Public Meeting Slides, Clinton 2003 End-of-Cycle AssessmentML041130170 |
Person / Time |
---|
Site: |
Clinton |
---|
Issue date: |
04/08/2004 |
---|
From: |
NRC/RGN-III |
---|
To: |
|
---|
References |
---|
Download: ML041130170 (19) |
|
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24127A0952024-05-0606 May 2024 License Renewal Public Scoping Meeting May 2024 ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23172A2092023-06-28028 June 2023 LRA - NRC Pre-Submittal Meeting Slides ML23172A2102023-06-28028 June 2023 CPS Lr Pre-Submittal Meeting Presentation ML23145A1342023-06-14014 June 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting - Constellation Slides ML23165A0162023-06-14014 June 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting - NRC Slides ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21194A1582021-07-13013 July 2021 and Lasalle Nuclear Generating Stations 2020 Annual Assessment Meeting Slides ML21021A0652021-01-21021 January 2021 NRC Pre-Application Meeting - Clinton One-Time Extension of the Containment Type a Leak Rate Test Frequency (Meeting Handout) ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20238B8662020-08-25025 August 2020 Hq Online EOC Slides ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML19318F9512019-11-20020 November 2019 Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit Frequency ML19317C9952019-11-12012 November 2019 In-Service Testing Supplemental Position Indication Relief Request NRC Pre-Application Meeting November 18, 2019 ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19151A6602019-05-31031 May 2019 BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19022A2002019-01-23023 January 2019 Request for Use of ASME Code Case N-879 for Exelon Nuclear Power Plants ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas U-604453, Regulatory Conference Information2018-11-19019 November 2018 Regulatory Conference Information ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML17067A3722017-03-16016 March 2017 March 7, 2017, Summary of Public Pre-Submittal Teleconference Meeting with Exelon Generation Company, LLC to Discuss Proposed License Amendment Request Regarding Residual Heat Removal System Operability in Mode 3 at Clinton Power Station, U ML17067A3622017-03-0707 March 2017 License Amendment Request; Mode 3 Applicability - Lpci/Sdc; NRC Pre-Submittal Teleconference - March 7, 2017 ML16314E4812016-11-14014 November 2016 Part 37 Applicability to Reactor Vessels and Associated Structures, Systems, and Components While in Safstor Awaiting Active Decommissioning Activities - November 14, 2016 ML16189A4332016-07-12012 July 2016 July 12, 2016, Public Meeting with NRC - Exelon Decommissioning Licensing Action Submittal Plan ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML16075A3292016-03-16016 March 2016 OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations ML15342A3542015-12-0808 December 2015 License Amendment Request Extension of Secondary Containment - NRC Pre- Application Meeting December 9, 2015 ML15173A3812015-06-19019 June 2015 Regulatory Conference Supplemental Information ML14223A5742014-08-11011 August 2014 8/7/14 Clinton Power Station Annual Assessment Meeting Licensee Slides ML14220A2492014-08-0707 August 2014 8/7/2014 NRC Slides of Clinton Power Station Annual Assessment Meeting Cy 2013 ML14114A7402014-04-0909 April 2014 Application of GE Hitachi Simplified Stability Solution GS3 Pre-Submittal Presentation ML13184A3152013-07-0202 July 2013 EOC Public Meeting Presentation July 2, 2013 ML12111A1282012-04-19019 April 2012 End-of-Cycle Performance Assessment Meeting Presentation Slides ML1208701402012-03-27027 March 2012 Licensee Slides for Exelon Fleet Pre-Submittal Public Meeting 4-10-12 Licensed Operator Eligibility Requirements LAR ML1111905212011-04-28028 April 2011 Clinton Power Station Cy 2010 End-Of-Cycle Open House Presentation ML1111905312011-04-28028 April 2011 Clinton Power Station Cy 2010 End-of-Cycle Open House Presentation (Short) ML0919803632009-08-20020 August 2009 Summary of Licensing Counterparts Meeting with Exelon Generation Company, to Discuss Licensing Practices and Processes ML0914003322009-05-11011 May 2009 Slides Presented at the Clinton 2008 EOC Performance/Reactor Issue Open House ML0908904942009-03-30030 March 2009 Presentation Slides for 03/31/2009 Meeting with the NRC Staff Concerning Proposed CO-60 Production at Clinton Station 2024-05-06
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24310A0672024-11-0505 November 2024 Constellation NRC Pre-Submittal Meeting Slides - Proposed Alternative for Reactor Vessel Closure Stud Exam Optimization ML24127A0952024-05-0606 May 2024 License Renewal Public Scoping Meeting May 2024 ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23172A2092023-06-28028 June 2023 LRA - NRC Pre-Submittal Meeting Slides ML23172A2102023-06-28028 June 2023 CPS Lr Pre-Submittal Meeting Presentation ML23165A0162023-06-14014 June 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting - NRC Slides ML23145A1342023-06-14014 June 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting - Constellation Slides NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML22028A0112022-01-31031 January 2022 Slides for Fbra Pre-submittal Meeting of 2022-01-31 ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21194A1582021-07-13013 July 2021 and Lasalle Nuclear Generating Stations 2020 Annual Assessment Meeting Slides ML21162A3322021-06-11011 June 2021 BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs ML21021A0652021-01-21021 January 2021 NRC Pre-Application Meeting - Clinton One-Time Extension of the Containment Type a Leak Rate Test Frequency (Meeting Handout) ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20238B8662020-08-25025 August 2020 Hq Online EOC Slides ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18333A3332018-11-30030 November 2018 Regulatory Enforcement Conference Slides for Clinton Power Station on November 30, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas U-604453, Regulatory Conference Information2018-11-19019 November 2018 Regulatory Conference Information ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML17067A3722017-03-16016 March 2017 March 7, 2017, Summary of Public Pre-Submittal Teleconference Meeting with Exelon Generation Company, LLC to Discuss Proposed License Amendment Request Regarding Residual Heat Removal System Operability in Mode 3 at Clinton Power Station, U ML16314E4812016-11-14014 November 2016 Part 37 Applicability to Reactor Vessels and Associated Structures, Systems, and Components While in Safstor Awaiting Active Decommissioning Activities - November 14, 2016 ML16189A4332016-07-12012 July 2016 July 12, 2016, Public Meeting with NRC - Exelon Decommissioning Licensing Action Submittal Plan ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML15342A3542015-12-0808 December 2015 License Amendment Request Extension of Secondary Containment - NRC Pre- Application Meeting December 9, 2015 ML15173A3812015-06-19019 June 2015 Regulatory Conference Supplemental Information ML14223A5742014-08-11011 August 2014 8/7/14 Clinton Power Station Annual Assessment Meeting Licensee Slides ML14220A2492014-08-0707 August 2014 8/7/2014 NRC Slides of Clinton Power Station Annual Assessment Meeting Cy 2013 RS-14-148, Transmittal of Proprietary Meeting Slides2014-04-28028 April 2014 Transmittal of Proprietary Meeting Slides ML14114A7402014-04-0909 April 2014 Application of GE Hitachi Simplified Stability Solution GS3 Pre-Submittal Presentation ML13184A3152013-07-0202 July 2013 EOC Public Meeting Presentation July 2, 2013 ML12185A0122012-07-12012 July 2012 Summary of June 14, 2012, Public Meeting to Discuss the Application Partial Site Release Request for Clinton Power Station ML12188A5122012-07-0606 July 2012 IEMA HAB Lessons Learned_rev1 ML12111A1282012-04-19019 April 2012 End-of-Cycle Performance Assessment Meeting Presentation Slides ML1208701402012-03-27027 March 2012 Licensee Slides for Exelon Fleet Pre-Submittal Public Meeting 4-10-12 Licensed Operator Eligibility Requirements LAR ML11201A2132011-07-20020 July 2011 Summary of Public Meeting to Discuss Exelon'S Plans for Implementing an Electronic Document Control System (Edocs) for Use by NRC Inspectors with U.S. Nuclear Regulatory Commission (NRC) Region III Staff ML1111905212011-04-28028 April 2011 Clinton Power Station Cy 2010 End-Of-Cycle Open House Presentation ML1015502442010-06-0202 June 2010 Presentation Slides from Clinton Power Station June 2, 2010 Annual Assessment Meeting ML0929400522009-10-22022 October 2009 Meeting Power Uprate Meeting Slides ML0914003322009-05-11011 May 2009 Slides Presented at the Clinton 2008 EOC Performance/Reactor Issue Open House 2024-05-06
[Table view] |
Text
Clinton Station Annual Assessment Meeting Reactor Oversight Program - CY 2003 Nuclear Regulatory Commission - Region III Clinton, Illinois April 8, 2004
Agenda l Introduction l Review of Reactor Oversight Process l National Summary of Plant Performance l Discussion of Plant Performance Results l Licensee Response and Remarks l NRC Closing Remarks l Break l NRC available to address public questions
NRC Representatives l Steven A. Reynolds, Director, Division Reactor Projects
- (630) 829-9600 l Patrick Hiland, Deputy Division Director, DRP
- (630) 829-9601 l Ann Marie Stone, Branch Chief l (630) 829-9729 l Billy Dickson, Senior Resident Inspector l - (217) 935-9521 l Carey Brown, Resident Inspector
- (217) 935-9521 l Douglas Tharp, Resident Inspector
- (217) 935-9521
Region III Organization James Caldwell Regional Administrator Geoffrey Grant Deputy Regional Administrator Steven A. Reynolds Cynthia D. Pederson Acting Director Division of Reactor Projects Director Division of Reactor Safety Patrick Hiland Roy Caniano Acting Deputy Director Deputy Director Ann Marie Stone Regional Specialists Branch Chief Clinton Resident Inspectors Project Engineer Billy Dickson Thomas Tongue Carey Brown Douglas Tharp
NRC Performance Goals l Maintain safety and protect the environment l Enhance public confidence l Improve effectiveness, efficiency, and realism of processes and decision making l Reduce unnecessary regulatory burden
Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Performance Indicator Baseline Inspection Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response
Examples of Baseline Inspections l Equipment Alignment ~92 hrs/yr l Triennial Fire Protection ~200 hrs every 3 yrs l Operator Response ~125 hrs/yr l Emergency Preparedness ~80 hrs/yr l Rad Release Controls ~100 hrs every 2 yrs l Worker Radiation Protection ~100 hrs/yr l Corrective Action Program ~200 hrs every 2 yrs l Corrective Action Case Reviews ~60 hrs/yr
Significance Threshold Performance Indicators Green: Only Baseline Inspection White: May increase NRC oversight Yellow: Requires more NRC oversight Red: Requires more NRC oversight Inspection Findings Green: Very Low safety issue White: Low to moderate safety issue Yellow: Substantial safety issue Red: High safety issue
Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions
Purpose of Todays Meeting n A public forum for discussion of the licensees performance n NRC will address the licensee performance issues identified in the annual assessment letter n Licensee will inform the NRC of new or existing programs to maintain or improve their performance
National Summary of Plant Performance Status at End of CY 2003 Licensee Response 75 Regulatory Response 22 Degraded Cornerstone 2 Multiple/Repetitive Degraded Cornerstone 3 Unacceptable 0 Total 102*
National Summary l Performance Indicator Results (at end of CY 2003)
Green 1825 White 15 Yellow 0 Red 0 l Total Inspection Findings (CY 2003)
Green 748 White 9 Yellow 2 Red 1
Clinton Assessment Results (Jan 1 - Dec 31, 2003) lAll Findings were categorized as very low safety significance (Green) lAll Performance Indicators were within the Green band lTherefore, Clinton Stations performance was within the Licensee Response Column of the NRC Action Matrix
Clinton Inspection Activities (Jan 1 - Dec 31, 2003) n Completed Baseline Inspections - 955 hours0.0111 days <br />0.265 hours <br />0.00158 weeks <br />3.633775e-4 months <br />
- Routine Integrated Inspections
- Operator Licensing Requalification Inspection n Senior Resident Reassigned - June 2003
Clinton Inspection Activities (Jan 1 - Dec 31, 2004) n Refueling Outage - February 2004 n Major team inspections
- Problem Identification and Resolution - March 2004
- Modification/10 CFR 50.59 - December 2004 n Resident Inspector Reassignment - May 2004
Clinton Annual Assessment Summary January 1 - December 31, 2003 l The Clinton Station was operated in a manner that preserved public health and safety.
l All cornerstone objectives were met.
l NRC plans baseline inspections at the Clinton Station for the remainder of the assessment period.
Licensee Response and Remarks Contacting the NRC l Report an emergency (301) 816-5100 (call collect) l Report a safety concern:
(800) 695-7403 Allegation@nrc.gov l General information or questions www.nrc.gov Select What We Do for Public Affairs
Reference Sources l Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html l Public Electronic Reading Room http://www.nrc.gov/reading-rm.html l Public Document Room 1-800-397-4209 (Toll Free)