Issue date | Title | Topic | |
---|---|---|---|
JAFP-99-0277, Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With | 30 September 1999 | Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With | |
ML20217A993 | 30 September 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data | |
JAFP-99-0261, Monthly Operating Rept for Aug 1999 for Jafnpp.With | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Jafnpp.With | |
JAFP-99-0236, Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with | 31 July 1999 | Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with | |
ML20216D954 | 28 July 1999 | Safety Evaluation Authorizing Proposed Alternatives for Second 10-year Interval Pursuant to 10CFR50.55a(a)(3)(ii) | VT-2 Incorporated by reference Liquid penetrant Dissimilar Metal Weld |
ML20196H862 | 30 June 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept | High Radiation Area Power change |
JAFP-99-0211, Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With | 30 June 1999 | Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With | |
JAFP-99-0175, Annual Summary of Changes,Tests & Experiments for 1997/1998. with | 2 June 1999 | Annual Summary of Changes,Tests & Experiments for 1997/1998. with | Safe Shutdown High winds Shutdown Margin Loop seal High Radiation Area Non-Destructive Examination Fire Barrier Stroke time Temporary Modification Liquid penetrant Fire Protection Program Fire Watch Grace period Power Uprate Overexposure |
JAFP-99-0181, Monthly Operating Rept for May 1999 for Jafnpp.With | 31 May 1999 | Monthly Operating Rept for May 1999 for Jafnpp.With | |
JAFP-99-0166, Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With | 30 April 1999 | Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With | |
JAFP-99-0142, Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With | 31 March 1999 | Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With | |
JAFP-99-0092, Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With | 28 February 1999 | Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With | |
ML20207E931 | 26 February 1999 | Part 21 Rept Re Sprague Model TE1302 Aluminum Electrolytic Capacitors with Date Code of 9322H.Caused by Aluminum Electrolytic Capacitors.Affected Capacitors Replaced | |
ML20202J089 | 3 February 1999 | Safety Evaluation Accepting Rev 2 of Third Interval Inservice Testing Program for Pumps & Valves for James a FitzPatrick Nuclear Power Plant | Stroke time Incorporated by reference Power-Operated Valves Power Operated Valves |
ML20199M089 | 22 January 1999 | Part 21 Rept Re Failure of Square Root Converters.Caused by Failed Aluminum Electrolytic Capacitory Spargue Electric Co (Model Number TE1302 with Mfg Date Code 9322H).Sent Square Root Converters Back to Mfg,Barker Microfarads,Inc | |
JAFP-99-0011, Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With | 31 December 1998 | Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With | |
ML20198F999 | 4 December 1998 | Assessment of Licensing Basis for Use of Containment Overpressure Credit for Net Positive Suction Head Analyses Power Authority of State of New York,James a Fitzpatrick Nuclear Power Plant | |
ML20196J350 | 4 December 1998 | SER Accepting License Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves | Stroke time |
JAFP-98-0396, Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with | 30 November 1998 | Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with | |
ML20196F925 | 25 November 1998 | Safety Evaluation Re Thrid 10-year Interval Inservice Insp Program Relief Requests for Plant | Packing leak Non-Destructive Examination Stroke time Hydrostatic Coatings Nondestructive Examination VT-2 Incorporated by reference Through-Wall Leakage Scaffolding |
ML20195J752 | 18 November 1998 | Rev 7 to Jaf Colr | |
ML20195K421 | 17 November 1998 | Safety Evaluation Authorizing Proposed Alternative in Relief Request VRR-05 Per 10CFR50.55a(a)(3)(i) & PRR-01,PRR-02R1, PRR-03,PRR-04,VRR-02,VRR-03 & VRR-04 Per 10CFR50.55a(a)(3)(ii) | Stroke time Incorporated by reference Excess Flow Check Valve Cold shutdown justification Power-Operated Valves |
ML20195E105 | 13 November 1998 | Safety Evaluation Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves, Issued 950817 | Power-Operated Valves Backfit |
ML20197G622 | 6 November 1998 | Non-proprietary Rev 7 to HI-971661, Licensing Rept for Reracking of Ja FitzPatrick Sfp | Earthquake Fuel cladding |
ML20155H532 | 3 November 1998 | Safety Evaluation Authorizing Alternative to ASME Code Requirements for CRD Bolting | Incorporated by reference |
ML20155H580 | 3 November 1998 | Safety Evaluation Authorizing Postponement of Beginning of Augmented Exam Requirements of 10CFR50.55a(g)(6)(ii)(A)(2) Re ASME Code,Section XI | Incorporated by reference |
JAFP-98-0360, Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With | 31 October 1998 | Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With | Downpower |
ML20155C282 | 30 October 1998 | Non-proprietary Rev 0 to GENE-187-30-1598 Np, CRD Bolting Flaw Evaluation for Ja FitzPatrick Nuclear Power Plant | |
ML20154L659 | 14 October 1998 | Safety Evaluation Accepting Licensee Proposed Alternative to Snubber Visual Inservice Exam Intervals & Sampling Rates Requirements Contained in ASME Code,Section Xi,Subsection Iwf,Article IWF-5000 | |
JAFP-98-0322, Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With | 30 September 1998 | Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With | |
ML20153D259 | 21 September 1998 | SER Accepting Proposed Alternative Testing of Containment Following ECCS Suction Strainer Replacement | VT-2 |
ML20153B561 | 1 September 1998 | Rev 1 to JAF-SE-98-013, RHR & Core Spray Suppression Pool Suction Strainer Replacement | Safe Shutdown Reactor Vessel Water Level Ultimate heat sink Non-Destructive Examination Fire Barrier Hydrostatic VT-2 Emergency Lighting Safeguards Contingency Plan Code Reconciliation Control of Heavy Loads Fire Protection Program Power Uprate Failure to Scram |
ML20151X689 | 31 August 1998 | Monthly Operating Rept for Aug 1998 for Ja FitzPatrick Nuclear Power Plant | Packing leak |
ML20237E836 | 25 August 1998 | Rev 6 to Colr | |
ML20237E947 | 8 August 1998 | Rev 6 to Colr | |
JAFP-98-0264, Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant | 31 July 1998 | Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant | |
ML20236X588 | 29 July 1998 | Safety Evaluation Supporting Amend 245 to License DPR-59 | Half scram |
ML20236V818 | 29 July 1998 | Safety Evaluation Accepting Request for Relief from Implementation of Requirements of 10CFR50.55a Related to Containment Repair & Replacement Activities for James a FitzPatrick Nuclear Power Plant | |
ML20153B578 | 28 July 1998 | Rev 0 to JAF-SE-98-025, HPCI & RCIC Suppression Pool Suction Strainer Replacement | Safe Shutdown Ultimate heat sink Fire Barrier Emergency Lighting Safeguards Contingency Plan Code Reconciliation Control of Heavy Loads Fire Protection Program Power Uprate |
ML20236X383 | 14 July 1998 | Rev 2 to JAF-RPT-MULTI-02671, Summary of Detailed Evaluation for NRC Generic Ltr 96-06 | Hydrostatic Residual transfer Design basis earthquake |
ML20154L920 | 10 July 1998 | SER Accepting Rev to Reactor Vessel Surveillance Capsule Withdrawal Schedule for James a Fitzpatrick Nuclear Power Plant | |
JAFP-98-0222, Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant | 30 June 1998 | Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant | |
JAFP-98-0193, Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant | 31 May 1998 | Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant | |
ML20248F353 | 21 May 1998 | Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted | Reverse polarity |
JAFP-98-0168, Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant | 30 April 1998 | Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant | |
JAFP-98-0128, Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant | 31 March 1998 | Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant | Downpower |
ML20217A463 | 23 March 1998 | Safety Evaluation Accepting Use of Three Heats/Lots of Hot Rolled XM-19 Matl in Core Shroud Repair Assemblies Re Licenses DPR-16 & DPR-59,respectively | |
JAFP-98-0091, Monthly Operating Rept for Feb 1998 for JAFNPP | 28 February 1998 | Monthly Operating Rept for Feb 1998 for JAFNPP | |
ML20202G908 | 6 February 1998 | Safety Evaluation Re Amend to License DPR-59 to Revise TS Tables 3.2-2 & 4.2-2 | Fire Protection Program |
JAFP-98-0058, Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant | 31 January 1998 | Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant |