JAFP-98-0360, Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With
ML20195B281
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/31/1998
From: Michael Colomb, Defillippo S
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
JAFP-98-0360, JAFP-98-360, NUDOCS 9811160082
Download: ML20195B281 (5)


Text

J mes A. FitzP; trick d -

Nucle:.r Pcwer PI:nt 268 Lake Road P.O. Box 41 1

Lycoming, New York 13093 1 315-342-3840 v .

A NewYorkPower uicn ia.Coiome  ;

4# Authority sue secu*e Omcer l

1 l

, November 7,1998 JAFP-98-0360 i 1

I U.S. Nuclear Regulatory Commission 1 Mail Station Pl-137 Washington, D.C. 20555 Attention: Document Control Desk i

SUBJECT:

OPERATING STATUS REPORT

Reference:

DOCKET NO. 50-333 ,

l

Dear Sir:

Enclosed please find the James A. FitzPatrick Nuclear Power Plant l

Operating Status Report for the month of October, 1998.

1 i

If there are any questions concerning this report, please contact Steve DeFillippo, Reactor Engineer, at (315) 349-6354.

Very truly yours, MICHAE

, J J.-COLOMB

\

SITE EXECUTIVE OFF CER l 1

MJC:SD:mac Enclosure

/ t.

CC: T. Landers JAF. Department Heads

/gh k

White Plains Office JTS JAFP File RMS 9811160082 981031 I PDR ADOCK 05000333 R PDR;

\

l

~- . .- - _ . ..

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT OPERATING DATA REPORT

& ., REPORT MONTH: October, 1998 DOCKET NO.: 50-333 UNIT NAME: FITZPATRICK DATE: Nov. 4, 1998 COMPLETED BY: S. Defillippo TELEPHONE: (315)349-6354 OPERATING STATUS

1. Unit Name: FITZPATRICK  : NOTES:  :
2. Reporting Period: 981001- 981031  :  :
3. Licensed Thermal Power (MWT): 2536  :  :
4. Nameplate Rating (Gross MWe): Flff0  :  :

'5. Design Electrical Rating (Net MWe): 816.0  :  :

6. . Maximum Dependable Capacity (Gross MWe) 813.0  :  :
7. . Maximum Dependable Capacjty (Net MWe) E  :  :
8. If changes occur in capacity ratings (Items 3-7) since last report, give reasons:
9. Power level' to which restricted, if any (Net MWe) :
10. Reasons for restrictions, if any:

THIS WONTH YR-TO-DATE CUMULATIVE

11. Hours in Reporting Period: 745.00 7296.00 203929.00
12. Number of Hours Reactor was Critical: 382.53 6477.25 148003.95
13. Reactor Reserve Shutdown Hours: 0 0 0
14. Hours Generator On-Line: 375.55 6347.84 143294.94
15. Unit Reserve Shutdown Hours: 0 0 0
16. Gross Thermal Energy Generated (MWh): 863345.25 15119743.49 321270715.49
17. Gross Electrical Energy Generated (MWh): 280130.00 4979210.00 108658560.00
18. Net Electrical Energy Generated (MWh): 273010.00 4840555.00 104572110.00
19. Unit Service Factor: 50.41 87.06 70.27 ,
20. Unit Availability Factors 50.41 87.00 70.27
21. Unit capacity Factor (using MDC Net): 46.66 84.47 71.94
22. Unit Capacity Factor (using DER Net): 44.91 81.31 62.84  !
23. Unit Forced Outage Rate: 4.44 8.59 11.79
24. Shutdowns scheduled over next 6 months (type, date, and duration of each):

Refuel outage commencing 10/16/98. Duration 47.5 days.

25. If shutdown at end of report period, estimated date of startup: 12/6/98
26. Units in Test St:.tus (prior to commercial operation): FORECAST ACHIEVED Initial Criticality Initial Electricity Commercial Operation __

i l

NEW YORK POWER AUTHORITY JAMED A. FITZPATRICK NUCLEAR POWER PLANT AVERAGE DAILY UNIT POWER LEVEL

  • REPORT MONTH: October, 1998 DOCKET NO.: 50-333 UNIT NAME: FITZPATRICK DATE: Nov.4, 1998 COMPLETED BY: S. DeFillippo TELEPHONE: (315)349-6354 DAY NET AVERAGE DAILY POWER LEVEL DAY NET AVERAGE DAILY POWER LEVEL 1 806 17 0 2 816 18 0 3 814 19 0 4 815 20 0 5 815 21 0 6 816 22 0 7 813 23 0 8 813 24 0 9 818 25 0 10 818 26 0 11 817 27 0 12 788 28 0 13 516 29 0 14 478 30 0 15 455 31 0 16 174

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PIANT UNIT SHUTDOWNS REPORT -

REPORT MONTH: October, 1998 DOCKET NO.: 333 i UNIT NAME: FITZPATRICK DATE: Nov. 4, 19.98 COMPLETED BY: S. DeFillippo TELEPHONE: (315)349-6354 D H S R U R METHOD 3 O A R E OF T MC NO. DATE T A SHUTTING LICENSEE E PO NSE MD mRRECM ACIW T S OD TO PREVENT RECURRENCE Y y S DOWN EVENT g P

o O THE REPORT NE E N N RmmR C E O

N D T E

5 981016 S 362.5 C 1 N/A END CYCLE 13 1

2 3 4 F: FORCED REASON: METHOD: EXHIBIT G -INSTRUCTIONS S: SCHEDULED A. EQUIPMENT FAILURE (EXPLAIN) 1. MANUAL FOR PREPARATION OF DATA ENTRY B. MAINTENANCE OR TEST 2. MANUAL SCRAM SHEETS FOR LICENSEE EVENT C. REFUELING 3. AUTOMATIC SCRAM REPORT (LER) FILE (NUREG-0161)

D. REGULATORY RESTRICTION 4. CONTINUED E. OPERATOR TRAINING AND LICENSE EXAMINATION 5. REDUCED LOAD F. ADMINISTRATIVE 9. OTHER G. OPERATIONAL ERROR (EXPLAIN)

H. OTHER (EXPLAIN)

' l NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PIANT NARRATIVE SIM4ARY OF OPERATING EXPERIENCE

'- REPORT MONTH: October, 1998 DOCKET NO: 50-333 UNIT NAME: FITZPATRICK DATE: Nov. 4, 1998 COMPLETED BY: S. DeFillippo TELEPHONE: (315)349-6354 The FitzPatrick plant operated at near full thermal power until October 12'h een a fdhm of mal level mud b Ge 4*h WM feed water heater forced a downpower to approximately 60%. ,

2 Continued problems with level control resulted in the decision to i commence shutdown for the refueling outage ahead of schedule. l Repairs to the level control system are scheduled for the refueling outage which commenced October 16*". The shutdown is scheduled for 47.5 days with an expected generator on line December 3, 1998.