JAFP-02-0199, September 2002 Monthly Operating Report for James A. FitzPatrick

From kanterella
(Redirected from ML022980047)
Jump to navigation Jump to search
September 2002 Monthly Operating Report for James A. FitzPatrick
ML022980047
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/14/2002
From: Ted Sullivan
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
JAFP-02-0199
Download: ML022980047 (6)


Text

Entrgy Nuclear Northeast EAlm Entergy Nuclear Operations, Inc SEntergy James A Fitzpatrick NPP PO Box 110 Lycoming, NY 13093 Tel 315 349 6024 Fax 315 349 6480 T.A. Sullivan Vice President, Operations-JAF October 14, 2002 JAFP-02-0199 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station O-P 1-17 Washington, D. C. 20555

SUBJECT:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Monthly Operating Report

Dear Sir:

Enclosed is the Monthly Operating Report for the James A. FitzPatrick Nuclear Power Plant for the month of September 2002.

If there are any questions concerning this report, please contact Sherard Anderson, Thermal Performance Engineer, (315) 349-6558.

.OPERATIONS TAS:BO:SB:SA:tmb Enclosure

Cc: Regional Administrator U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. Guy Vissing, Project Manager Project Directorate I Division of Licensing Project Management U.S. Nuclear Regulatory Commission Mail stop OWFN 8C2 Washington, DC 20555 Mr. R. Toole ENN BWR SRC Operations Subcommittee Chairman 605 West Homer Street Ebensburg, PA 15931 JENG JAFP Files RMS (JAF)

RMS (WPO)

ENTERGY NUCLEAR NORTHEAST JAMES A. FITZPATRICK NUCLEAR POWER PLANT OPERATING DATA REPORT REPORT MONTH: SEPTEMBER 2002 Docket No.: 50-333 Unit Name: FitzPatrick Date: October 8, 2002 Completed By: S. Anderson Telephone: (315)349-6558 OPERATING STATUS

1. Unit name: FitzPatrick
2. Reporting period: 9/01/2002 - 9/30/2002
3. Licensed thermal power (MWT): 2536
4. Nameplate rating (gross MWE): 883.0
5. Design electrical rating (net MWE): 816
6. Maximum dependable capacity (gross MWE): 839
7. Maximum dependable capacity (net MWE): 813
8. If changes occur in capacity ratings (Items 3-7) since last report, give reasons:
9. Power level to which restricted, if any (net MWE):
10. Reasons for restrictions, if any:

NO. DATA REQUESTED THIS YR-TO-DATE CUMULATIVE MONTH 11 Hours in reporting period: 720 6,551 238,247 12 Number of hours reactor was critical: 720 6,513.7 179,673.8 Reactor reserve shutdown hours: 0.00 0.00 0.00 13 14 Hours generator on-line: 720 6,483.1 174,504.9 Unit reserve shutdown hours: 0.00 0.00 0.00 15 16 Gross thermal energy generated (MWH): 1,804,098.5 16,240,308.7 397,969,818.3 17 Gross electrical energy generated (MWH): 598,090 5,508,160 134,588,300 18 Net electrical energy generated (MWH): 579,540 5,332,385 129,677,155 19 Unit service factor: 100 98.96 73.25 20 Unit availability factor: 100 98.96 73.25 21 Unit capacity factor (using MDC net): 99.01 100.12 74.90 22 Unit capacity factor (using DER net) 98.64 99.75 66.70 23 Unit forced outage rate: 0.00 0.00 10.93

24. Shutdowns scheduled over next 6 months (type, date, and duration of each): Refuel Outage 15 October 7, 2002
25. If shutdown at end of report period, estimated date of startup: N/A FORECAST ACHIEVED
26. Units in test status (prior to commercial operation):

Initial Criticality:

Initial Electricity:

Commercial Operation:

ENTERGY NUCLEAR NORTHEAST JAMES A. FITZPATRICK NUCLEAR POWER PLANT OPERATING DATA REPORT REPORT MONTH: SEPTEMBER 2002 Docket No.: 50-333 Unit Name: FitzPatrick Date: October 8, 2002 Completed By: S. Anderson Telephone: (315)349-6558 DAY NET AVERAGE DAILY DAY NET AVERAGE DAILY POWER LEVEL POWER LEVEL 1 841 17 760 2 841 18 793 3 840 19 795 4 834 20 794 5 828 21 792 6 824 22 793 7 820 23 793 8 817 24 792 9 811 25 789 10 810 26 788 11 808 27 781 12 809 28 798 13 805 29 798 14 804 30 793 15 800 31 16 797

REPORT MONTH: SEPTEMBER 2002 Docket No.: 50-333 Unit Name: FitzPatrick Date: October 8, 2002 Completed By: S. Anderson Telephone: (315)349-6558 CAUSE and CORRECTIVE ACTION TO PREVENT RECURRENCE REASON: METHOD: EXHIBIT G: Instructions for preparation of F: FORCED data entry sheets for Licensee Event Report A. Equipment failure (explain) 1. Manual S: SCHEDULED (LER) file (NUREG-0161)

B. Maintenance or Test 2. Manual Scram C. Refueling 3. Automatic Scram D. Regulatory Restriction 4. Continued E. Operator training and license examination 5. Reduced load F. Administrative 9. Other G. Operational error (explain)

H. Other (explain)

i I REPORT MONTH: SEPTEMBER 2002 Docke tNo.: 50-333 Unit N [ame: FitzPatrick Date: October 8, 2002 Comp] leted By: S. Anderson Telepl.ione: (315)349-6558 OPERATIONAL

SUMMARY

The FitzPatrick plant - with the exception of minor derates for rod adjustments - operated at or near rated power for the duration of the month of September 2002.

"* September 5, 2002 The plant began end-of-cycle coastdown.

" September 10, 2002 - 1545 The plant commenced insertion of control rods to increase reactor power.

Core thermal power increased from approximately 98% to 99.5% Power was then increased to 100% by adjusting Reactor Water Recirculation flow at 1628.

" September 17, 2002 - 0900 The plant reduced power to 90% to support implementation of Final Feedwater Temperature Reduction. Power was further reduced at roughly 1630 to 70% to allow for completion of scheduled activities. Extraction steam to the 6th point Feedwater Heaters was isolated at approximately 1730, and power ascension then commenced. The plant was returned to 100% power at 2100.

" September 27, 2002 - 0903 The plant reduced power to 83% to support a control rod pattern adjustment. Control rod manipulations were completed at 1030 and power ascension commenced at 1040. The plant was returned to full power at 1727.