Letter Sequence Other |
|---|
TAC:ME4907, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) TAC:ME4908, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: L-2012-118, Response to NRC ITSB RAI Regarding Clean TS Changes for EPU LAR No. 205 and Incorporation of Amendments 247 and 243 TS Changes on Relocation of Cycle Specific Parameters to the Core Operating Limits Report, L-2012-263, CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 30 Day Special Report, L-2012-293, FPL Review Comments on Extended Power Uprate Safety Evaluation Report, L-2012-426, Extended Power Uprate Cycle 26 Startup Report, ML110960521, ML110960523, ML112280292, ML12074A248, ML12074A251, NRC-2011-0094, Federal Register Notice, Notice of Consideration Regarding Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information.
|
MONTHYEARL-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate (LAR 205)2010-10-21021 October 2010 Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate (LAR 205) Project stage: Request ML1035601692010-10-21021 October 2010 License Amendment Request for Extended Power Uprate (LAR 205) Project stage: Request L-2010-160, Supplement to the Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 Regarding the EPU Related System Impact Study (SIS)2010-10-29029 October 2010 Supplement to the Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 Regarding the EPU Related System Impact Study (SIS) Project stage: Supplement L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix B, Additional Codes and Methods2010-12-14014 December 2010 Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix B, Additional Codes and Methods Project stage: Request ML1035601742010-12-14014 December 2010 License Amendment Request for Extended Power Uprate, Attachment 1; Descriptions and Technical Justifications for the Renewed Operating License, Technical Specifications, and Licensing Basis Changes Project stage: Request ML1035601832010-12-14014 December 2010 License Amendment Request for Extended Power Uprate, Attachment 07; Supplemental Environmental Report Project stage: Supplement L-2010-303, Supplemental Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Equivalent Margin Analysis (EMA)2010-12-21021 December 2010 Supplemental Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Equivalent Margin Analysis (EMA) Project stage: Supplement ML1036400512010-12-26026 December 2010 Logbook Entry for 12/26/2010 Project stage: Request ML1036400522010-12-27027 December 2010 Logbook Entry for 12/27/2010 Project stage: Request L-2011-004, Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Mechanical/Civil Engineering Issues2011-01-0707 January 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Mechanical/Civil Engineering Issues Project stage: Response to RAI ML1103101842011-01-12012 January 2011 Crocodile Log Book 1/12/2011 Project stage: Request L-2011-005, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Instrumentation & Control (I&C) Issues - Round 12011-01-28028 January 2011 Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Instrumentation & Control (I&C) Issues - Round 1 Project stage: Response to RAI L-2011-027, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Fire Protection Issues2011-02-22022 February 2011 Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Fire Protection Issues Project stage: Response to RAI L-2011-030, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Human Performance Issues - Round 12011-03-0303 March 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Human Performance Issues - Round 1 Project stage: Response to RAI ML1107000212011-03-11011 March 2011 Acceptance for Review of License Amendment Request for Extended Power Uprate Project stage: Acceptance Review L-2011-102, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Unit 3 Mechanical/Civil Engineering Issues2011-03-25025 March 2011 Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Unit 3 Mechanical/Civil Engineering Issues Project stage: Response to RAI L-2011-081, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Electrical Engineering Branch Issues2011-03-31031 March 2011 Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Electrical Engineering Branch Issues Project stage: Response to RAI ML1108907262011-03-31031 March 2011 Slides for Turkey Point, 3 and 4, Regarding Extended Power Uprate and Spent Fuel Criticality Project stage: Request ML11095A0122011-04-21021 April 2011 Summary of Public Meeting with Florida Power & Light Company, on Turkey Points, Units 2 and 4 Extended Power Uprate License Amendment Request Currently Under Review Project stage: Meeting L-2011-135, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Environmental Review Issues2011-04-22022 April 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Environmental Review Issues Project stage: Response to RAI L-2011-153, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues2011-04-22022 April 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues Project stage: Response to RAI L-2011-084, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Containment and Ventilation Issues2011-04-28028 April 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Containment and Ventilation Issues Project stage: Response to RAI L-2011-142, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Health Physics and Human Performance Issues2011-04-29029 April 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Health Physics and Human Performance Issues Project stage: Response to RAI NRC-2011-0094, Federal Register Notice, Notice of Consideration Regarding Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information.2011-05-0202 May 2011 Federal Register Notice, Notice of Consideration Regarding Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information. Project stage: Other ML1109605232011-05-0202 May 2011 Federal Register Notice, Notice of Consideration Regarding Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information Project stage: Other ML1109605212011-05-0606 May 2011 Letter, Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing and Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information Project stage: Other L-2011-170, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Nuclear Performance and Code Review Issues2011-05-19019 May 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Nuclear Performance and Code Review Issues Project stage: Response to RAI L-2011-210, Regarding Supplementary Information Related to FPLs Response to NRC Request for Additional Information (RAI) IHPB-1.52011-06-0707 June 2011 Regarding Supplementary Information Related to FPLs Response to NRC Request for Additional Information (RAI) IHPB-1.5 Project stage: Supplement ML11188A0702011-06-21021 June 2011 Response to NRC Request for Additional Information from Reactor System Branch (Srxb) Concerning Retran Related to Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 Project stage: Response to RAI L-2011-190, Turkey Point, Units 3 and 4 - Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues2011-06-21021 June 2011 Turkey Point, Units 3 and 4 - Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues Project stage: Request ML11174A1652011-06-21021 June 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues Project stage: Response to RAI ML11178A0672011-06-23023 June 2011 Outline, Turkey Point Nuclear Plant, Units 3 and 4, Outline Epitome/Containment Volume RAI Response Project stage: RAI ML11178A0682011-06-23023 June 2011 Meeting Slides, Turkey Point Nuclear Plant, Units 3 and 4, Extended Power Uprate (Epu), NRC and FPL Public Meeting Project stage: Meeting L-2011-223, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Electrical Engineering Branch Issues2011-07-0707 July 2011 Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Electrical Engineering Branch Issues Project stage: Response to RAI ML11203A2532011-07-21021 July 2011 Logbook Entry for 7/21/2011 Project stage: Request ML11195A1522011-07-22022 July 2011 Summary Public Meeting Florida Power & Light Company, on Turkey Point Units 3 and 4 Extended Power Uprate License Amendment Request Currently Under Review Project stage: Meeting L-2011-237, Supplemental Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Containment and Ventilation Issues2011-07-22022 July 2011 Supplemental Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Containment and Ventilation Issues Project stage: Supplement L-2011-278, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Nuclear Performance and Code Review (Snpb) Issues2011-07-29029 July 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Nuclear Performance and Code Review (Snpb) Issues Project stage: Response to RAI L-2011-233, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues2011-08-0505 August 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues Project stage: Response to RAI L-2011-305, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues2011-08-19019 August 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues Project stage: Response to RAI L-2011-334, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues2011-08-25025 August 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues Project stage: Response to RAI L-2011-302, Response to NRC RAI Regarding EPU LAR No. 205 Technical Specification and Instrumentation and Control Issues2011-08-29029 August 2011 Response to NRC RAI Regarding EPU LAR No. 205 Technical Specification and Instrumentation and Control Issues Project stage: Response to RAI ML1122802922011-09-0909 September 2011 Request to Initiate Informal Section 7 Consultation for the Proposed Turkey Point Plant Units 3 and 4 Extended Power Uprate Project stage: Other ML11270A3792011-11-0404 November 2011 Transmittal Letter - Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate Project stage: Draft Other ML11270A3802011-11-0404 November 2011 FRN: General Notice. Turkey Point Units 3 and 4 - Federal Register Notice - Draft Environmental Assessment Project stage: Request L-2011-539, Draft Environmental Assessment Review Supporting Extended Power Uprate License Amendment Request No. 2052011-12-0909 December 2011 Draft Environmental Assessment Review Supporting Extended Power Uprate License Amendment Request No. 205 Project stage: Draft Request ML12027A0422012-01-12012 January 2012 Westinghouse Input to NRC Frapcon Models Related to the Turkey Point Unit 3 & 4 Extended Power Uprate (EPU) License Amendment Request (LAR) (Cover Letter) Project stage: Request NRC-2011-0259, Comment (2) of Gordon Wissinger, on Behalf of the National Park Service, Opposing Turkey Point Units 3 and 4 Draft Environmental Assessment (Dea) and Finding of No Significant Impact (Fonsi) Related to the Proposed Extended Power Uprat2012-01-12012 January 2012 Comment (2) of Gordon Wissinger, on Behalf of the National Park Service, Opposing Turkey Point Units 3 and 4 Draft Environmental Assessment (Dea) and Finding of No Significant Impact (Fonsi) Related to the Proposed Extended Power Uprate Project stage: Request L-2012-019, Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Thermal Conductivity Degradation2012-01-16016 January 2012 Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Thermal Conductivity Degradation Project stage: Request L-2012-020, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Thermal Conductivity Degradation2012-01-17017 January 2012 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Thermal Conductivity Degradation Project stage: Response to RAI 2011-04-28
[Table View] |
Text
0JUL 0 3 2012 0 L L-2012-263 F=PL.
10 CFR 50.46 POWERING TODAY.
EMPOWERING TOMORROW.
U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-0001 Re:
Turkey Point Unit 3 Docket No. 50-250 10 CFR 50.46, "Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors" - 30 Day Special Report
References:
- 1. FPL letter L-2012-204 from Michael Kiley to US Nuclear Regulatory Commission, "Turkey Point Units 3 and 4, Docket Nos. 50-250 and 50-251, 10 CFR 50.46, 'Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors' - 2011 Annual Report," April 30, 2012.
- 2. FPL letter L-2010-113 from Michael Kiley to US Nuclear Regulatory Commission, "Florida Power & Light Company, Turkey Point Units 3 and 4, Docket Nos. 50-250 and 50-251, License Amendment Request for Extended Power Uprate (LAR 205)," October 21, 2010.
- 3. FPL letter L-2012-019 from Michael Kiley to US Nuclear Regulatory Commission, "Turkey Point Units 3 and 4, Docket Nos. 50-250 and 50-251, Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Thermal Conductivity Degradation," January 16, 2012.
- 4. NRC Letter from Jason Paige to Mano Nazar (FPL), "Turkey Point Units 3 and 4 - Issuance of Amendments Regarding Extended Power Uprate (TAC Nos. ME4907 and ME4908)," June 15, 2012.
10 CFR 50.46(a)(3)(ii) requires that changes to the Large Break Loss of Coolant Accident (LBLOCA) Evaluation Model (EM) and Small Break LOCA (SBLOCA) EM peak clad temperature (PCT) exceeding 50°F have to be reported to the NRC within 30 days. This letter meets this requirement.
FPL letter L-2012-204 (Reference 1), submitted the Turkey Point Units 3 and 4 10 CFR 50.46 2011 annual report. The LBLOCA PCT reported was 1998 OF, and the SBLOCA PCT reported was 1689 OF. The cumulative changes reported by L-2012-204 for the LBLOCA and SBLOCA were 283 OF and 105 OF, respectively.
By letter L-2010-113 (Reference 2), FPL requested a License Amendment for Extended Power Uprate (EPU) for Turkey Point Units 3 and 4 (LAR 205). Reference 3 documented the LBLOCA and SBLOCA EPU EM PCTs for Turkey Point Units 3 and 4 for the EPU conditions. On June 15, 2012, the NRC issued Amendments 249 and 245 (Reference 4) approving the EPU for Turkey Point Units 3 and 4. Turkey Point Unit 3 is implementing the approved EPU during the
- current Unit 3 Cycle 26 refueling outage. Therefore, the new reference LBLOCA EPU EM PCT is 2152 OF and the new reference SBLOCA EPU EM PCT is 1231 °F.
- A002, an FPL Group company 0tf
L-2012-263 Page 2 of 2 In support of the EPU, Turkey Point Unit 3 implemented new 15x1 5 Upgrade fuel assemblies in Unit 3 Cycle 25 and the current Cycle 26 reload. As per Reference 3, Westinghouse identified a mixed core penalty for the Turkey Point Units 3 and 4 LBLOCA PCT of 12'F due to the presence of the new 15x1 5 Upgrade fuel assemblies and the old 15x1 5 DRFAs in the same core. The mixed core penalty is applicable only for Unit 3 Cycle 26 and any future cycles during which 15x15 DRFAs and 15x15 Upgrade fuel assemblies are both present in the core. The SBLOCA PCT is not affected by the mixed core effects.
Table 1 below provides a summary of the new LBLOCA and SBLOCA PCTs for the EPU conditions. The LBLOCA PCT for Unit 3 is 2164 OF with a cumulative change of 12°F due to the mixed core penalty. This is a change of 166 OF in PCT from the LBLOCA PCT of 1998 OF reported in the 2011 annual report. The new SBLOCA PCT is 1231'F. This is a change of 458 OF in PCT from the SBLOCA PCT of 1689 OF reported in the 2011 annual report.
Table I Turkey Point Unit 3 SBLOCA and BE LBLOCA EPU PCT Summary Peak Cladding Cumulative Temperature Change LBLOCA EPU EM (Ref. 3) 2152 OF 0 OF Mixed Core Penalty* (Ref. 3) 12 OF 12 OF Mixed Core EPU PCT 2164 OF 12 OF Peak Cladding Cumulative Temperature Change SBLOCA EPU EM (Ref. 2) 1231 OF 0 OF
- The mixed core penalty is only applicable to mixed cores with 15x1 5 Upgrade and DRFA fuel.
Should there be any questions, please contact Robert Tomonto, Licensing Manager, at 305-246-7327.
Very truly yours, Michael Kiley4 Vice President Turkey Point Nuclear Plant cc:
Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant