OPERATING DATA REPORT DOCKET NO. 50-333 DATE Oct. 1983 COMPLETED BY J. Cook TELEPHONE (119342-3840 OPERATING STATUS FitzPatrick Notes

1. Unit Name:
2. Reponing Period: 830901-830930
3. Licensed Thermal Power (MWt): 7416
4. Nameplate Rating (Gross MWe): 883
5. Design Electrical Rating (Net MWe): 821
6. Maximum Dependable Capacity (Gross MWe):

830

7. Maximum Dependable Capacity (Net MWe): R1n
8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted,if Any (Net MWe): None
10. Reasons For Restrictions.lf Any:

This Montis Yr to-Date Cumulative I1. Hours in Reporting Period 720 6551 71688

12. Nuraber Of Hours Reactor Was Critical 673.2 4064.1 50319.8
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On-Line 622.7 3975.7 48990.9
15. Unit Reserve Shutdown Hours n n n
16. Gross Thermal Energy Generated (MWHj 1237056 8907000 102430858
17. Gross Electrical Energy Generated (MWH) 400370 2998850 35433630
18. Net Electrical Energy Generated (MWH) 386875 2905655 33770040
19. Unit Service Factor a c. Sv 60.7% 68.3%
20. Unit Availability Factor 86.5% 60.7% 68.3%

l 21. Unit Capacity Factor (Using MDC Net) 66.3% 54.8% 61.8%

22. Unit Capacity Factor (Using DER Net) _ 65.4% 54.0% 57.4%
23. Unit Forced Outage Rate 0 7.8% 15.1%
24. Shutdcwns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):

i

{

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

, 8310120435 830930 gh i PDR R ADOCK 05000333 '

! PDR

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT FitzPatrick DATE October 1983 COMPLETED BY J. Cook TELEPHONE (11SY342-1840 September 1983 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (gwe. Net) 3 0 736 17 2 0 33 768 3

10 769 39 37 769 4 20 5 64 21 770 6 173 773 7 216 23 745 8 251 24 601 9 41 3 25 726 10 575 26 777 660 779 12 599 28 782 13 584 29 14 622 780 30 15 638 3 16 725 Summary: The FitzPatrick plant returned to service on 830903 following the fifth refueling outage.

DOCKET NO.

50-333 UNITSHUTDOWNS AND POWER REDUCTIONS UNIT NAME FitzPatrick DATE october 1983 COMPLETED BY J. Cook REPORTMONTH Serstember TELEPilONE (3157342-3840 r.

b C

No. Date g

.! E 3g g j .Y E jg5 Licensee ,Eg je. Cause & Corrective H

i Event p o3 Action to

$$ 35cg e

Report # mO u$ U Prevent Recurrence O

8 830603 s 46.8 c 1 N/A N/A N/A Refueling outage (cumulative hours 2189.4)

I 2 3 4 F: Forced Re .on: Method:

S: Scheduled Exhibit G - Inst ructions A Equipment Failure (Explain) I-Manual for Preparation of Data B Maintenance of Test 2 ManualScram. Entry Sheets for Licensee C Refueling 3 Automatic Scram.

D Regulatory Restriction Event Report (LER) File (NUREG-4-01her (Explain) 0161)

E-Operator Training & License Examination F Administrative 5 G-Operational Error (Explain)

Il-Other (Explain) Exhibit I - Same Source

f NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE SEPTEMBER 1983 The refueling outage was completed on September 3, 1983. The unit was returned to service at approximately 2130 hours0.0247 days <br />0.592 hours <br />0.00352 weeks <br />8.10465e-4 months <br />. Power was increased at the preconditioned rate.

At the end of the reporting period the unit is operating at approx-imately 780 MWe.

9

, - - , - - - ,. ,ry,. ,,,a._ - - - - - ,-,-

, JAMES A. F112PATRICE N'JCLEAR POWER PLANT POWER AUTil0RITY OF Tl!E STATE OF NEW YORK REFUELING INFdRMAf10N

1. The date of the next scheduled refueling outage is February ,19 85 -
2. The scheduled date for restart following refueling is May _19_85
3. Will refueling' or resumption of operation thereafter require a technical specification change or other license amendment?

'YES X' If yes, describe in general what these will be and go to question S.

New Minimum Critical Power Ratio operating limits may be required. If new fuel enrichments are introduced, New Maximum Average Planar Linear Heat Generation Limits will be required.

If no, answer question 4. .:

. NO

4. ANSWER ONLY IF ANShER TO 3. ABOVE IS NO.

!!as the reload fuci design and core configuration been reviewed by the Plant Safety Review coiamittee to determine whether any unreviewed safety questions are associated ,

with the core reload (Ref.10 CFR Section 50.59)?

YES

,19 NO ,The next scheduled review date is __.

S. ANSWER ONLY 1F ANSWER TO 3. ABOVE IS YES.

The scheduled date for submitting proposed licensing action and supporting information is January ,19 85 .

6. Answer the following important licensing considerations YES NO New fuel design? X a) X b) New fuel supplier?

Are there any new unreviewed design or performance analysis methods? X c).

d) Are there any new operating procedures?

Other

[}X(

e) _g-

.Specify: _,

7. There are' normally 560 fuel assemblies in the core during operation, present ly there are- 566 in the core.

S. a) There are 626 fuel assemblies of the licensed allowable 2244in the spent fuel pool.

b) An increase in the licensed storage capacity:

X is not.being contemplated at this time.

is not planned at this time, for an additional fuel assemblies.

has been requested for. an additional fuel assemblies.

9. ' December ,19 90 is the last possible refueling date that can be Frojectedat this time given the presently licensed spent fuel pool storage capacity.

POWER AUTHORITY OF THE STATE OF NEW YORK -

JAMES A. FITZPATRICK . NUCLEAR POWER PLANT p MAINTENANCE

SUMMARY

I&c sentember 1'983 E  :

CAUSE OF RESULTS OF ACTION TAKEN REPAIR DATE SYSTEM -WORK REQUEST # H D CTED TO PRECLUDE TIME i

COMPONEN1 # MALFUNCTION MALFUNCTION RECURRENCE HOURS .

25278 OPS 11 Acoustic Monitor Alarm did not Replaced w/ 2 9/3/83 02 spare l

l RV-71H ,

malfunction clear 1

Normal wear Pen does not Tightened drive 3 9/4/83 02 25284 OPS TR-165 drive clutch

. \

9/9/83 02 26380 JIC Switch malfunction Flo switch out Replaced switch 8 l DPIS-Il6D of Tech Specs & retested 26394 JIC Leak / Age MSL HI Flo/ Leak' Beplaced valve 8 9/8/83 02 pking on low side DPIS-ll7A on 3 valve man 02-3 28231 OPS Broken wire on Recorder won't Replaced broken 4 9/12/83  !

LR-98 chart drive sw drive chart wire i'

25266 OPS Bad Q16 Rod ind full in Changed Q16 8 9/28/83 03 l ROD-22-03 when full out 9/4/83 03 25285 OPS Open circuit in Rod full in ind Inserted 34-07 2 ROD-34-07 rod indication malfunctions full in 9/4/83 03 25286 OPS Short in indicator Rod full in Replaced rod 2 ROD-18-43 indicator shorted indicator module 9/4/83 03 25287 JIC A0V's out of Valves didn't Readjust A0V 2 -

A0V-35,39 adjustment operate 30 see stroke times 9/4/83 05 25291 OPS All rods not full Mode switch Inserted rod 2 RMCS in power sel ignored 34-07 Low gross fail Unit inop or Adjusted low 10 9/1/83 05 27377 OPS RPS-ATTS needed adjust gross fail alarms gross fail alarm

I POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT' -

E a

f.

= '

_ MAINTENANCE

SUMMARY

I&C September 1983 A j

. 4  !+

DATE SYSTEM WORK REQUEST #

H .D'ETECTED CAUSE OF RESULTS OF ACTION TAKEN ,

REPAIR j, COMPONENT # MALFUNCTION MALFUNCTION TO PRECLUDE TlME l-RECURRENCE HOURS s-

'I . ,

)!

m9/7/83, 06 25301 i JIC

~

i Out of Low output Adjusted zeros & 40 p

- f' FT-51A,C ,i calibration calibrated j}

w 'R' 9/20/83 06 26382

' JIC. Age e '

v ,j$t Ele:n e control Replaced gemac 4

  1. " PA-104 / Malfunctions shorted diode  ;.

't '

9/L3/B3 06 26302 .>

~

,< JIC Instrument drift Possible ,

Performed static 48 j-FT-50A,B <

f instrument drif t alignment j

s 9/15/83 06- 28245 ,

/ / OPS Bad capacitor on Recorder failed Replaced bad 20 -

,[

FR-96 "

amp board high capacitor e i ~ '

9/20/83, 06 28358 JIC. Age

~

Difference in / Repl ind A,B/ 24 LI-94A,B,C --

'fdwtr level. ind'

^

calibrated A,B,C i r e

., j J . . , , , l' 8/2/53 07 21429 , - ' OPS / ' Broken wire in' 'G-IRM bus no Soldered broken 4  ;'

L-IRM > preamp' response b

,- r

< wire 9/1/83 07 26374 _

> JIC Faulty LPRK cable CabledonNector Replaced connector 3 3 LPRM-28-21 , ' connector faulty'

,,9/1/83 07 27384 '

Cable jaramed at H-IRM won't drive

- .s ,0PS Repaired IRM b. k

'(

H-IRM -

d gear' box out of core

  • drive' gear box

' ' .s.

9/26/83 07 27399 - OI S S Bad connector @ Won't indicate 4epaired' connector 16 H-IRM [. .

drive gear unit full in core in unit '

9/22/83 10 21499 '

OPS Timing adjustment ST-2A requires =5 Adjusted relay to 0.5 -

AK-45A chance min. nor =3 be e5 min 9/9/83 10 28310 OPS Burned-out'11ght Switch won't Replaced light 10 LS-105A bulbs reset bulbs

- l l

]* e

o ,

e,

< , i (; {

POWER AUTHORITY OF THE STATE OF NEW.. YORK -

JAMES A. FITZPATRICK NUCLEAR POWER PLANT .o MAINTENANCE

SUMMARY

I&C September 1983  :

i WORK REQUEST # CAUSE OF RESULTS OF ACTION TAKEN REPAIR DATE SYSTEM H D UECTED TO PRECLUDE TIME COMPONENT # MALFUNCTION MALFUNCTION ,

RECURRENCE HOURS i 9/1/83 13 21431 , OPS Loose screw Solenoid' won't Tightened screw 30 i LS-74 deenergize f-9/26/83 14 26398 JIC Bad light bulb Lo-lo-lo lamp Replaced light 3 DS-24A defective' bulb

.j f -'

9/14/83 '14 ~ 26400 JIC Incorrect contact Relay energized Adjusted relay 6 14A-K6B closure continuously  !

l 9/9/83 16-1 25299 OPS Battery expired Recorder reads Replaced battery 24  !

DPR-200 '

too low 9/9/83 17 26393 JIC New setpoints Perform F-IP-17.1 None 12  !

RM-50B for monitor 9/29/83 17 27768 OPS Alarm drift A stack rad monitoc Performed steps 2 ,

RM-50A inoperable of IMP-17.1  !

9/16/83 17 28263 OPS None Check source Pulled S.D.- - 6 RIS-452B drive won't go in bench tested OK l 9/15/83 23 25300 JIC Out of cal- - Difference bet Perform ISP 29 & 4 LT-201A,BC Water in dry side level ind 29-1 9/12/83 27 25295 OPS Defective Amp, Inaccurate Replaced amplifier 6 AZ-101B Fan motor reading Fan motor 9/23/83 27 28211 RES Worn out Repl rec ink pad Replaced print 10 RR-104A & print wheel wheel 9/23/83 29 27679 OPS Switch maladjuste<iSW for 29-A0V-86B Readjusted switch 6 LS-5,7 didn't reset per ISP-65-1 A

4 POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK . NUCLEAR POWER PLANT '

e:

.* t

MAINTENANCE

SUMMARY

i) T&C September 1983  :

1-0 WORK REQUEST # CAUSE OF RESULTS OF ACTION TAKEN REPAIR

[

DATE SYSTEM COMPONENT #

H DUECTED MALFUNCTION MALFUNCTION yy E T

9/20/83 68 26378 JIC Age /Use Print head cable Replaced print 32 i I. TR-103 , needs replace head cable j

. t-9/13/83- 71 28246 OPS Bad computer pt Computer pt C172 Rechecked / worked 8 i,. Computer indication reads low properly  ;

l 9/15/83 76 25267 OPS- Faulty multiplxr Hi temp alarm did Multiplexer 0 i

HI TMP ALM on other unit not energize repaired /other WR  !

9/12/83 76 28230 OPS Defective DC-DC Alarm won't clear Replaced defectiv. s 8 [

ZH-30 converter when reset converter

, 9/13/83 76 28321 OPS Defective power General communica- Replaced power 12  ;

MPX #3 supply tions failure supply i t

l 9/26/83 93 28364 OPS Level indicator Level ind close Cal LT-101D, 8 [

LI-101D out of cal to out of tolr LI-101D L&R L i

1  ;

4 9

_ m l

p .

POWER AUTHORITY OF THE STATE OF NEW YORK

' JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL LiAINTENANCE

SUMMARY

t S

DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T l '9/3 00 20132 N/A No' Malfunction Removed tape from electrical 3 l 02A0V-39 connections & re-spliced l

8/23 02 22896 Routine facility air supply Replaced fittings 4 RV71F Surveill. .

9/7 03 2829'6 Surveill. Ground iri Condolet Reinsulated splice 6 CRD 09-16 Testing 8/27 02 22961 Hydro Pilot Base to Main Replaced gasket 160 RV71C Body Leak 9/6 10 27358 Visual Body-Bonnet Leak Replaced gasket 434 ADV-68A ,

Replaced handle 2 9/6 10 26918 OPS Limitorque Handle -

. MOV-150 Missing 25274 Br'oken Lamp Socket Replaced socket 2 9/12 13 OPS DS45 9/6 23 25559 Visual Broken Seallite Cut back seallilte 4 LT201A e

~

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRidK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

~

DATE SYSTEM WORK REQUEST # HOW DETECTED REPAIR CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME HOURS

.9/12 70 26810 OPS N/A Took vibration readings and 4 AHU3A checked bearings 9/8 71 22891 N/A N/A Watered Batteri~es 12 SBA&B '

9/16 10 28355 OPS Pinion gear key Replaced motor, gear;& key 22 1/2 MOV-258 fell out 9/23 13 28389 OPS De'fective relay Replaced relay 9 Motor Control Circuit 9/26 13 28243 OPS Missing Handwheel Replaced handwheel 3 RC1-40 9/27 23 27647 OPS Position switch Replaced position switch 6 A0V-43 malfunction 9/26 27 4630 OPS "0" Ring Leak Replaced "0" ring - pumped down 64 TH78 insulating vacuum 9/25 71 27735 OPS Bad circuit board Replaced circuit board 18 INV 3B

y . _ . - - _

James A. F taPa*.rtek

, Nuclear Poe'er PW

/. P.O. Box 41

  • Lycoming, New Wrk 13093 315 342.3840
  1. > NewYorkPbwer 4# Authority October 6, 1983 JAFP-83-1021 Director, Office of Management Information & Program Control United States Nuclear Regulatory Commission Washington, D.C. 20555

REFERENCE:

Docket No. 50-333

Dear Sir:

The Operating Status Report for the monch of September, 1983 is enclosed. The refueling information has been updated and is enclosed with report.

If there are any questions concerning this report, contact John Cook at (315) 342-3840, Ext. 439.

Very truly yours, h N. -

CAM:JPC:rv Corbin A. McNeill, Jr.

Enclosures i i L