-0606 February 2024 Pre-submittal Meeting for Palisades Nuclear Plant Power Operations Technical Specifications Administrative Controls and Quality Assurance Program (Presentation) ML23334A1322023-12-0505 December 2023 Pre-submittal Meeting with Holtec for Palisades Nuclear Plant Power Operations Technical Specifications (Presentation) PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations ML23235A1802023-08-29029 August 2023 Public Meeting 08/29/23 - Palisades Nuclear Plant - Return to Power Operations - Exemption to CFR 50.82(a)(2) ML23139A1922023-05-24024 May 2023 Slides for Public Meeting on 5/24/23 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML22262A3032022-09-22022 September 2022 Post-Shutdown Decommissioning Activities Report Public Meeting Slides - September 22, 2022 ML21196A0872021-07-15015 July 2021 Slideshow for the July 1, 2021 Public End of Cycle Meeting for Palisades Nuclear Plant ML21124A0062021-05-12012 May 2021 Pre-Application PDTS Meeting Slides (L-2021-LRM-xxxx) ML20342A0022020-12-0808 December 2020 NRC License Transfer Application Pre-Submittal Meeting ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML19231A2852019-08-19019 August 2019 NEIMA Meeting Slides - August 21 Palisades Meeting ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML17150A0012017-06-20020 June 2017 6/20/2017 Meeting Slides - Entergy Nuclear Operations, Inc. - Licensing Action Submittal Plan - Decommissioning (CAC Nos. MF9624, MF9625, MF9626, MF9627, and MF9628) ML17166A2892017-06-20020 June 2017 Entergy Slides for 06/20/2017 Public Meeting, Licensing Action Submittal Plan - Decommissioning. ML17080A1782017-03-20020 March 2017 3/20/2017, Meeting Slide Re. Palisades Nuclear Plant License Amendment Request; Application Meeting Cyber Security Plan Milestone 8 Implementation Schedule Change ML16344A0882016-12-0707 December 2016 December 7, 2016, Summary of Public Meeting with Entergy Nuclear Operations, Inc.- Meeting Slides ML16277A6212016-09-28028 September 2016 GSI-191 Closure Plan: September 28, 2016 - Meeting Slides ML16167A3722016-06-23023 June 2016 Nrc'S Annual Performance Assessment of Palisades for 2015 ML15107A3062015-04-14014 April 2015 April 14, 2015, Public Meeting Slides for Primary Coolant System Branch Connection Weld Volumetric Examination Status - Palisades Nuclear Plant ML15107A3072015-04-14014 April 2015 April 14, 2015, Corrected Public Meeting Slides for Primary Coolant System Branch Connection Weld Volumetric Examination Status - Palisades Nuclear Plant ML15093A2902015-04-0303 April 2015 Licensee End-of-Cycle Meeting Slides ML15093A2942015-04-0303 April 2015 NRC Meeting Slides ML14175A2992014-06-24024 June 2014 Licensee Presentation for Palisades 2013 Annual Assessment Public Meeting ML13193A3302013-07-16016 July 2013 NRC Internet Event Briefing - Palisades Safety Injection Refueling Water Tank (SIRWT) Leak Repair and Inspections ML13190A2552013-07-16016 July 2013 NRC Internet Event Briefing - Palisades Safety Injection Refueling Water Tank (SIRWT) Leak Repair and Inspections ML13140A3582013-05-20020 May 2013 May 23, 2013 NRC Presentation ML13091A1172013-04-0101 April 2013 EOC Licensee Slides for April 2, 2013 Meeting ML13080A3852013-03-21021 March 2013 NRC Slides for EOC Meeting 4/2/13 ML13010A2822013-01-10010 January 2013 January 12, 2013 Webinar Presentation Slides ML12338A1072012-12-11011 December 2012 NRC Public Meeting Slides for 12-11-12 PNP 2012-109, Public Meeting Slides for December 11, 2012 Meeting2012-12-0707 December 2012 Public Meeting Slides for December 11, 2012 Meeting ML12314A3712012-11-13013 November 2012 NFPA 805 Presubmittal Meeting 11 9 12 Rev 8 ML12255A0092012-09-11011 September 2012 Licensee Slides for Public Meeting September 12, 2012 ML12074A0692012-03-14014 March 2012 NRC EOC Slide Presentation for Public Meeting ML12058A4912012-02-27027 February 2012 Public Meeting Slides, Palisades Nuclear Plant ML1201000572012-01-11011 January 2012 Swp Presentation for Meeting January 11, 2012 at 9am ML1117906392011-06-28028 June 2011 Summary of Meeting with Entergy Operations Inc ML1111605022011-05-0505 May 2011 EOC NRC Slides Presentation for Public Meeting ML1110401532011-04-13013 April 2011 Licensee Slides from 4/13/11 Meeting with Entergy Operations, Inc., to Discuss Proposed National Fire Protection Programs Standards 805 License Amendment Submittal for Arkansas Nuclear One, Units 1 & 2 ML1020206332010-07-21021 July 2010 July 21, 2010, Areva Meeting Slides ML1017400612010-06-22022 June 2010 Palisades NRC Planning Meeting TLAA 10 CFR 54.21(c)(1)(iii) Pressurized Thermal Shock 10CFR50.61 (Slides) ML1012602072010-05-11011 May 2010 Slides, Presentation for Palisades Annual Assessment Meeting - Reactor Oversight Program - 2009 ML1013002252010-05-0707 May 2010 Draft Responses to NRC RAI in Preparation for Meeting on May 12 and 13, 2010 - GL 2004-02 2024-07-30
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24296B1652024-10-22022 October 2024 Pre-Submittal Meeting Slides Oct 24 GSI191 ML24212A3452024-07-30030 July 2024 August 1, 2024 Holtec Public Meeting Presentation on Potential Palisades Nuclear Plant Restart ML24193A0252024-07-11011 July 2024 NRC Presentation on Palisades Nuclear Plant Potential Reauthorization Scoping Meeting PNP 2024-023, Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-0909 May 2024 Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis ML24116A2932024-04-29029 April 2024 Pre-Submittal Meeting on April 29, 2024 - Palisades Nuclear Plant Power Operations Quality Assurance Program Manual ML24086A5822024-04-0303 April 2024 Construction Permit Application: Initial Environmental & Site Characterization ML24074A3302024-03-18018 March 2024 March 18, 2024 Pre-submittal Meeting for Proposed Emergency Plan at the Palisades Nuclear Plant (Presentation) ML24036A1082024-02-0606 February 2024 Pre-submittal Meeting for Palisades Nuclear Plant Power Operations Technical Specifications Administrative Controls and Quality Assurance Program (Presentation) ML23334A1322023-12-0505 December 2023 Pre-submittal Meeting with Holtec for Palisades Nuclear Plant Power Operations Technical Specifications (Presentation) PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations ML23235A1802023-08-29029 August 2023 Public Meeting 08/29/23 - Palisades Nuclear Plant - Return to Power Operations - Exemption to CFR 50.82(a)(2) ML23139A1922023-05-24024 May 2023 Slides for Public Meeting on 5/24/23 ML23075A3312023-03-16016 March 2023 KM Session OL Process February 9, 2023 ML23075A3322023-03-16016 March 2023 Containment 2008 ML23075A3332023-03-16016 March 2023 Ts/Rg 1.33 V. Appendix B, Criterion V ML23075A3352023-03-16016 March 2023 KM-KT Session Presentation Disputed Violations PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML22262A3032022-09-22022 September 2022 Post-Shutdown Decommissioning Activities Report Public Meeting Slides - September 22, 2022 ML22153A1702022-06-16016 June 2022 Public Presentation Slides for Palisades Webinar June 16, 2022 ML21196A0872021-07-15015 July 2021 Slideshow for the July 1, 2021 Public End of Cycle Meeting for Palisades Nuclear Plant ML21124A0062021-05-12012 May 2021 Pre-Application PDTS Meeting Slides (L-2021-LRM-xxxx) ML20342A0022020-12-0808 December 2020 NRC License Transfer Application Pre-Submittal Meeting ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML20231A2312020-08-17017 August 2020 2019 Palisades - EOC Presentation ML19231A2852019-08-19019 August 2019 NEIMA Meeting Slides - August 21 Palisades Meeting ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML18075A1232018-03-20020 March 2018 Entergy Nuclear Operations - March 20, 2018, Presentation Slides for Surveillance Frequency Control Program, UFSAR Change Considerations ML17335A0332017-11-28028 November 2017 Meeting Slides for November 27, 2017 Public Meeting with Entergy Nuclear Operations, Inc. Regarding Request to Extend Enforcement Discretion for Tornado Missle Non-Conformances ML17160A1952017-06-12012 June 2017 Meeting Slides for Pre-Submittal Meeting with Entergy Regarding the Plan for Decommissioning Licensing Actions PNP 2017-017, Notification in Response to Confirmatory Order, EA-15-0392017-05-0404 May 2017 Notification in Response to Confirmatory Order, EA-15-039 ML17080A1782017-03-20020 March 2017 3/20/2017, Meeting Slide Re. Palisades Nuclear Plant License Amendment Request; Application Meeting Cyber Security Plan Milestone 8 Implementation Schedule Change ML16344A0882016-12-0707 December 2016 December 7, 2016, Summary of Public Meeting with Entergy Nuclear Operations, Inc.- Meeting Slides ML16277A6212016-09-28028 September 2016 GSI-191 Closure Plan: September 28, 2016 - Meeting Slides ML16167A3722016-06-23023 June 2016 Nrc'S Annual Performance Assessment of Palisades for 2015 ML15107A3062015-04-14014 April 2015 April 14, 2015, Public Meeting Slides for Primary Coolant System Branch Connection Weld Volumetric Examination Status - Palisades Nuclear Plant ML15107A3072015-04-14014 April 2015 April 14, 2015, Corrected Public Meeting Slides for Primary Coolant System Branch Connection Weld Volumetric Examination Status - Palisades Nuclear Plant ML15093A2902015-04-0303 April 2015 Licensee End-of-Cycle Meeting Slides ML15093A2942015-04-0303 April 2015 NRC Meeting Slides ML15012A3682015-01-12012 January 2015 EA-14-168; Palisades Nuclear Plant Conference Slides ML14175A2842014-06-24024 June 2014 NRC Presentation for Palisades 2013 Annual Assessment Public Meeting ML14175A2992014-06-24024 June 2014 Licensee Presentation for Palisades 2013 Annual Assessment Public Meeting ML13316C4722013-11-14014 November 2013 Palisades Independent Spent Fuel Storage Installation (ISFSI) at Nuclear Power Plants ML13262A4492013-09-23023 September 2013 October 9, 2013, EMA Presentation Slides for Conference Call with Entergy Nuclear Operations ML13193A3302013-07-16016 July 2013 NRC Internet Event Briefing - Palisades Safety Injection Refueling Water Tank (SIRWT) Leak Repair and Inspections ML13190A2552013-07-16016 July 2013 NRC Internet Event Briefing - Palisades Safety Injection Refueling Water Tank (SIRWT) Leak Repair and Inspections ML13140A3582013-05-20020 May 2013 May 23, 2013 NRC Presentation ML13093A1912013-04-0303 April 2013 EOC Public NRC Meeting Slides Final ML13091A1172013-04-0101 April 2013 EOC Licensee Slides for April 2, 2013 Meeting ML13091A2202013-03-29029 March 2013 Public Meeting Slides ML13080A3852013-03-21021 March 2013 NRC Slides for EOC Meeting 4/2/13 2024-07-30
[Table view] |
Text
www.holtec.com
NRC Meeting:
Regulatory Path for Reauthorization of Power Operations at the Palisades Nuclear Plant
May 24, 2023 Meeting Agenda
Introductions
Purpose & Outcome
Overview Palisades Site Status
Regulatory Framework Overview
Submittal Discussion
Environmental Review
Open Forum
www.holtec.com l Page 2
Introductions
Nuclear Regulatory Commission (NRC) staff Holtec Staff
- Jean Fleming -Holtec International, Vice President of Licensing, Regulatory Affairs & PSA
- Michael Schultheis -HDI, Manager of Regulatory Assurance for Palisades & Big Rock Point
www.holtec.com l Page 3 Purpose & Outcome
PURPOSE: To present a regulatory framework of submittals associated withthe reauthorization of power operations at the Palisades Nuclear Plant.
OUTCOME:
- 1. Obtain comment from the NRC staff on the clarity of the regulatory framework.
- 2. Obtain comment from the NRC staff on potential gaps in the regulatory framework.
www.holtec.com l Page 4 Overview Palisades Site Status
- The Palisades Nuclear Plant (PNP) is located on Lake Michigan, in Van Buren County's Covert Township, Michigan, on approx. 432-acres site, 5 miles south of South Haven, Michigan, USA
- PNP is currently in Incremental DECON as described in the Post-Shutdown Decommissioning Activities Report (PSDAR) submitted in December 2020
[ML20358A232]
- The Holtec decision to pursue the restart of PNP was influenced by the Infrastructure Investment and Jobs Act (IIJA) and State Governor support to provide Michigan with; 840 megawatts of safe and reliable carbon-free electricity added to Michigan electrical grid A dependable baseload generation vital to Michigan residents and businesses A viable path to clean energy transition
www.holtec.com l Page 5 Regulatory Framework Overview
- Rescinds Certification of permanent cessation of power operations and Certification of permanent fuel removal.
- Request License Amendments (LAR) to restore operating plant licensing basis and authorize power operations at PNP through 10 CFR 50.90, Application for amendment of license, construction permit, or early site permit, to include:
- Palisades' Renewed Facility Operating License (RFOL);
- Technical Specifications (TS); and
- Emergency Plan
- Revise PNP regulatory programs to support power operations, such as:
- Quality Assurance Program
- Physical Security Plan (voluntary LAR for substantial revision)
- Inservice Inspection Program
- Emergency Operating Procedures
www.holtec.com l Page 6 Regulatory Framework Overview
- Safety reclassification of Systems, Structures and Components (SSCs) to support operating the PNP reactor.
- Accomplished under 10 CFR 50.59, Changes, tests, and experiments process
- Review NRC orders and industry initiatives for applicability to resume power operations
- Docket plans to resolve outstanding actions
- Example -Reinstate Security Order EA-02-026 ICM B.1.a.
- Restore Systems, Structures, and Components (SSCs) to power operations licensing basis operability/functionality through Return-to-Service plans
- SSC Return-to-Service plans will document actions taken to reestablish equipment qualifications through maintenance and testing
www.holtec.com l Page 7 Submittal Discussion
- Exemption Request from 10 CFR 50.82(a)(2), Upon docketing of the certifications for permanent cessation of operations and permanent removal of fuel from the reactor vessel, or when a final legally effective order to permanently cease operations has come into effect, the 10 CFR part 50 license no longer authorizing operation of the reactor or emplacement or retention of fuel into the reactor vessel
o Per 10 CFR 50.12(a)(2)(vi), special circumstances are present that would benefit public interest
o 10 CFR 50.82 certifications rescinded coincident with Exemption Implementation
o Will include conditional rescission of granted decommissioning exemptions Certified Fuel Handler Exemption Severe Weather Authority Exemptions for Permanently Defueled Emergency Plan (PDEP) post zirconium fire off-site ERO Exemption to 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) Use of Decommissioning Trust Fund for Spent Fuel Management and Site Restoration without prior NRC Notification Record Keeping Exemption for Declassified Systems
o Withdrawal PSDAR coincident with Exemption Implementation
www.holtec.com l Page 8 Submittal Discussion
- License Amendment Request (LAR), to reinstate the PNP Technical Specifications (TS) to support power operations o Per 10 CFR 50.90 o No material changes being sought to previous operating TSs o Any future TS changes will be requested via future LARs
- LAR, to reinstate the PNP TS Administrative Controls to support power operations o Per 10 CFR 50.90 o No material changes being sought to pervious operating TS Administrative Controls
- LAR, to reinstate with updates the PNP Emergency Plan and Emergency Action Levels (EAL) for an Operating Reactor o Per 10 CFR 50.90 o Update EALs to NEI 99-01 Rev 6 (Rev 7, if available) o Transition to an Integrated Public Alert & Warning System (IPAWS) -per 50.54(q)
- LAR, to Update the PNP Physical Security Plan o Per 10 CFR 50.90, o Details will be discussed with the Office of Nuclear Security and Incident Response
www.holtec.com l Page 9 Environmental Review
- Exemptions and Amendments Expected to Meet Eligibility Criteria for 10 CFR 51.22 Categorical Exclusion
- Amendments and Exemptions
- No Significant Hazards Consideration
- No Significant Increase in the Amounts or Types of Effluents Released Offsite
- No Significant Increase in Individual or Cumulative Public or Occupational Exposure
- No Significant Construction Impact
- No Significant Increase in the Potential for or Consequences from Radiological Accidents
- Exemption Involves Other Regulatory Requirements of an Administrative, Managerial, or Organizational Nature
www.holtec.com l Page 10 Open Forum
www.holtec.com l Page 11 Thank You