Category:Letter
MONTHYEARML23298A0532024-04-11011 April 2024 Exemption FA Cover Letter ML24085A2192024-03-11011 March 2024 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML24085A2222024-03-11011 March 2024 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML24047A0552024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Formal Announcement of Change in ISFSI Manager ML24057A0212024-01-12012 January 2024 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage IR 07200031/20234012023-10-0404 October 2023 Yankee Atomic Electric Company - Independent Spent Fuel Storage Security Inspection Report 07200031/2023401 ML23157A1012023-05-0404 May 2023 Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(2) for the Yankee Nuclear Power Station Independent Spent Fuel Storage Installation ML23130A1562023-04-24024 April 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2022 ML23080A1072023-03-0606 March 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML23080A1112023-03-0606 March 2023 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22340A4752023-02-24024 February 2023 Closeout Letter to Yankee Atomic Electric Company Regarding 2018 and 2021 Updated DFPs for Yankee Nuclear Power Station ISFSI ML23041A1132023-01-0505 January 2023 Yankee Atomic Electric Company - Report of 10 CFR 72.48 Changes, Tests, and Experiments ML23041A1122023-01-0505 January 2023 Independent Spent Fuel Storage Installation, 10 CFR 50.59 Changes, Tests, and Experiments Report ML22347A2802022-12-21021 December 2022 Yankee Atomic Electric Company - Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22237A0632022-08-0303 August 2022 Yankee Atomic Electric Company - Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML22136A1562022-04-28028 April 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2021 ML22119A2112022-04-18018 April 2022 Independent Spent Fuel Storage Installation - Yankee Atomic Electric Company Adoption of NAC-MPC System, Amendment 8 Certificate of Compliance and Canister Registration ML22089A1002022-03-14014 March 2022 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22082A1232022-03-14014 March 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML22011A1292022-01-31031 January 2022 Yankee Atomic Electric Company- Independent Spent Fuel Storage Installation Security Inspection Plan ML22038A2062022-01-20020 January 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage ML22038A1982022-01-20020 January 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Property Insurance Coverage ML22010A0122022-01-10010 January 2022 Yankee Atomic Electric Company - Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan IR 05000029/20210012021-10-29029 October 2021 Yankee Atomic Electric Company - NRC Independent Spent Fuel Storage Installation Inspection Report 07200031/2021001 and 0500029/2021001 ML21287A1012021-10-0404 October 2021 Yankee Atomic Electric Company - Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Biennial Update to the Yankee Nuclear Power Station License Termination Plan ML21291A1602021-10-0404 October 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Biennial Update of the Yaec Quality Assurance Program ML21287A0362021-10-0404 October 2021 Biennial Update to the Yankee Nuclear Power Station Final Safety Analysis Report ML21189A0502021-06-0101 June 2021 Independent Spent Fuel Storage Installation, Formal Announcement of Change in ISFSI Manager ML21062A2472021-04-0707 April 2021 Close-out Letter - Yankee Rowe ISFSI DFP ML21105A7382021-03-0202 March 2021 Yankee Nuclear Power Station Independent Sperit Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML21077A1682021-03-0202 March 2021 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML21042A1452021-01-27027 January 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Property Insurance Coverage ML21042A9812021-01-27027 January 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage ML21028A0632021-01-26026 January 2021 M210211: Welcome Letter to W. Norton 05000029/LER-2021-001, Compensatory Measure Not Established for a Momentary I/O Board Communication Loss2021-01-12012 January 2021 Compensatory Measure Not Established for a Momentary I/O Board Communication Loss ML20167A3032020-07-10010 July 2020 Letter - Ynps Exemption 190502, Rev 0 ML20167A3022020-07-0202 July 2020 FRN - Ynps Exemption 190502, Rev 0 ML20162A1282020-06-23023 June 2020 Issuance of Temporary Exemption from 10 CFR Part 73, Appendix B, for Yankee Rowe ISFSI (COVID-19) ML20160A0402020-05-20020 May 2020 BYR 2020-014 - Yaec Letter BYR 2020-014 Temporary Exemption - Annual Physical Requirement ML20087J6642020-03-16016 March 2020 Yankee Nuclear Power Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML20108F5362020-03-12012 March 2020 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML20054B6392020-02-0606 February 2020 Independent Spent Fuel Storage Installation - Formal Announcement of Change in ISFSI Manager ML20015A4942020-01-15015 January 2020 Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan ML20013F6882019-12-17017 December 2019 Independent Spent Fuel Storage Installation - Formal Announcement of Change in Isfsj Manager ML19295E1062019-10-0202 October 2019 Biennial Update of the Yankee Atomic Electric Company Quality Assurance Program (Rev. 39) for the Yankee Rowe ISFSI ML19165A0262019-06-0505 June 2019 Independent Spent Fuel Storage Installation - Formal Announcement of Change in ISFSI Manager ML19176A0752019-05-0202 May 2019 Independent Spent Fuel Storage Installation - Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML19121A4202019-04-23023 April 2019 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2018 ML18354A7382018-12-10010 December 2018 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Three-Year Update to the Decommissioning Funding Plan IR 05000029/20180012018-05-30030 May 2018 Yankee Atomic Electric Company, Rowe, Massachusetts Site - NRC Independent Spent Fuel Storage Installation Report Nos. 07200031/2018001 and 05000029/2018001 2024-04-11
[Table view] Category:Report
MONTHYEARML16043A3752016-01-25025 January 2016 Yankee ISFSI - Revision 3 to the Post-Shutdown Decommissioning Activities Report ML15051A3712015-02-0404 February 2015 Yankee Atomic Electric Company - Yankee Rowe Independent Spent Fuel Storage Installation - 10 CFR 95.57(b) Log for January 2015 ML14069A1842014-02-25025 February 2014 Yankee Nuclear Power Station, Independent Spent Fuel Storage Installation, Revision 2, Post-Shutdown Decommissioning Activities Report ML13028A1222013-01-14014 January 2013 Yankee Atomic Electric Company - Report of 10 CFR 72.48 Changes, Tests and Experiments ML11166A1242011-06-0808 June 2011 Response to Second Request (Part 2) for Additional Information for Application for NRC Consent to Indirect License Transfer/Threshold Determination - Merger of Northeast Utilities and Nstar ML0907001352009-02-23023 February 2009 10 CFR 72.48 Evaluation Biennial Summary Report for 2007/2008 ML0906804082009-02-19019 February 2009 Yankee Atomic Electric Company (Yaec) - 10CFR50.59 Evaluation Biennial Summary Report for 2007 and 2008 ML0715203992007-05-30030 May 2007 Fy 2007 Final Fee Rule Workpapers ML0703204732006-12-12012 December 2006 Licensee Response, Dated 12/12/2006, to NRC Comments on Yankee Final Status Survey Reports, NOL-03, NOL-06, OOL-10, OOL-11, and OOL-18 ML0633204422006-10-27027 October 2006 YA-REPT-00-018-06, Estimated Doses from Inhalation, Ingestion and Remote Exposure from Residual Discrete Particles at Yankee Nuclear Power Station Following NRC License Termination. ML0629700392006-10-0606 October 2006 Yankee Nuclear Power Station - Control Point Portable Instrument Accountability Form ML0629700362006-10-0606 October 2006 Yankee Nuclear Power Station - Attachment B Data Quality Assessment Plots and Curves, Figures 1 OOL-07-01 Through 15 OOL-07-03 ML0629700692006-10-0505 October 2006 Yankee Nuclear Power Station - Attachment B Data Quality Assessment Plots and Curves, Figures 1 NOL-05-01 Through 10 NOL-05-02 ML0701602732006-08-0909 August 2006 Yankee Nuclear Power Station Final Status Survey Reports, YNPS-FSS-OMB06-00 & YNS-FSS-OOL15-00, for Survey Areas OMB-06 & OOL-15 ML0629300872006-06-12012 June 2006 YA-REPT-00-003-05, Generic ALARA Evaluation Comparison Worksheet ML0600403082005-12-0808 December 2005 Response to Request for Final Status Survey-Related Procedures ML0615303932005-12-0202 December 2005 In-Process Inspection Survey Results for the Turbine Building Slab Area at the Yankee Nuclear Power Station, Rowe, Massachusetts (Docket No. 50-29; Rfta No. 05-008) ML0701601132005-11-0909 November 2005 YNPS-FSS-OOL-03-00, Appendix a, Final Status Survey Planning Worksheets. ML0701601242005-11-0909 November 2005 YNPS-FSS-OOL-03-00, Appendix D, Generic ALARA Evaluation Comparison Worksheet. ML0629700622005-11-0404 November 2005 Yankee Nuclear Power Station - Use of In-Situ Gamma Spectrum Analysis to Perform Elevated Measurement Comparisons in Support of Final Status Surveys, YA-REPT-00-018-05 ML0627803832005-11-0404 November 2005 YA-REPT-00-018-05, Rev 0, Use of In-Situ Gamma Spectrum Analysis to Perform Elevated Measurement Comparisons in Support of Final Status Surveys. ML0531202752005-10-31031 October 2005 Yankee Atomic Electric Company Request for Approval of Revised Proposed Procedures in Accordance with 10 CFR 20.2002 ML0615303832005-10-12012 October 2005 In-Process Inspection Survey Results for the Reactor Support Structure Concrete Base and Inside Open Land Areas at the Yankee Nuclear Power Station, Rowe, Massachusetts (Docket No. 50-29; Rfta No. 05-008) ML0702304712005-10-11011 October 2005 Appendix D, YA-REPT-00-018-05, Rev . 0, Use of In-Situ Gamma Spectrum Analysis to Perform Elevated Measurement Comparisons in Support of Final Status Surveys. ML0630705032005-08-26026 August 2005 Yankee - YA-REPT-00-003-05, Generic ALARA Evaluation Comparison Worksheet. ML0716601052005-06-17017 June 2005 Yankee Nuclear Power Station Site Closure Project Amended Phase III - Remedial Action Plan/Phase IV - Remedy Implementation Plan ML0525004532005-06-0101 June 2005 Yankee Atomic Electric Company In-Situ Gamma Spectrum Analysis Reports; Use of Gamma Spectrum Analysis to Support Final Status Surveys for Compliance with License Termination Criteria ML0525004512005-05-0909 May 2005 Yankee Atomic Electric Company In-Situ Gamma Spectrum Analysis Reports; Use of Gamma Spectrum Analysis to Evaluate Bulk Materials for Compliance with License Termination Criteria ML0513704122005-05-0505 May 2005 Errata for Report of Continuing Hydrogeologic Investigations in 2004 ML0511501762005-04-14014 April 2005 YA-REPT-00-010-05, Report of Continuing Hydrogeologic Investigations in 2004. ML0704304972005-03-22022 March 2005 Yankee Nuclear Power Station Revised Beneficial Use Determination for Structures ML0632104992005-01-18018 January 2005 YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0631201422005-01-18018 January 2005 Yankee Nuclear Power Stations, Technical Report, YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0633402622005-01-18018 January 2005 Yankee Nuclear Power Station, Generic ALARA Review for Final Status Survey of Soil at Ynps, YA-REPT-00-003-05 ML0633502172005-01-18018 January 2005 Yankee Nuclear Power Station - Report YNPS-FSS-OOL-04-00, Final Status Survey Report for Survey Area OOL-04, Appendix C - YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0631201082005-01-18018 January 2005 YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0630705022005-01-18018 January 2005 Yankee - Technical Report YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0630600562005-01-18018 January 2005 Yankee Nuclear Power Station - Technical Report YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0629901572005-01-18018 January 2005 Yankee Nuclear Power Station - Generic ALARA Review for Final Status Survey of Soil at Ynps, YA-REPT-00-003-05 ML0629700582005-01-18018 January 2005 Yankee Nuclear Power Station - Generic ALARA Review for Final Status Survey of Soil at Ynps, YA-REPT-00-003-05 ML0634804382005-01-18018 January 2005 Appendix C - YA-REPT-00-003-005, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0634804112005-01-18018 January 2005 Appendix C - YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0629700302005-01-18018 January 2005 Yankee Nuclear Power Station - Generic ALARA Review for Final Status Survey of Soil at Ynps, YA-REPT-00-003-05 ML0629300852005-01-18018 January 2005 YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0701604912005-01-18018 January 2005 Yankee Nuclear Power Station - Final Status Survey Report, Generic ALARA Review for Final Status Survey of Soil at Ynps, Appendix B - YA-REPT-00-003-05 ML0700305502005-01-18018 January 2005 Yankee Nuclear, Final Status Survey Report, Appendix C - YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0700305272005-01-18018 January 2005 Yankee Final Status Survey Report, Appendix C - YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0701601202005-01-18018 January 2005 YNPS-FSS-OOL-03-00, Appendix C, YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0634806042005-01-18018 January 2005 YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0435700142004-12-10010 December 2004 Ynps Technical Report - Use of Gamma Spectrum Analysis to Evaluate Bulk Materials for Compliance with License Termination Criteria 2016-01-25
[Table view] Category:Technical
MONTHYEARML0703204732006-12-12012 December 2006 Licensee Response, Dated 12/12/2006, to NRC Comments on Yankee Final Status Survey Reports, NOL-03, NOL-06, OOL-10, OOL-11, and OOL-18 ML0633204422006-10-27027 October 2006 YA-REPT-00-018-06, Estimated Doses from Inhalation, Ingestion and Remote Exposure from Residual Discrete Particles at Yankee Nuclear Power Station Following NRC License Termination. ML0701602732006-08-0909 August 2006 Yankee Nuclear Power Station Final Status Survey Reports, YNPS-FSS-OMB06-00 & YNS-FSS-OOL15-00, for Survey Areas OMB-06 & OOL-15 ML0701601242005-11-0909 November 2005 YNPS-FSS-OOL-03-00, Appendix D, Generic ALARA Evaluation Comparison Worksheet. ML0701601132005-11-0909 November 2005 YNPS-FSS-OOL-03-00, Appendix a, Final Status Survey Planning Worksheets. ML0629700622005-11-0404 November 2005 Yankee Nuclear Power Station - Use of In-Situ Gamma Spectrum Analysis to Perform Elevated Measurement Comparisons in Support of Final Status Surveys, YA-REPT-00-018-05 ML0627803832005-11-0404 November 2005 YA-REPT-00-018-05, Rev 0, Use of In-Situ Gamma Spectrum Analysis to Perform Elevated Measurement Comparisons in Support of Final Status Surveys. ML0702304712005-10-11011 October 2005 Appendix D, YA-REPT-00-018-05, Rev . 0, Use of In-Situ Gamma Spectrum Analysis to Perform Elevated Measurement Comparisons in Support of Final Status Surveys. ML0525004532005-06-0101 June 2005 Yankee Atomic Electric Company In-Situ Gamma Spectrum Analysis Reports; Use of Gamma Spectrum Analysis to Support Final Status Surveys for Compliance with License Termination Criteria ML0525004512005-05-0909 May 2005 Yankee Atomic Electric Company In-Situ Gamma Spectrum Analysis Reports; Use of Gamma Spectrum Analysis to Evaluate Bulk Materials for Compliance with License Termination Criteria ML0511501762005-04-14014 April 2005 YA-REPT-00-010-05, Report of Continuing Hydrogeologic Investigations in 2004. ML0704304972005-03-22022 March 2005 Yankee Nuclear Power Station Revised Beneficial Use Determination for Structures ML0630600562005-01-18018 January 2005 Yankee Nuclear Power Station - Technical Report YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0633502172005-01-18018 January 2005 Yankee Nuclear Power Station - Report YNPS-FSS-OOL-04-00, Final Status Survey Report for Survey Area OOL-04, Appendix C - YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0633402622005-01-18018 January 2005 Yankee Nuclear Power Station, Generic ALARA Review for Final Status Survey of Soil at Ynps, YA-REPT-00-003-05 ML0632104992005-01-18018 January 2005 YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0634804112005-01-18018 January 2005 Appendix C - YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0631201422005-01-18018 January 2005 Yankee Nuclear Power Stations, Technical Report, YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0631201082005-01-18018 January 2005 YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0630705022005-01-18018 January 2005 Yankee - Technical Report YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0629901572005-01-18018 January 2005 Yankee Nuclear Power Station - Generic ALARA Review for Final Status Survey of Soil at Ynps, YA-REPT-00-003-05 ML0629700582005-01-18018 January 2005 Yankee Nuclear Power Station - Generic ALARA Review for Final Status Survey of Soil at Ynps, YA-REPT-00-003-05 ML0634806042005-01-18018 January 2005 YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0700305272005-01-18018 January 2005 Yankee Final Status Survey Report, Appendix C - YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0700305502005-01-18018 January 2005 Yankee Nuclear, Final Status Survey Report, Appendix C - YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0701601202005-01-18018 January 2005 YNPS-FSS-OOL-03-00, Appendix C, YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0701604912005-01-18018 January 2005 Yankee Nuclear Power Station - Final Status Survey Report, Generic ALARA Review for Final Status Survey of Soil at Ynps, Appendix B - YA-REPT-00-003-05 ML0629300852005-01-18018 January 2005 YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0634804382005-01-18018 January 2005 Appendix C - YA-REPT-00-003-005, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0629700302005-01-18018 January 2005 Yankee Nuclear Power Station - Generic ALARA Review for Final Status Survey of Soil at Ynps, YA-REPT-00-003-05 ML0435700142004-12-10010 December 2004 Ynps Technical Report - Use of Gamma Spectrum Analysis to Evaluate Bulk Materials for Compliance with License Termination Criteria ML0630705002004-10-17017 October 2004 Yankee - Technical Report, YA-REPT-00-015-04, Rev 0, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe ML0700305282004-10-13013 October 2004 Yankee Final Status Survey Report, Appendix D - ALARA Evaluations, OOL-08 ML0629700572004-10-0707 October 2004 Yankee Nuclear Power Station - Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe, YA-REPT-00-015-04, Revision 0 ML0627803792004-10-0707 October 2004 YA-REPT-00-015-04, Rev 0, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe. ML0629901302004-10-0707 October 2004 Yankee Nuclear Power Station - Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe, YA-REPT-00-015-04, Rev 0 ML0631201052004-10-0707 October 2004 YA-REPT-00-015-04, Revision 0, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe. ML0631201412004-10-0707 October 2004 Yankee Nuclear Power Stations, Technical Report, YA-REPT-00-015-04, Rev. 0, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe. ML0632104972004-10-0707 October 2004 YA-REPT-00-015-04, Rev 0, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of Final Status Survey at Yankee Rowe. ML0633402592004-10-0707 October 2004 Yankee Nuclear Power Station, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculation in Support of the Final Status Survey, YA-REPT-00-015-04 ML0634804102004-10-0707 October 2004 Appendix B - YA-REPT-00-015-04, Rev 0 Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe. ML0634806032004-10-0707 October 2004 YA-REPT-00-015-04, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculation in Support of the Final Status Survey at Yankee Rowe ML0634806222004-10-0707 October 2004 YA-REPT-00-015-04, Revision 0, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe ML0629300842004-10-0707 October 2004 YA-REPT-00-015-04, Rev 00, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of Final Status Survey at Yankee Rowe ML0629700212004-10-0707 October 2004 Yankee Nuclear Power Station - Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe, YA-REPT-00-015-04, Rev 0 ML0702304292004-10-0707 October 2004 Appendix B, YA-REPT-00-015-04, Rev. 0, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe. ML0702302652004-10-0707 October 2004 Appendix B, YA-REPT-00-015-04, Rev. 0, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe. ML0701601162004-10-0707 October 2004 YNPS-FSS-OOL-03-00, Appendix B, YA-REPT-00-015-04, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe. ML0700305492004-10-0707 October 2004 Yankee Nuclear, Final Status Survey Report, Appendix B - YA-REPT-00-015-04, Rev 0, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe ML0700305262004-10-0707 October 2004 Yankee Final Status Survey Report, Appendix B - YA-REPT-00-015-04, Rev 0, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe 2006-08-09
[Table view] |
Text
YANKEE ATOMIC ELECTRIC COMPANY Telephone (413) 424-5261 49 Yankee Road, Rowe, Massachusetts 01367 YANKEE April 27, 2004 BYR 2004-043 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Reference:
(a) License No. DPR-3 (Docket No. 50-29)
Subject:
Technical Report - Dose Due to Tritium in Groundwater for the YNPS License Termination Plan (LTP)
This letter provides a hardcopy of a technical report in support of the LTP1 for the Yankee Nuclear Power Station (YNPS). The specific report provided is:
(1) YA-REPT-00-003-04, "Estimate of Dose Due to Tritium in Groundwater at the EPA's Maximum Contaminant Level (MCL)"
In the YNPS LTP, a commitment has been made to meet the EPA's maximum contaminant level (MCL) for H-3 (20,000 pCi/I) in groundwater by the time of license termination. During a February 2004 public meeting, the NRC asked Yankee to calculate the dose that a resident farmer might receive from groundwater containing H-3 at the EPA's MCL. The enclosed technical report provides the calculation and the resulting dose was determined to be 0.77 mrem/yr.
1 YAEC Letter to USNRC, "Submittal of YNPS License Termination Plan and Proposed Revision to Possession Only License," dated November 24, 2003, BYR 2003-080.
A-60 I
U.S. Nuclear Regulatory Commission BYR 2004-043, Page 2/2 This technical report is provided for your review. If you have any questions, please contact us.
Sincerely, YANKEE ATOMIC ELECTRIC COMPANY fames A. Kay I Principal Licensing Engineer cc: J. Hickman, NRC, Senior Project Manager, NMSS J. Wray, Inspector, NRC Region I (w/o enclosure)
R. Gallaghar, MA DPH D. Howland, MA DEP M. Rosenstein, EPA, Region 1 W. Perlman, Executive Committee Chair, FRCOG T. W. Hutcheson, Chair, Franklin Regional Planning Board L. Dunlavy, Executive Director, FRCOG P. Sloan, Director of Planning & Development, FRCOG D. Katz, CAN
I TECHNICAL REPORT TITLE PAGE Estimate of Dosc Due to Tritium in Groundwater at the EPA's Maximum Contaminant Level (MCL)
Title YA-REPT-00-003-04 Technical Report Number Approvals A (Print & Sign Name)
Preparer: Alice Carson Qon- _ Date: t2/~°f Reviewer: Estella Keefer Date:
Date:
Reviewer: Ron Cardarelli Date:
Approver (Cognizant Manager): G us 4$ A Date: -kA0) Lo 6-e&e YA-REPT-00-003-04 Page I of I11
TECiINICAL REPORT TITLE PAGE Estimate of Dose Due to Tritium in Groundwater at the EPA's Maximum Contaminant Level (MCL)
Title YA-REPT-0-003-04 Technical Report Number Approvals (Print & Sign Name)
Preparer: Alice Carson _
Date:
Reviewer: Estella Keefer Date:
I /
Reviewer: Ron Cardarelli Date:
Approver (Cognizwat Manaet Date:
YA-REPT-00-003-04 Page I of l I
TEChNICAL REPORT TITLE PAGE Estimate of Dose Duc to Tritium in Groundwater at the EPA's Maximum Contaminant Level (MCL)
Title YA-REPT-00-003-04 Technical Report Number Approvals (Print & Sign Name)
Preparer: Alice Carson Date:
Reviewer: Estella Keefer Date:
Reviewer: Ron Cardarelli
<) Lt Date:
Approver (Cognizant Manager Date:
YA-REPT-00-003-04 Pag~e I of II
Executivc Summary Tritium (H-3) has been identif ie in the groundwater at the Yankee Nuclear Power Station (YNPS) site. In the License Termination Plan (LTP), Yankee Atomic Energy Company (YAEC) made a commitment to meet the EPA's maximum contaminant level (MCL) for H-3 in groundwater by the time of license termination. During a February 2004 public meeting, the NRC asked YAEC to calculate the dose that a resident farmer might receive from groundwater containing H-3 at the EPA's MCL. Although YAEC has not calculated site-specific groundwater concentrations corresponding to 25 mrem/yr for the YNPS site, Connecticut Yankee (CY) did provide groundwater derived concentration guideline levels (DCGLs) for a dose of 25 mrem/yr in its approved LTP. Therefore, the CY DCGL for H-3 was used to calculate the dose corresponding to 20,000 pCi/l-the EPA's MCL for H-3. The dose was determined to be 0.77 mrem/yr.
Introduction During groundwater sampling at YNPS, H-3 was detected. Additional drilling and sampling were performed to define the extent and magnitude of the contamination. Currently, H-3 is the only radionuclide related to the operation of YNPS that has been positively identified in the groundwater. The highest level of H-3 was found adjacent to the Spent Fuel Pit (SFP), and this was approximately 45,000 pCi/l. The SFP and the adjacent Ion Exchange Pit are the suspected sources of the contamination. Because the SFP has been drained already and remediation activities are planned for soil and concrete in that area, it is anticipated that the source of the contamination will be eliminated and that, therefore, the levels of H-3 in groundwater wvill steadily decrease over time.
Because the levels of H-3 in the groundwater are already relatively low and believed to be declining, no DCGLs have been calculated for groundwater at the YNPS site. Rather, in the LTP (Reference 1), a commitment was made to sample onsite wells in order to confirm "that the concentration of well water available, based upon the well supply requirements assumed in Section 6 for the resident farmer, is below the EPA MCLs".
During a February 2004 meeting to discuss the LTP, the NRC asked YAEC to estimate the dose contribution attributable to groundwater containing H-3 at the EPA's MCL. The NRC stated that preparing site-specific DCGLs for YNPS was not necessary and that approved DCGLs, such as those already prepared at CY, could be used to determine the dose contribution. The following discussion first addresses the appropriateness of applying CY groundwater DCGLs at YNPS.
Then, the discussion describes the results of calculations that use these CY DCGLs to estimate the dose contribution of groundwater at the EPA's MCL for 11-3.
YA-REPT-00-003 -04 Page 2 of II
Discussion Evaluating the validity of appijing CY Groundwater DCGLs at YNPS In order to determine if the CY DCGLs for groundwater apply to YNPS, the assumptions and important parameter values underlying dose calculations were identified from their respective sensitivity analyses and DCGL calculations. These assumptions and parameters were compared in order to determine if CY DCGLs for groundwater could be validly applied to YNPS. The CY dose analyses addressed groundwater doses in two parts:
- 1. Dose contribution from groundwater contamination due to leaching of radionuclides from the soil to the groundwater (addressed by soil analyses) and
- 2. Dose contribution due to initially contaminated groundwater (addressed by groundwater analysis).
The methodology used at CY combined doses to ensure that the total dose (all pathways and media) remained at, or below, 25 mrem/yr. As appropriate, the assumptions and parameter values used in the CY soil analysis were maintained consistently in the CY groundwater analysis.
Thus, the assumptions and parameters used for the CY groundwvater analysis should be consistent with those used in the YNPS soil analysis.
The resident farmer scenario was used to model the dose due to contaminated groundwater at the CY site and the computer code used to calculate the doses in this model was RESRAD. The same scenario and computer code were used to model contaminated soils at the YNPS site.
The method of selecting parameter values was very similar for the CY and YNPS analyses. For both analyses, values for metabolic and behavioral parameters were taken from Volume 3 of NUREG/CR-5512. The difference between the two analyses is the method of selecting parameter values for physical parameters.
For both CY and YNPS, a sensitivity analysis was used to identify sensitive parameters, and conservative values (defined as the 25h % or 7 5th % value of the distribution, or the mean if more conservative) were used for these parameters. However, a difference exists in the ways that CY and YNPS assigned values to parameters that were not sensitive. Specifically, the CY analyses used a default value, median value, or literature value as the input for insensitive parameters. In contrast, the YNPS analysis employed a probabilistic version of the code, and a distribution was used as the input for parameters that were not sensitive.
Table 1 provides information about the sensitivity of input parameters (as determined in the sensitivity analyses) and the input values used for calculating the DCGLs in the CY soil and groundwater evaluations and the YNPS soil analysis. For the CY soil analysis, the sensitive parameters are the distribution coefficient of H-3, the thickness of the contaminated zone, the contaminated zone hydraulic conductivity, and the depth of roots. Similarly, for the YNPS soil analysis, the sensitive parameters are the distribution coefficient of 11-3, the thickness of the YA-REPT-00-003-04 Page 3 of I I
contaminated zone, and the depth of roots. For the CY groundwater analysis, there are no sensitive parameters related to H-3.
Sensitive parameters for H-3 were carefully reviewed to assess relevance to groundwater use. It should be noted that three of the four sensitive parameters identified in the CY soil analysis and all three of the sensitive parameters identified in the YNPS soil analysis are either not used or given a value of 0.0 in the groundwater analysis. These values were altered for the groundwater dose calculation to ensure that the calculated dose originates entirely from existing water-dependent pathways and not from contamination leaching into the groundwater from the soil (dose determined in the soil analysis). The remaining sensitive parameter from the CY soil analysis, the contaminated zone hydraulic conductivity, was determined to be insensitive in the YNPS soil analysis. The CY soil and groundwater analyses use the same parameter value for hydraulic conductivity. Because that parameter was identified as being insensitive in the YNPS soil analysis, it is expected that a change to this parameter would have little affect on dose.
As indicated above, only doses associated with the use of the initially contaminated groundwater are calculated. Differences existing between site-specific input values used in the CY groundwater and soil analyses and the YNPS soil analysis were evaluated for their influence on water-dependent pathways. In order to evaluate the significance of the influence, these water-dependent pathways and the fraction of dose coming from each of the pathways were first identified. For the CY groundwvater evaluation:
- 77.53% of the dose was from water pathways
- 0.02% of the dose was from plant (vegetation) pathways
- 4.42% of the dose was from meat pathways
- 18.03% of the dose was from milk pathways.
The effect of the difference in input values for parameters contributing to each of these pathways (see Table 1) was reviewed and addressed as follows:
Water Pathways: The majority of the dose is due to water pathways. No differences wvere identified in the input parameter values for the water pathway: the drinking water consumption rates are the same in the CY and YNPS analysis, as is the fraction of onsite water used.
Plant (Vegetation) Pathways: Plant pathways contribute insignificantly to the dose. Although the CY and YNPS analyses use the plant food consumption rates from NUREG/CR-5512, Vol. 3, differences exist in the input values used for the plant transfer factors. These differences will have a minimal impact on dose calculations as these parameters have been determined to be insensitive in both analyses and plant pathways represent a very small fraction of the total dose.
Meat Pathways: Meat pathways contribute only slightly to dose. Although the CY and YNPS analyses use the meat and poultry consumption rates from NUREG/CR-5512, Vol. 3, differences exist in the meat transfer factors. These differences will have a minimal impact on dose calculations because these parameters have been determined to be insensitive in both analyses and meat pathways represent a small fraction of the total dose.
YA-REPT-00-003-04 Page 4 of II
Milk Pathways: Milk pathways contribute less than 20% of the total dose. Although the CY and YNPS analyses use the milk consumption rates from NUREG/CR-5512, Vol. 3, differences exist in the milk transfer factors. These differences will have minimal impact on dose calculations because these parameters have been determined to be insensitive in both analyses and milk pathways represent a small fraction of the total dose.
The conclusion that differences in the input values between the CY and YNPS analyses do not lead to significant changes in dose is also supported by the fact that considering these differences, the YNPS soil DCGL for tritium is within 11% of the CY soil DCGL for tritium.
Thus, based upon a review of the parameter values and assumptions used in the CY groundwater analysis and upon a comparison of those same values in the YNPS soil analysis, it is concluded that the DCGLs for groundwater at CY can be validly applied at YNPS.
Calculation of Dose from Groundwater at MCL The current MCL for tritium in drinking water was taken from the Federal Register on "National Primary Drinking Water Regulations; Radionuclides; Final Rule," 65 FR 76708 (Reference 3).
The MCL for H-3 is 20,000 pCi/l.
Nuclide specific DCGL values in groundwater at CY are provided in Table 6-2 of the Haddam Neck Plant LTP (Reference 1). The value of the groundwater DCGL for H-3 is 6.52E+05 pCi/l.
The following relationship was used to determine the dose corresponding to the MCL for H-3:
Dose at MCL 25mrem/yr 2.0E + 04pCi /l 6.52E + 05pCi /I Or Dose at MCL =25mrem / yrx 2.OE + 04pCi / I 6.52E + 05pCi / I Using this relationship, the dose associated with an MCL of 2.OE+04 pCi/I is 0.77 mrem/yr.
Conclusions By reviewing the input parameters and assumptions of the CY and YNPS dose calculations, it has been determined that the groundwater DCGLs that were calculated at CY are, in fact, appropriate for calculating the dose from YNPS groundwater when at the EPA's MCLs. Using the CY groundwater DCGL of 6.52E+05 pCi/I (representing a dose of 25 mrem/yr), the groundwater at YNPS will result in a dose of 0.77 mrem/yr when at the EPA's MCL for H-3 (2.OE+04 pCi/l ).
YA-REPT-00-003-04 Page 5 of 11
Rcfcrcnccs I "Haddam Neck Plant License Termination Plan," Rev. I a, dated October 2002.
2 YNPS Calculation YA-CALC-02-001-03, "RESRAD Sensitivity Analysis for Resident Farmer Scenario-Soil."
3 Federal Register, 65 FR 76708, "National Primary Drinking Water Regulations; Radionuclides; Final Rule," dated December 7, 2000.
4 "Yankee Nuclear Plant Site License Termination Plan," Rev. 0, dated November 2003.
YA-REPT-00-003-04 Page 6 of II
A Table 1 Comparison of Parameter Sensitivities and Values CY Soil Eval CY Groundwater Eval Rowe Soil Eval Parameter (unit) Sensitive 1 Input Parameter Sensitive Input Parameter Sensitive Input Parameter Par._Value/Distribution Parameter?** **
Value/Distribution i Parameter? Value/Distribution Basic radiation dose limit (mrem/y) J _ 25 _ 25 _ 25 Initial principal radionuclide (pCilg) l - l Distribution Coefficient H-3 (cm3/g) Y 0.06 _ 100 Y 4.301-02 Initial concentration of radionuclides present in _ . 0 _ 9.97* -
groundwater (pCi/A)
Time since placement of material (y) 0 II 0 Timeforcalculations(y) 0, 1,3, 10,30, 100,300, . 0, I 0, 1,3, 10,30, 100,300, 1000 . , 1000 2
Area ofcontaminated zone (mi ) . 15600 _ 15600 . 13022 Thickness of contaminated zone (m) Y 1.575 1.575 Y 2.89 Length parallel to aquifer flow (m) _ 141 .. 141 _ 129 Cover iand Contaminaited Zone l1ydogeog16glcal DaW:a' ,-. -'<'*U*-;,.;
Cover depth (m) 0 _ 0 0 Density of contaminated zone (glcm3 ) N 1.563 _ 1.56 N Distribution Applied Contaminated zone erosion rate (m/y) N 1.401-03 .. 1.40E-03 8.5E Contaminated zone total porosity N 0.41 - 0.41 N Distribution Applied Contaminated zone field capacity _ 0.06 - 0.06 0.05 Contaminated zone hydraulic conductivity Y 1.03E+03 - 1.03E+03 N Distribution Applied (W/y)
Contaminated zone b parameter N 1.36 __1.36 N Distribution Applied Humidity in air (gumW) 8.00 _ _ 6.1 Evapotranspiration coefficient - 0.36 - 0.36 N Distribution Applied Average annual wind speed (m/sec) 1.70 - 1.70 2.03 Precipitation (mly) 1.1 - 1.1 1.2 Irrigation (mfy) - 0.1125 - 0.1125 N Distribution Applied Irrigation mode - Overhead Overhead Overhead Runoff coefficient 0.18 0.18 0.6 YA-REPT-00-003-04 Page 7of I
'N Table 1 Comparison of Parameter Sensitivities and Values CY Soil Eval CY Groundwater Eval Rowe Soil Eval Parameter (unit) Sensitive Input Parameter Sensitive Input Parameter Sensitive Input Parameter Parameter? Value/Distribution Parameter?*** Value/Distribution Parameter? Value/Distribution Watershed area for nearby stream or pond (mi2 ) 5.93E+05 5.93E+05 _ 7.77E+05 Accuracy for water/soil computations _ I.OOE-03 _ I.OOE-03 _ 1.001-03 Saturated Zonc 1ydr ata Igeological DtK,' ..ibW. .- ! , , ' *.',,','-.j/
Density of saturated zone (g/cm3 ) N 1.5635 . _ 1.5635 N Distribution Applied Saturated zone total porosity N 0.41 _ 0.41 N Distribution Applied Saturated zone effective porosity N 0.35 _ 0.35 N Distribution Applied Saturated zone field capacity _ 0.06 . 0.06 _ 0.05 Saturated zone hydraulic conductivity (mfy) N 1.03E+03 1.03E+03 N Distribution Applied Saturated zone hydraulic gradient 0.017 0.017 0.1 Saturated zone b parameter N 1236 _ 1.36 N Distribution Applied Water table drop rate (m/y) I.OOe-03 . - 1.002-03 I 1.00-03 Well pump intake depth (m below water table) N 14.51 _ 14.51 N Distribution Applied _",
- . t-
, - . - Z Model: Nondispersion (ND) or Mass-Balance ND MB ND . . _4 -
(MB)
Well pumping rate (m3/y) N 884.5 _ 884.5 N Distribution Applied Unsaturated ZonIe lid riego6loglcilD- V.AS' . .;'. - . 1 ;.*. x i -
Number of unsaturated zone strata I 0 ..
Unsat. zone 1.thickness (m) N 1.430 _ N Distribution Applied Unsat. zone 1,soil density (glcm3 ) N 1.5635 _ N Distribution Applied Unsat. zone I total porosity N 0.41 . N Distribution Applied Unsat. zone 1,effective porosity N 0.353 _ N Distribution Applied Unsat. zone 1 field capacity 0.06 .. .. 0.05 Unsat. zone I*hydraulic conductivity (m/y) N 1.03e+03 _ N Distribution Applied Unsat. zone 1,soil-specific b parameter N 1.36 _ N Distribution Applied Inhalation rate (m3/y) 8400 _ 8_
400 Mass loading for inhalation (gum 3) N 2.332-05 _ N Distribution Applied Exposure duration _ 30 _ - 30 - 30 YA-REPT-00-003-04 Page 8 of I11
Table 1 Comparison of Parameter Sensitivities and Values CY Soil Eval CY Groundwater Eval Rowe Soil Eval Parameter (unit) Sensitive Input Parameter Sensitive Input Parameter Sensitive Input Parameter Parameter? Value/Distribution Parameter?** Value/Distribution Parameter? Value/Distribution Indoor dust filtration factor N 0.55 _ N Distribution Applied Shielding factor, external gamma N 0.2725 _ N Distribution Applied Fraction of time spent indoors 0.6571 _ _ 0.6571 Fraction oftime spent outdoors (on site) 0.1181 _ _ 0.1181 Shape factor flag, external gamma _ I_
l _ Circular Fruits, vegetables, grain consumption (kgfy) - 112 _ 112 112 Leafy vegetable consumption (kg/y) l_ 21.4 21.4 21.4 Milk consumption (tly) _ 233 - 233 233 Meat and poultry consumption (fgty) l _ _ 65.1 _ 65.1 _ 65.1
. . ...6;.
Fish consumption (kgty) ; ___- _20.6 _ - 20.6 Other seafood consumption (kg/y) 0.9 _ 0.9 Soil ingestion rate (g/y) 18.26 _ 18.26 Drinking water intake (L/y) _ 478.5 _ 478.5 - 478.5 Contamination fraction of drinking water I - I_
Contamination fraction of household water N/A NA l NA (if used)
Contamination fraction of livestock wvater- I I l .1 Contamination fraction of irrigation water _I _
Contamination fraction of aquatic food _ I I Contamination fraction of plant food _I _l_ I _
Contamination fraction of meat I- I
_l__ 1 Contamination fraction of milk _I -I _ -
nie'iz' .,. - , ..'; I-, ".1", - :' !".I , "..,'%
i t.io n"' N oini'ab -jetary--:.-,- ; -, . 1 . r.,:,I -, - .-
, ." -."I"',
I -1. " . -.- .,.., , ,f: ". ,
., 1 -. k"'.. .1.1..,t, '! .. "., , - "- : "-;7 ;
". -.- :!, '. j -,
. 'i, .,-! ., , -... : . ", 1)11 T:,- i.
Livestock fodder intake for meat (kg/day) l271 27.1 Livestock fodder intake for milk (kg/day) l l63 632_ _ 63.2 Livestock water intake for meat (Uday) l __ l50 _ 50.6 Livestock water intake for milk (L/day) - 60 .. _ 60 YA-REPT-00-003-04 Page 9 of II
of3 Table 1 Comparison of Parameter Sensitivities and Values CY Soil Eval CY Groundwater Eval Rowe Soil Eval Parameter(unit) Sensitive Input Parameter Sensitive Input Parameter Sensitive Input Parameter Parameter? Value/Distribution Parameter?*** Value/Distribution Parameter? Value/Distribution Livestock soil intake (kg/day) _ 0.5 _ 0.00 0.5 Mass loading for foliar deposition (g/m3) 4.00E-04 _ 0.00 .. 4.00E-04 Depth of soil mixing layer (m) N 0.23 0.23 N Distribution Applied Depth of roots (m) Y 2.15 0.00* Y 1I.17E+00 Drinking water fraction from ground water - 1 I -. -
Household water fraction from ground water - NA _ _ -. NA (if used)__ _ _ _ _ _ _ _ _ _ _
Livestock water fraction from ground water' - I _
Irrigation fraction from ground water Il I Wet weight crop yield for Non-Leafy (kg/m 2) . N 1.75 N 1.75 N Distribution Applied I'mI -: I Wet weight crop yield for Leafy (kg/iM2) - 2.88921 . 2.88921 .. 2.88921 Wet weight crop yield for Fodder (kg/m2 ) - 1.8868 1.8868 1.8868 Growing Season for Non-Leafy (years) - 0.246 L 0.246 0.246 - ~Z:
Growing Season for Leafy (years) _ 0.123 .. 0.123 0.123 Growing Season for Fodder (years) - 0.082 0.082 0.082 Translocation Factor for Non-Leafy _ 0.1 _ 0.1 .. 0.1 Translocation Factor for Leafy l I_
l I.
Translocation Factor for Fodder .. I I I Weathering Removal Constant for Vegetation N 32.97 N 32.97 N Distribution Applied (I/y)_ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _
Wet Foliar Interception Fraction for Non-Leafy .. 0.35 _ 0.35 . 0.35 Wet Foliar Interception Fraction for Leafy N 0.58 N 0.58 N- Distribution Applied Wet Foliar Interception Fraction for Fodder _ 0.35 _ 0.35 0.35 Dry Foliar Interception Fraction for Non-Leafy - 0.35 _ 0.35 _ 0.35 Dry Foliar Interception Fraction for Leafy -0.35 0.35 0.35 Dry Foliar Interception Fraction for Fodder 0.35 - 0.35 _ 0.35 St rage Tinieior C~ra inait&dFoostufs (days); -- ^' ;.- .,{.- ~.;. is',;;-.,;, t ~;4K;
- ~s < ;.. "z-.Go , X' Fruits, non-leafy vegetables, and grain l __l_14 l .... 14.................14 l _ l 14 Leafy vegetables l _II_ ll_ l l l _4 YA-REPT-00-003-04 Page 10 of I
Table 1 Comparison of Parameter Sensitivities and Values CY Soil Eval CY Groundwater Eval Rowe Soil Eval Parameter (unit) Sensitive Input Parameter Sensitive Input Parameter Sensitive Input Parameter Parameter? Value/Distribution Parameter?*** Value/Distribution Parameter? Value/Distribution Milk I - I I_
Meat and poultry 20 - 20 , 20 Fish 7 - 7 7 Crustacea and mollusks 7 - 7 7 Well water I - I I Surface water I - I I Livestock fodder _ 45 - 45 45 H-3 - 6.40E-08 - 6.40E-08 6.40E-08 DoseConverionFacts (In~ *hnmrCj.40E08 .
H-3 . l 6.40E-08 l 6.40E-08 6.40E-08 11-3 l 4.8E+00 l 4.8E+00 N Distribution Applied NI(Tfin fer'Fctcor pC'/sg)/( Cl/d ' 4 ;.-.
H1-3 1.22-02 l 1.2E-02 N l Distribution Applied Milk Trans er Factors (pCit)/(pClfd',. . . ; ,~ . 4 -
11-3 1.02-02 l _..OE-02 N Distribution Applied 1316 scumulat'on Factorirol:Fish'(pCi/4 Gi~io)'i,, 4;"',.^,.t' :,, ',,' ,'.i:.-'
, s ~'--
.'i';7
H-3 l 1.0E+00 ll_ N Distribution Applied lliacacumuaalon Fictor (rc'rCi's't'-e id 7'ol."sk;.-:pCkg)(pC i :
H-3 l 1.0E+00 l _ l.OOE+00
- Indicated in CY analysis as the equilibrium ground water concentration and that this value would not affect results.
- Indicated in CY analysis that value was selected to ensure contributions to dose were from water-dependent pathways only.
- "-" indicates that sensitivity analysis was not performed on the subject parameter; "N" indicates that sensitivity analysis was performed on parameter and results indicate it is not sensitive; "Y" indicates that sensitivity analysis was performed on parameter and results indicated it is sensitive.