Clinton Station Clinton Station Annual Assessment Meeting Annual Assessment Meeting Reactor Oversight Program - CY 2003 Reactor Oversight Program - CY 2003 Nuclear Regulatory Commission - Region III Nuclear Regulatory Commission - Region III Clinton, Illinois Clinton, Illinois April 8, 2004 April 8, 2004

Agenda

 Introduction

 Review of Reactor Oversight Process

 National Summary of Plant Performance

 Discussion of Plant Performance Results

 Licensee Response and Remarks

 NRC Closing Remarks

 Break

 NRC available to address public questions

NRC Representatives NRC Representatives

 Steven A. Reynolds, Director, Division Reactor Projects

- (630) 829-9600

 Patrick Hiland, Deputy Division Director, DRP

- (630) 829-9601

 Ann Marie Stone, Branch Chief

 (630) 829-9729

 Billy Dickson, Senior Resident Inspector

 - (217) 935-9521

 Carey Brown, Resident Inspector

- (217) 935-9521

 Douglas Tharp, Resident Inspector

- (217) 935-9521

Region III Organization James Caldwell Regional Administrator Geoffrey Grant Deputy Regional Administrator Steven A. Reynolds Acting Director Division of Reactor Projects Patrick Hiland Acting Deputy Director Cynthia D. Pederson Director Division of Reactor Safety Roy Caniano Deputy Director Ann Marie Stone Branch Chief Regional Specialists Clinton Resident Inspectors Billy Dickson Carey Brown Douglas Tharp Project Engineer Thomas Tongue

NRC Performance Goals

 Maintain safety and protect the environment

 Enhance public confidence

 Improve effectiveness, efficiency, and realism of processes and decision making

 Reduce unnecessary regulatory burden

Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas

Examples of Baseline Inspections

 Equipment Alignment

~92 hrs/yr

 Triennial Fire Protection

~200 hrs every 3 yrs

 Operator Response

~125 hrs/yr

 Emergency Preparedness

~80 hrs/yr

 Rad Release Controls

~100 hrs every 2 yrs

 Worker Radiation Protection ~100 hrs/yr

 Corrective Action Program

~200 hrs every 2 yrs

 Corrective Action Case Reviews ~60 hrs/yr

Significance Threshold Performance Indicators Green:

Only Baseline Inspection White:

May increase NRC oversight Yellow:

Requires more NRC oversight Red:

Requires more NRC oversight Inspection Findings Green:

Very Low safety issue White:

Low to moderate safety issue Yellow:

Substantial safety issue Red:

High safety issue

Action Matrix Concept Licensee

Response

Regulatory

Response

Degraded Cornerstone Multiple/Rep.

Degraded Cornerstone Unacceptable Performance Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions

Purpose of Todays Meeting

 A public forum for discussion of the licensees A public forum for discussion of the licensees performance performance

 NRC will address the licensee performance NRC will address the licensee performance issues identified in the annual assessment letter issues identified in the annual assessment letter

 Licensee will inform the NRC of new or Licensee will inform the NRC of new or existing programs to maintain or improve their existing programs to maintain or improve their performance performance

National Summary of Plant Performance Status at End of CY 2003 Licensee Response 75 Regulatory Response 22 Degraded Cornerstone 2

Multiple/Repetitive Degraded Cornerstone 3

Unacceptable 0

Total 102*

National Summary

 Performance Indicator Results (at end of CY 2003)

Green 1825 White 15 Yellow 0

Red 0

 Total Inspection Findings (CY 2003)

Green 748 White 9

Yellow 2

Red 1

Clinton Assessment Results (Jan 1 - Dec 31, 2003)

All Findings were categorized as very low safety significance (Green)

All Performance Indicators were within the Green band

Therefore, Clinton Stations performance was within the Licensee Response Column of the NRC Action Matrix

Clinton Inspection Activities (Jan 1 - Dec 31, 2003)

(Jan 1 - Dec 31, 2003)

 Completed Baseline Inspections - 955 hours0.0111 days <br />0.265 hours <br />0.00158 weeks <br />3.633775e-4 months <br />

  • Routine Integrated Inspections
  • Operator Licensing Requalification Inspection

 Senior Resident Reassigned - June 2003

Clinton Inspection Activities (Jan 1 - Dec 31, 2004)

(Jan 1 - Dec 31, 2004)

 Refueling Outage - February 2004

 Major team inspections

  • Problem Identification and Resolution - March 2004
  • Modification/10 CFR 50.59 - December 2004

 Resident Inspector Reassignment - May 2004

Clinton Annual Assessment Summary January 1 - December 31, 2003

 The Clinton Station was operated in a manner that preserved public health and safety.

 All cornerstone objectives were met.

 NRC plans baseline inspections at the Clinton Station for the remainder of the assessment period.

Licensee Response and Remarks

Contacting the NRC

 Report an emergency (301) 816-5100 (call collect)

 Report a safety concern:

(800) 695-7403 Allegation@nrc.gov

 General information or questions www.nrc.gov Select What We Do for Public Affairs

Reference Sources

 Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html

 Public Electronic Reading Room http://www.nrc.gov/reading-rm.html

 Public Document Room 1-800-397-4209 (Toll Free)