June 2002 Monthly Operating Report for James A. FitzPatrick
ML022070535
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 07/15/2002
From: Ted Sullivan
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
JAFP-02-0142
Download: ML022070535 (6)


Text

Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A. Fitzpatrick NPP P.O. Box 110

" Entergyv Lycoming, NY 13093 Tel 315 3496024 Fax 315 349 6480 T.A. Sullivan Vice President, Operations-JAF July 15, 2002 JAFP-02-0142 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station O-P1-17 Washington, DC 20555 ATTENTION:Document Control Desk

SUBJECT:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Monthly Operatini Report

Dear Sir:

Enclosed is the Monthly Operating Report for the James A. FitzPatrick Nuclear Power Plant for the month of June 2002.

If there are any questions concerning this report, please contact Sherard Anderson, Thermal Performance Engineer, (315) 349-6558.

TAS:BO:SB:SA:tmb Enclosure 9I />

Cc: Regional Administrator U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. Guy Vissing, Project Manager Project Directorate I Division of Licensing Project Management U.S. Nuclear Regulatory Commission Mail stop OWFN 8C2 Washington, DC 20555 Mr. R. Toole ENN BWR SRC Operations Subcommittee Chairman 605 West Homer Street Ebensburg, PA 15931 JENG JAFP Files RMS (JAF)

RMS (WPO)

ENTERGY NUCLEAR NORTHEAST JAMES A. FITZPATRICK NUCLEAR POWER PLANT OPERATING DATA REPORT REPORT MONTH: JUNE 2002 Docket No.: 50-333 Unit Name: F itzPatrick Date: J uly 8, 2002 Completed By:  ;. Anderson Telephone: ( 315)349-6558 OPERLATING STATUS

1. Unit name: FitzPatrick
2. Reporting period: 6/01/2002 - 6/30/2002
3. Licensed thermal power (MWT): 2536
4. Nameplate rating (gross MWE): 883.0
5. Design electrical rating (net MWE): 816
6. Maximum dependable capacity (gross MWE): 839
7. Maximum dependable capacity (net MWE): 813
8. If changes occur in capacity ratings (Items 3-7) since last report, give reasons:
9. Power level to which restricted, if any (net MWE):
10. Reasons for restrictions, if any:

NO. DATA REQUESTED THIS YR-TO-DATE CUMULATIVE MONTH 11 Hours in reporting period: 720 4,343 236,039 12 Number of hours reactor was critical: 682.7 4,305.7 177,465.8 13 Reactor reserve shutdown hours: 0.00 0.00 0.00 14 Hours generator on-line: 652.1 4,275.1 172,296.9 15 Unit reserve shutdown hours: 0.00 0.00 0.00 16 Gross thermal energy generated (MWH): 1,609,113.0 10,671,042.2 392,400,551.8 17 Gross electrical energy generated (MWH): 545,130 3,654,280 132,734,420 18 Net electrical energy generated (MWH): 527,755 3,537,915 127,882,685 19 Unit service factor: 90.56 98.44 73.00 20 Unit availability factor: 90.56 98.44 73.00 21 Unit capacity factor (using MDC net): 90.16 100.20 74.64 22 Unit capacity factor (using DER net) 89.83 99.83 66.40 23 Unit forced outage rate: 0.00 0.00 11.06

24. Shutdowns scheduled over next 6 months (type, date, and duration of each): Refuel Outage 15 October 7, 2002
25. If shutdown at end of report period, estimated date of startup: N/A
26. Units in test status (prior to commercial operation): FORECAST ACHIEVED Initial Criticality:

Initial Electricity:

Commercial Operation:

ENTERGY NUCLEAR NORTHEAST JAMES A. FITZPATRICK NUCLEAR POWER PLANT OPERATING DATA REPORT REPORT MONTH: JUNE 2002 Docket No.: 50-333 Unit Name: FitzPatrick Date: July 8, 2002 Completed By: S. Anderson Telephone: (3 15)349-6558 DAY NET AVERAGE DAILY DAY NET AVERAGE DAILY POWER LEVEL POWER LEVEL 1 839 17 837 2 839 18 836 3 838 19 836 4 838 20 835 5 838 21 836 6 837 22 832 7 837 23 830 8 836 24 545 9 837 25 0 10 835 26 0 11 837 27 194 12 834 28 697 13 840 29 781 14 840 30 825 15 841 16 839

REPORT MONTH: JUNE 2002 Docket No.: 50-333 Unit Name: FitzPatrick Date: July 8, 2002 Completed By: S. Anderson Telephone: (3 15)349-6558 NO. DATE TYPE DURATION REASON METHOD OF LICENSEE SYSTEM COMPONENT CAUSE and CORRECTIVE HOURS SHUTTING EVENT CODE CODE ACTION TO PREVENT DOWN THE REPORT RECURRENCE REACTOR NO.

6/24/02 S 67.95 B I N/A Plant was shutdown to replace 'C' and 'F' SRVs due to pilot stage leakage.

Maintenance Rule action plan addressing SRV Pilot Leakage is in progress F: FORCED REASON: METHOD: EXHIBIT G: Instructions for preparation of S: SCHEDULED A. Equipment failure (explain) 1. Manual data entry sheets for Licensee Event Report B. Maintenance or Test 2. Manual Scram (LER) file (NUREG-0161)

C. Refueling 3. Automatic Scram D. Regulatory Restriction 4. Continued E. Operator training and license examination 5. Reduced load F. Administrative 9. Other G. Operational error (explain)

H. Other (explain)

REPORT MONTH: JUNE 2002 Docket No.: 50-333 Unit Name: FitzPatrick Date: July 8, 2002 Completed By: S. Anderson Telephone: (315)349-6558 OPERATIONAL

SUMMARY

The FitzPatrick plant - with the exception of minor derates for rod adjustments - operated at or near rated power during the month of June 2002 except for the following:

0 June 24, 2002 - 0700 The plant commenced a shutdown to replace 'C' and 'F' SRVs. The generator was taken offline at 1431, and all control rods were inserted at 2232. Outage work was completed, and startup was begun at 0753 on June 26 when the mode switch was placed in the STARTUP / HOT STANDBY position. Control rod withdrawals began at 0841 and the reactor was made critical at 1153. The generator was placed online at 1028 on June 27. Power ascension continued until full power was achieved at 1950 on June 29.

The outage duration (generator offline) was 67 hours7.75463e-4 days <br />0.0186 hours <br />1.107804e-4 weeks <br />2.54935e-5 months <br /> and 57 minutes. The total duration of the decrease in power was 5 days, 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, and 50 minutes.