Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/30/1998
From: Michael Colomb, Defillippo S
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
JAFP-98-0322, JAFP-98-322, NUDOCS 9810130302
Download: ML20154G771 (6)


Text

- _.

James A. FitzP trick

. Nuclear PowIr Plint

. 268 Lika Road

, P.O. Box 41 l Lycoming, New York 13093 i 315-342-3840 h NewYorkPower uica..i a. coioma I

i

& Authority sne execu*e omcer 1 October 2,1998 JAFP-98-0322  ;

1 U.S. Nuclear Regulatory Commission j Mail Station Pl-137 '

Washington, D.C. 20555 l

Attention: Document Control Desk

SUBJECT:

OPERATING STATUS REPORT

Reference:

DOCKET NO. 50-333

Dear Sir:

Enclosed please f'.nd the James A. FitzPatrick Nuclear Power Plant  ;

Operating Status Report for the month of September, 1998, i If there are any questions concerning this report, please contact i Steve DeFillippo, Reactor Engineer, at (315) 349-6354. 1 Very truly yours, (j' .

MICHAE J. COLOMB SITE EXECUTIVE OF ICER MJC:SD:mac Enclosure i CC: T. Landere JAF Department Heads White Plains Office f h @q JTS JAFP File /

RMS 981'0130302 900930 I PDR ADOCK 05000333 R PDR;

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT' OPERATING DATA REPORT REPORT MONTH: September, 1998 DOCKET NO.: 50-333 UNIT NAME: FITZPATRICK DATE: October 1,1998  !

COMPLETED BY: S. DeFillippo '

TELEPHONE: (315)349-6354 -l OPERATING STATUS

1. Unit'Name: FITZPATRICK  : NOTES:  :
2. Reporting Period: 980901 - 980930  :  :
3. Licensed Thermal Power.(MWT): 2336  :  :
4. Nameplate Rating (Gross MWE): FETTO  :  :
5. . Design Electrical Rating (Net MWE) : 816.0  :  :
6. Maximum Dependable Capacity-(Gross MWE) 813.0 .:  :
7. Maximum Dependable Capacity-(Net MWE) 733TT  :  :  !
8. If changes occur in capacity ratings (Items 3-7) since last report, give reasons:  ;
9. - Power level to 'which restricted, if any (Net MWE) :  !
10. Reasons.for restrictions, if any:  !

THIS MONTH YR-TO-DATE CUMULATIVE

11. Hours in Reporting Period: 720.00 6551.00 203184.00 i

'12. Number of Hours Reactor was Critical: 720.00 6094.72 147621.42 I

'13. Reacter Reserve Shutdown Hours: 0 0- 0

14. Hours Generator On-Line: 720.00 5972.29 142919.39
15. . Unit-Reserve Shutdown Hours: 0 0 0

'16.. . Gross Thernal Energy. Generated (MWH): 1797310.0 14256398.24 320407370.24 17.: Gross Electrical Energy Generated (MWH): 587830.0 4699080.0 108378430.00 ,

~18. Net Electrical Energy Generated (MWH): 572850.0 4567545.0 104299100.00 [

19. Unit Service Factor: 100.0 91.17 70.34
20. . Unit Availability Factor: 100.0 91.17 70.34
21. Unit' Capacity Factor (using MDC Net): 101.3 88.77 72.04 ,

~22. Unit Capacity Factor (using DER Net): 97.5 85.44 62.91 '

23. Unit Forced Outage Rate: 0 8.83 11.81
24. Shutdowns scheduled over next 6 months'(type, date, and duration of each):

RO13 is scheduled to begin 10/16/98 with an estimated duration of 45 days.

25. If shutdown at end of report period, estimated date of startup:
26. Units in Test Status '(prior to commercial operation) : FORECAST ACHIEVED Initial Criticality Initial Electricity Commercial Operation j I

l l

NEW YORK POWER AUTHORITY

(. JAMES A. FITZPATRICK NUCLEAR POWER PLANT AVERAGE DAILY UNIT POWER LEVEL REPORT MONTH: Septernbe r, 1998 -

{

i DOCKET NO.: 50-333 I UNIT NAME: FITZPATRICK DATE: October 1, 1998 COMPLETED BY: S. DeFillippo '

TELEPHONE: (315)349-6354 _

l DAY NET AVERAGE DAILY POWER LEVEL DAY NET AVERAGE DAILY POWER LEVEL 1 803 17 801 2 798 18 807 3 803 19 807

  • 4 761 20 804 5 702 21 804 6 764 22 803 7 801 23 760 -

8 801 24 774 9 802 25 810 10 804 26 810 ,

11 793 27 804 i 12 805 28 810 13 805 29 811 14 -804 30 809 15 805 31 16 -806'

e

'NEW YORK POWER AUTHORITY .

JAMES A. FITZPATRICK NUCLEAR POWER-PLANT ,

UNIT SHUTDOWNS REPORT' .

. REPORT MONTH: September,1998 DOCKET NO.: 50-333 ,

UNIT NAME: FITZPATRICK DATE: October 1, 1998-COMPLETED BY: S. DeFillippo

  • TELEPHONE: (315)349-6354 ,

D H S R METHOD- O 3

E OF T MC A R PO CAUSE AND CORRECTIVE ACTION NO. DATE T T S A SHUTTING LICENSEE E Y y S DOWN EVENT g OD TO PREVENT RECURRENCE P g O THE REPORT HE E N REACTOR E N e N O

D T

E 2 3 4 F: FORCED REASON: METHOD: EXHIBIT G -INSTRUCTIONS S: SCHEDULED A. EQUIPMENT FAILURE (EXPLAIN) 1. MANUAL FOR PREPARATION OF DATA ENTRY  ;

B. MAINTENANCE OR TEST 2. MANUAL SCRAM SHEETS FOR LICENSEE EVENT

D. REGULATORY RESTRICTION 4. CONTINUED E. OPERATOR TRAINING AND LICENSE EXAMINATION 5. REDUCED LOAD F. ADMINISTRATIVE 9. OTHER

  • G. OPERATIONAL ERROR (EXPLAIN)

H. OTHER (EXPLAIN) i t

9 L

._.- _. m.._m - ______:_____m _ _ _ _ _ _.___e_m. _=___o_ _ _ _ _ _ _ _ _ _ .- __iw -

. _ - - _ _ e- --w-, -w-. _ _ - - e _m_.

- , . . . . . . _ .. - . - - . - - . - - - - - - - . - . - . - . ~ - -

l-

-NEW YORK POWER AUTHORITY

-JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE SUl44ARY OF OPERATING EXPERIENCE l

. REPORT' MONTH: ' SEPTEMBER, 1998 DOCKET NO: 50-333  !

UNIT NAME: FITZPATRICK DATE: October 1, 1998 COMPLETED BY: S. DeFillippo  ;

TELEPHONE: (315)349-6354 -

l t

'JAF operated at or near full power for the month of September, i 1998. All derates were planned and conducted due to nearing the end of Operating cycle 13. t h