IR 05000528/1984047

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-528/84-47.Addl Clarification Required.Statistics Should Be Included in Analysis of Units 2 & 3 Reinsp Program
ML17298B832
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/21/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
NUDOCS 8501250379
Download: ML17298B832 (4)


Text

~pS RECy, (4 Np0

+a*++

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION V

1450 MARIALANE,SUITE 210 WALNUTCREEK, CALIFORNIA94596

)pg P j 1985 Docket Nos. 50-528, 50-529 and 50-530 Arizona Public Service Company P. 0. Box 21666 Phoenix, Arizona 85036

'IE FILE COPY Attention:

Mr. E. E.

Van Brunt, Jr.

Vice President Gentlemen:

Thank you for your letter dated January 4,

1985, informing us of the steps you have taken to correct the items which we brought to your attention in our letter dated December 5, 1984.

Your corrective actions will be verified during a future inspection.

Our review of your corrective action indicates some additional clarification or action is required.

It is our understanding that the subject pipe support would have failed because it was a relatively heavily loaded support attached to a relatively light structural member.

Therefore, it would appear prudent for you to include statistics in the analysis of the Units 2/3 reinspection program for heavily loaded supports attached to light structural members where the bracket weld orientation problem exists.

In this way, the extent of this failure mechanism can be identified specifically.

Please respond with the results of your consideration and provide further clarification or identify additional actions as appropriate.

Sincerely, irsch, Acting Director Division of Reactor Safety and Projects 8501250379 850i2i PDR ADOCK 05000528 PDR y~/ i

y

~ / kali~ i'['

CC:

J.

Bynum, Director, Nuclear Operations S.

R. Frost, Supervisor Nuclear Operations Licensing, Station 4080 T. D. Shriver, Manager, equality Systems 8 Engineering M. E. Ide, Manager, Corporate gA/(}C C. N. Russo, Manager, gA Audits Ms. Jill Morrison Lynne Bernabei Arthur C. Gehr, Esq.

bcc:

RSB/Document Control Desk (RIDS)

Mr. J. Martin Project Inspector Resident,, Inspector Joan ZollicoH'er gag 2z )985 D.Hollknbach:dh P.Narbut 1//7 /85 1//g'/85 L. ilier 1/ig /85 D. i sch I/@( /85 gC.

i(~/>>