L-2012-338, Initial Exam 2012-301 General Correspondence

From kanterella
Jump to navigation Jump to search
Initial Exam 2012-301 General Correspondence
ML13225A173
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 09/10/2012
From: Jensen J
Florida Power & Light Co
To: Phillip Capehart, Widmann M
Division of Reactor Safety II
References
IR-12-301, 50-335/12-301, 50-389/12-301, L-2012-338
Download: ML13225A173 (4)


Text

  • FPL. September 10, 2012 10 CFR 55.5 10 CFR 55.40 Mr. Malcolm Widmann L-2012-338 Attn. Mr. Phillip Capehart U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257

( KE: St. Lucie Units 1 &~

" - -DocketNc5?.51J-335 and 50-389 Reactor and Senior Reactor Operator Initial Examinations Outline -

050000335/2012301 & 05000389/2012301 Facility License Nos. DPR-67 and NFP-16 In accordance with the requirements of NUREG-1021, Revision 9, Supplement 1, the operating test outline is due 75 days prior to the Nuclear Regulatory Commission (NRC) examination date. St. Lucie Plant Reactor and Senior Reactor Operator (RO/SRO) initial examinations are scheduled December 3, 2012.

Specific items enclosed per these requirements are:

  • ES-201-2, Examination Outline Quality Checklist
  • ES-201-3, Examination Security Agreement
  • ES-301-2, Control Room/In-Plant Systems Outline
  • ES-401-3, Generic Knowledge and Abilities Outline (Tier 3)
  • ES-401-4, Record of Rejected K/As Questions or comments should be directed to Mr. Paul Farnsworth at (772) 465-3550, extension 3358 or 3339 (office) or (772) 579-9515 (cell); or Mr. Reese Kilian at (772) 467-7364 (office) or (772) 214-6696 (cell).

In accordance with 10 CFR 2.390 and NUREG-1021(Revision 9, Supplement 1, ES-201) information must be withheld from public disclosure until after the examinations are complete.

n~fhb"'lensen Site Vice President St. Lucie Plant JJ/tlt Enclosures Rorida Power & Ught Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

October 16, 2012 10 CFR 55.5 PPL 10 CFR 55.40 Mr. Malcolm Widmann L-2012-372 Attn. Mr. Phillip Capehart U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 RE: St. Lucie Units I & 2 Docket Nos. 50-335 and 50-389 Reactor and Senior Reactor Operator Initial Examination Materials 050000335/2012301 &05000389/2012301 Facility License Nos. DPR-67 and NFP-16 In accordance with the requirements of NUREG-1 021, Revision 9, Supplement 1, the proposed operating examination, supporting documents and reference material is due 45 days prior to the Nuclear Regulatory Commission (NRC) examination date. St. Lucie Plant Reactor and Senior Reactor Operator (RO/SRO) initial examinations are scheduled December 3, 2012.

Specific items enclosed per these requirements are:

  • NRC Written Examination
  • NRC Simulator Scenarios
  • ES-301-3, Operating Test Quality Checklist
  • ES-301-4, Simulator Scenario Quality Checklist
  • ES-30 1-6, Competencies Checklist
  • ES-401-6, Written Examination Quality Checklist
  • ES-201-3, Examination Security Agreement
  • 2 flash drives with supporting documentation including plant procedures and Technical Specifications Questions or comments should be directed to Mr. Paul Farnsworth at (772) 465-3550, extension 3358 or 3339 (office) or (772) 579-9515 (cell); or Mr. Reese Kilian at (772) 467-7364 (office) or (772) 214-6696 (cell).

In accordance with 10 CFR 2.390 and NUREG-1 021 (Revision 9, Supplement 1, ES-201) information must be withheld from public disclosure until after the examinations are complete.

V ryru urs,

/

Jose h ensen Site ice President St. Lucie Plant JJ/tlt Enclosures Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

December 21, 2012 F=PL.. 10 CFR 55.5 10 CFR 55.40 Mr. Malcolm Widmann L-2012-411 Attn. Mr. Phillip Capehart U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 RE: St. Lucie Units 1 & 2 Docket Nos. 50-335 and 50-389 Post NRC Written Examination Facility Activities-050000335/2012301 & 05000389/2012301 Facility License Nos. DPR-67 and NFP-16 In accordance with Operator Licensing Examination Standards for Power Reactors, NuREG-1 021 Rev. 9, Supplement 1, ES-403 and ES-501, Florida Power & Light St.

Lucie Nuclear Plant is submitting the HLC-21 NRC post examination facility activities.

Specific items provided per those requirements are:

  • Signed ES-403-1, Written Examination Grading Quality Checklist
  • 13 Original applicant written examination answer sheets
  • 13 Photo copied applicant written examination answer sheets
  • 13 Graded, photo copied applicant written examination answer sheets
  • 13 Applicant written examination signed cover sheets
  • 1 Master SRO written examination
  • 1 Master RO written examination
  • 1 Master answer key
  • 10 Pages of student questions with proctor responses
  • 1 Applicant seating chart
  • Written examination performance analysis
  • Attachment 1 - ES-501 St. Lucie NRC Examination Facility Comments ES-201-3, Examination Security Agreement, is currently being completed. It will be sent under separate correspondence.

Questions or comments should be directed to Mr. Paul Farnsworth at (772) 465-3550, extension 3358 or 3339 (office) or (772) 579-9515 (cell); or Mr. Reese Kilian at (772) 467-7364 (office) or (772) 214-6696 (cell) .

Very truly yours, (ACTtNc.)

Joseph Jense Site Vice President St. Lucie Plant JJ/tlt Enclosures Florida Power & Ught Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

  • FPL.

January 7, 2013 10 CFR 55.5 10 CFR 55.40 L-2013-001 Mr. Malcolm Widmann Attn. Mr. Phillip Capehart U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 RE: St. Lucie Units 1 & 2 Docket Nos. 50-335 and 50-389 Post NRC Examination Facility Activities - Examination Security Agreement 050000335/2012301 & 05000389/2012301 Facility License Nos. DPR-67 and NFP-16 In accordance with Operator Licensing Examination Standards for Power Reactors, NUREG-1021 Revision 9, Supplement 1, ES-501, Florida Power & Light Company (FPL) forwards NRC post examination facility activities ES-201-3, Examination Security Agreement for HLC-21.

Enclosed for review is ES-201-3, Examination Security Agreement forms.

Questions or comments should be directed to Mr. Paul Farnsworth at (772) 465-3550, extension 3358 or 3339 (office) or (772) 579-9515 (cell); or Mr. Reese Kilian at (772) 467-7364 (office) or (772) 214-6696 (cell).

Very truly yours,

~~(klt..x,)

  • J~n Site Vice President St. Lucie Plant JJ/tlt Enclosure Rorida Power & Ught Company 6501 S. Ocean Drive, Jensen Beach, FL 34957