MONTHYEARML11193A0932011-05-27027 May 2011 Reply to RAI for the Review of the Davis-Besse Nuclear Power Station, Unit 1, License Renewal Application Environmental Report and Enclosure a - Environmental Audit Needs List Project stage: Other ML1108202762011-06-0303 June 2011 Summary of Site Audit Related to the Review of the License Renewal Application for Davis-Besse Nuclear Power Station, Unit 1 Project stage: Approval L-11-154, Reply to Request for Additional Information for the Review of License Renewal Application, Environmental Report Severe Accident Mitigation Alternatives Analysis, and License Renewal Application Amendment No. 102011-06-24024 June 2011 Reply to Request for Additional Information for the Review of License Renewal Application, Environmental Report Severe Accident Mitigation Alternatives Analysis, and License Renewal Application Amendment No. 10 Project stage: Response to RAI L-11-222, Ohio Department of Natural Resources Office of Coastal Management Concurrence with Federal Consistency Certification Related to the Review of License Renewal Application Environmental Report2011-07-11011 July 2011 Ohio Department of Natural Resources Office of Coastal Management Concurrence with Federal Consistency Certification Related to the Review of License Renewal Application Environmental Report Project stage: Other ML1122701392011-08-15015 August 2011 Request for Additional Information Response Clarification from Davis-Besse Nuclear Power Station in Support of License Renewal Application Review Project stage: RAI L-11-251, Reply to Supplemental Request for Additional Information for Review of License Renewal Application, Environmental Report Severe Accident Mitigation Alternatives Analysis2011-09-0101 September 2011 Reply to Supplemental Request for Additional Information for Review of License Renewal Application, Environmental Report Severe Accident Mitigation Alternatives Analysis Project stage: Supplement L-11-288, License Renewal Application Amendment No. 17, Supplemental Information for Environmental Report2011-09-19019 September 2011 License Renewal Application Amendment No. 17, Supplemental Information for Environmental Report Project stage: Supplement L-11-289, License Renewal Application Amendment No. 16, Supplemental Information for the Review of the License Renewal Application Environmental Report2011-09-19019 September 2011 License Renewal Application Amendment No. 16, Supplemental Information for the Review of the License Renewal Application Environmental Report Project stage: Supplement ML12032A1312012-01-31031 January 2012 Schedule Revision for the Environmental Review of the Davis-Besse Nuclear Power Station, Unit No. 1, LRA Project stage: Approval ML12025A1092012-01-31031 January 2012 Schedule Revision for the Environmental Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application Project stage: Approval L-12-244, Correction of Errors in the License Renewal Application Environmental Report Severe Accident Mitigation Alternatives Analysis, and License Renewal Application Amendment No. 292012-07-16016 July 2012 Correction of Errors in the License Renewal Application Environmental Report Severe Accident Mitigation Alternatives Analysis, and License Renewal Application Amendment No. 29 Project stage: Other ML13205A0362013-07-31031 July 2013 Schedule Revision for the Environmental and Safety Review of the Davis-Besse Nuclear Power Station License Renewal Application (TAC Nos. ME4613 and ME4640) Project stage: Approval ML13302C2072013-11-0606 November 2013 Schedule Revision for the Review of the Davis-Besse Nuclear Power Station License Renewal Application (TAC ME4613 and ME4640) Project stage: Approval ML14027A2172014-01-30030 January 2014 Schedule Revision for Environmental Review of Davis-Besse Nuclear Power Station License Renewal Application Project stage: Approval ML14097A2722014-03-25025 March 2014 Slides for Davis-Besse Draft SEIS for License Renewal Public Meeting - Preliminary Site-Specific Results of the License Renewal Environmental Review for Davis-Besse Nuclear Power Station, March 25, 2014 Project stage: Draft Approval ML14097A2532014-03-25025 March 2014 Transcript of 03/25/2014 for Davis-Besse Nuclear Power Station Draft Environmental Impact Statement Public Meeting: Evening Session - Corrected. Pages 1-84 Project stage: Request ML14097A2542014-03-25025 March 2014 Draft Environmental Impact Statement Public Meeting: Afternoon Session - Corrected. Pages 1-56 Project stage: Request ML14112A3152014-04-21021 April 2014 Review of Draft Plant-Specific Supplement 52 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding ML14099A3392014-04-22022 April 2014 March 27, 2014, Summary of Telephone Conference Call Held Between Nuclear Regulatory Commission and First Energy Nuclear Operating Company Concerning Commitment 13 of the Safety Evaluation Report Pertaining to the Davis Besse Unit 1, Licens Project stage: Request ML14099A4642014-05-0606 May 2014 Summary of Public Meetings to Discuss Draft Supplement 52 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Davis-Besse Nuclear Generating Station, Unit 1 L-14-206, License Renewal Application Amendment No. 50 - Annual Update2014-06-23023 June 2014 License Renewal Application Amendment No. 50 - Annual Update Project stage: Other ML14329A4792014-11-28028 November 2014 Schedule Revision for the Review of the Davis-Besse Nuclear Power Station License Renewal Application (TAC No. ME613) Project stage: Approval ML15054A5342015-02-27027 February 2015 Schedule Revision and Project Manager Change for the Review of the Davis-Besse Nuclear Power Station License Renewal Application Project stage: Approval ML15113A1072015-04-30030 April 2015 Schedule Revision for the Review of the Davis-Besse Nuclear Power Station License Renewal Application Project stage: Approval 2013-11-06
[Table View] |
|
---|
Category:Letter type:L
MONTHYEARL-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program L-23-034, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-13013 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-31031 May 2023 Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-101, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 20222023-05-12012 May 2023 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 2022 L-23-131, Readiness for Resumption of NRC Supplemental Inspection2023-05-12012 May 2023 Readiness for Resumption of NRC Supplemental Inspection L-23-092, Occupational Radiation Exposure Report for Year 20222023-04-27027 April 2023 Occupational Radiation Exposure Report for Year 2022 L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-059, Response to Apparent Violation in NRC Inspection Report 05000346/2022091; EA 23-0022023-03-0909 March 2023 Response to Apparent Violation in NRC Inspection Report 05000346/2022091; EA 23-002 L-22-212, CFR 50.55a Request RP-5 Regarding Inservice Pump Testing2023-03-0606 March 2023 CFR 50.55a Request RP-5 Regarding Inservice Pump Testing L-23-048, Response to Request for Additional Information Regarding Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report2023-03-0101 March 2023 Response to Request for Additional Information Regarding Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-22-253, Submittal of Pressure and Temperature Limits Report, Revision 52023-01-10010 January 2023 Submittal of Pressure and Temperature Limits Report, Revision 5 L-22-284, Request for Notice of Enforcement Discretion for Technical Specification 3.7.9, Ultimate Heat Sink (UHS)2022-12-28028 December 2022 Request for Notice of Enforcement Discretion for Technical Specification 3.7.9, Ultimate Heat Sink (UHS) L-22-211, Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report2022-09-29029 September 2022 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-22-216, Submittal of Pressure and Temperature Limits Report. Revision 42022-09-27027 September 2022 Submittal of Pressure and Temperature Limits Report. Revision 4 L-22-213, Occupational Radiation Exposure Report for Year 2021 - Correction2022-09-23023 September 2022 Occupational Radiation Exposure Report for Year 2021 - Correction L-22-129, Submittal of the Updated Final Safety Analysis Report, Revision 342022-09-20020 September 2022 Submittal of the Updated Final Safety Analysis Report, Revision 34 L-22-194, Submittal of Supplemental Information for the Reanalysis for Protection Against Low Temperature Reactor Coolant System Overpressure Events2022-09-19019 September 2022 Submittal of Supplemental Information for the Reanalysis for Protection Against Low Temperature Reactor Coolant System Overpressure Events L-22-203, Submittal of Evacuation Time Estimates2022-09-12012 September 2022 Submittal of Evacuation Time Estimates L-22-050, Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual2022-08-0909 August 2022 Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual L-22-152, Response to Request for Additional Information Regarding a License Amendment Request That Revises the Davis-Besse Nuclear Power Station Emergency Plan2022-07-0505 July 2022 Response to Request for Additional Information Regarding a License Amendment Request That Revises the Davis-Besse Nuclear Power Station Emergency Plan L-22-068, Cycle 22 and Refueling Outage 22 Inservice Inspection Summary Report2022-06-30030 June 2022 Cycle 22 and Refueling Outage 22 Inservice Inspection Summary Report L-22-037, 2021 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2022-06-30030 June 2022 2021 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-22-149, Post Accident Monitoring Report2022-06-23023 June 2022 Post Accident Monitoring Report L-22-153, Readiness for NRC Supplemental Inspection Required for a White Finding2022-06-22022 June 2022 Readiness for NRC Supplemental Inspection Required for a White Finding L-22-098, Withdrawal of Proposed Inservice Inspection Alternative RR-A22022-06-22022 June 2022 Withdrawal of Proposed Inservice Inspection Alternative RR-A2 2024-08-27
[Table view] |
Text
FENOC Davis-Besse Nuclear Power Station 5501 N. State Route 2 FirstEnergyNuclear OperatingCompany Oak Harbor,Ohio 43449 July 11, 2011 L-1 1-222 10 CFR 54 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50-346, License Number NPF-3 Ohio Department of Natural Resources Office of Coastal Management Concurrence With Federal Consistency Certification Related to the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application Environmental Report (TAC No. ME4613)
By letter dated August 27, 2010, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102450565), FirstEnergy Nuclear Operating Company (FENOC) submitted an application pursuant to Title 10 of the Code of Federal Regulations, Part 54 for renewal of Operating License NPF-3 for the Davis-Besse Nuclear Power Station, Unit Number 1 (Davis-Besse). The License Renewal Application (LRA), Appendix E, "Applicant's Environmental Report - Operating License Renewal Stage," Attachment D, "Coastal Zone Management Consistency," provided certification documenting the FENOC determination that U.S. Nuclear Regulatory Commission (NRC) renewal of the Davis-Besse operating license would be consistent with enforceable policies of the approved Ohio Coastal Management Program.
The Ohio Department of Natural Resources (ODNR) Office of Coastal Management provided concurrence with the Federal Consistency Certification by letter dated February 18, 2011. The Enclosure provides a copy of the ODNR concurrence letter.
Davis-Besse Nuclear Power Station, Unit No. 1 L-11-222 Page 2 If there are any questions or if additional information is required, please contact Mr. Clifford I. Custer, Fleet License Renewal Project Manager, at 724-682-7139.
I declare under penalty of perjury that the foregoing is true and correct. Executed on July // , 2011.
Sincerely, Kendall W. By Director, Site Ferformance Improvement
Enclosure:
Ohio Department of Natural Resources (ODNR) Office of Coastal Management Letter to FirstEnergy Nuclear Operating Company Dated February 18, 2011 cc: NRC DLR Project Manager NRC DLR Environmental Project Manager NRC Region III Administrator cc: w/o Enclosure NRC DLR Director NRR DORL Project Manager NRC Resident Inspector Utility Radiological Safety Board
Enclosure Davis-Besse Nuclear Power Station, Unit No. 1 Letter L-11-222 Ohio Department of Natural Resources (ODNR) Office of Coastal Management Letter to FirstEnergy Nuclear Operating Company Dated February 18, 2011 1 Page
Ohio Department of Natural Resources JOHN R. KASICH, GOVERNOR DAVID NiUSlINE', DIRFCTOR OFFICE OF COASTAL MANAGEMENT 105 WEST SHORELINE DRIVE SANDUSKY, OH-o 44870 (419) 626-7980 February 18, 2011 Barry S. Allen Davis-Besse Nuclear Power Station 2 ,mk 5501 N. State Route 2 Oak Harbor, Ohio 43449
Dear Mr. Allen:
--
- This letter regards the Federal Consistency Certification submitted with the Davis-Besse Nuclear Power Station License Renewal application to the U.S. Nuclear Regulatory Commission. The proposed project lies within Ohio's designated coastal zone; to obtain a federal permit, applicants are required to certify consistency with the Ohio Coastal Management Program, which is administered by the Ohio Department of Natural Resources (ODNR) Office of Coastal Management.
This letter is to inform you that ODNR concurs with your Federal Consistency Certification. No further coordination with this office regarding Federal Consistency is required.
If you need additional information or have any questions regarding your Federal Consistency review, please feel free to contact me at (419) 626-7980.
Sincerely, Steve Holland Federal Consistency Administrator c: John Watkins, P.E., Chief, ODNR Office of Coastal Management Brian Mitch, ODNR Division of Engineering File