|
---|
Category:Letter
MONTHYEARML24303A3282024-10-29029 October 2024 Information Request for the Cyber Security Baseline Inspection Identification to Perform Inspection ML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components IR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 ML24269A0552024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 The Associated Independent Spent Fuel Storage Installations ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments 2024-09-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24274A1482024-09-30030 September 2024 NRR E-mail Capture - Davis-Besse - RAI Re Relief Request L-23-214 ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station ML24204A0012024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information Vistraops Fleet Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234022023-07-13013 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000346/2023402 ML23131A2732023-05-15015 May 2023 Notification of NRC Supplemental Inspection 95001 and Request for Information ML23033A0322023-02-0101 February 2023 NRR E-mail Capture - Request for Additional Information for Davis-Besses 2022 Steam Generator Inspection Report (L-2022-LRO-0115) ML22357A0302022-12-23023 December 2022 Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000346/2023010 ML22266A1102022-09-23023 September 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding July 21, 2022, Request for Withholding Information from Public Disclosure ML22214A7042022-08-0202 August 2022 Reissue - Davis-Besse Nuclear Power Station, Unit 1 Notification of Nrc Fire Protection Team Inspection Request for Information: Inspection Report 05000346/2022011 ML22187A0992022-07-0606 July 2022 Notification of NRC Supplemental Inspection (95001) and Request for Information ML22164A8572022-06-13013 June 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan ML22118A6862022-04-28028 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML22112A1092022-04-22022 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building ML22055A0872022-02-23023 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3 IR 05000346/20210912021-12-17017 December 2021 NRC Inspection Report (05000346/2021091) Preliminary Greater than Green Finding ML21321A3792021-11-16016 November 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML21301A0992021-10-28028 October 2021 Draft Request for Additional Information: Proposed Alternate for Examination of Steam Generator Welds - Energy Harbor Nuclear Corp., Davis-Besse Nuclear Power Station, Unit No. 1 ML21203A3252021-07-28028 July 2021 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000346/2021011 ML21155A1952021-06-0404 June 2021 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Davis Besse Nuclear Power Station ML21041A5452021-02-10010 February 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Steam Generator Tube Inspection Reports ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20300A5592020-10-27027 October 2020 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML20154K7642020-06-0202 June 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425 ML20133J9792020-05-14014 May 2020 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20021A3162020-01-21021 January 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request to Revise Containment Leakage Rate Testing ML19192A2222019-07-18018 July 2019 Request for Additional Information Regarding Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML19179A1382019-06-28028 June 2019 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding the Decommissioning Quality Assurance Program ML19164A1532019-06-13013 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Post-Shutdown Emergency Plan ML19162A3922019-06-11011 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML19143A0732019-05-29029 May 2019 FENOC Fleet - Beaver Valley, Units 1 and 2; Davis-Besse, Unit 1, Perry, Unit 1 - Supplemental Information Needed for Acceptance of Requested Licensing Action; Application for Order Consenting to License Transfer and Conforming Amendments ML18305B0192018-11-0101 November 2018 18 Davis-Besse Nuclear Power Station - Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information(Rdb) ML18201A4122018-07-19019 July 2018 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding License Amendment Request to Adopt NFPA 805 ML18190A4902018-07-0909 July 2018 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team), Inspection Report 05000346/2018011 (DRP-DXB) ML18102B0852018-04-12012 April 2018 NRR E-mail Capture - Follow-up Request for Additional Information (RAI) FENOC FLEET-- Exemption Request for a Physical Barrier Requirement for Beaver ML18043A0102018-02-0909 February 2018 NRR E-mail Capture - FENOC--MG0010-MG0011, MG-0012, MG0013-- Request for Additional Information (RAI) - Exemption Request Security Barrier in Physical Plans ML17355A3722017-12-21021 December 2017 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt NFPA 805 ML17303B1582017-11-0707 November 2017 FENOC-Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, Perry Nuclear Power Plant Unit 1 - Generic Letter 2016-01, Request for Supplemental Information ML17257A1402017-09-14014 September 2017 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt NFPA 805 ML17135A3612017-05-12012 May 2017 Information Request for NRC Triennial Evaluations of Changes, Tests, and Experiments (50.59) Baseline Inspection 05000346/2017010 (Jvb) ML17129A4112017-05-0909 May 2017 Request for Additional Information Regarding Evaluation Submitted in Response to License Renewal Commitment No. 54 ML17100A1732017-04-19019 April 2017 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Associated Standard 805 ML16364A2792017-01-23023 January 2017 Request for Additional Information Regarding License Renewal Commitment No. 42 ML16355A0352016-12-19019 December 2016 Ltr 12/19/16 Davis-Besse Nuclear Power Station, Unit 1 - Information Request for an NRC Post-Approval Site Inspection for License Renewal 05000346/2017009 (Bxj) ML16256A0662016-10-18018 October 2016 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Associated Standard 805 2024-09-05
[Table view] |
Text
UNITED STATES "0 NUCLEAR REGULATORY COMMISSION 0 REGION III 801 WARRENVILLE ROAD LISLE ILLINOIS 60532-4351 lop May 6, 2002 Mr. Howard Bergendahl Vice President - Nuclear, Davis-Besse FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE DAVIS-BESSE NUCLEAR POWER STATION SAFETY SIGNIFICANCE ASSESSMENT
Dear Mr. Bergendahl:
Based on our ongoing review of the "Safety Significance Assessment of the Davis-Besse Nuclear Power Station, Unit I Reactor Pressure Vessel Head Degradation" that you submitted (RAI). This on April 8, 2002, we have developed the enclosed request for additional information assessment of the safety significance of this Davis-Besse RAI is necessary for our independent event.
by We understand that you plan to provide an addendum to your April 8, 2002, submittal submittal.
May 10, 2002. Please incorporate your response to the RAI with your May 10 2002, Should you have any questions on this issue, please contact me at (630) 829-91 9.
Sincerely, Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-346 License No. NPF-3
Enclosure:
Request for Additional Information (RAI)
See Attached Distribution
H Bergendahl -2 cc: B. Saunders, President - FENOC Plant Manager Manager - Regulatory Affairs M. O'Reilly, FirstEnergy Ohio State Liaison Officer R. Owen, Ohio Department of Health Public Utilities Commission of Ohio President, Board of County Commissioners Of Lucas County
Request for Additional Information Concerning the FENOC "Probabilistic Safety Assessment" for the Void in the RPV Head at Davis Besse
- 1. The probabilistic safety assessment does not address the probabilities that the cavity could have become larger before being detected or that the void could have formed at a location in the RPV head that had thinner cladding material. Please provide the following information to support the staffs estimation of the risk. Should the requested information be difficult to produce, provide the justification for your basis that the actual measurements are representative of the worst case values.
- a. All record= of the clad thickness on the RPV head that were produced in the fabrication, quality control, and acceptance testing processes. The staff expects that some thickness measurements were made to verify that the cladding is within the design specifications of 1116" to 3/8" in thickness.
- b. All UT measurements that show clad thickness on the RPV head, including the head location coordinates for each of the measurements.
- c. The estimated rate of growth of the cavity at the time just prior to the plant shutdown on February 16, 2002. The average growth rate for the entire period of cavity development Is not an appropriate response unless it is also demonstrated with appropriate evidence that the growth rate was constant over the period. Any discussion of assumed rates of cavity growth should address the difference between the aspect ratios of the cavities found at nozzles 2 and 3. Please provide growth rate estimates in terms of linear rate of cavity expansion In the directions perpendicular to the cavity walls. Volumetric estimates for growth rates are not useful for the intended analyses.
Please provide an estimate of the uncertainty In the cavity growth rate at the end of the period, In a form suitable for use in probabilistic assessment.
- d. The estimated areas of exposed clad material that would cause the cladding to fail at normal operating pressure for clad thicknesses of 0.297" and 0.125".
- 2. The probabilistic safety assessment uses a log-normal equation to represent the probability distribution for the strength of the clad material. Please provide the following information:
- a. The value of the constant, 0, used to represent the randomness of the material strength parameter.
- b. Any data on the strength properties of stainless steel alloy 308 that demonstrate the degree of randomness exhibited by that material.
- c. The mathematical relationship between the data and the value of 13, used in the safety assessment.
- 3. In Table 2 In Section B.3.2, the probabilistic safety assessment provides a set of RCS pressure ranges and the corresponding values for the number of events experienced In those ranges at Davis Besse and the estimated frequency for experiencing events In those ranges.
Please clarify the following information:
- a. The pressure ranges are all shown as greater than a specific numerical value, indicating a cumulative distribution, but the number of events experienced at
">2300 psig" is larger than the number shown as ">2250 psig," which indicates that the distribution is not cumulative with respect to the number of events experienced. Is the distribution for the number of events cumulative, or should the table indicate pressure ranges? For the last pressure, '>2500 psig," is the frequency value intended to be cumulative for all pressures above 2500, or does it apply to a pressure interval limited by an upper bound? If an upper bound is applicable, what is it?
psig
- b. The text states that the frequency column entries for RCS pressures above 2405 were based on "a Bayesian update with a non-informative prior..." Please describe the shape of the prior as a function of pressure, including any limits used on the pressures to which the prior distribution is assumed to be applicable. Please provide the other statistical information used to perform the update, in sufficient detail for the staff to duplicate the computation.
of a
- 4. In the Davis Besse IPE submittal dated February, 1993, it is stated in the description the RCS to the point at large LOCA: "A large LOCA is, by definition, sufficient to depressudze which reflooding of the core would be required by the core flood tanks, with makeup in the longer term by the decay heat removal (DHR) system operating in the low pressure injection (LPI) mode.... It is assumed that rate of loss from the RCS would be large enough that the high pressure injection (HPI) and makeup pumps would not be capable of providing sufficient large flow to keep the core covered without running out. ... The break size that defines the LPI LOCA therefore ranges from the smallest break that could be accommodated solely by the of a reactor coolant hot or cold leg. The and the core flood tanks, up to a double ended rupture large LOCA ... is therefore any break whose equivalent flow area exceeds 0.5 ft2."
The description of a medium LOCA in the IPE submittal includes: "For Davis Besse, this that, corresponds to a range of equivalent break areas of 0.02 to2 0.5 ft2.... It should be noted HPI is needed to provide at the lower end of this range (approximately 0.02 to 0.1 ft ),... only is adequate makeup to the RCS. ... As a practical matter, the frequency of a medium LOCA it is reasonable estimated in part that there have been no Initiating breaks in this range. Hence, to define one event that covers the full range to simplify the analysis..."
This seems to indicate that the medium LOCA category should be considered to be two classes of LOCAs, which we will designate "big-medium" and "little-medium" to avoid LOCA" appears to be break sizes between 0.1 ft2 nomenclature confusion. The "big-medium and 0.5 ft2 , and require success of only core flood tanks and LPI (injection and recirculation between modes) to prevent core damage. The "little-medium LOCA" appears to be break sizes 0.02 ft2 and 0.1 ft2, and require success of at least HPI (injection mode) to prevent core damage.
medium With respect to the conditional core damage probability for these two parts of the LOCA spectrum, there seems to be a discrepancy between the IPE submittal and the "probabilistic safety assessment" for the RPV head cavity. The IPE submittal states "It should success criteria be noted that, at the lower end of this range (approximately 0.02 to 0.1 ft2), the range of medium are actually substantially less restrictive than those applied later for the full
breaks.... From a qualitative perspective, therefore, it is conservative to include these smaller breaks in the medium LOCA category." However, in section B.4, on page12 of 19 in the safety assessment it is stated that "The largest LOCA within the postulated range [for cavity failure]
allows the shortest time to transfer to recirculation, but exceeds the LOCA size that would require high pressure injection. Therefore, a smaller LOCA that requires high pressure injection could be more limiting."
In order to clarify the risk analyses, please provide the following information:
- a. For the Davis Besse PSA, what systems/modes of operation are required to perform for successfully to prevent core damage for the "little-medium" LOCAs? Can the need ECCS recirculation mode be avoided? If ECCS recirculation mode is not avoided, is recirculation required in the high, low or both pressure ranges?
- b. For the current Davis Besse PSA, what is an appropriate CCDP for"big-medium LOCAs?"
- c. The core damage frequency contribution from medium LOCAs that is calculated in What the Davis Besse IPE submittal appears to be applicable to "big-medium LOCAs."
is the value of the CODP for "big-medium LOCAs in the IPE submittal?" If it differs from the value in the current Davis Besse PSA, is that due solely to requantification or were success criteria changed between the two PSA versions? If success criteria were changed, please clearly specify what changes were made.
- 5. For the analysis provided in your April 8, 2002 submittal, please quantitatively describe (1) the uncertainty in the resulting value for the frequency of cavity rupture and (2) the uncertainty in the CCDP value used for the resulting medium LOCA. If the analysis for the cavity rupture frequency is altered or augmented as a result of responding to the preceding questions, please provide a quantitative description of the uncertainty in that result, also.