- James A. Fit 2 Patrick

.,4 3 Nuclest Tower Plant e . P.O. Box 41

,, Lycoming. New York 13093 315 342 3840 t .

E I Michael J. Colomb M Ority site executive Officer April 9, 1997 JAFP-97-0126 U.S.. Nuclear Regulatory Commission Mail Stction P1-137 Washington, D.C. 20555 Attention: Document Control Desk

SUBJECT:

OPERATING STATUS REPOEI

Reference:

DOCKET NO. 50-333

Dear Sir:

Enclosed please find the James A. FitzPatrick Nuclear Power Plant Operating Status Report for the month of March, 1997.

If there are any questions concerning this report, please contact i

.Yan Gao, System Engineer, at (315) 349-6353.  !

Very truly yours,

~

MICHAEL J COLOMB SITE EXECUTIVE OFFICER l MJC: mac Enclosure i CC: F. Edler ffb JAF Department Heads

-White Plains Office JTS JAFP File RMS - JAP j i

l l i

.\

jGO183 Nb f l l l

i l

'4160071 970331 " pg

_ . Jk ' ADOCK 05000333-l @.Eh .

R- PDR- fj; -

i

t NEW YORK POJER AUTHORITY

, JAMES A. FIT 2 PATRICK NUCLEAR POWER PLANT OPERATING DATA REPORT DOCKET NO. 50-333 UNIT NAME: FITZPATRICK DATE: April 3r 1997 COMPLETED BY: YAN GAO TELEPHONE: (315)349-6353 OPERATING STATUS

1. Unit Names FITZPATRICK
2. Reporting Period 970301 - 970331 NOTES:
3. Licensed Thermal Power (MWT): 213,s
4. Nameplate Rating (Gross MWE): 883.0
5. Design Electrical Rating (Net HWE): 816.0
6. Maximum Dependable Capacity (Gross MWE) 826.0 7 Maximum Dependable capacity (Net MWE) 798.6
8. - If changes occur in capacity ratings (Items 3-7) since last report, give reasons:

1 i

. 9. Power level to which restricted, if any (Net MWE):

10. Reasons for restrictions, if any:

THIS MONTH YR-TO-DATE CUMULATIVE

11. Hours in Reporting Period: 744.00 2160.00 190033.00 1
12. Number of Hours Reactor was Critical: 744.00 2063.83 135180.53
13. Reactor Reserve Shutdown Hours: 0 0 0
14. Hours Generator On-Lines _ 744.00 2034.20 130670.95
15. Unit Reserve Shutdown Hours: 0 0 0
16. Gross Thermal Energy Generated (MWH): 1852944.0 5012112.0 290622951.0
17. Gross Electrical Energy Generated (MWH): 626840.0 1693000.0 98537280.00 18.- Net Electrical Energy Generated (MWH): 606380.0 1639050.0 94746025.00
19. Unit Service Factor: 100.00 94.18 68.7%
20. Unit Availability Factor: 100.00 94.18 68.76
21. Unit Capacity Factor (using MDC Net): 102.06 95.02 70.64
22. Unit Capacity Factor (using DER Net): 99.88 92.99 61.10
23. Unit Forced Outage Rate: 0 QQ 5.82 12.43
24. Shutdowns scheduled over next 6 months (type, date, and duration of each):
25. If shutdown at end of report period, estimatnd date of startup:
26. Units in Test Status (prior to commercial operation): FORECAST ACHIEVED ,

Initial Criticality Initial Electricity Commercial Operation

, NEW YORK PODER AUTHORITY

, JAMES A.. FIT 2 PATRICK NUCLEAR POWER PLANT AVERAGE DAILY UNIT POWER LEVEL REPORT HONTH: March, 1997 DOCKET NO.s 50-333 UNIT NAMES F1TEPATRICK DATES April 2, 1997 COMPLETED BY: YAN GAO TELEPHONES (315)349-6353 DAY NET AVERAGE DAILY POWER LEVEL DAY NET AVERAGE DAILY POWER LEVEL 1 830 17 830 2 830 18 830 3 830 19 830 4 830 20 830 5 830 21 830 6- 829 22 534 7 830 23 748 8 830 24 796 9 830 25 783 10 830 26 825 11 830 27 830 12 830 28 830 13 P30 29 830 14 830 30 831 15 830 31 830 I

16 830 l

I i

l l

I

-1

. . _ __~ ~ . -. .. . .. .

- s NEW YORK POWER AUTHORITY JAME3 A. FITZPATRICK NUCLEAR POWER PLANT ,

UNIT SHUTDOWNS REPORT ,

REPORT MONTH: March, 1997 DOCKET No.: 50-333 -

UNIT NAME: FITZPATRICK DATE: April 2, 1997 COMPLETED BY: YAN GAO

-TELEPHONE: (315)349-6353 D C UH R METHOD S O RO E OF YC MC NO. DATE TYPE AU A SHUTTING LICENSEE SO PO CAUSE AND CORRECTIVE ACTION TR S DOWN EVENT TD 0D TO PREVENT RECURRENCE IS O THE REPORT EE NE .

O N REACTOR M E N N T

  • i a

2 3 4 F: FORCED REASON: METHOD: EXHIBIT G ~INSTRUCIONR  ;

S: SCHEDULED A. EQUIPMENT FAILURE (EXPLAIN) 1. MANUAL FOR PREPARATION OF DATA ENTRY B. MAINTENANCE OR TEST 2. MANUAL SCRAM SHEETS FOR LICENSEE EVENT C. REFUELING 3. AUTOMATIC SCRAM REPORT (LER) FILE (NUREG-0161).  ;

REGULATORY RESTRICTION 4. CONTINUED D.

E. OPERATOR TRAINING AND LICENSE EXAMINATION 5. REDUCED LOAD F. ADMINISTRATIVE 9. OTHER G. OPERATIONAL ERROR (EXPLAIN)

H. OTHER (EXPLAIN) t

_ e . -- _ . . - -_ -_ . _ . . . - _ _ _ _ _ - . - - _ _ . - _ - _ _ - _ _ _ _ _ _ _ _ . _ _ - _ _ . _ _ - - _ - _ . _ - - - . _ _ _ _ . - -- 2 _

~ ,c ~ , _ _ -- - . - . _ _ . .

'J

, NEW' YORK POJER AUTHORITY JAMES A. FITZPATRICK NUCLEAR PO2ER PLANT NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE REPORT HONTHt March, 1997 DOCKET NO.:- 50-333-UNIT NAME: FIT 2 PATRICK DATE: April 2, 1997 COMPLETED BY YAN GAO TELEPHONE: (315) 349-6353

'l The FitzPatrick Plant remained at full power operation for the month of March excspt for a down power commenced on 3/22 and ended on 3/26 for Control Rod

- pattern adjustment.

i 1

E l 4