Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
JAFP-99-0277, Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With30 September 1999Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With
ML20217A99330 September 1999NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data
JAFP-99-0261, Monthly Operating Rept for Aug 1999 for Jafnpp.With31 August 1999Monthly Operating Rept for Aug 1999 for Jafnpp.With
JAFP-99-0236, Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with31 July 1999Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with
ML20216D95428 July 1999Safety Evaluation Authorizing Proposed Alternatives for Second 10-year Interval Pursuant to 10CFR50.55a(a)(3)(ii)VT-2
Incorporated by reference
Liquid penetrant
Dissimilar Metal Weld
ML20196H86230 June 1999NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 ReptHigh Radiation Area
Power change
JAFP-99-0211, Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With30 June 1999Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With
JAFP-99-0175, Annual Summary of Changes,Tests & Experiments for 1997/1998. with2 June 1999Annual Summary of Changes,Tests & Experiments for 1997/1998. withSafe Shutdown
High winds
Shutdown Margin
Loop seal
High Radiation Area
Non-Destructive Examination
Fire Barrier
Stroke time
Temporary Modification
Liquid penetrant
Fire Protection Program
Fire Watch
Grace period
Power Uprate
Overexposure
JAFP-99-0181, Monthly Operating Rept for May 1999 for Jafnpp.With31 May 1999Monthly Operating Rept for May 1999 for Jafnpp.With
JAFP-99-0166, Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With30 April 1999Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With
JAFP-99-0142, Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With31 March 1999Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With
JAFP-99-0092, Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With28 February 1999Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With
ML20207E93126 February 1999Part 21 Rept Re Sprague Model TE1302 Aluminum Electrolytic Capacitors with Date Code of 9322H.Caused by Aluminum Electrolytic Capacitors.Affected Capacitors Replaced
ML20202J0893 February 1999Safety Evaluation Accepting Rev 2 of Third Interval Inservice Testing Program for Pumps & Valves for James a FitzPatrick Nuclear Power PlantStroke time
Incorporated by reference
Power-Operated Valves
Power Operated Valves
ML20199M08922 January 1999Part 21 Rept Re Failure of Square Root Converters.Caused by Failed Aluminum Electrolytic Capacitory Spargue Electric Co (Model Number TE1302 with Mfg Date Code 9322H).Sent Square Root Converters Back to Mfg,Barker Microfarads,Inc
JAFP-99-0011, Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With31 December 1998Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With
ML20198F9994 December 1998Assessment of Licensing Basis for Use of Containment Overpressure Credit for Net Positive Suction Head Analyses Power Authority of State of New York,James a Fitzpatrick Nuclear Power Plant
ML20196J3504 December 1998SER Accepting License Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated ValvesStroke time
JAFP-98-0396, Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with30 November 1998Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with
ML20196F92525 November 1998Safety Evaluation Re Thrid 10-year Interval Inservice Insp Program Relief Requests for PlantPacking leak
Non-Destructive Examination
Stroke time
Hydrostatic
Coatings
Nondestructive Examination
VT-2
Incorporated by reference
Through-Wall Leakage
Scaffolding
ML20195J75218 November 1998Rev 7 to Jaf Colr
ML20195K42117 November 1998Safety Evaluation Authorizing Proposed Alternative in Relief Request VRR-05 Per 10CFR50.55a(a)(3)(i) & PRR-01,PRR-02R1, PRR-03,PRR-04,VRR-02,VRR-03 & VRR-04 Per 10CFR50.55a(a)(3)(ii)Stroke time
Incorporated by reference
Excess Flow Check Valve
Cold shutdown justification
Power-Operated Valves
ML20195E10513 November 1998Safety Evaluation Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves, Issued 950817Power-Operated Valves
Backfit
ML20197G6226 November 1998Non-proprietary Rev 7 to HI-971661, Licensing Rept for Reracking of Ja FitzPatrick SfpEarthquake
Fuel cladding
ML20155H5323 November 1998Safety Evaluation Authorizing Alternative to ASME Code Requirements for CRD BoltingIncorporated by reference
ML20155H5803 November 1998Safety Evaluation Authorizing Postponement of Beginning of Augmented Exam Requirements of 10CFR50.55a(g)(6)(ii)(A)(2) Re ASME Code,Section XIIncorporated by reference
JAFP-98-0360, Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With31 October 1998Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.WithDownpower
ML20155C28230 October 1998Non-proprietary Rev 0 to GENE-187-30-1598 Np, CRD Bolting Flaw Evaluation for Ja FitzPatrick Nuclear Power Plant
ML20154L65914 October 1998Safety Evaluation Accepting Licensee Proposed Alternative to Snubber Visual Inservice Exam Intervals & Sampling Rates Requirements Contained in ASME Code,Section Xi,Subsection Iwf,Article IWF-5000
JAFP-98-0322, Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With30 September 1998Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With
ML20153D25921 September 1998SER Accepting Proposed Alternative Testing of Containment Following ECCS Suction Strainer ReplacementVT-2
ML20153B5611 September 1998Rev 1 to JAF-SE-98-013, RHR & Core Spray Suppression Pool Suction Strainer ReplacementSafe Shutdown
Reactor Vessel Water Level
Ultimate heat sink
Non-Destructive Examination
Fire Barrier
Hydrostatic
VT-2
Emergency Lighting
Safeguards Contingency Plan
Code Reconciliation
Control of Heavy Loads
Fire Protection Program
Power Uprate
Failure to Scram
ML20151X68931 August 1998Monthly Operating Rept for Aug 1998 for Ja FitzPatrick Nuclear Power PlantPacking leak
ML20237E83625 August 1998Rev 6 to Colr
ML20237E9478 August 1998Rev 6 to Colr
JAFP-98-0264, Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant31 July 1998Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant
ML20236X58829 July 1998Safety Evaluation Supporting Amend 245 to License DPR-59Half scram
ML20236V81829 July 1998Safety Evaluation Accepting Request for Relief from Implementation of Requirements of 10CFR50.55a Related to Containment Repair & Replacement Activities for James a FitzPatrick Nuclear Power Plant
ML20153B57828 July 1998Rev 0 to JAF-SE-98-025, HPCI & RCIC Suppression Pool Suction Strainer ReplacementSafe Shutdown
Ultimate heat sink
Fire Barrier
Emergency Lighting
Safeguards Contingency Plan
Code Reconciliation
Control of Heavy Loads
Fire Protection Program
Power Uprate
ML20236X38314 July 1998Rev 2 to JAF-RPT-MULTI-02671, Summary of Detailed Evaluation for NRC Generic Ltr 96-06Hydrostatic
Residual transfer
Design basis earthquake
ML20154L92010 July 1998SER Accepting Rev to Reactor Vessel Surveillance Capsule Withdrawal Schedule for James a Fitzpatrick Nuclear Power Plant
JAFP-98-0222, Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant30 June 1998Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant
JAFP-98-0193, Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant31 May 1998Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant
ML20248F35321 May 1998Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being AdoptedReverse polarity
JAFP-98-0168, Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant30 April 1998Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant
JAFP-98-0128, Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant31 March 1998Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power PlantDownpower
ML20217A46323 March 1998Safety Evaluation Accepting Use of Three Heats/Lots of Hot Rolled XM-19 Matl in Core Shroud Repair Assemblies Re Licenses DPR-16 & DPR-59,respectively
JAFP-98-0091, Monthly Operating Rept for Feb 1998 for JAFNPP28 February 1998Monthly Operating Rept for Feb 1998 for JAFNPP
ML20202G9086 February 1998Safety Evaluation Re Amend to License DPR-59 to Revise TS Tables 3.2-2 & 4.2-2Fire Protection Program
JAFP-98-0058, Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant31 January 1998Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant