L-MT-18-026, NRC Regulatory Issue Summary 2018-02 - Preparation and Scheduling of Operator Licensing Examinations

From kanterella
Jump to navigation Jump to search
NRC Regulatory Issue Summary 2018-02 - Preparation and Scheduling of Operator Licensing Examinations
ML18117A181
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 04/27/2018
From: Church C
Northern States Power Company, Minnesota, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-MT-18-026, RIS 2018-02
Download: ML18117A181 (3)


Text

2807 West County Road 75 Monticello, MN 55362 fl Xcel Energy*

RES PONS I B LE BY NAT U RE 800.895.4999 xcelenergy.com April 27, 2018 L-MT-18-026 RIS 2018-02 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket No. 50-263 Renewed Facility Operating License No. DPR-22 NRC Regulatory Issue Summary 2018 Preparation and Scheduling of Operator Licensing Examinations As requested by Nuclear Regulatory Commission (NRG) Regulatory Issue Summary (RIS) 2018-02, "Preparation and Scheduling of Operator Licensing Examinations", dated March 26, 2018, Northern States Power Company, a Minnesota Corporation (NSPM), doing business as Xcel Energy, hereby submits the operator licensing examination data for calendar years 2020 through 2023, for the Monticello Nuclear Generating Plant (MNGP). Enclosed is the corresponding NRG Form 536, which provides the estimated number of applicants to be tested and proposed primary and alternate dates for the examinations.

Summary of Commitments kes no new commitments and no revisions to existing commitments.

Christo er . Church Site Vice President, Monticello Nuclear Generating Plant Northern States Power Company - Minnesota Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USNRC

ENCLOSURE Operator Licensing Examination Data For the Monticello Nuclear Generating Plant (MNGP) 1 page follows

NRG FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)

~n11~ltt

~~ '1>. EsUmaled burden per response 10 complywilh !his voluntaiy lnformaUon collection request: 1hour. This

/ ' . %. OPERA TOR LICENSING lnfonnalion collacUon Is used lo plan budgets and resources for operator examlnaUons. Send

!J i comments regarding burden estimate lo !he lnfonnaUon SelVlces Branch (T-2 F43), U.S. Nuclear

\;

i l EXAMINATION DATA Regulaloiy Commission, Washington, DC20555-000 I, or by e-mail to lnfocollecls.Resource@nro.gov, and lo Iha Desk Officer, Office of lnfonnaOon and Regulalo,y Affelra, NEOB-10202, (3150-0131), O!liee 1,.,._.~:i,.

.,.; *. 0....

ol Management and Budge!, Washington, DC 20503. If a means used to Impose an lnronnatlon oolleotlon does not display a currently valid 0MB conlfol number, !he NRG may not conduct or sponsor, and a person Is no! reqtired lo respond to, !he lnfom1atlon coUectlon.

FACILITY NRG REGION

!Monticello Nuclear Generating Plant ll111 I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2020 CY 2021 CY 2022 cy2023 ESTIMATED NUMBER OF UCENSEE-PREPARED 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED EXAMINATIONS

8. INITIAL OPERATOR LICENSE EXAMINATIONS CY2021 CY2022 CY2023 CY2020 PROPOS~D NUMBER NUMBER OF REACTOR OPERATORS 6 4 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 2 2 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 1 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 10/26/2020 10/17/2022 ALTERNATE DATE 11/30/2020 11/21/2022 NRG FORM 636 (11-2017)

2807 West County Road 75 Monticello, MN 55362 fl Xcel Energy*

RES PONS I B LE BY NAT U RE 800.895.4999 xcelenergy.com April 27, 2018 L-MT-18-026 RIS 2018-02 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket No. 50-263 Renewed Facility Operating License No. DPR-22 NRC Regulatory Issue Summary 2018 Preparation and Scheduling of Operator Licensing Examinations As requested by Nuclear Regulatory Commission (NRG) Regulatory Issue Summary (RIS) 2018-02, "Preparation and Scheduling of Operator Licensing Examinations", dated March 26, 2018, Northern States Power Company, a Minnesota Corporation (NSPM), doing business as Xcel Energy, hereby submits the operator licensing examination data for calendar years 2020 through 2023, for the Monticello Nuclear Generating Plant (MNGP). Enclosed is the corresponding NRG Form 536, which provides the estimated number of applicants to be tested and proposed primary and alternate dates for the examinations.

Summary of Commitments kes no new commitments and no revisions to existing commitments.

Christo er . Church Site Vice President, Monticello Nuclear Generating Plant Northern States Power Company - Minnesota Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USNRC

ENCLOSURE Operator Licensing Examination Data For the Monticello Nuclear Generating Plant (MNGP) 1 page follows

NRG FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)

~n11~ltt

~~ '1>. EsUmaled burden per response 10 complywilh !his voluntaiy lnformaUon collection request: 1hour. This

/ ' . %. OPERA TOR LICENSING lnfonnalion collacUon Is used lo plan budgets and resources for operator examlnaUons. Send

!J i comments regarding burden estimate lo !he lnfonnaUon SelVlces Branch (T-2 F43), U.S. Nuclear

\;

i l EXAMINATION DATA Regulaloiy Commission, Washington, DC20555-000 I, or by e-mail to lnfocollecls.Resource@nro.gov, and lo Iha Desk Officer, Office of lnfonnaOon and Regulalo,y Affelra, NEOB-10202, (3150-0131), O!liee 1,.,._.~:i,.

.,.; *. 0....

ol Management and Budge!, Washington, DC 20503. If a means used to Impose an lnronnatlon oolleotlon does not display a currently valid 0MB conlfol number, !he NRG may not conduct or sponsor, and a person Is no! reqtired lo respond to, !he lnfom1atlon coUectlon.

FACILITY NRG REGION

!Monticello Nuclear Generating Plant ll111 I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2020 CY 2021 CY 2022 cy2023 ESTIMATED NUMBER OF UCENSEE-PREPARED 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED EXAMINATIONS

8. INITIAL OPERATOR LICENSE EXAMINATIONS CY2021 CY2022 CY2023 CY2020 PROPOS~D NUMBER NUMBER OF REACTOR OPERATORS 6 4 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 2 2 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 1 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 10/26/2020 10/17/2022 ALTERNATE DATE 11/30/2020 11/21/2022 NRG FORM 636 (11-2017)