Forwards Revised Long-Term Iodine Control in Reactor Containment Bldgs Using C-E Iodine Removal Sys, Per 830323 Meeting Commitment to Revise CESSAR-F SER Confirmatory Item 12
ML20069K608
Person / Time
Site: 05000470
Issue date: 04/22/1983
From: Scherer A
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML20069K611 List:
References
LD-83-034, LD-83-34, NUDOCS 8304260418
Download: ML20069K608 (1)


Text

.t e C-E Power Syst:ms Tel 203/688-1911 Combustion E ngineenng. Inc. Telex 99297 1000 Prospect Hill Road Windsor Connecticut 06095 H POWERSYSTEMS Docket No. STN 50-470F April 22,1983 LD-83-034 Mr. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

CESSAR SER Confirmatory Item Number 12

Reference:

Letter LD-82-076, A. E. Scherer to D. G. Eisenhut, dated August 19, 1982

Dear Mr. Eisenhut:

An appeal meeting regarding Confirmatory Item No.12 of the CESSAR-F SER was held March 23, 1983, between Combustion Engineering (C-E) and the Nuclear Regulatory Commission (NRC). Confirmatory Item No.12 concerns the CESSAR-F Interface Requirement for sump pH following a LOCA. The CESSAR-F position was based on hydrazine injection provided by the Iodine Removal System (IRS) to the containment sprays, which allows maintenance of a lower value of sump pH than specified in the SRP.

As a result of that meeting, it was agreed that the discussion of the IRS in CESSAR-F is acceptable provided that C-E revise CESSAR-F to specifically require the ability to refill the Spray Chemical Storage Tank to ensure IRS restart capability for long term iodine control. Accordingly, we have revised our report entitled, "Long Term Iodine Control in Reactor Containment Buildings Using Combustion Engineering Iodine Removal System", which was submitted via l the Reference. The enclosed document supercedes the earlier report in its I enti rety. Submittal of this revised report fulfills C-E's commitments for the l

resolution of Confirm-atory Item No.12 of the CESSAR-F SER. Changes to CESSAR-F identified in the enclosed report will be incorporated into a future amendment of CESSAR-F.

If I can be of any further assistance in this matter, please contact either j myself or Mr. G. A. Davis of my staff at (203) 688-1911, extension 2803.

Very truly yours, I

COMBUSTION ENGINE ING, INC.

>ye A.EdcIIerer Director Nuclear Licensing AES:las f

8304240418 830422 PDR ADOCK 05000470 E PDR