Mid-Cycle Performance Review & Inspection Plan - Perry Nuclear Power Plant (August 23, 2002)
ML022400279
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/23/2002
From: Ring M
NRC/RGN-III/DRP/RPB1
To: Kanda W
FirstEnergy Nuclear Operating Co
References
Download: ML022400279 (7)


Text

August 23, 2002 Mr. William R. Kanda Vice President - Nuclear FirstEnergy Nuclear Operating Company P. O. Box 97, A200 Perry, OH 44081

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN PERRY NUCLEAR POWER PLANT

Dear Mr. Kanda:

On July 31, 2002, the NRC staff completed its mid-cycle plant performance assessment of Perry Nuclear Power Plant. The mid-cycle review for Perry involved the participation of all technical divisions in evaluating performance indicators for the most recent quarter and inspection results for the period of January 1, 2002, through June 30, 2002. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections which may conflict with your plant activities.

Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only baseline inspections at your facility through September 30, 2003.

The enclosed inspection plan details the inspections scheduled through September 30, 2003.

The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspection plan for the last six months is tentative and may be revised at the end of cycle review.

In addition, the NRC is in the process of finalizing a Temporary Instruction that will be used to review implementation of the Interim Compensatory Measures required by the Agencys Security Order to all commercial nuclear power plants dated February 25, 2002. Schedules have not yet been finalized, but it is anticipated that these inspections will begin within the next calendar quarter. Once finalized, the details will be communicated by separate correspondence.

W. Kanda In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9703 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mark A. Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-440 License No. NPF-58

Enclosure:

Perry Inspection/Activity Plan See Attached Distribution

DOCUMENT NAME: G:\Branch TSS\midcycle2002\inspectionplnltrs-02\per-inspectionplnltr.wpd To receive a copy of this document, indicate in the box "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME PPelke:co MRing DATE 08/ /02 08/ /02 OFFICIAL RECORD COPY

W. Kanda cc w/encl: B. Saunders, President - FENOC G. Dunn, Manager, Regulatory Affairs T. Lentz, Director, Nuclear Engineering Department T. Rausch, General Manager Nuclear Power Plant Department K. Ostrowski, Director, Nuclear Maintenance Department B. Coad, Director Nuclear Services Department Public Utilities Commission of Ohio State Liaison Officer, State of Ohio R. Owen, Ohio Department of Health C. Glazer, State of Ohio Public Utilities Commission N. Hofstetter, Chairman, Geauga County Board D. Wedge, Director, Department of Emergency Services G. Simmons, Geauga County Sheriff R. S. Boggs, Ashtabula County Commissioner W. Johnson, Ashtabula County Sheriff E. Somppi, Emergency Management Coordinator The Honorable Joseph Verkin G. Adams, Genoa Village Administrator D. Troy, Lake County Board President D. Dunlap, Lake County Sheriff R. McMahon, City Manager, Painesville K. Gauntner, Jr., County Administrator The Honorable Frank J. Sarosy The Honorable Dan Di Liberto The Honorable Julie Morales T. Neuman, President, Geneva City Council J. Pearson, Geneva City Manager The Honorable Edmund J. Podojil The Honorable Robert M. Shiner J. Suso, Mentor City Manager The Honorable John M. Rogers K. Molenaar, Administrative Director The Honorable Mort ORyan The Honorable David E. Anderson The Honorable Lorraine M. Fende The Honorable David Reed J. Sample, Administrator, Village of Madison P. Wayman, Chairman, Madison Board of Trustees The Honorable John Turben The Honorable Georgette Allison The Honorable Joseph Dudas The Honorable Sam Santangelo, Jr.

The Honorable Alan Di Liberto INPO W. Kanda ADAMS Distribution:

AJM DFT H. Nieh, OEDO Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb J. Caldwell, RIII G. Grant, RIII B. Clayton, RIII R. Lickus, RIII SRI Perry DRPIII DRSIII PLB1 JRK1

Page 1 of 2 Perry 08/26/2002 13:16:05 Inspection / Activity Plan Report 22 09/01/2002 - 09/30/2003 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type ICM TI - SAFEGUARDS INTERIM COM MEASURES - ORDER 4 1 IP 7113003 Response to Contingency Events (Protective Strategy and Implementation of Protective Strategy) 09/30/2002 10/04/2002 Baseline Inspections IP 71121 - RP INSTRUMENTATION INSPECTION 1 1 IP 7112101 Access Control to Radiologically Significant Areas 10/07/2002 10/11/2002 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 10/07/2002 10/11/2002 Baseline Inspections 1 IP 71151 Performance Indicator Verification 10/07/2002 10/11/2002 Baseline Inspections 71111.11 - LIC OPERATOR REQUAL PROGRAM EVALUATION 2 1 IP 7111111B Licensed Operator Requalification 10/28/2002 11/01/2002 Baseline Inspections HT SNK B - HEAT SINK BIENNIAL (DRS) 1 1 IP 7111107B Heat Sink Performance 11/04/2002 11/08/2002 Baseline Inspections IP 71121 - OCCUPATIONAL RAD SAFETY INSPECTION 1 1 IP 7112101 Access Control to Radiologically Significant Areas 12/02/2002 12/06/2002 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 12/02/2002 12/06/2002 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 12/02/2002 12/06/2002 Baseline Inspections MR - MAINTENANCE RULE 1 1 IP 7111112B Maintenance Effectiveness 12/09/2002 12/13/2002 Baseline Inspections FY 2003 - PERRY INIT PREP 12/2002 3 1 W90060 OL - INITIAL EXAM - PERRY - DEC 2002/JAN 2003 01/06/2003 01/10/2003 Not Applicable FY 2003 - PERRY INIT EXAM 01/2003 3 1 W90060 OL - INITIAL EXAM - PERRY - DEC 2002/JAN 2003 01/27/2003 02/07/2003 Not Applicable MOD50.59 - MODIFICATIONS & 50.59 4 1 IP 7111102 Evaluation of Changes, Tests, or Experiments 02/10/2003 02/14/2003 Baseline Inspections 1 IP 7111117B Permanent Plant Modifications 02/10/2003 02/14/2003 Baseline Inspections IP 71114 - NON-EXERCISE BASELINE EP INSPECTION 1 1 IP 7111402 Alert and Notification System Testing 02/24/2003 02/28/2003 Baseline Inspections 1 IP 7111403 Emergency Response Organization Augmentation Testing 02/24/2003 02/28/2003 Baseline Inspections 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 02/24/2003 02/28/2003 Baseline Inspections 1 IP 71151 Performance Indicator Verification 02/24/2003 02/28/2003 Baseline Inspections IP 71122 - RAD MATERIAL PROC/TRANS INSPECTION 1 1 IP 7112101 Access Control to Radiologically Significant Areas 03/10/2003 03/14/2003 Baseline Inspections 1 IP 7112202 Radioactive Material Processing and Transportation 03/10/2003 03/14/2003 Baseline Inspections 71111.01 - ADVERSE HOT WEATHER PROTECTION 2 1 IP 7111101 Adverse Weather Protection 04/01/2003 06/30/2003 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Perry 08/26/2002 13:16:05 Inspection / Activity Plan Report 22 09/01/2002 - 09/30/2003 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71111.06 - FLOOD PROTECTION MEASURES 2 1 IP 7111106 Flood Protection Measures 04/01/2003 06/30/2003 Baseline Inspections 7112102 - OUTAGE ALARA / ACCESS CONTROL 1 1 IP 7112101 Access Control to Radiologically Significant Areas 04/07/2003 04/11/2003 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 04/07/2003 04/11/2003 Baseline Inspections ISI - ISI 1 1 IP 7111108 Inservice Inspection Activities 04/14/2003 04/18/2003 Baseline Inspections PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 3 1 IP 71152B Identification and Resolution of Problems 06/09/2003 06/27/2003 Baseline Inspections 7112102 - ALARA OUTAGE REVIEW 1 1 IP 7112101 Access Control to Radiologically Significant Areas 09/15/2003 09/19/2003 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 09/15/2003 09/19/2003 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.