MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.2023-06-28028 June 2023 Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-069, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-05-31031 May 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-072, Preparation and Scheduling of Operator Licensing Examinations2023-05-22022 May 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-061, 2022 Annual Radiological Environmental Operating Report2023-05-12012 May 2023 2022 Annual Radiological Environmental Operating Report L-2023-062, Cycle 33 Core Operating Limits Report2023-04-27027 April 2023 Cycle 33 Core Operating Limits Report L-2023-060, Radiological Emergency Plan, Revision 752023-04-26026 April 2023 Radiological Emergency Plan, Revision 75 L-2023-054, Submittal of Periodic Reports2023-04-12012 April 2023 Submittal of Periodic Reports L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report2023-03-30030 March 2023 Correction to U4R33 Steam Generator Tube Inspection Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-040, Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application2023-03-0303 March 2023 Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application L-2023-037, Annual Radioactive Effluent Release Report2023-03-0101 March 2023 Annual Radioactive Effluent Release Report L-2023-017, Radiological Emergency Plan Revision 73 and Revision 7 42023-02-17017 February 2023 Radiological Emergency Plan Revision 73 and Revision 7 4 L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis2023-02-10010 February 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis L-2023-004, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results2023-01-17017 January 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-181, Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 52022-12-0101 December 2022 Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5 L-2022-182, Emergency Response Data System (Eros) Changes2022-11-17017 November 2022 Emergency Response Data System (Eros) Changes L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2022-171, 10 CFR 50.59(d)(2) Summary Report2022-10-20020 October 2022 10 CFR 50.59(d)(2) Summary Report L-2022-167, Submittal of Periodic Reports2022-10-13013 October 2022 Submittal of Periodic Reports L-2022-166, Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement2022-10-0505 October 2022 Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement L-2022-149, U4R33 Steam Generator Tube Inspection Report2022-10-0404 October 2022 U4R33 Steam Generator Tube Inspection Report L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-148, Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade Dedication2022-09-16016 September 2022 Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade Dedication L-2022-151, Evacuation Time Estimate Study2022-09-15015 September 2022 Evacuation Time Estimate Study L-2022-142, Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-0042022-08-19019 August 2022 Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 L-2022-136, Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report2022-08-12012 August 2022 Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report L-2022-109, Inservice Inspection Program - Owner'S Activity Report (OAR-1)2022-06-27027 June 2022 Inservice Inspection Program - Owner'S Activity Report (OAR-1) L-2022-076, Subsequent License Renewal Application - Appendix E Environmental Report Supplement 22022-06-0909 June 2022 Subsequent License Renewal Application - Appendix E Environmental Report Supplement 2 2024-01-25
[Table view] Category:Annual Report
MONTHYEARL-2015-059, 2014 Annual Report of Reactor Coolant Specific Activity Limits2015-02-25025 February 2015 2014 Annual Report of Reactor Coolant Specific Activity Limits L-2014-153, Errata Correction to FPL Letter L-2013-085 Regarding the 2012 Annual Radioactive Effluent Release Report2014-05-21021 May 2014 Errata Correction to FPL Letter L-2013-085 Regarding the 2012 Annual Radioactive Effluent Release Report L-2014-084, 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 2013 Annual Report and 30-Day Special Report2014-04-16016 April 2014 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 2013 Annual Report and 30-Day Special Report L-2013-108, 10 CFR 50/46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 2012 Annual Report2013-04-29029 April 2013 10 CFR 50/46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 2012 Annual Report L-2007-054, Annual Radioactive Effluent Release Report for the Period January 1, 2006 Through December 31, 20062007-03-29029 March 2007 Annual Radioactive Effluent Release Report for the Period January 1, 2006 Through December 31, 2006 L-2005-260, Price Anderson Guarantees/Annual Financial Report2005-12-29029 December 2005 Price Anderson Guarantees/Annual Financial Report L-2005-096, CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - Annual Report and 30-Day Report2005-04-27027 April 2005 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - Annual Report and 30-Day Report L-2005-050, 2004 Annual Reports of Occupational Exposure and Reactor Coolant Specific Activity Limits2005-02-25025 February 2005 2004 Annual Reports of Occupational Exposure and Reactor Coolant Specific Activity Limits L-2003-077, Annual Radioactive Effluent Release Report2003-03-24024 March 2003 Annual Radioactive Effluent Release Report L-2003-038, 2002 Annual Reports of Occupational Exposure, and Reactor Coolant Specific Activity Limits2003-02-21021 February 2003 2002 Annual Reports of Occupational Exposure, and Reactor Coolant Specific Activity Limits L-2003-018, CFR50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - Annual Report.2003-01-30030 January 2003 CFR50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - Annual Report. L-2002-198, 10 CFR 50.59 Report2002-10-0707 October 2002 10 CFR 50.59 Report ML18227E2091978-01-0101 January 1978 Submit Ecological Monitoring of Selected Parameters at the Turkey Point Plant, Annual Report, 1977. ML18227E2081977-08-31031 August 1977 Submit Ecological Monitoring of Selected Parameters at the Turkey Point Plant, Semiannual Report, January - June 1977. ML18227A9911977-02-11011 February 1977 Submit Financial & Statistical Report, Supplement to 1976 Annual Report ML18227A9901977-02-0707 February 1977 Submit Beyond the Crises, Annual Report 1976 ML18227A9921975-11-19019 November 1975 Submit 1974 Annual Report. 2015-02-25
[Table view] |
Text
.April 29, 2013 0 L-2013-108 FPL. 10 CFR 50.46 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-0001 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 10 CFR 50.46, "Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors" - 2012 Annual Report
References:
- 1. Letter from Michael Kiley to US NRC Document Control Desk, "Turkey Point Unit 3, Dockets No. 50-250, 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors- 30 Day Special Report," L-2012-263, July 3, 2012.
- 2. Letter from Michael Kiley to US NRC Document Control Desk, "Turkey Point Unit 4, Docket No. 50-251, Nuclear Fuel Pellet Thermal Conductivity Degradation Impact on current Turkey Point Unit 4 Cycle 26 BE LBLOCA Analysis using the 1996 CQD Methodology 10 CFR 50.46 30-Day Special Report," L-2012-355, October 3, 2012.
- 3. Letter from Michael Kiley to US NRC Document Control Desk, "Turkey Point Units 3 & 4, Dockets Nos. 50-250 and 50-251, 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 2011 Annual Report," L-2012-204, April 30, 2012.
- 4. Letter from Michael Kiley to US NRC Document Control Desk, "Turkey Point Unit 4, Docket No. 50-251, 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors- 30 Day Special Report," L-2013-032, February 11, 2013.
10 CFR 50.46(a)(3)(ii) requires that licensees report to the Commission at least annually the nature of changes to, or errors discovered in, the Emergency Core Cooling System (ECCS) evaluation models (EM), or in the application of such models that affect the peak clad temperature calculation and their effect on the limiting ECCS analysis. Attachments 1 and 2 to this letter provide the Florida Power and Light Company (FPL) 10 CFR 50.46 Peak Cladding Temperature (PCT) 2012 reports for Turkey Point Units 3 and 4, respectively.
Reference 1 reported the implementation of revised approved EMs for the Turkey Point Unit 3 Large Break LOCA (LBLOCA) and Small Break LOCA (SBLOCA) in support of an Extended Power Uprate (EPU). Attachment 1 reports the 2012 changes to, or errors discovered in the revised approved EMs for Turkey Point Unit 3 not previously reported in Reference 1.
Florida Power & Light Company 9760 SW 344 St Homestead, FL 33035
L-2013-108 Page 2 Reference 2 reported all the changes to, or errors discovered in the current approved Large Break LOCA (LBLOCA) EM for Turkey Point Unit 4, including the impact of Thermal Conductivity Degradation (TCD) on PCT. Attachment 2 reports the changes and errors for 2012 in the LBLOCA evaluation model for Turkey Point Unit 4 not previously reported in Reference 2.
Reference 3 reported the changes and errors for 2011 in the SBLOCA EM for Turkey Point Unit
- 4. Attachment 2 reports the 2012 changes and errors in the SBLOCA evaluation model for Turkey Point Unit 4 not previously reported in Reference 3.
Based on Attachment 1, the 2012 Turkey Point Unit 3 EPU LBLOCA and SBLOCA PCTs are 2164 OF and 1231 OF, respectively. The cumulative changes are 12 OF and 0 OF, respectively.
Based on Attachment 2, the 2012 Turkey Point Unit 4 pre-EPU LBLOCA and SBLOCA PCTs are 1917 OF and 1689 OF, respectively. The cumulative changes are 811 OF and 105 °F, respectively. The Unit completed its last cycle (Cycle 26) at pre-EPU conditions in 2012 and has started Cycle 27 at EPU conditions in April 2013.
10 CFR 50.46(a)(3)(ii) also requires that a schedule for reanalysis be provided or compliance with the requirements of the regulation be shown if the error is significant. For Unit 4 compliance with 10 CFR 50.46 requirements is demonstrated by total estimated LBLOCA and SBLOCA PCTs of 1917 OF and 1689 OF, respectively, both remaining below the limit of 2200 °F.
However, revised approved EMs for the Turkey Point Units 3 and 4 LBLOCA and SBLOCA in support of an EPU have already been implemented (References 1 and 4).
Should there be any questions, please contact Robert Tomonto, Licensing Manager, at 305-246-7327.
Very truly yours, Michael Kiley Vice President Turkey Point Nuclear Plant cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant
Attachment 1 to L-2013-108 ATTACHMENT I TURKEY POINT UNIT 3 2012 ANNUAL
SUMMARY
EPU SBLOCA AND LBLOCA PCT RACK-UPS Peak Cladding Cumulative Temperature Chanae SBLOCA EPU New Evaluation Model (Al) 1231 OF 0 OF Evaluations (Al)
- Thermal Conductivity Degradation 0 OF 0 OF (Al)
Plant Modifications
- Increased Maximum Containment Spray Flow 0 OF 0 OF 2012 10 CFR 50.46 Annual Report 1231 OF 0 OF Peak Cladding Cumulative Temperature Change LBLOCA EPU New Evaluation Model (Al) 2152 OF 0 OF Evaluations & Assessments (Al)
- HOTSPOT Burst Temperature Zirlo Cladding 0 OF 0 OF
- HOTSPOT Calculation of Initial Pellet Temperature 0 OF 0 OF
- WCOBRAITRAC Automated Restart Logic Error 0 OF 0 OF
- Rod Intemal Pressure Calculation 0 OF 0 OF Plant Modifications (Al)
- Final EPU Containment Heat Sinks Evaluation 0 OF 0 OF
- Increased Maximum Containment Spray Flow 0 OF 0 OF Mixed Core Penalty (A', A2) 12 OF 12 OF 2012 10 CFR 50.46 Annual Report 2164 OF 12 OF REFERENCES Al. Letter from R. Kerr to R. Klein, "Turkey Point Units 3 & 4 - 10 CFR 50.46 Report 2012," NF-FP-13-44, March 5, 2013.
A2. Letter from M. Kiley to US NRC Document Control Desk, "Turkey Point Units 3 & 4, Dockets Nos. 50-250 and 50-251, 10 CFR 50.46, 'Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors' -30 Day Special Report," L-2010-231, October 19, 2010.
Attachment 2 to L-2013-108 ATTACHMENT 2 TURKEY POINT UNIT 4 2012 ANNUAL
SUMMARY
PRE-EPU SBLOCA AND LBLOCA PCT RACK-UPS Peak Cladding Cumulative Temperature Change SBLOCA 2011 10 CFR 50.46 Annual Report (Al) 1689 OF 105 OF (A2)
Evaluations
- Thermal Conductivity Degradation 0 OF 0 OF 2012 10 CFR 50.46 Annual Report 1689 OF 105 OF Peak Cladding Cumulative Temperature Change LBLOCA 2012 TCD Impact Update (A3) 1917 OF 811 OF Evaluations & Assessments (A2)
- HOTSPOT Burst Temperature Zirlo Cladding 0 OF 0 OF
- HOTSPOT Calculation of Initial Pellet Temperature 0 OF 0 OF
- WCOBRA/TRAC Automated Restart Logic Error 0 OF 0 OF
- Rod Internal Pressure Calculation 0 OF 0 OF 2012 10 CFR 50.46 Annual Report 1917 OF 811 OF REFERENCES Al. Letter from M. Kiley to the U.S. Nuclear Regulatory Commission, "Turkey Point Units 3 and 4, Docket Nos. 50-250 and 50-251,10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 2011 Annual Report," L-2012-204, April 30, 2012.
A2. Letter from R. Kerr to R. Klein, "Turkey Point Units 3 &4 - 10 CFR 50.46 Report 2012," NF-FP-1 3-44, March 5, 2013.
A3 Letter from M. Kiley to the U.S. Nuclear Regulatory Commission, "Turkey Point Unit 4, Docket No. 50-251, Nuclear Fuel Pellet Thermal Conductivity Degradation Impact on current Turkey Point Unit 4 Cycle 26 BE LBLOCA Analysis using the 1996 CQD Methodology, 10 CFR50.46 30-Day Special Report," L-2012-355, October 3, 2012.