Category:INSPECTION REPORT
MONTHYEARIR 05000483/19990101999-10-14014 October 1999 Insp Rept 50-483/99-10 on 990913-16.No Violations Noted. Major Areas Inspected:Plant Support Re Biennial Exercise of Emergency Plan & Procedures IR 05000483/19990111999-09-22022 September 1999 Insp Rept 50-483/99-11 on 990812-20.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19990081999-09-13013 September 1999 Insp Rept 50-483/99-08 on 990725-0904.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19990071999-09-10010 September 1999 Insp Rept 50-483/99-07 on 990809-13.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluating Operators IR 05000483/19990061999-08-13013 August 1999 Insp Rept 50-483/99-06 on 990613-0724.One Severity Level 4 Violation Noted & Being Treated as Ncv.Major Areas Inspected:Operations,Maint & Plant Support IR 05000483/19990051999-06-25025 June 1999 Insp Rept 50-483/99-05 on 990502-0612.Two Violations Noted & Being Treated as Noncited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19990031999-05-19019 May 1999 Insp Rept 50-483/99-03 on 990321-0501.Noncited Violation Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19990011999-04-0505 April 1999 Insp Rept 50-483/99-01 on 990207-0320.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19980181998-12-0404 December 1998 Insp Rept 50-483/98-18 on 980914-1002.Violations Noted. Major Areas Inspected:Review of Design & Licensing Basis for Essential Service Water Sys,Associated Electrical Support Sys & Review of Program Implement 10CFR50.59 IR 05000483/19980221998-11-25025 November 1998 Insp Rept 50-483/98-22 on 980927-1114.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000483/19980241998-11-25025 November 1998 Insp Rept 50-483/98-24 on 981026-30.Violation Noted.Major Areas Inspected:Licensee Implementation of NRC Approved Fire Protection Program IR 05000483/19980231998-10-28028 October 1998 Insp Rept 50-483/98-23 on 981013-15.No Violations Noted. Major Areas Inspected:Operational Status of License Emergency Preparedness Program Was Conducted IR 05000483/19980151998-10-26026 October 1998 Insp Rept 50-483/98-15 on 980706-10.No Violations Noted. Major Areas Inspected:Guidance of Temporary Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers IR 05000483/19980201998-10-15015 October 1998 Insp Rept 50-483/98-20 on 980817-0904.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000483/19980211998-10-0909 October 1998 Insp Rept 50-483/98-21 on 980816-0926.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19980191998-09-29029 September 1998 Insp Rept 50-483/98-19 on 980914-18.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980121998-08-21021 August 1998 Insp Rept 50-483/98-12 on 980705-0815.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 05000483/19980171998-08-14014 August 1998 Insp Rept 50-483/98-17 on 980803-07.Violations Noted.Major Areas Inspected:Implementation of Solid Radioactive Waste Mgt & Radioactive Matls Transportation Program IR 05000483/19980161998-08-0606 August 1998 Insp Rept 50-483/98-16 on 980713-17.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980131998-07-29029 July 1998 Insp Rept 50-483/98-13 on 980714-17.Violation Noted.Major Areas Inspected:Engineering & Plant Support IR 05000483/19980141998-07-17017 July 1998 Insp Rept 50-483/98-14 on 980629-0702.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000483/19980111998-07-0808 July 1998 Insp Rept 50-483/98-11 on 980524-0704.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19980081998-06-0808 June 1998 Insp Rept 50-483/98-08 on 980412-0523.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980091998-05-19019 May 1998 Insp Rept 50-483/98-09 on 980428-30.No Violations Noted. Major Areas Inspected:Maint & Plant Support IR 05000483/19980071998-05-19019 May 1998 Insp Rept 50-483/98-07 on 980427-0501.Violations Noted.Major Areas Inspected:Radiation Protection Program Focussing on Refueling Outage Activities ML20247M2241998-05-19019 May 1998 Insp Rept 50-483/98-10 on 980428-30.No Violations Noted. Major Areas Inspected:Contingency Plan Developed in Response to Insp Findings in NRC Insp Rept 50-483/98-06 W/Special Emphasis on Training Process Used to Qualify People for Er IR 05000483/19980051998-05-0808 May 1998 Insp Rept 50-483/98-05 on 980413-0501.No Violations Noted. Major Areas Inspected:Maintenance,Engineering & Plant Support ML20217F4881998-04-22022 April 1998 Insp Rept 50-483/98-06 on 980324-26.Violations Noted.Major Areas Inspected:Plant Support IR 05000483/19980031998-04-17017 April 1998 Insp Rept 50-483/98-03 on 980301-0411.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19980041998-04-17017 April 1998 Insp Rept 50-483/98-04 on 980406-10.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000483/19980021998-03-26026 March 1998 Insp Rept 50-483/98-02 on 980202-06.Violation Noted.Major Areas Inspected:Maint,Engineering Re Bldg Emergency Filter Sys Adsorber IR 05000483/19980011998-03-0909 March 1998 Insp Rept 50-483/98-01 on 980118-0228.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support IR 05000483/19970211998-01-27027 January 1998 Insp Rept 50-483/97-21 on 971207-980117.No Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980251998-01-12012 January 1998 Insp Rept 50-483/98-25 on 981115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support,Including Health Physics & Security IR 05000483/19970191997-12-18018 December 1997 Insp Rept 50-483/97-19 on 971117-1211.No Violations Noted. Major Areas Inspected:Engineering IR 05000483/19970201997-12-16016 December 1997 Insp Rept 50-483/97-20 on 971026-1206.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19970181997-11-12012 November 1997 Insp Rept 50-483/97-18 on 971027-31.No Violations Noted. Major Areas Inspected:Access Authorization,Alarm Stations, Communications,Access Control of Personnel,Packages & Vehicles,Assessment Aids & Security Plans IR 05000483/19970171997-11-12012 November 1997 Insp Rept 50-483/97-17 on 970914-1025.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970161997-10-0707 October 1997 Insp Rept 50-483/97-16 on 970915-19.No Violations Noted. Major Areas Inspected:External & Internal Exposure Controls, Dose Assessment & Records,Controls of Radioactive Matl & Contamination & Surveying & Monitoring IR 05000483/19970151997-09-22022 September 1997 Insp Rept 50-483/97-15 on 970802-0913.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970131997-09-0404 September 1997 Insp Rept 50-483/97-13 on 970811-15.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000483/19970141997-08-0606 August 1997 Insp Rept 50-483/97-14 on 970622-0802.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering ML20141E4791997-06-26026 June 1997 Insp Rept 50-483/97-05 on 970210-14 & 24-28.Violations Noted.Major Areas Inspected:Engineering IR 05000483/19970061997-06-20020 June 1997 Insp Rept 50-483/97-06 on 970519-23.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program IR 05000483/19970081997-05-20020 May 1997 Insp Rept 50-483/97-08 on 970317-0404.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970101997-05-19019 May 1997 Insp Rept 50-483/97-10 on 970330-0510.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000483/19970091997-05-0909 May 1997 Partially Withheld Insp Rept 50-483/97-09 on 970422-25.No Violations Noted.Major Areas Inspected:Licensee Implementation of Land Vehicle Control Measures Implemented IAW 10CFR73, Physical Protection of Plants & Matl IR 05000483/19970071997-04-0808 April 1997 Insp Rept 50-483/97-07 on 970216-0329.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970011997-03-26026 March 1997 Insp Rept 50-483/97-01 on 970224-28.No Violations Noted. Major Areas Inspected:Competency of Six SRO and Five RO Applicants for Issuance of Operating Licenses IR 05000483/19970041997-02-28028 February 1997 Insp Rept 50-483/97-04 on 970127-31.No Violations Noted. Major Areas Inspected:Routine Insp Reviewed Program to Maintain Occupational Exposures Alara,Training & Qualifications of Radiation Protection Organizations 1999-09-22
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000483/19990101999-10-14014 October 1999 Insp Rept 50-483/99-10 on 990913-16.No Violations Noted. Major Areas Inspected:Plant Support Re Biennial Exercise of Emergency Plan & Procedures IR 05000483/19990111999-09-22022 September 1999 Insp Rept 50-483/99-11 on 990812-20.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19990081999-09-13013 September 1999 Insp Rept 50-483/99-08 on 990725-0904.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19990071999-09-10010 September 1999 Insp Rept 50-483/99-07 on 990809-13.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluating Operators IR 05000483/19990061999-08-13013 August 1999 Insp Rept 50-483/99-06 on 990613-0724.One Severity Level 4 Violation Noted & Being Treated as Ncv.Major Areas Inspected:Operations,Maint & Plant Support IR 05000483/19990051999-06-25025 June 1999 Insp Rept 50-483/99-05 on 990502-0612.Two Violations Noted & Being Treated as Noncited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19990031999-05-19019 May 1999 Insp Rept 50-483/99-03 on 990321-0501.Noncited Violation Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19990011999-04-0505 April 1999 Insp Rept 50-483/99-01 on 990207-0320.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19980181998-12-0404 December 1998 Insp Rept 50-483/98-18 on 980914-1002.Violations Noted. Major Areas Inspected:Review of Design & Licensing Basis for Essential Service Water Sys,Associated Electrical Support Sys & Review of Program Implement 10CFR50.59 IR 05000483/19980221998-11-25025 November 1998 Insp Rept 50-483/98-22 on 980927-1114.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000483/19980241998-11-25025 November 1998 Insp Rept 50-483/98-24 on 981026-30.Violation Noted.Major Areas Inspected:Licensee Implementation of NRC Approved Fire Protection Program IR 05000483/19980231998-10-28028 October 1998 Insp Rept 50-483/98-23 on 981013-15.No Violations Noted. Major Areas Inspected:Operational Status of License Emergency Preparedness Program Was Conducted IR 05000483/19980151998-10-26026 October 1998 Insp Rept 50-483/98-15 on 980706-10.No Violations Noted. Major Areas Inspected:Guidance of Temporary Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers IR 05000483/19980201998-10-15015 October 1998 Insp Rept 50-483/98-20 on 980817-0904.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000483/19980211998-10-0909 October 1998 Insp Rept 50-483/98-21 on 980816-0926.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19980191998-09-29029 September 1998 Insp Rept 50-483/98-19 on 980914-18.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980121998-08-21021 August 1998 Insp Rept 50-483/98-12 on 980705-0815.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 05000483/19980171998-08-14014 August 1998 Insp Rept 50-483/98-17 on 980803-07.Violations Noted.Major Areas Inspected:Implementation of Solid Radioactive Waste Mgt & Radioactive Matls Transportation Program IR 05000483/19980161998-08-0606 August 1998 Insp Rept 50-483/98-16 on 980713-17.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980131998-07-29029 July 1998 Insp Rept 50-483/98-13 on 980714-17.Violation Noted.Major Areas Inspected:Engineering & Plant Support IR 05000483/19980141998-07-17017 July 1998 Insp Rept 50-483/98-14 on 980629-0702.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000483/19980111998-07-0808 July 1998 Insp Rept 50-483/98-11 on 980524-0704.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19980081998-06-0808 June 1998 Insp Rept 50-483/98-08 on 980412-0523.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980091998-05-19019 May 1998 Insp Rept 50-483/98-09 on 980428-30.No Violations Noted. Major Areas Inspected:Maint & Plant Support IR 05000483/19980071998-05-19019 May 1998 Insp Rept 50-483/98-07 on 980427-0501.Violations Noted.Major Areas Inspected:Radiation Protection Program Focussing on Refueling Outage Activities ML20247M2241998-05-19019 May 1998 Insp Rept 50-483/98-10 on 980428-30.No Violations Noted. Major Areas Inspected:Contingency Plan Developed in Response to Insp Findings in NRC Insp Rept 50-483/98-06 W/Special Emphasis on Training Process Used to Qualify People for Er IR 05000483/19980051998-05-0808 May 1998 Insp Rept 50-483/98-05 on 980413-0501.No Violations Noted. Major Areas Inspected:Maintenance,Engineering & Plant Support ML20217F4881998-04-22022 April 1998 Insp Rept 50-483/98-06 on 980324-26.Violations Noted.Major Areas Inspected:Plant Support IR 05000483/19980031998-04-17017 April 1998 Insp Rept 50-483/98-03 on 980301-0411.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19980041998-04-17017 April 1998 Insp Rept 50-483/98-04 on 980406-10.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000483/19980021998-03-26026 March 1998 Insp Rept 50-483/98-02 on 980202-06.Violation Noted.Major Areas Inspected:Maint,Engineering Re Bldg Emergency Filter Sys Adsorber IR 05000483/19980011998-03-0909 March 1998 Insp Rept 50-483/98-01 on 980118-0228.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support IR 05000483/19970211998-01-27027 January 1998 Insp Rept 50-483/97-21 on 971207-980117.No Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980251998-01-12012 January 1998 Insp Rept 50-483/98-25 on 981115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support,Including Health Physics & Security IR 05000483/19970191997-12-18018 December 1997 Insp Rept 50-483/97-19 on 971117-1211.No Violations Noted. Major Areas Inspected:Engineering IR 05000483/19970201997-12-16016 December 1997 Insp Rept 50-483/97-20 on 971026-1206.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19970181997-11-12012 November 1997 Insp Rept 50-483/97-18 on 971027-31.No Violations Noted. Major Areas Inspected:Access Authorization,Alarm Stations, Communications,Access Control of Personnel,Packages & Vehicles,Assessment Aids & Security Plans IR 05000483/19970171997-11-12012 November 1997 Insp Rept 50-483/97-17 on 970914-1025.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970161997-10-0707 October 1997 Insp Rept 50-483/97-16 on 970915-19.No Violations Noted. Major Areas Inspected:External & Internal Exposure Controls, Dose Assessment & Records,Controls of Radioactive Matl & Contamination & Surveying & Monitoring IR 05000483/19970151997-09-22022 September 1997 Insp Rept 50-483/97-15 on 970802-0913.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970131997-09-0404 September 1997 Insp Rept 50-483/97-13 on 970811-15.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000483/19970141997-08-0606 August 1997 Insp Rept 50-483/97-14 on 970622-0802.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering ML20141E4791997-06-26026 June 1997 Insp Rept 50-483/97-05 on 970210-14 & 24-28.Violations Noted.Major Areas Inspected:Engineering IR 05000483/19970061997-06-20020 June 1997 Insp Rept 50-483/97-06 on 970519-23.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program IR 05000483/19970081997-05-20020 May 1997 Insp Rept 50-483/97-08 on 970317-0404.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970101997-05-19019 May 1997 Insp Rept 50-483/97-10 on 970330-0510.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000483/19970091997-05-0909 May 1997 Partially Withheld Insp Rept 50-483/97-09 on 970422-25.No Violations Noted.Major Areas Inspected:Licensee Implementation of Land Vehicle Control Measures Implemented IAW 10CFR73, Physical Protection of Plants & Matl IR 05000483/19970071997-04-0808 April 1997 Insp Rept 50-483/97-07 on 970216-0329.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970011997-03-26026 March 1997 Insp Rept 50-483/97-01 on 970224-28.No Violations Noted. Major Areas Inspected:Competency of Six SRO and Five RO Applicants for Issuance of Operating Licenses IR 05000483/19970041997-02-28028 February 1997 Insp Rept 50-483/97-04 on 970127-31.No Violations Noted. Major Areas Inspected:Routine Insp Reviewed Program to Maintain Occupational Exposures Alara,Training & Qualifications of Radiation Protection Organizations 1999-09-22
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000483/19990101999-10-14014 October 1999 Insp Rept 50-483/99-10 on 990913-16.No Violations Noted. Major Areas Inspected:Plant Support Re Biennial Exercise of Emergency Plan & Procedures IR 05000483/19990111999-09-22022 September 1999 Insp Rept 50-483/99-11 on 990812-20.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19990081999-09-13013 September 1999 Insp Rept 50-483/99-08 on 990725-0904.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19990071999-09-10010 September 1999 Insp Rept 50-483/99-07 on 990809-13.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluating Operators IR 05000483/19990061999-08-13013 August 1999 Insp Rept 50-483/99-06 on 990613-0724.One Severity Level 4 Violation Noted & Being Treated as Ncv.Major Areas Inspected:Operations,Maint & Plant Support IR 05000483/19990051999-06-25025 June 1999 Insp Rept 50-483/99-05 on 990502-0612.Two Violations Noted & Being Treated as Noncited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19990031999-05-19019 May 1999 Insp Rept 50-483/99-03 on 990321-0501.Noncited Violation Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19990011999-04-0505 April 1999 Insp Rept 50-483/99-01 on 990207-0320.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19980181998-12-0404 December 1998 Insp Rept 50-483/98-18 on 980914-1002.Violations Noted. Major Areas Inspected:Review of Design & Licensing Basis for Essential Service Water Sys,Associated Electrical Support Sys & Review of Program Implement 10CFR50.59 IR 05000483/19980221998-11-25025 November 1998 Insp Rept 50-483/98-22 on 980927-1114.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000483/19980241998-11-25025 November 1998 Insp Rept 50-483/98-24 on 981026-30.Violation Noted.Major Areas Inspected:Licensee Implementation of NRC Approved Fire Protection Program IR 05000483/19980231998-10-28028 October 1998 Insp Rept 50-483/98-23 on 981013-15.No Violations Noted. Major Areas Inspected:Operational Status of License Emergency Preparedness Program Was Conducted IR 05000483/19980151998-10-26026 October 1998 Insp Rept 50-483/98-15 on 980706-10.No Violations Noted. Major Areas Inspected:Guidance of Temporary Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers IR 05000483/19980201998-10-15015 October 1998 Insp Rept 50-483/98-20 on 980817-0904.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000483/19980211998-10-0909 October 1998 Insp Rept 50-483/98-21 on 980816-0926.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19980191998-09-29029 September 1998 Insp Rept 50-483/98-19 on 980914-18.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980121998-08-21021 August 1998 Insp Rept 50-483/98-12 on 980705-0815.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 05000483/19980171998-08-14014 August 1998 Insp Rept 50-483/98-17 on 980803-07.Violations Noted.Major Areas Inspected:Implementation of Solid Radioactive Waste Mgt & Radioactive Matls Transportation Program IR 05000483/19980161998-08-0606 August 1998 Insp Rept 50-483/98-16 on 980713-17.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980131998-07-29029 July 1998 Insp Rept 50-483/98-13 on 980714-17.Violation Noted.Major Areas Inspected:Engineering & Plant Support IR 05000483/19980141998-07-17017 July 1998 Insp Rept 50-483/98-14 on 980629-0702.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000483/19980111998-07-0808 July 1998 Insp Rept 50-483/98-11 on 980524-0704.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19980081998-06-0808 June 1998 Insp Rept 50-483/98-08 on 980412-0523.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980091998-05-19019 May 1998 Insp Rept 50-483/98-09 on 980428-30.No Violations Noted. Major Areas Inspected:Maint & Plant Support IR 05000483/19980071998-05-19019 May 1998 Insp Rept 50-483/98-07 on 980427-0501.Violations Noted.Major Areas Inspected:Radiation Protection Program Focussing on Refueling Outage Activities ML20247M2241998-05-19019 May 1998 Insp Rept 50-483/98-10 on 980428-30.No Violations Noted. Major Areas Inspected:Contingency Plan Developed in Response to Insp Findings in NRC Insp Rept 50-483/98-06 W/Special Emphasis on Training Process Used to Qualify People for Er IR 05000483/19980051998-05-0808 May 1998 Insp Rept 50-483/98-05 on 980413-0501.No Violations Noted. Major Areas Inspected:Maintenance,Engineering & Plant Support ML20217F4881998-04-22022 April 1998 Insp Rept 50-483/98-06 on 980324-26.Violations Noted.Major Areas Inspected:Plant Support IR 05000483/19980031998-04-17017 April 1998 Insp Rept 50-483/98-03 on 980301-0411.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19980041998-04-17017 April 1998 Insp Rept 50-483/98-04 on 980406-10.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000483/19980021998-03-26026 March 1998 Insp Rept 50-483/98-02 on 980202-06.Violation Noted.Major Areas Inspected:Maint,Engineering Re Bldg Emergency Filter Sys Adsorber IR 05000483/19980011998-03-0909 March 1998 Insp Rept 50-483/98-01 on 980118-0228.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support IR 05000483/19970211998-01-27027 January 1998 Insp Rept 50-483/97-21 on 971207-980117.No Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980251998-01-12012 January 1998 Insp Rept 50-483/98-25 on 981115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support,Including Health Physics & Security IR 05000483/19970191997-12-18018 December 1997 Insp Rept 50-483/97-19 on 971117-1211.No Violations Noted. Major Areas Inspected:Engineering IR 05000483/19970201997-12-16016 December 1997 Insp Rept 50-483/97-20 on 971026-1206.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19970181997-11-12012 November 1997 Insp Rept 50-483/97-18 on 971027-31.No Violations Noted. Major Areas Inspected:Access Authorization,Alarm Stations, Communications,Access Control of Personnel,Packages & Vehicles,Assessment Aids & Security Plans IR 05000483/19970171997-11-12012 November 1997 Insp Rept 50-483/97-17 on 970914-1025.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970161997-10-0707 October 1997 Insp Rept 50-483/97-16 on 970915-19.No Violations Noted. Major Areas Inspected:External & Internal Exposure Controls, Dose Assessment & Records,Controls of Radioactive Matl & Contamination & Surveying & Monitoring IR 05000483/19970151997-09-22022 September 1997 Insp Rept 50-483/97-15 on 970802-0913.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970131997-09-0404 September 1997 Insp Rept 50-483/97-13 on 970811-15.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000483/19970141997-08-0606 August 1997 Insp Rept 50-483/97-14 on 970622-0802.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering ML20141E4791997-06-26026 June 1997 Insp Rept 50-483/97-05 on 970210-14 & 24-28.Violations Noted.Major Areas Inspected:Engineering IR 05000483/19970061997-06-20020 June 1997 Insp Rept 50-483/97-06 on 970519-23.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program IR 05000483/19970081997-05-20020 May 1997 Insp Rept 50-483/97-08 on 970317-0404.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970101997-05-19019 May 1997 Insp Rept 50-483/97-10 on 970330-0510.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000483/19970091997-05-0909 May 1997 Partially Withheld Insp Rept 50-483/97-09 on 970422-25.No Violations Noted.Major Areas Inspected:Licensee Implementation of Land Vehicle Control Measures Implemented IAW 10CFR73, Physical Protection of Plants & Matl IR 05000483/19970071997-04-0808 April 1997 Insp Rept 50-483/97-07 on 970216-0329.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970011997-03-26026 March 1997 Insp Rept 50-483/97-01 on 970224-28.No Violations Noted. Major Areas Inspected:Competency of Six SRO and Five RO Applicants for Issuance of Operating Licenses IR 05000483/19970041997-02-28028 February 1997 Insp Rept 50-483/97-04 on 970127-31.No Violations Noted. Major Areas Inspected:Routine Insp Reviewed Program to Maintain Occupational Exposures Alara,Training & Qualifications of Radiation Protection Organizations 1999-09-22
[Table view] Category:UTILITY
MONTHYEARIR 05000483/19900181990-11-14014 November 1990 Insp Rept 50-483/90-18 on 901001-03 & 1105.No Violations Noted.Major Areas Inspected:Inservice Insp Activities Including Review of Program Procedures,Observation of Work Activities & Data Review IR 05000483/19900161990-10-22022 October 1990 Insp Rept 50-483/90-16 on 901001-05.No Violations Noted. Major Areas Inspected:Insp of Licensee Corrective Actions Initiated for Issues Identified in self-initiated Safety Sys Assessment of ESW Sys IR 05000483/19900151990-10-18018 October 1990 Insp Rept 50-483/90-15 on 900816-0930.No Violations Noted IR 05000483/19900141990-08-31031 August 1990 Insp Rept 50-483/90-14 on 900724-27.No Violations Noted. Major Areas Inspected:Licensee fitness-for-duty Program,Drug & Alcohol Abuse Policies,Testing Program & Randon Testing Program IR 05000483/19900131990-08-28028 August 1990 Insp Rept 50-483/90-13 on 900701-0815.Violations Noted. Major Areas Inspected:Lers,Followup on Previous Insp Findings,Followup on Generic Ltrs,Plant Operations,Maint/ Surveillance & Regional Requests IR 05000483/19900121990-07-13013 July 1990 Insp Rept 50-483/90-12 on 900516-0630.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations, ESF Walkdown & Maint & Surveillance Performed IR 05000483/19900031990-02-13013 February 1990 Insp Rept 50-483/90-03 on 900124-25 & 900131 Telcon.No Violations Noted.Major Areas Inspected:Radiochemistry & Radiological Environ Monitoring Programs,Including Qa/Qc Program in Counting Room,Procedures,Organization & Training IR 05000483/19890171989-09-22022 September 1989 Insp Rept 50-483/89-17 on 890821-25.No Violations or Deviations Noted.Major Areas Inspected:Chemistry Program, Including Procedures,Organization,Training,Primary & Secondary Sys Water QC Programs & Qa/Qc Program in Lab IR 05000483/19890161989-09-0707 September 1989 Insp Rept 50-483/89-16 on 890821-25.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection & Radwaste Mgt Programs Including Changes Since Last Insp, Audits & Appraisals,External Exposure Control & ALARA IR 05000483/19890141989-08-28028 August 1989 Insp Rept 50-483/89-14 on 890717-0803.No Violations or Deviations Noted.Major Areas Inspected:Design Changes & Mod & Dedication of Commercial Grade Equipment for safety- Related Applications IR 05000483/19890111989-07-27027 July 1989 Insp Rept 50-483/89-11 on 890601-0715.No Violations Noted. Major Areas Inspected:Nonroutine Events,Plant Operations & Maint/Surveillance IR 05000483/19880081989-07-21021 July 1989 Addendum to Insp Rept 50-483/88-08 Comparing Results of Analyses Performed on Liquid Spike & Monitor Tank Sample IR 05000483/19890121989-07-18018 July 1989 Partially Withheld Safeguards Insp Rept 50-483/89-12 on 890626-0707 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Protected Area Assessment Aids,Power Supply, Training & Qualification IR 05000483/19890091989-06-22022 June 1989 Safety Insp Rept 50-483/89-09 on 890401-0531.No Violations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance & Onsite Followup of Nonroutine Events IR 05000483/19890081989-06-0101 June 1989 Insp Rept 50-483/89-08 on 890328-0515.No Violations Noted. Major Areas Inspected:Inservice Insp Activities,Including Review of Procedures,Observation of Work Activities & Review of Data IR 05000483/19890101989-05-30030 May 1989 Insp Rept 50-483/89-10 on 890501-05 & 11.No Violations Noted.Major Areas Inspected:Radiation Protection Program During Refueling/Maint Outage Including,Changes in Organization,Audits & Appraisals IR 05000483/19890071989-04-14014 April 1989 Insp Rept 50-483/89-07 on 890403-06.No Violations Noted. Major Areas Inspected:Emergency Preparedness Program, Including Emergency Plan Activations,Licensee Actions on Previously Identified Items & Operational Status of Program IR 05000483/19890041989-04-13013 April 1989 Safety Insp Rept 50-483/89-04 on 890216-0331.No Violations Noted.Major Areas Inspected:Plant Operations,Radiological Controls,Maint/Surveillance,Emergency Preparedness,Security & Safety Assessment/Quality Verification IR 05000483/19890031989-03-21021 March 1989 Partially Withheld Physical Security Insp Rept 50-483/89-03 on 890213-23 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Mgt Support,Protected & Vital Area Barriers,Access Control,Personnel,Packages,Vehicles & Alarm Stations IR 05000483/19890011989-03-0606 March 1989 Safety Insp Rept 50-483/89-01 on 890101-0215.Weaknesses Noted.Major Areas Inspected:Previous Insp Findings,Lers, Plant Operations,Radiological Controls,Maint Surveillance, Emergency Preparedness & Security IR 05000483/19890021989-03-0202 March 1989 Insp Rept 50-483/89-02 on 890124-0215.Violations Noted. Major Areas Inspected:Environ Qualification of Electrical Equipment within Scope of 10CFR50.49 (Modules 30703 & 92701) IR 05000483/19880151988-09-22022 September 1988 Insp Rept 50-483/88-15 on 880731-0831.Violations Noted.Major Areas Inspected:Ler,Plant Operations,Radiological Controls, Maint/Surveillance,Emergency Preparedness,Security, Engineering & Technical Support & Safety Assessment IR 05000483/19880171988-09-16016 September 1988 Insp Rept 50-483/88-17 on 880822-26.No Violations Noted. Major Areas Inspected:Chemistry Program,Including Procedures,Organization & Training,Reactor Sys Water QC Programs & Qa/Qc Programs in Labs IR 05000483/19880161988-09-16016 September 1988 Insp Rept 50-483/88-16 on 880815-19.No Violations Noted. Major Areas Inspected:Maint Activities Using Selected Portions of Insp Modules 62700,62702,62705 & 62720 IR 05000483/19880141988-08-11011 August 1988 Insp Rept 50-483/88-14 on 880703-30.No Violations or Deviations Noted.Major Areas Inspected:Lers,Plant Operations,Radiological Controls,Maint/Surveillance, Emergency Preparedness,Security & Technical Support IR 05000483/19880091988-07-12012 July 1988 Insp Rept 50-483/88-09 on 880606-09.No Violations, Deficiencies or Deviations Noted.Major Areas Inspected: Emergency Preparedness Program,Emergency Response Facility Appraisal & Review of Radioactive Release Assessment IR 05000483/19880111988-06-17017 June 1988 Partially Withheld Physical Security Insp Rept 50-483/88-11 on 880523-27 (Ref 10CFR73.21).Noncompliance Noted:Four Licensee Designated Vehicles Failed to Meet Security Plan Criteria for Such Designation IR 05000483/19880101988-06-16016 June 1988 Insp Rept 50-483/88-10 on 880606-07.No Violations, Deficiencies,Deviations or Exercise Weaknesses Noted.Major Areas Inspected:Plant Emergency Exercise.Objectives of Exercise Encl IR 05000483/19880131988-06-16016 June 1988 Insp Rept 50-483/88-13 on 880525.Allegations Not Substantiated.Major Areas Inspected:Allegation Re Aberrant Behavior by Named Individual W/Unescorted Access to Plant IR 05000483/19880071988-06-0707 June 1988 Insp Rept 50-483/88-07 on 880403-0521.No Violations Noted. Major Areas Inspected:Plant Operations,Esf Sys Walkdown,Qa, Administrative Controls Affecting Quality,Surveillance, Maint,Fire Protection Radiological Controls & Security ML20155D4101988-05-31031 May 1988 Insp Rept 50-483/88-08 on 880502-06.No Violations or Deviations Noted.Major Areas Inspected:Confirmatory Measurements & Radiological Environ Monitoring Programs, Including Plant Chemistry,Organization & Mgt Control IR 05000483/19880041988-04-25025 April 1988 Insp Rept 50-483/88-04 on 880207-0402.Violations Noted. Major Areas inspected:LERs,inspector-identified Problems, Plant Operations,Esf Walkdown,Radiological Controls,Maint, Fire Protection,Emergency Preparedness & Security ML20150C8181988-03-17017 March 1988 Partially Withheld Insp Rept 50-483/88-05 on 880218,0222-26 & 0303 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Mgt Effectiveness - Security Program,Records, Protected Area Barriers & Alarms & Lighting Assessment Aids IR 05000483/19870361988-02-23023 February 1988 Insp Rept 50-483/87-36 on 871205-880206.No Violations Noted. Major Areas inspected:LER,inspector-identified Problems, Plant Operations,Esf Sys Walkdown,Radiological Controls, Maint,Surveillance,Fire Protection & Security IR 05000483/19880031988-02-19019 February 1988 Insp Rept 50-483/88-03 on 880125-0202.Violations Noted. Major Areas Inspected:Emergency Preparedness Program Including,Emergency Plan Activations,Licensee Actions on Previously Identified Items & Required Drills IR 05000483/19880021988-02-0404 February 1988 Safety Insp Rept 50-483/88-02 on 880105-14.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings,Control Rod Testing,Core Power Distribution Limits & Calibr of Nuclear Instrumentation Sys IR 05000483/19870321987-12-31031 December 1987 Safety Insp Rept 50-483/87-32 on 871004-1204.Violations Noted But No Notice Issued.Major Areas Inspected:Lers,Plant Operations,Esf Sys,Radiological Controls,Maint,Surveillance, Fire Protection,Emergency Preparedness & Security IR 05000483/19870291987-12-16016 December 1987 Insp Rept 50-483/87-29 on 870921-1203.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp Work Activities,Training & Qualification Effectiveness & Facility Mods (73501,73057,73753,73755,41400,37701,55700 & 57700) IR 05000483/19870311987-11-19019 November 1987 Insp Rept 50-483/87-31 on 871006-09.Violations Noted.Major Areas Inspected:Radiation Protection Program,Including Changes in Organization,Personnel,Facilities,Equipment, Programs & Procedures IR 05000483/19870351987-11-19019 November 1987 Enforcement Conference Rept 50-483/87-35 on 871110. Violations Noted.Major Areas Discussed:Condition in Which Mispositioned Flow Balancing Damper Affected Performance of One Train of Control Room Emergency Ventilation Sys IR 05000483/19870331987-11-0404 November 1987 Safety Insp Rept 50-483/87-33 on 871007-17.Violations Noted: Failure to Perform Adequate Preoperational Test & Failure to Promptly Rept Condition Adverse to Quality.Major Areas Inspected:Mispositioned Balancing Damper IR 05000483/19870341987-10-27027 October 1987 Enforcement Conference Rept 50-483/87-34 on 871002 Re Events in Which Mispositioned Valve Resulted in Reduced Flow Capability of One Essential Svc Water Train & Breached Seals Resulted in Emergency Ventilaton Sys Inoperability IR 05000483/19870301987-09-29029 September 1987 Safety Insp Rept 50-483/87-30 on 870922-24.No Violations or Deviations Noted.Major Areas Inspected:Snubber Surveillance & Functional Testing Program & Training IR 05000483/19870201987-09-29029 September 1987 Insp Rept 50-483/87-20 on 870601-0801.No Violations or Deviations Noted.Major Areas Inspected:Previous Insp Findings,Operational Safety,Esf Sys Walkdown,Radiological Control,Maint,Fire Protection,Security & Quality Programs ML20235J7981987-09-25025 September 1987 Insp Rept 50-483/87-23 on 870908-11.Violations Noted.Major Areas Inspected:Licensee Action Following 870709 Surveillance Test Which Indicated That Both Independent Control Room Emergency Ventilation Sys Inoperable IR 05000483/19870281987-09-25025 September 1987 Insp Rept 50-483/87-28 on 870824-0911.Violation Noted Re Failure to Identify & Correct Incorrect Essential Svc Water Valve Position.Major Areas Inspected:Essential Svc Water Sys Operability IR 05000483/19870251987-09-17017 September 1987 Safety Insp Rept 50-483/87-25 on 870812-21.Violation Noted. Major Areas Inspected:Isolation of Safety Injection Sys Combined Recirculation Valve BN-HV-8813 IR 05000483/19870241987-09-0303 September 1987 Insp Rept 50-483/87-24 on 870730 & 0804-07.Violations Noted. Major Areas Inspected:Nonconservative Setting of Overtemp delta-temp Reactor Trip Setpoint & Adequacy of Corrective Actions Specified in LER 87-012-01 IR 05000483/19870271987-09-0101 September 1987 Partially Withheld Insp Rept 50-483/87-27 on 870811-18. Violation Noted.Major Areas Inspected:Circumstances Re Event Involving Safeguards Info Documents Not Adequately Protected at Offsite Location IR 05000483/19870221987-08-20020 August 1987 Insp Rept 50-483/87-22 on 870714-17.No Violations Noted. Major Areas Inspected:Ie Bulletin 85-003, Motor-Operated Valve Failures During Plant Transients Due to Improper Switch Settings 1990-08-31
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000483/19990101999-10-14014 October 1999 Insp Rept 50-483/99-10 on 990913-16.No Violations Noted. Major Areas Inspected:Plant Support Re Biennial Exercise of Emergency Plan & Procedures IR 05000483/19990111999-09-22022 September 1999 Insp Rept 50-483/99-11 on 990812-20.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19990081999-09-13013 September 1999 Insp Rept 50-483/99-08 on 990725-0904.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19990071999-09-10010 September 1999 Insp Rept 50-483/99-07 on 990809-13.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluating Operators PNO-IV-99-035A, on 990810,heater Drain Line Pipe Rupture Occurred.Caused by Flow Accelerated Corrosion in Conjunction with Moisture Impingement.Licensee Has Completed Replacement of Damage Heater Drain Piping & Conducted Insps of Piping1999-08-18018 August 1999 PNO-IV-99-035A:on 990810,heater Drain Line Pipe Rupture Occurred.Caused by Flow Accelerated Corrosion in Conjunction with Moisture Impingement.Licensee Has Completed Replacement of Damage Heater Drain Piping & Conducted Insps of Piping IR 05000483/19990061999-08-13013 August 1999 Insp Rept 50-483/99-06 on 990613-0724.One Severity Level 4 Violation Noted & Being Treated as Ncv.Major Areas Inspected:Operations,Maint & Plant Support PNO-IV-99-035, on 990810,operators Initiated Manual Rt When High Pressure Heater Drain Line Ruptured in Turbine Bldg. Licensee Is Evaluating Options for Facilitating Repair & Restarting Plant.Region IV Will Conduct Special Insp1999-08-11011 August 1999 PNO-IV-99-035:on 990810,operators Initiated Manual Rt When High Pressure Heater Drain Line Ruptured in Turbine Bldg. Licensee Is Evaluating Options for Facilitating Repair & Restarting Plant.Region IV Will Conduct Special Insp IR 05000483/19990051999-06-25025 June 1999 Insp Rept 50-483/99-05 on 990502-0612.Two Violations Noted & Being Treated as Noncited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19990031999-05-19019 May 1999 Insp Rept 50-483/99-03 on 990321-0501.Noncited Violation Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19993021999-05-0303 May 1999 Exam Rept 50-483/99-302 on 990416.Exam Results:Ro License Applicant Passed Retake Written Exam & Test Matl Adequate IR 05000483/19990011999-04-0505 April 1999 Insp Rept 50-483/99-01 on 990207-0320.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19993011999-02-0202 February 1999 NRC Operator Licensing Exam Rept 50-483/99-301 for Exams Administered on 990111-15 ML20199D9261999-01-12012 January 1999 Notice of Violation from Insp on 981115-1226.Violation Noted:Licensee Failed to Perform Written Safety Evaluation, from 840611-980505 IR 05000483/19980181998-12-0404 December 1998 Insp Rept 50-483/98-18 on 980914-1002.Violations Noted. Major Areas Inspected:Review of Design & Licensing Basis for Essential Service Water Sys,Associated Electrical Support Sys & Review of Program Implement 10CFR50.59 ML20198A1231998-12-0404 December 1998 Notice of Violation from Insp on 980914-1002.Violation Noted:Listed Activities Affecting Quality Either Not Prescribed by Documented Instructions Appropriate to Circumstances or Not Accomplished with Procedures PNO-IV-98-059, on 981129,licensee Commenced Plant Shutdown from 100% Power to Mode 3 to Replace Fan Motor.Resident Inspector Monitored Portion of Plant Shutdown from Cr.Info Has Been Discussed with Licensee1998-11-30030 November 1998 PNO-IV-98-059:on 981129,licensee Commenced Plant Shutdown from 100% Power to Mode 3 to Replace Fan Motor.Resident Inspector Monitored Portion of Plant Shutdown from Cr.Info Has Been Discussed with Licensee IR 05000483/19980241998-11-25025 November 1998 Insp Rept 50-483/98-24 on 981026-30.Violation Noted.Major Areas Inspected:Licensee Implementation of NRC Approved Fire Protection Program ML20196G3471998-11-25025 November 1998 Notice of Violation from Insp on 981026-30.Violation Noted: on 981030,control Room Pantry Fire Door,Identified as Being Nonfunctional Without Fire Barrier Impairment Permit or Conpensatory Actions,As Required by Procedure APA-ZZ-00701 IR 05000483/19980221998-11-25025 November 1998 Insp Rept 50-483/98-22 on 980927-1114.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000483/19980231998-10-28028 October 1998 Insp Rept 50-483/98-23 on 981013-15.No Violations Noted. Major Areas Inspected:Operational Status of License Emergency Preparedness Program Was Conducted IR 05000483/19980151998-10-26026 October 1998 Insp Rept 50-483/98-15 on 980706-10.No Violations Noted. Major Areas Inspected:Guidance of Temporary Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers IR 05000483/19980201998-10-15015 October 1998 Insp Rept 50-483/98-20 on 980817-0904.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000483/19980211998-10-0909 October 1998 Insp Rept 50-483/98-21 on 980816-0926.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19980191998-09-29029 September 1998 Insp Rept 50-483/98-19 on 980914-18.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980121998-08-21021 August 1998 Insp Rept 50-483/98-12 on 980705-0815.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support ML20237B8931998-08-14014 August 1998 Notice of Violation from Insp on 980803-07.Violation Noted: on 980804,inspector Noted Three Containers of Dry Active Waste Stored within 10 Feet of Permanent Structure IR 05000483/19980171998-08-14014 August 1998 Insp Rept 50-483/98-17 on 980803-07.Violations Noted.Major Areas Inspected:Implementation of Solid Radioactive Waste Mgt & Radioactive Matls Transportation Program IR 05000483/19980161998-08-0606 August 1998 Insp Rept 50-483/98-16 on 980713-17.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980131998-07-29029 July 1998 Insp Rept 50-483/98-13 on 980714-17.Violation Noted.Major Areas Inspected:Engineering & Plant Support ML20236V3251998-07-29029 July 1998 Notice of Violation from Insp on 980714-17.Violation Noted: Grinding Needle Gun Work Performed on 2,000 Ft Elevation of Cb Liner Floor Plate W/O Performing Surveys to Evaluate Concentration or Quantities of Radioactive Matl IR 05000483/19980141998-07-17017 July 1998 Insp Rept 50-483/98-14 on 980629-0702.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000483/19980111998-07-0808 July 1998 Insp Rept 50-483/98-11 on 980524-0704.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20248L2621998-06-0808 June 1998 Notice of Violation from Insp on 980412-0523.Violation Noted:On 980419,workman Protection Assurance 26226 Was Inadequate to Ensure Safety During Work on Valve EJHV8804A IR 05000483/19980081998-06-0808 June 1998 Insp Rept 50-483/98-08 on 980412-0523.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980071998-05-19019 May 1998 Insp Rept 50-483/98-07 on 980427-0501.Violations Noted.Major Areas Inspected:Radiation Protection Program Focussing on Refueling Outage Activities ML20247M2241998-05-19019 May 1998 Insp Rept 50-483/98-10 on 980428-30.No Violations Noted. Major Areas Inspected:Contingency Plan Developed in Response to Insp Findings in NRC Insp Rept 50-483/98-06 W/Special Emphasis on Training Process Used to Qualify People for Er IR 05000483/19980091998-05-19019 May 1998 Insp Rept 50-483/98-09 on 980428-30.No Violations Noted. Major Areas Inspected:Maint & Plant Support IR 05000483/19980051998-05-0808 May 1998 Insp Rept 50-483/98-05 on 980413-0501.No Violations Noted. Major Areas Inspected:Maintenance,Engineering & Plant Support ML20217F4491998-04-22022 April 1998 Notice of Violation from Insp on 980324-26.Violations Noted: on 970529,licensee Made Changes to Emergency Plan W/O Commission Approval,That Decreased Effectiveness of Plan & Did Not Continue to Meet Planning Standard 50.47(b)(2) ML20217F4881998-04-22022 April 1998 Insp Rept 50-483/98-06 on 980324-26.Violations Noted.Major Areas Inspected:Plant Support IR 05000483/19980041998-04-17017 April 1998 Insp Rept 50-483/98-04 on 980406-10.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000483/19980031998-04-17017 April 1998 Insp Rept 50-483/98-03 on 980301-0411.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering ML20217F1921998-03-26026 March 1998 Notice of Violation from Insp on 980202-06.Violation Noted: Licensee Did Not Demonstrate That Either Train of Auxiliary Fuel Bldg Emergency Filter Sys Adsorbers Could Comply W/Ts 4.7.7.b.2 Until Charcoal from Each Train Was Replaced IR 05000483/19980021998-03-26026 March 1998 Insp Rept 50-483/98-02 on 980202-06.Violation Noted.Major Areas Inspected:Maint,Engineering Re Bldg Emergency Filter Sys Adsorber IR 05000483/19980011998-03-0909 March 1998 Insp Rept 50-483/98-01 on 980118-0228.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support ML20216A7971998-03-0909 March 1998 Notice of Violation from Insp on 980118-0228.Violation Noted:On 980216,instructions to Work Authorization C612323 Did Not Provide Adequate Guidance for Concrete Core Drilling Work,As Result,Licensee Personnel Drilled Into Power Cable IR 05000483/19970211998-01-27027 January 1998 Insp Rept 50-483/97-21 on 971207-980117.No Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980251998-01-12012 January 1998 Insp Rept 50-483/98-25 on 981115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support,Including Health Physics & Security IR 05000483/19970191997-12-18018 December 1997 Insp Rept 50-483/97-19 on 971117-1211.No Violations Noted. Major Areas Inspected:Engineering IR 07100026/20120061997-12-16016 December 1997 Notice of Violation from Insp on 971026-1206.Violation Noted:Licensee Personnel Failed to Follow Documented Instructions During Preventive Maint Task to Record Differential Pressure Across Essential Svc Water Supply 1999-09-22
[Table view] |
Text
. _ . .
.
_
,
U. S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-483/86009(DRSS)
Docket No. 50-483 License No. NPF-30 Licensee: Union Electric Company l
Post Office Box 149 - Mail Code 400 St. Louis, MO 63166 Facility Name: Callaway Nuclear Power Plant Inspection At: Callaway Plant, Reform, M0 Inspection Conducted: March 24-28, 1986 Inspectors:
$$
J. Patterso
~'
Team Leader Date s Date Date fih W. Snell, Chrlef .c9 Approved By: #/#
Emergency Preparedness Section Date
'
Inspection Summary Inspection on March 24-28, 1986 (Report No. 50-483/86009(DRSS))
Areas Insnected: Routine, unannounced inspection of the following areas of the Callaway Nuclear Power Plant emergency preparedness program: activations of the licensee's emergency plan; emergency detecticn and classification; protective action decisionmaking, notifications and communications; changes to the emergency preparedness and performance of dutiestraining);
(program;licensee shift staffing audit and augmentation; The inspection wasknowledge conducted by three NRC inspectors and two consultant Results: No violations, deficiencies, or deviations were identified. However, five Open Items were identified during the inspectio PDR ADOCK 05000483 G PDR
.
.
DETAILS 1. Persons Contacted D. Schnell, Vice President, Nuclear
- S. Miltenberger, Manager, Callaway Plant
- A. Neuhalfen, Manager, QA G. Hughes, Supervisor, Independent Safety Engineering Group
- M. Evans, Senior Training Supervisor M. Faulkner, Administrator, Nuclear Affairs
- G. Nevels, Training Supervisor
- Norton, QA Engineer L. Kanuckel, Supervisory Engineer, QA Program R. McAleenan, Manager, Nuclear Information
- J. Gearhart, Supervising Engineer, Quality Assurance
- H. Bono, Engineer, Quality Assurance G. Poteat, Nuclear Scientist W. Hinchic, Assistant Engineer, Emergency Preparedness S. Harvey, Administrator, Nuclear Affairs S. Leach, Rad / Chem Foreman P. Bell, Chemist D. Heinlin, Assistant Plant Superintendent B. Schoenbach, Operating Supervisor N. Barnet, Operating Supervisor R. Hamblen, Shift Technical Advisor S. Rutthoff, Shift Supervisor W. Lacefield, Operations Supervisor T. Moser, Shift Technical Advisor P. Hobbs, Operations Supervisor D. Neil, Operations Supervisor L. Rippy, Shift Technical Advisor L. Auman, Health Physics Foreman C. Graham, Health Physics Supervisor S. Halvorsen, Senior Training Supervisor, Simulator R. Burris, Senior Training Supervisor, I&C, Maintenance and Quality Control J. Hogg, Supervisory Engineer, Operations R. Gunderstrom, Rad / Chem Foreman
- * Denotes those attending the exit interview on March 28, 198 . Activations of the Licensee's Emergency Plan
, (Closed) Open Item Nos. 483/85001-XX,483/85002-XX. Two activations of j the Callaway Radiological Emergency Response Plan (RERP) were identified
'
as having occurred since the last inspection. The first event, which occurred during plant startup on February 22, 1985, was due to a reactor trip initiated by a loss of power to the reactor coolant pumps (caused by a power failure to the startup transformer). The second event, on March 30, 1985, was due to a Safety Injection System activation for 5-10 minutes due to a low steamline pressure signal during plant cooldow I
l
] ,
.
Both event classifications were based on the correct Emergency Action Level (EAL) and each was correctly classified as a Notice of Unusual Event. Also, the inspector verified that notifications to State and
. local governmental agencies and the NRC Operations Center were made within the required times. The addition of a ring-down telephone, which reaches all support agencies at one time, has reduced notification times from those noted in the previous inspectio . Emergency Detection and Classification A thorough review of procedure EIP-ZZ-00101 " Classification of Emergencies" was conducted. The procedure is now in Revision 5, dated February 14, 1986. Individual Emergency Action Level criteria were compared to the guidance in Appendix 1 of NUREG-0654, 10 CFR 50, the Callaway Technical Specifications, Callaway drawings, FSAR, and other procedures. Problems identified were reviewed with licensee personnel responsible for EAL development to ensure that related plant system performance and procedures were understood by the reviewer. The basic categories of problems in the present EAL scheme are listed below. Detailed examples of EAL problems are provided as a separate attachment (Attachment 1).
The extensive use of t.onfirmatory grab sample analysis to verify various process radiation monitor alarms introduces unnecessary delays of approximately 45 minutes to two hours in meeting several EAL detection criteri The sets of indicators used to detect certain events and equipment failures are not consistent among different EALs which contain the same failures as part of the decisionmaking criteria. The sets of indications used to detect the occurrence of a Steam Generator tube failure are the most inconsisten The EALs often rely on alarms and confirmatory sample results from systems which would be automatically or manually isolated within a few seconds of initiation of a transient. Therefore, it is unlikely that the sample would be representative of the system it was meant to sampl At least one EAL, " Loss of RHR Cooldown", does not consider the functional capability of the system to be lost until virtually all system components are lost, when in fact, loss of either RHR flow or the system heat sink would remove RHR capabilit The Callaway EAL scheme is very complete in considering the applicability of EALs to limited sets of plant operating modes. The use of numerous instrument numbers and setpoints is in keeping with the intent of
,
10 CFR 50, Appendix E, Part IV.B. The various revisions to the EAL scheme l have produced an extremely complex set of AND/0R logic statements which may impede Emergency Response personnel in their attempt to properly j classify an accident situatio In reviewing the detailed examples of
'
potential EAL problems (see Attachment 1), licensee personnel should not rely upon the general prudential statements of "Shif t Supervisor or Emergency Coordinator Opinion" as the basis for decisionmaking when j revision of the technical statements in the EAls is warrante l i
_ _ _______ __ ____
. .
.
.
.
Walkthroughs and interviews were conducted with three Shift Technical Advisors, five Shift Operations Supervisors, and a Shift Supervisor, using scenarios prepared by the inspector which required demonstration of event detection and classification. Details of the walkthroughs are discussed in other sections of this report, except as noted belo Personnel interviewed were able to adequately use Procedure EIP-ZZ-00101,
Revision 5, " Classification of Emergencies", to classify emergencie However, all found the procedure to be cumbersome due to the extensive use of multiple initiating conditions combined with the various and/or logic and paragraph / subparagraph numbering. This problem was compounded in that the various Emergency Action Level (EAL) combinations for a given condition were spread over multiple pages as well as overlaps existing in the titles of various groups. Examples include Group 7 (Hazards to Station Operations) and Group 3 (Natural Events). The overlap in this case is that most significant natural events are also hazards to station operations. A Group 1 Primary System Event (Safety Injection initiation) is also a safety system function (Group 3). Such overlaps can cause confusion in locating the proper EAL. One group of control room personnel interviewed had not located the loss of RHR cooldown capability EAL after 3-4 minutes of f searching through the EAL Licensee personnel indicated they would review EIP-ZZ-00101, Revision 5,
, " Classification of Emergencies," against the findings in this section and Attachment 1 of this report. This review will consider changes to technical content, format, groupings, and group titles which will facilitate classification of emergencies. This will be tracked as Open Item No. 483/86009-01(DRSS).
4. Protective Action Decisionmaking Walkthroughs were conducted with control room personnel using scenarios which required demonstration of protective action decisionmakin Protective action recommendations made by personnel interviewed were correct and timely except as noted belo All control room personnel interviewed did not consider a two mile precautionary evacuation after declaring a General Emergency due to a
" loss of physical control of the facility." Upon review of EIP-ZZ-0212
" Protective Action Recommendations," Revision 6, it was noted that the above guidance, found in NUREG-0654, Page 1-17, Paragraph 3, was not incorporated into the procedur Based on the above findings, this portion of the licensee's program is acceptable; however, the following item should be considered for improvement:
Incorporate the guidance of NUREG 0654 Page 1-17, Paragraph 3 into procedure EIP-ZZ-0212. " Protective Action Recomendations."
I
_ _ _ _ _ _ - _ _ _ _ . _ . . . . . _ . . . .
. _ _ _ _ _ _ _ _ _ _ _
-
.
5. Dose Calculation and Assessment Review of Dose Calculation and Assessment capabilities included a review of procedures EIP-ZZ-01210 "Padiological Release Information System Operation " EIP-ZZ-01211 " Initial and Intermediate Dose Assessment,"
EIP-ZZ-01212 " Contingency Release Rate Determination," and EIP-ZZ-02211
"Long Term Dose Assessment." Two Dose Assessment Coordinators were interviewed and various sample problems were analyzed, partially using the Radiological Release Information System (RRIS). Problems noted during these reviews and interviews are as follows: The RRIS system is difficult to use as a predictive tool and therefore procedures direct Dose Assessment personnel to use a COMPAQ or HP-1000 computer for Dose Projection calculations. There was no COMPAQ computer available in the Technical Support Center (TSC) at the time of the inspection, and the TSC HP-1000 was in use elsewhere in the Power Block in support of the current plant outage. The licensee should evaluate the acceptability of using Emergency Equipment to support normal plant operations which would delay emergency availability, During the interviews, one Dose Assessment Coordinator assumed that the RRIS displayed wind direction in the "toward" directio Applying the 180 degree conversion in procedure EIP-ZZ-01211 then caused Dose Projections to be oriented 180 degrees in the wrong direction. This individual stated that he had not yet been formally trained on the use of the RRI Wind speed displayed on the RRIS is in units of Kilometers / hour. All Dose calculation forms in EIP-ZZ-1211 use wind speed in meters /secon One Dose Assessment Coordinator was delayed in making calculations through not locating the proper form which contained the conversion factor for Km/hr to m/se During scenario walkthrough, one individual would have classified J a release of 2.5E+8 uci/sec as a Site Area Emergency, when it is properly a General Emergenc The RRIS Dose Assessment Computer is designed as a real time analyzer using automated updates of all necessary input parameters. Procedures adequately warn users that the RRIS has limited usefullness as a predictive device. With the RRIS in the automatic mode, it has the following shortcomings: Many of the top level displays do not alert the operator to the fact that some inputs (e.g. release rate, wind direction) may be in the manual insert mode. In manual insert mode, the input does not come from system monitors, as might be assumed by the operato The system does not directly display peak centerline doses for radiation plume .
. The isotope library has no explanation in the index for the type of accident associated with the release cas . Hard copies of RRIS displays and data are available only in the control room (the printer is in the BOP computer room), which is distant from the TSC. This could make hardcopy acquisition difficult during an actual emergenc There is no direction on fonn CA-1014 of EIP-ZZ-01211 as to which of the three possible wind speeds available on RRIS is to be used for manual dose calculation It should be noted that many of the the above problems can be obviated through adequate training and procedure revisions. Licensee actions to address Items a through j above will be tracked as Open Item ,
No.483/86009-02(DRSS).
Attachment 13 to EIP-ZZ-01211 is the manual dose Projection form for a l main steam line break. The form presently considers three potential monitored or calculated release paths. These are Containment leakage, Unit Vent Stack, and Auxiliary Feed Pump Turbine steam. A review of plant drawings indicates that Area 5 (Steam Tunnel), which contains the Main Steam Isolation Valves, Steam Generator safeties and dumt valves, has blowout panels on the roof. A main steam line break in ihls area could result in an unmonitored release through these panels to the environment if accompanied by a Steam Generctor tube brea Several personnel interviewed initially thought that all steam released to this area would vent to the Auxiliary and Turbine buildings and subsequently to the Unit Vent. Procedures should be developed to allow estimation of radiological releases in the event of a main steam line break in Area This will be tracked as Open Item No. 483/86009-03(DRSS).
6. Notifications and Comunications (Closed) Open Item 483/85003-01: The licensee has revised procedure EIP-ZZ-0021 to require that all initial messages to State and county officials include information on the topics listed in NUREG 0654, l Revision 1, Criterion (0 pen) Open Item 483/85003-02: The licensee has revised the notification priorities in what is now Attachment 4 to EIP-2Z-00201 to indicate that the on-call Recovery Manager and the NRC Operations Center will be l notified of any emergency imediately after appropriate County and State organizations have been contacted. However, the revised notification sequence of Attachment 4, " Notification Checklist" does not also meet 10 CFR 50.72, which requires..that the NRC Operations Center be called imediately after State and/Gr local officials. Sections 5.2.4, 5.2.5, and 5.2.5.3 will also require revision to be consistent with a revised checklist and current notification requirement _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.
.
Procedure EIP-ZZ-A0023 has been revised to specify only months for the quarterly and annual emergency communication eqaipment tests rather than certain weeks of certain months. This was identified as an area of improvement during the 1985 routine inspection. A review of the monthly, quarterly and annual emergency communication tests performed from December 1984 through March 1986 indicated all tests were conducted in accordance with the revised procedur The inspector reviewed procedure EIP-ZZ-A0021, "Public Alert Maintenance System Procedures," and relevant correspondence, files and checklist This review indicated that tests and maintenance procedures are satisfactorily conducted by licensee personnel in accordance with approved procedures. Also reviewed were records of periodic siren tests conducted by local off41als. These records were adequately detailed, and indicated the licensee had taken timely actions to correct system deficiencies observed during testing. The inspector reviewed and discussed the licensee's provisions for siren system preventive maintenance and determined that they were adequat Provisions for distribution of tone alert radios were also contained in EIP-ZZ-A0021. The inspector reviewed documentation and discussed implementation of the tone alert radio system with licensee personnel, and determined there was an adequate program for identification of households requiring tone alert radios, distribution of radios and replacement batteries, radio testing and replacemen . Changes to the Emergency Preparedness Program l l
All revisions to the Radiological Emergency Response Plan (RERP) are made !
in accordance with new procedure NSEP-EP-00400, " Preparation, Review, and Approval of Revisions to the Radiological Emergency Response Plan." EIP revisions are prepared in accordance with procedure APA-ZZ-00101,
" Preparation, Review, Approval, and Control of Plant Procedures." The inspector determined that procedures are in place to assure all changes to the plan and implementing procedures are reviewed and approved by licensee management, and any changes which might decrease the effectiveness of the plan are identifie Pevision 9 of the RERP was recently submitted to the NRC for revie Changes in notification methods for state and local agencies, updated EALs and char.ges in the company's organizational structure constituted the major changes in this revision. The licensee has removed the RERP i from the FSAR, and converted it into a licensing document. This allows '
changes to the RERP without updating the FSAR for each change, and is an acceptable practic Administrative procedures contained in Emergency Implementing Procedures ,
(EIPs) are presently being revised in accordance with procedure i APA-ZZ-00101. A review of a draft copy of EIP-ZZ-A0020 (in the process l of revision), and the review package, indicated adequate management '
review was being implemented to assure maintenance of plan effectivenes _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ - _ _ _
-
.
.
The licensee has an Action Item Tracking system for tracking items or issues generated by internal or external reviews. The inspector's review of Open Items 483/85003-01 and 483/85002-02 on the licensee's Action Item Tracking system verified that NRC or licensee-generated areas of concern are identified and monitored effectively by the EP staf The inspector reviewed the RERP, Revision 9, and EIP-ZZ-00241 and determined that the relocation of the Operations Support Center from the lunchroom to the maintenance office is reflected in the current revision of the plan and corresponding implementing procedure Distribution of changes to the RERP and Emergency Fian Implementing Procedures (EPIPs) were accomplished within 30 days as required by 10 CFR 50.54(q) and 10 CFR 50, Appendix E, Paragraph Based on the above firdings, tbt, portion of the licensee's program is acceptabl . Shift Staffing and Augmentation (Closed) Open Item 483/85003-05: A successful drill of the augmentation of the on-site organization was conducted on December 2, 198 (0 pen) Open Item 483/85003-03: The single drill conducted to demonstrate the augmentation of the interim-E0F organization failed to meet time goals. A drill to test interim-E0F augmentation is tentatively scheduled for April,1986. As interim-EOF augmentation has not been successfully demonstrated in a semiannual, off-hours drill, Open Item 483/85003-03 will remain ope The inspector reviewed the procedures utilized to callout personnel to staff the on-site, interim-EOF, corporate, and public information emergency response organizations (procedures EIP-ZZ-00202, -00502, -C0020, and -PR010, respectively). Also reviewed were the February 1986 edition of the Emergency Telephone Directory, and records of five augmentation drills held between December 1985, and February 1986. Procedures and drill results were discussed with licensee personne All five augmentation drills involved callout of the onsite emergency organization, with the early drills failing to meet time goals. A June 1985 drill also tested callout of the corporate and public information staff. The February drill tested augmentation of the interim-EOF organizatio In general, improvaments in notification timeframes were noted in the documentation of each successive drill, with a successful onsite augmentation drill being accomplished after a callout procedure change to utilize a telephone answering service for notification All five augmentation drills were critiqued and well documente Notification times had been added to commute times to arrive at an estimated total response time for each individual, completing an improvement item from the previous inspection. Drill critiques were
.. ..
. .
.
.
. _ _ _ _ _ _ _
. _ -
__ _
.
.
of differing formats, and it was recommended that each drill critique be of a standard fonnat, containing drill results, problems noted, and reconnendations. This would allow a direct comparison of results from drill to dril The inspector reviewed the February 7,1986 Emergency Telephone Directory '
and determined that it listed name, home and work telephone numbers, pager number (if applicable) and comute time for each person liste Listings were by position, with 6t least three individuals identified for each coordinator or manager position. Many positions have a symbol indicating the primary individual for the position, and all individuals fcr each position were listed by increasing comute times. If several individuals have equal commute times, they are listed alphabeticall The Emergency Preparedness staff is responsible for issuing quarterly updates of the Emergency Telephone Directory, per procedure EIP-ZZ-A0020, and a new revision will be issued April 1,1986. Procedure EIP-ZZ-A0020 is in the process of revision itself, to remove and place requirements pertaining to the EP staff in the EP staff procedure Licensee personnel indicated that individuals in the Emergency Telephone Directory have a fifteen month " disqualification period" after which they are removed from the Directory if they have not received retraining. A computerized list is utilized to track the disqualification date, and this list is provided to the Training Department. If an individual is disqualified, his name is not included in the quarterly update of the Emergency Telephone Directory submitted to the Document Control group for duplication and distributio In addition to the previous Open Item remaining open, the following item should be considered for improvement:
Augmentation drill critiques should be of a standard format, containing drill results, problems observed, and recomendation . Knowledge and Perfurmance of Duties (Training)
The NRC inspectors reviewed the licensee's Emergency Preparedness training Program. The review consisted of an examination of selected training records for key Emergency Response Personnel, lesson plans and governing procedures. The inspectors also reviewed the training objectives and the course matri Individuals whose records were to be reviewed were selected from the Callaway Emergency Telephone Directory which also specifies the individuals emergency response positio Training records of 38 emergency positions out of 55 were reviewed and found to be current. These 38 positions included corporate level-emergency positions plus those interviewed during the inspectio EP training has ncw been incorporated into Simulator training for those Control Room personnel with emergency response functions. This integrated training of reactor operations personnel resulted partly from a recomendation in the previous inspection. To better define the
. _ _
. _ _ _ _ . . _ , . - - _ _ _ . _ _ ._
.
.
objectives and responsibilities of each emergency response position, a Job Task Analysis is being developed by the Training Department. Three lesson plans have been established for each of the 55 emergency response positions. The first includes a review of the RERP, the second includes
,
the emergency plan implementing procedures, and the third emphasizes the practical, hands-on activities relating to the position. This approach should improve the integration of the training program with the emergency preparedness program, at both the corporate and site leve The Emergency Preparedness Required Reading Procedure, EIP-ZZ-A024, has been revised as suggested in an improvement item from the previous inspection. This procedure is used to assure that emergency response personnel review and understand EIP revisions made between training sessions. The revised EIP-ZZ-A024 makes the supervisor accountable for assuring that the procedure is adhered to by the emergency response person under his supervision. A brief title or description of the change is now included on the cover sheet to aid the recipient. The supervisor of EP now determines whether the procedural change is significant enough to be assigned as required reading; if not, the revision is not included as required readin A Course Deficiency File has been developed by the Training Department to log and review critique findings, improvement items, procedural changes or other items that relate to Emergency Preparedness (EP). A change relating to actions on a callout or shift augmentation was traced by the inspector from initiation by the EP group to a review by training staff to determine whether this information was relevant. The item was ultimately removed from the Course Deficiency File and became a permanent part of the course conten The inspector also observed two hours of a four hour offsite agencies training session given by a Training Department Supervisor. This course was presented to Callaway County emergency workers in Fulton, Missouri on March 25, 1986. The instructor was knowledgeable, and the course content was relevant in basic concepts and practical applications. The instructor encouraged questions and kept the class's attention. Additional Offsite support agancy training, by EP or Training Department staff, was conducted during the week of the inspectio Walkthroughs were conducted with nine selected members of the Emergency Response Organization. Walkthroughs with Shift Supervisors, Shift Operations Supervisors, and Shift Technical Advisers were conducted to verify the adequacy of their training in detection, classification, notification, and protective action recommendations. Each control room group was prebriefed that all procedures should be used, health physics and chemistry support could be requested, and all plant information and i l
indications requested would be supplied by the inspector. In addition to walking through various scenario situations, specific questions were posed to all groups concerning changes to the Emergency Preparedness Program, the required Reading Program and Emergency Plan trainin Response to scenario problems and questions was adequate except as noted belo ..
t r
All control room personnel interviewed were unaware of the requirement in 10 CFR 50.72(a)3 that the licensee shall notify the NRC Operations Center immediately after notification of State and local authorities. A review of the Emergency Plan Lesson Plan and discussions with licensee ;
training staff indicated this requirement had not been incorporated into the training program. The licensee should incorporate the above requirement into Emergency Preparedness Training and train required emergency response personnel on the revised notification requirement I This is considered to be an Open Item 483/86009-04(DRSS).
10. Licensee Audits The inspectors confirmed that independent audits of the Emergency Preparedness Program have been conducted by the licensee's Quality Assurance (QA) Department within the last twelve months. This annual audit consisted of two parts; one specifically related to the annual emergency exercise conducted from June 3-21, 1985; while the other was related to seven areas of the emergency preparedness program and was conducted between January 6-16, 1986.. The first audit included the evaluation of the adequacy of the interface with State and local governments in conjunction with observing parts of the emergency exercise which demonstrated the interface with off-site agencies in the Joint Public Information Center and the Fulton County Emergency Operations Center. This requirement was also met by evaluations made in some of the seven areas audited in January 1986. Selected portions of the following seven areas constituted the scope of this second audit: Emergency Response; Support and Resources; Emergency Facilities and Equipment; Radiological Emergency Response Training; Exercises and Drills; Public Education and Information; Responsibility for the planning effort, development, periodic review and distribution of Emergency Plans, Supplementary Procedures and Diagrams; and Emergency Connunication The June 1985 audit identified three Requests for Corrective Action (RCA)
and the January 1986 audit identified five RCAs. Audit findings are categorized as Level 1, 2, 3, or 4, with level I being the most serious and level 4 the least important. The inspector reviewed the findings, their significance to the EP program, and followup actions. Through '
interviews with the EP staff and QA auditors, the inspector verified that adequate actions were taken to correct the findings within established timeframe The January 1986 audit verified that all required drills and exercises were conducted within the required frequency. This finding was verified by an independent check of EP record The audit records should add another specific area of review to the seven listed previously, namely, evaluation for adequacy of interfaces with State and local governments. As noted above, licensee personnel indicated that this item was covered in the audits, and discussion verified the review; however it was difficult to identify from other documented audit observations. It is a 10 CFR 50.54(t) requirement that the interface with State and local governments be audited, and the portion of the audit
'
"
dealing with the interface made available to state and local agencie This is an Open Item 483/86009-05(DRSS).
.- . _ . . . . - - . - - .,_
_______ _-- _
.
.
11. Public Information Program The inspector reviewed the March 1986 revision of the Public Information bre,chure and determined that the emergency planning information contained in the publication is as specified in 10 CFR 50, Appendix E. Needs of residents who may require special assistance are addressed by use of a return form which is forwarded by the utility to the Area Emergency Management Director for use in emergency evacuations. Telephone numbers for local Emergency Mana Management Agency (SEMA)gement are listed asDirectors, and the for points of contact State Emergency informatio A special rumor control number, operated by SEMA during emergencies is also listed in the brochur Brochure distribution is accomplished by bulk mailing to residents of the Emergency Planning Zone and by hand delivery to public facilitie The annual news media briefing is in the process of being scheduled for the week before the 1986 exercis l Based on the above findings, this portion of the licensee's program is acceptabl . Exit Interview The NRC team leader discussed the scope and findings of the inspectio A considerable portion of the exit interview was devoted to discussion of the EAL review. Licensee personnel were receptive to the discussion, and indicated that they would make any needed changes to tne present EAL system in the short term, and research a revised EAL schem The inspectors also discussed the content of the report to determine if the licensee thought that any of the informaticn was proprietary. The licensee responded that none of the information was proprietar Attachment: Discussion of Emergency Action Level (EAL) Problems l
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
._ .
.
.
.
.
ATTACHMENT 1 DISCUSSION OF EMERGENCY ACTION LEVEL (EAL) PROBLEMS In the following, each discussion is prefaced with the EAL group (GR) and Condition (C).
GR(1)-C(F): (Set 3) On pages 8 and 9 of 53, Steam Generator Tube Failure is I combined with Cladding Failure as a basis for a General Emergency. All of the '
indicators used to detect the Steam Generator (S/G) tube rupture are keyed to alarms on process radiation munitors and a confirmatory grab sample analysi Grab sample analysis taken to the point of ccmputing a nose Equivalent of I-131 concentration would typically take 45 minutes ic two hours if sufficient personnel were available to obtain the sample and perfom the analysis. There ,
are several quicker, positive indications of a S/G tube rupture available I including S/G differential pressure (with respect to the other, unruptured S/Gs), S/G level and the coincidence of two or more of the process radiation monitor alarms without need for a confirmatory laboratory analysis. The EAL authors have in fact used other, classic (thermal-hydraulic) indicators of a S/G tube rupture in other EAL GR(1)-C(F): (Set 2) Failure of Primary Coolant Boundary, does not allow for j detection of an interfacing system Loss Of Coolant Accident (LOCA) outside of containment (e.g. injection, letdown or charging line break outside of containment) because of the AND statement requiring high containment radiation level If the break were outside of containment, radiation levels would not be expected to increase within containmen GR(2)-C(D): Part d.1.e.1, Letdown System Activity, is a poor indicator for Core Degradation following a LOCA with ECCS failur The letdown system would likely have isolated autometically or would have been manually isolated in the first few seconds of such a transient, thereby preventing the flow of high activity coolant to the Chemical and Volume Control System (CVCS). This EAL also precludes detection of a pipe break outside containment because of AND statements in C.1 and C.2, requiring high containment radiation OR pressur This set of ever,ts could be caused by a small pipe break outside containment if ECCS faile GR(2)-C(F): This EAL, " Rapid Failure of Steam Generator Tubes," requires that either a high air ejector Process Padiation Monitor reading and backup sample or a high S/G water sample reading be obtained to detect the tube ruptur Neither of these conditions (both requiring a chemistry sample) could be met in less than 45 minutes. As in other EALs, there are several thermal-hydraulic indicators available which would allow an operator to quickly diagnose a tube ruptur GR(2)-C(G): This is an example of inconsistency in EAL criteria. Step 1. of this EAL has a qualifier that there be "no indicated increase in containment pressure, temperature, or humidity". The same qualifier is not applied to GR(2)-C(F). EAL GR(2)-C(G) does not include instrument numbers for RCS pressure and pressurizer level, while the equivalent steps in GR(2)-C(F) do include instrument number ..
.
.
Attachment 1 2 (
Criteria 1.b.2 of this EAL implies that the S/G safety relief valve tailpipes are a monitored release point, while a review of plant instrumentation and discussion with Rad / Chem personnel indicates they are not monitore GR(3)-C(A): This is another example of inconsistency in EAL criteri Criteria 1.b.2.c, under pressurizer power operated relief valve (PORV)
failure, qualifies the degree of failure or leakage by requiring that the Pressurizer Relief Tank rupture disk be intact. It is not clear why this qualifier applies to the PORV, and not to the Pressurizer Safety valves, which discharge to the same tan GR(3)-C(E): This EAL contains two sets of criteria for detecting Losses of Functions Needed for Cold Shutdown (i.e. Steaming capability and Reactor Heat Removal [RHR] Cooldown). The set of criteria for detecting loss of RHR Cooldown capability basically requires that both RHR system flow and RHR heat exchanger heat sink be lost to declare a loss of the function. If either system flow (i.e. pumps or RHR piping restrictions) or heat exchanger heat sink (i.e. CCW, SW or ESW systems) are lost, then the system function is los This EAL condition is actually met by loss of either system flow or heat sink. The AND/0R statements in this EAL require modification to reflect this fact.
J GR(3)-C(F,G,G): The Anticipated Transient Without Scram (ATWOS) event is covered in parts of all three of the EAL conditions F, G and H (f.1.a.1), G (all) and H (all).
related to NUREG-0654,The criteria Appendixin EAL 1, Example conditions F and Initiating H are apparently(#9).
Conditions: Alert Although it appears that EAL G was intended to correspond to NUREG-0654,
< Appendix 1, Examaple Initiating Conditions: Site Area Emergency (#11) it actually detects an ATWOS where both automatic and manual scrams are !
' unsuccessful with power generation continuing. This effectively makes EAL G the same as EALs F and H. This leaves the EAL set with no EAL for the situation where the Reacter Protection System fails to initiate a scram, but operators successfully and quickly initiate a manual scra GR(3)-C(J): This EAL is for "Most of All Alarms (Annunciators) Lost". As worded, the EAL accepts the Station Computer (Plant Process Computer, a non-safety system) as an acceptabte backup for the panel annunciators. All panel annunciator tiles could be failed and an Alert would not be declared as long as the Station Computer was functioning properly. This substitutes the line printer and CRT outputs of the computer for the flashing tiles and audible alarms of the annunciator system. The inspector indicated that this interpretation was not the intent of the guidance in NUREG-065 GR(3)-C(K): A similar problem to that described above in GR(3)-C(J) exists for the Site Area Emergency criteria (Loss of Annunciators with Plant Transient in Progress). If the Process Computer were still operational, with panel annunciators failed and a transient in progress, a Site Area Emergency would not be declare I
- - - . - -
, -- -, - - - , - . . . - ~ -n - - ~ - - - - , - - , , - . - ,
-
-n , - . - - ,
.
.
.
Attachment 1 3 GR(4)-C(C): This EAL, " Loss of Offsite Power and Loss of All Onsite Power for More Than 15 Minutes" contains two OR statements directing the personnel in the control room to make the classification if the Shift Supervisor is absent or out of communication with the control room for 15 minutes while the loss of power problem is in effec It is unclear why this EAL differs from others with respect to the remaining Control Room Senior Reactor Operator taking charge if the Shift Supervisor is absen GR(5)-C(C): This is a further example of EAL criteria inconsistency. This EAL " Steam line break with >50 GPM Primary to Secondary leakage and indication of Fuel Damage", does not contain a criteria for detecting the break inside containment using containment radiation levels as does EAL GR(5)-C(b) part 2.c.1. Criteria 2.b.1 and 3.a.1 would both require more than 45 minutes of sample and analysis time to confirm. The fact that part 3.a.1 (alarm on CVCS confirmatory sample analysis of >1000 uci/gm Dose Equivalent I-131) is an AND statement would probably preclude this EAL from being met for two reasons; (1) The time required to obtain a sample and (2) The fact that, in this transient, letdown would have isolated well before such activities reached the letdown lin GR(5)-C(0): This EAL is for " Loss of Feedwater and Condensate Systems followed by a Failure of Auxiliary Feedwater for an Extended Period". Parts 2.c.2 and 2.a.2 (AFW not available in accordance with Technical Specification 3.7.1.2) are redundant. This EAL takes credit for primary system cooling using " feed and bleed" of the primary system. The EAL is only applicable in modes 1, 2, and 3 (power, startup and hot s'. " _' There is no apparent reason why charging pumps and not Safety Injection paups have been considered as a source of primary fee It is also not clear why RHR pumps have been considered as a source of primary feed when the primary pressure is above the RHR pressure in modes 1, 2, and GR(6)-C(A and B): A potential problem exists for these EALs, which are intended to detect liquid and gaseous effluent releases exceeding Technical Specification limits in that they both require a confirmatory grab sample, the results of which " indicate greater than Limiting Condition for Operations (LCO)" for liquid and gaseous effluents. LCOs are written in terms of doses and dose rates off-sit Sample results are given in isotopic concentration Licensee personnel should verify that Chemistry and Health Physics Technicians can readily, by procedure, relate sample concentrations to quarterly and annual off-site doses using existing flowrates from the effluent points and any other factors affecting the determinatio Many plants use alarm setpoints and predetermined sample gross or isotopic analysis values to determine such .
an LC l GR(6)-C(E): The > and < signs have been reversed between the condition and the indication (Area Radiation Levels or High Airborne Activity >1000 Times Normal). When the Emergency Plan EALs were checked for this typographical error, it was not found. This indicates that the Revision 9 EALs in the Emergency Plan may not be identical to the Revision 5 EALs in the Implementing Procedure Licensee personnel should check for additional differences i between the plan and the procedure l l