JAFP-97-0341, Monthly Operating Rept for Aug 1997 for Jfnpp

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1997 for Jfnpp
ML20217A498
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 08/31/1997
From: Michael Colomb, Gao Y
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
JAFP-97-0341, JAFP-97-341, NUDOCS 9709190196
Download: ML20217A498 (5)


Text

e J:mee A. Fit:P:ttich g

Nucle:t P:w t Pl:nt M.8 Lue Road PO Don 41 Lyconung. New York IXS3 31$.342 3040 A NewYorkPower uien..i s. ceieme 4# Authority sat = *aO"ar Septaiber 15, 1997 JMP-97-0341 U.S. 11uclear Regulatory Commission

. Mail Station F1-137 Washington, D.C. 20555 Attention: Document Control Desk

SUBJECT:

OPERATII1,G_ STATUS REPORT

Reference:

DOCKET NO. 50-333

Dear Sir:

Enclosed please find the James A. FitzPatrick Nuclear Power Plant Operating Status Report for the month of August 1997.

If there are any questions concerning this report, please contact Yan Gao, System Engineer, at (315) 349-6353.

Very truly yours, v

y MICilA'EL . COLOMB SITE EXECU'"IVE OF ICER DL: mac Enclosure CC: F. Edler /d JAF Department lieads White Plains Office JTS JAFP File RMS - JAF hhff /

9709190196 970831 1g!.11tilll111111110111

' L i ' *

  • PDR ADOCK 05000333 R PDR 100058

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PIANT OPERATING DATA REPORT REPORT MONTH: AUGUST 1997 DOCKET NO. 50-333 UNIT NAME: FITZPATRICK DATE: 9/15/1997 COMPLETED 15Y: YAN GAO TELEPHONE: (315)349-6353 OPERATIllG STATUS

1. Unit Names FITZPATRICK  : 110TES :  :
2. Reporting Period: 970801 - 970831  :  :
3. Licensed Thermal Power (BR): 2536  :  :
4. Nameplate Rating (Gross MWE): BITO  :  :
5. Design Electrical Rating (Net ERT. i 816.0  :  :
6. Maximum Dependable capacity (Gross MWE) ME~D  :  :
7. Maximum Dependable Capacity (Net MWE) 79T.6  :  :

1.....................................:

8. If changes occur in capacity ratings (Items 3-7) since last report, give reasons:
9. Power level to which restricted, if any (Net MWE):
10. Reasons for restrictions, if any:

THIS HONTH YR-TO-DATE CUMULATIVE

11. Hours in Reporting Period 744.0 5831.00 193704.0
12. Number of liours Reactor was Critical 744.0 5613.09 ' 13677 G
13. Reactor Reserve Shutdown Hours: 0 0 0
14. Hours Generator On-Lines 744.0 5550.30 134187.05
15. Unit Peserve Shutdown Hours: 0 0 0
16. Gron,s Thermal Energy Generated (MWH): 'T&3TT0 D 13645416.0 2.99E + 08
17. Gross Electrical Energy Generated (MWH): 590920.0 ' 4 543T53-~5 TDTIB7580.0
18. Net Electrical Energy Generated (MWH): 373TED T301460.0 9750T E 3
19. Unit Service Factor: 100.00 95.19 69.27
20. Unit Availability Factor: 100.01 95.19 69.27
21. Unit capacity Factor (using MDC Net): 96.52 9CM 71.15
22. Unit Capacity Factor (using DER Net): 94.472 92.56 61.6s
23. Unit Forced Outage Rate: 00.00 3.28 12.13
24. Shutdowns scheduled o' c next 6 months (type, date, and duration of each):
25. If shutdown at end ot ceport period, estimated date of startup:
26. Units in Test Status (prior to commercial operation): TORECAST ACHIEVED Initial Criticality Initial Electricity ~

Commercial Operation l

NEW YORK PCMER AUTHORITY JN4ES A. FITZPATRICK NUCLEAR POWER PIANT AVERAGE DAILY UNIT POWER LEVEL REPORT MONTH: AUGUST 1997 DOCKET NO.: $0 333 UNIT NAME: FITZPATRICK DATES 9/15/1997 COMILETED BY YAN GAO TELEPHONE: (315)349-635 DAY HET AVERAGE DAILY POWER LEVEL DAY NET AVERAGE DAILY l'OWER LEVEL 1 796 17 785 2 796 18 791 3 795 19 790 4 795 20 793 5 795 21 809 6 $63 22 807 7 635 23 799 8 763 24 799 9 793 25 -798 10 790 26 797 j 11 788 27 796 12 788 28 795 13 789 29 794 14 764 30 794 15 791 31 495

'< 791

l NEW YORK POWER AUTHORITY JAMES A. TITZPATRICK NUCLEAR POWER PLANT -

UNIT SHUTDOWNS REPORT REPORT MONTH: AUGUST 1997 DOCF3T NO.: 50-333 UNIT NAME: FITZPATRICK DATE: 9/15/1997 COMPLETED BY: YAN GAO TELEPHONE: (315)349-63353 D C UH R METHOD S O RO E OF YC MC NO. DATE TYPE AU A SHUTTING LICENSEE SO PO CAUSE AND CORRECTIVE ACTION TR S DOWN EVENT TD OD TO PREVENT RECURRENCE IS O THE REPORT EE NE O N REACTOR M E N N T

2 3 4 F: FORCED REASON: METHOD; EXHIBIT G -INSTRUCTIONS S: SCHEDULED A. EQUIPMDIT FAILURE (EXPLAIN) 1. MANUAL FOR PREPAPATION OF DATA ENTRY B. MAINTENANCE OR TEST 2. MANUAL SCRAM SHEETS FOR LICENSEE EVENT C. REFUELING 3. AUTOMATIC SCRAM REPORT (LER) FILE (NUREG-0161)

D. REGULATORY RESTRICTION 4. CONTINUED E. OPERATOR TPAINING AND LICENSE EXAMINATION 5. REDUCED LOAD F. ADMINISTRATIVE 9. OTHER G. OPERATIONAL ERROR (EXPLAIN)

H. OTHER (EXPLAIN)

_ i

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE REPORT MONTH: AUGUST 1997 DOCKET NO: 50-333 UNIT NAME: FITZPATRICK DATE: 9/15/1997 COMPLETED BY: YAN GAO TELEPHONE: (315)349-6353 The FitzPatrick plant remained at full power operation for most of e month of August. A down power was commenced on August 6 due to e i Standby Gas Treatment System die;harge piping was blocked by water. Piping drain line was found plugged. The drain line was cleaned and water was drained, the SBGTS was declared operable at 0030 on August 7.

On August 31, a power reduction was required to replace "A" RWR MG set tachometer.