JAFP-96-0401, Monthly Operating Rept for Sept 1996 for Jfnpp

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1996 for Jfnpp
ML20128N318
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/30/1996
From: Michael Colomb, Gao Y
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
JAFP-96-0401, JAFP-96-401, NUDOCS 9610160350
Download: ML20128N318 (5)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _,

J:mes A. FitzP; trick

  • Nucle:r P1wir Pl:nt

{

P.O. Box 41 Lycommg, New York 13093 31'5-342 3840

  1. > NewYorkPower wcnoei a. Coiome

& Authority piant uanager Otober 10, 1996 JAFP-96-0401 U.S. Nuclear Regulatory Commission Mail Station F1-137 Washington, D.C.

20555 Attention:

Document Control Desk

SUBJECT:

OPERATING STATUS REPORT

Reference:

DOCKET NO. 50-333

Dear Sir:

Enclosed please find the James A. FitzPatrick Nuclear Power Plant Operating Status Report for the month of September, 1996.

If there are any questions concerning this report, please contact Yan Gao, Reactor Engineer, at (315) 349-6322.

Very truly yours, LOD W, MICHAEL J.

COLOMB

/

MJC/RF/jmk Enclosure CC:

P.Donahue JAF Departm6nt Heads White Plains Office Laura Katz TS JAFP File l

}

L.

Donovan i

Q RMS - JAF

]j 9610160350 960930 PDR ADOCK 05000333 R

PDR 100UbH j

NEW YORK POWER AUTHORITY JAMES A.

FITZPATRICK NUCLEAR POWER PLANT OPERATING DATA REPORT DOCKET No.:

50-333 UNIT NAME:

FITZPATRICK DATE:

October 2r 1996 COMPLETED BY: YAN GAO l

TELEPHONE:

(315)349-6322 OPERATING STATUS 1.

Unit Name FITZPATRICK 2.

Reporting Period: 960901 - 960931 NOTES:

3.

Licensed Thermal Power (MWT) : 2436 4.

Nameplate Rating (Gross MWE) : 883.0 5.

Design Electrical Rating (Net MWE) :

816.0 6.

Maximum Dependable Capacity (Gross MWE) 794.0 7.

Maximum Dependable Capacity (Net MWE) 766.6 8.

If changes occur in capacity ratings (Items 3-7) since last report, give reasons:

9.

Power level to which restricted, if any (Net MWE):

10.

Reasons for restrictions, if any:

THIS MONTH YR-TO-DATE CUMULATIVE 11.

Hours in Reporting Period:

720.0 6575.0 185664.0 12.

Number of Hours Reactor was Critical:

591.3 6193.4 132003.0 13.

Reactor Reserve Shutdown Hours:

0 0

0 14.

Hours Generator On-Line:

542.7 6065.1 127664.1 15.

Unit Reserve Shutdown Hours:

0 0

0 16 Gross Thermal Energy Generated (MWH):

1168587.0 14370815.0 283538487.0 17.

Gross Electrical-Energy Generated (MWH) :

380520.0 4780300.0 96164560.0 18.

Net Electrical Energy Generated (MWH) :

369390.0 4631050.0 92447645.0 19 Unit Service Factor:

75.38 92.2 68.8 20.

Unit Availability Factor:

75.38 92.2 68.8 21.

Unit Capacity Factor (using MDC Net) :

66.92 91.9 70.6 22.

Unit Capacity Factor (using DER Net) :

62.87 86.3 61.0 23, Unit Forced Outage Rate:

24.62 7.8 10.8 24.

Shutdowns scheduled over next 6 months (type, date, and duration of each) :

Refuelina outage 10/26/96 - 45 dovs l

25.

If shutdown at end of report period, estimated date of startup:

26.

Units in Test Status (prior to commercial operation).

FORECAST ACHIEVED Initial Criticality Initial Electricity Commercial Operation I

\\

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT AVERAGE DAILY UNIT POWER LEVEL REPORT MONTH: SEPTEMBER 1996 DOCKET NO.:

50-333 UNIT NAME:

FITZPATRICK DATE:

October 2, 1996 COMPLETED BY:

YAN GAO TELEPHONES (315)349-6322 DAY NET AVERAGE DAILY POWER LEVEL DAY NET AVERAGE DAILY POWER LEVEL 1

770 17 0

2 768 18 0

3 766 19 0

4 768 20 0

5 756 21 0

6 768 22-0 l

l 7

785 23 7

8 796 24 234 9

782 25 436 10 780 26 524 l

11 778 27 532 l

12 781 28 533 I

13 786 29 533 14 778 30 518 l

15 785 16 784 l

l

NEW YORK POWER AUTHORITY JAMES Ao FITZPATRICK NUCLEAR POWER PLANT UNIT SHUTDOWNS REPORT REPORT MONTH: SEPTEMBER 1996 DOCKET NO.:

50-333 UNIT NAME:

FITZPATRICK DATE:

September 2, 1996 COMPLETED BY: YAN GAO TELEPHONE:

(315)349-6322 D

C UH R

METHOD S

O RO E

OF YC MC NO.

DATE TYPE AU A

SHUTTING LICENSEE SO PO CAUSE AND CORRECTIVE ACTION TR S

DOWN EVENT TD OD TO PREVENT RECURRENCE IS O

THE REPORT EE NE O

N REACTOR M

E N

N T

i 1

9-16-96 F

177.28 H

3 96-010 EL During performance of 345KV relay calibration two terminals were inadvertently shortened causing the 10042 and 10052 breakers to open leading to a scram.

Work process is being reviewed for impact on plant operations.

i t

l 1

2 3

4 F: FORCED REASON:

METHOD:

EXHIBIT G -INSTRUCTIONS S: SCHEDULED A. EQUIPMENT FAILURE (EXPLAIN)

1. MANUAL FOR PREPARATION OF DATA ENTRY B. MAINTENANCE OR TEST
2. MANUAL SCRAM SHEETS FOR LICENSEE EVENT C. REFUELING
3. AUTOMATIC SCRAM REPORT (LER) FILE (NUREG-0161)

D.

REGULATORY RESTRICTION 4.

CONTINUED E.

OPERATOR TRAINING AND LICENSE EXAMINATION

5. REDUCED LOAD F. ADMINISTRATIVE 9.

OTHER G. OPERATIONAL ERROR (EXPLAIN)

I H. OTHER (EXPLAIN)

L

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE REPORT NONTHt SEPTENBER 1996 DOCKET NO.s 50-333 UNIT NAMES FITZTATRICK DATE:

October 2, 1996 COMPLETED BY:

YAN CAO TELEPHONE:

(315)349-6322 The Fitzpatrick plant operated at 100% power until an automatic scram occurred on 9/16/96.

The shutdown was caused by a full load reject due to the inadvertent short across a relay termination terminal.

The plant resumed power on 09/23/96 at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> (generator on-line) and is currently holding at approximately 70% power due to the unavailability of the B Reactor feed pump.

-