JAFP-96-0066, Monthly Operating Rept for Jan 1996 for JAFNPP
| ML20100F981 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 01/31/1996 |
| From: | Flagg R, Harry Salmon POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| JAFP-96-0066, JAFP-96-66, NUDOCS 9602220273 | |
| Download: ML20100F981 (5) | |
Text
...... -..
I
. N lear P P.O. Dos 41 l
Lycoming, New York 13093 1
315 342.38do A
New Yo.rk Power no,n, p. soimon, a,.
4# Authonty sa. execee omcer l
February 16, 1996 JAFP-96-0066 l
U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C.
20555 Attention:
Document Control Desk
SUBJECT:
OPERATING STATUS REPORT l
Reference:
DOCKET NO. 50-333 i
Dear Sir:
Enclosed please find the James A.
FitzPatrick Nuclear Power Plant i
Operating Status Report for the month of January 1996.
If there are any questions concerning this report, please contact Russ Flagg, Performance Engineering, at (315) 349-6768.
Very truly yours, tb
')
HARRY P. SALMON, JR.
HPS:RGF:mac Enclosure CC:
P. Donahue k JAF Department Heads White Plains Office TS File RMS, JAF 9602220273 960131 PDR ADOCK 05000333 R
PDR 1
L l
NED YORK POWER AUTHORITY JAMES A.
FITZPATRICK NUCLEAR POWER PLANT OPERATING DATA REPORT DOCKET NO.:
50-333 UNIT NAME:
FITZPATRICK DATE:
FEBRUARY 1996 COMPLETED BY:
RUSSELL ELAGG TELEPHONE:
(315)349-6768 OPERATING STATUS 1.
Unit Names FITZPATRICK 2.
Reporting Period 960101 - 960131 NOTES:
3.
Licensed Thermal Power (MWT): 2436 4.
Nameplate Rating (Gross MWE): 883.0 5.
Design Electrical Rating (Net MWE):
Hlb _d 6.
Maximum Dependable Capacity (Gross HWE) 789,7 7.
Maximum Dependable Capacity (Net HWE) 779.7 8.
If changes occur in capacity ratings (Items 3-7) since last report, give reasons:
. Revisions (lines 6 & 7) based on 1995 plant performance 9.
Power level to which restricted, if any (Het MWE):
797 MWE 10.
Reasons for restrictions, if any:
MVAR LOADING (SEE PAGE 5)
THIS MONTH YR-TO-DATE CUMUIATIVE 11.
Hours in Reporting Period:
744.0 744.0 179833.0 l
12.
Number of Hours Reactor was critical:
744.0 744.8 126553.6 13.
Reactor Reserve Shutdown Hours:
0 0
0 14.
Hours Generator On-Lines 744.0 744.4 122343.0 15.
Unit Reserve Shutdown Hours:
0 0
0 16.
Gross Thermal Energy Generated (MWH):
1804152.0 1804152.0 270971824 2 17.
Gross Electrical Energy Generated (MWH):
610960.0 610960.0
_91995220.0 10.
Net Electrical Energy Generated (MWH):
589895.0 589895.0 88406490.0 l
19.
Unit Service Factor 100.0 100.0 68.0 20.
Unit Availability Factor:
100.0 100.0 68.0 21.
Unit Capacity Factor (using MDC Net):
104.1 104.1 70.0 22.
Unit Capacity Factor (using DER Net):
97.2 97.2 60.2 23.
Unit Forced Outage Rate:
0.0 0.0 11.1 24.
Shutdowns scheduled over next 6 months (type, date, and duration of each):
25.
If shutdown at end of report period, estimated date of startup:
26.
Units in Test Status (prior to commercial operation):
FORECAST ACHIEVED Initial Criticality Initial Electricity Commercial Operation s
NEW YORK POWER AUTHORITY JANES 1. PIT 5 PATRICK NUCLEAR POWER PLANT AVIEAGE DAILY UNIT POWER LEVEL REPORT MONTH MOVEMBER 1995 DOCKET NO.s 50-333 UNIT NANEt FITEPATRICK DATE:
FEBRUARY 1996 COMPLETED BY: RD58 ELL FLAGG TELEPHONES (315)349-6768 DAY NET AVERAGE DAILY PONER LEVEL DAY NET AVERAGE DAILY POWER LEVEL 1
796 17 794 2
796 18 795 3
796 19 795 4
796 20 794 5
796 21 795 6-724 22 794 7
796 23 795 i
8 795 24 795 i
9 796 25 795 10 786 26 795 l
11 796 27 795 12 795 28 794 13 795 29 795 14 796 30 794 15 795 31 793 l
l 16 795
(
i 1
lljlj11\\!Il il illll 1jll l
l
)
Y 1
6G0 R
6 7G6 T
1 K7A7 N 0 C1L6 ET-I F-NG RY 7
SAEE TRL4 N
NTVR 3AAL3 O
OAEU 3FETR)
I ID N
E 3 EMS 5 T
- TES1 C C T
E(
N CFE 0IET3 A
UOSE H
E 5EFJ(
R R NL E R TNEI V U SOCF I
Y T C NII E
ITL) s B
C R A R RRE E
PF(
N A TO O
TE E
TN EH C V IRST LP E
BPTR E
KTEPE D
I EO R
CITML N P RREP ONAOE A
KOHE DUDCT O
EFSR E
4 T
S U
AC M
T A
N R
A MC D L
AS A
P R
O CCDL R
CODE SIETUD E
COMP 0NENT LLANE YW AAMICR sUUOTUE TO 6
T DNNTNDH IP R 9
9 OAAUOET ROR O 1
CODE HMMACRO T.
P SYSTEM E
HA E
YR M123459 TE R A
3 UL AC U
8 N
U N A
E RN W J
E T T N
S R
O E
N WK O N E T
O I
D H
E V A
P OC T T
C E E PIR U N
I R
N H
O L
I M
KT M
A S
RA X
OP T
E T
R Y5 I
O G
R E
T N P
D N O
S WI E
O IN U
R HFTW HC N
E N
)
N
)
ET EFN.
TOTO TA I
C I
E UD E A
I A
A M H R
L L L S
P N
P X
OD X S
E IN E
E (T
TA
(
N S
C EE IG R
A REASON RT RN O J
U TI R)
LR SNERN IO EIVEI A
RAI A FE RTLL HOURS C YTAAP TNGR RNX DURATION NANORTOE ENITOSI(
MELATIT PTELANAR sINUURIRE NUIFGEMEH E
OQAEEPDPT P
SEMRROAOO Y
A T
E..
RABCDEFGH 2
D E
E T
L A
DU D
FS N
1 l,i l!l l
lt
E r
/
NEW YORK POWER AUTHORITY r
JAMES A. PIT 5 PATRICK NUCLEAR POWER PLANT u
NARRATIVE
SUMMARY
OF OPERhTING EXPERIENCE REPORT MONTH: JANUARY 1996 DOCKET NO.s 50-333 UNIT NAMES FITEPAYRICK DATES FEBRUARY 1996 CCMPLETED BYs RUSSELL ELAGG TELEPHONES (315)349-6768 Tho FitzPatrick Plant remained in service throughout the reporting period. Unit output is reduced by approximately 5 MWE due to MVAR loading because of the possibility of transmission line instabilities.