JAFP-97-0012, Monthly Operating Rept for Dec 1996 for Ja FitzPatrick Nuclear Power Plant

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1996 for Ja FitzPatrick Nuclear Power Plant
ML20149M705
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 12/31/1996
From: Michael Colomb, Edler F, Gao Y
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
JAFP-97-0012, JAFP-97-12, NUDOCS 9701240303
Download: ML20149M705 (5)


Text

J me2 A.FitzPatrick Nucirr P:wir Ptnt

, , P.O. Box 41 Lycoming, New York 13093 315 342 3840 4 NewYofkPbwer u,cn,., 3. coioms

& Authonty Piant Manager January 15, 1997 JAFP-97-0012 U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C. 20555 Attention: Document Control Desk

SUBJECT:

OPERATING STATUS REPORT

Reference:

DOCKET NO. 50-333

Dear Sir:

Enclosed please find the James A. FitzPatrick Nuclear Power Plant Operating Status Report for the month of December, 1996.

If there are any questions concerning this report, please contact Yan Gao, Performance Engineer, at (315) 349-6322.

Very truly yours, bt \

s MICHA J. COLOMB PLANT MANAGER MJC: mac Enclosure CC: F. Edler /

JAF Department Heads White Plains Office i L. Katz .

l L. Donovan JTS JAFP File /

RMS - JAF /

y

/

  1. /

9701240303 961231  !

PDR ADOCK 05000333 / "O '9' I

~

R PDR l

'. NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT OPERATING DATA REPORT DOCKET NO.: 50-333

' UNIT NAME: FZTZPATRICK DATE: January 7, 1997 COMPLETED BY: YAN GAO TELEPHONE: (315)349-6322 OPERATING STATUS

1. Unit Names FITZPATRICK
2. Reporting Period: 961201 - 961231 NOTES:

) 3. Licensed Thermal Power (MWT): 2536*

4

4. Nameplate Rating (Gross MWE) : 883.,0,
5. Design Electrical Rating (Net MWE) : 816,0 i 6. Maximum Dependable Capacity (Gross MWE) 789.0 l 7. Maximum Dependable Capacity (Net MWE) 761,6 r
8. If changes occur in capacity ratings (Items 3-7) since last report, give reasons:
9. Power level to which restricted, if any (Net MWE) :
10. Reasons for restrictions, if any:

THIS MONTH YR-TO-DATE CUMULATIVE

11. Hours in Reporting Period: 744.0 8784.0 187873.0
12. Number of Hours Reactor was Critical: 498.7 7307.1 133116.7
13. Reactor Reserve Shutdown Hours: 0 0 0
14. Hours Generator On-Line: 367.0 7037.8 128636.8
15. Unit Reserve Shutdown Hours: 0

)

0 0 '

16. Gross Thermal Energy Generated (MWH) : 709536.0 16443167 285610839.0
17. Gross Electrical Energy Generated (MWH): 227970.0 5460020 96844280 d
18. Net Electrical Energy Generated (MWH): 220295.0 5290380 93106975.0
19. Unit Service Factor: 49.33 80.1 68.5 1
20. Unit Availability Factor: 49.33 80.1 68.5
21. Unit Capacity Factor (using MDC Net) : 38.62 78.6 70.2
22. Unit Capacity Factor (using DER Net) : 36.29 73.8 60.7
23. Unit Forced Outage Rate: 21.41 8.0 10.7
24. Shutdowns scheduled over next 6 months (type, date, and duration of each):
25. If shutdown at end of report period, estimated date of startup:
26. Units in Test Status (prior to commercial operation) : FORECAST ACHIEVED Initial Criticality Initial Electricity Commercial Operation
  • The James A. FitzPatrick Plant was granted a revision to it's operating license on 12/7/96 to operate at 2536 MWT. Power Uprate operation was delayed until January 1997.

The operation in December was at a limit of 2436 MWT.

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT AVERAGE DAILY UNIT POWER LEVEL REPORT MONTH: December, 1996 DOCKET No.: 50-333 UNIT NAME: FITZPATRICK DATE: January 7, 1997 COMPLETED BY: YAN GAO TELEPHONE: (315)349-6322 DAY NET AVERAGE DAILY POWER LEVEL DAY NET AVERAGE DAILY POWER LEVEL 1 0 17 0 2 0 18 0 3 0 19 192 4 0 20 365 5 0 21 457 6 0 22 670 7 0 23 654 8 0 24 800 9 0 25 000 10 0 26 800 11 0 27 796 12 46 28 799 13 172 29 799 I 14 221 30 801 15 9 31 799 16 0 i

l NEW YORK P'ONER AUTHORITY JAMES A.-FITZPATRICK NUCLEAR POWER PLANT .  ;

UNIT SHUTDOWNS REPORT ,

REPORT MONTH: DECENBER, 1996- , ,

DOCKET NO.: 50-333 ,

UNIT NAME: FITZPATRICK i DATE: January 7, 3997 COMPL m u BY: YAN GAO [

TELEPHONE: (315)349-6322 D C UH R METHOD S O RO E OF YC MC NO. DATE TYPE AU A SHUTTING LICENSEE SO PO CAUSE AND CORRECTIVE ACTION i TR S DOWN EVENT TD OD TO PREVENT RECURRENCE IS O THE REPORT EE NE O N REACTOR M E N N T

1 12-15-96 F 100.13 A 2 96-14 TG Seal EHC HYDRAULIC FLUID LEAK ON NO. 1 TURBINE BYPASS VALVE ACTUA'IT)R SEAL.

~

I 2 3 4 ,

F: FORCED REASON: -

METHOD: EXHIBIT G -INSTRUCTIONS S: SCHEDULED A. EQUIPMENT FAILURE (EXPLAIN) 1. MANUAL FOR PREPARATION OF DATA ENTRY B. MAINTENANCE OR TEST 2. MANUAL SCRAM SHEETS FOR LICENSEE EVENT C. REFUELING 3. AUTOMATIC SCRAM REPORT (LER) FILE (NUREG-0161). '

D. REGULATORY RESTRICTION 4. CONTINUED E. OPERATOR TRAINING AND LICENSE EXAMINATION 5. REDUCED LOAD F. ADMINISTRATIVE 9. OTHER G. OPERATIONAL ERROR (EXPLAIN) j H. OTHER (EXPf&IN) l l

7 L

i i

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT  !

1 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE REPORT MONTH: DECEMBER, 1996 DOCKET NO.: 50-333 UNIT NAME: FITZPATRICK i DATE: Jarmanry 7,1997 .f COMPLETED BY: YAN GAO  !

TELEPHONE: (315) 349-6322 i l

The FitzPatrick Plant remained off line for the end of Cycle 12 Refueling Outage until 12/12/96.

The Reactor was manually scrammed on 12/15/96 at 0058 due to EHC hydraulic fluid leak on no. 1 turbine bypass valve actuator seal.

The plant resumed operation on 12/19/96 at 0506 (generator on-  !

line). l 1

l 4

1

,