Insp Rept 50-483/86-04 on 860317-21.No Violation or Deviation Noted.Major Areas Inspected:Radiation Protection Program During Maint Outage,Including Changes in Organization,Personnel,Facilities,Equipment & ProceduresML20155D854 |
Person / Time |
---|
Site: |
Callaway |
---|
Issue date: |
04/10/1986 |
---|
From: |
Gill C, Grant W, Greger L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
---|
To: |
|
---|
Shared Package |
---|
ML20155D847 |
List: |
---|
References |
---|
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.3, TASK-2.F.1, TASK-TM 50-483-86-04, 50-483-86-4, IEIN-85-081, IEIN-85-81, NUDOCS 8604170451 |
Download: ML20155D854 (12) |
|
|
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000483/19990101999-10-14014 October 1999 Insp Rept 50-483/99-10 on 990913-16.No Violations Noted. Major Areas Inspected:Plant Support Re Biennial Exercise of Emergency Plan & Procedures IR 05000483/19990111999-09-22022 September 1999 Insp Rept 50-483/99-11 on 990812-20.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19990081999-09-13013 September 1999 Insp Rept 50-483/99-08 on 990725-0904.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19990071999-09-10010 September 1999 Insp Rept 50-483/99-07 on 990809-13.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluating Operators IR 05000483/19990061999-08-13013 August 1999 Insp Rept 50-483/99-06 on 990613-0724.One Severity Level 4 Violation Noted & Being Treated as Ncv.Major Areas Inspected:Operations,Maint & Plant Support IR 05000483/19990051999-06-25025 June 1999 Insp Rept 50-483/99-05 on 990502-0612.Two Violations Noted & Being Treated as Noncited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19990031999-05-19019 May 1999 Insp Rept 50-483/99-03 on 990321-0501.Noncited Violation Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19990011999-04-0505 April 1999 Insp Rept 50-483/99-01 on 990207-0320.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19980181998-12-0404 December 1998 Insp Rept 50-483/98-18 on 980914-1002.Violations Noted. Major Areas Inspected:Review of Design & Licensing Basis for Essential Service Water Sys,Associated Electrical Support Sys & Review of Program Implement 10CFR50.59 IR 05000483/19980221998-11-25025 November 1998 Insp Rept 50-483/98-22 on 980927-1114.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000483/19980241998-11-25025 November 1998 Insp Rept 50-483/98-24 on 981026-30.Violation Noted.Major Areas Inspected:Licensee Implementation of NRC Approved Fire Protection Program IR 05000483/19980231998-10-28028 October 1998 Insp Rept 50-483/98-23 on 981013-15.No Violations Noted. Major Areas Inspected:Operational Status of License Emergency Preparedness Program Was Conducted IR 05000483/19980151998-10-26026 October 1998 Insp Rept 50-483/98-15 on 980706-10.No Violations Noted. Major Areas Inspected:Guidance of Temporary Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers IR 05000483/19980201998-10-15015 October 1998 Insp Rept 50-483/98-20 on 980817-0904.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000483/19980211998-10-0909 October 1998 Insp Rept 50-483/98-21 on 980816-0926.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19980191998-09-29029 September 1998 Insp Rept 50-483/98-19 on 980914-18.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980121998-08-21021 August 1998 Insp Rept 50-483/98-12 on 980705-0815.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 05000483/19980171998-08-14014 August 1998 Insp Rept 50-483/98-17 on 980803-07.Violations Noted.Major Areas Inspected:Implementation of Solid Radioactive Waste Mgt & Radioactive Matls Transportation Program IR 05000483/19980161998-08-0606 August 1998 Insp Rept 50-483/98-16 on 980713-17.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980131998-07-29029 July 1998 Insp Rept 50-483/98-13 on 980714-17.Violation Noted.Major Areas Inspected:Engineering & Plant Support IR 05000483/19980141998-07-17017 July 1998 Insp Rept 50-483/98-14 on 980629-0702.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000483/19980111998-07-0808 July 1998 Insp Rept 50-483/98-11 on 980524-0704.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19980081998-06-0808 June 1998 Insp Rept 50-483/98-08 on 980412-0523.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980091998-05-19019 May 1998 Insp Rept 50-483/98-09 on 980428-30.No Violations Noted. Major Areas Inspected:Maint & Plant Support IR 05000483/19980071998-05-19019 May 1998 Insp Rept 50-483/98-07 on 980427-0501.Violations Noted.Major Areas Inspected:Radiation Protection Program Focussing on Refueling Outage Activities ML20247M2241998-05-19019 May 1998 Insp Rept 50-483/98-10 on 980428-30.No Violations Noted. Major Areas Inspected:Contingency Plan Developed in Response to Insp Findings in NRC Insp Rept 50-483/98-06 W/Special Emphasis on Training Process Used to Qualify People for Er IR 05000483/19980051998-05-0808 May 1998 Insp Rept 50-483/98-05 on 980413-0501.No Violations Noted. Major Areas Inspected:Maintenance,Engineering & Plant Support ML20217F4881998-04-22022 April 1998 Insp Rept 50-483/98-06 on 980324-26.Violations Noted.Major Areas Inspected:Plant Support IR 05000483/19980031998-04-17017 April 1998 Insp Rept 50-483/98-03 on 980301-0411.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19980041998-04-17017 April 1998 Insp Rept 50-483/98-04 on 980406-10.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000483/19980021998-03-26026 March 1998 Insp Rept 50-483/98-02 on 980202-06.Violation Noted.Major Areas Inspected:Maint,Engineering Re Bldg Emergency Filter Sys Adsorber IR 05000483/19980011998-03-0909 March 1998 Insp Rept 50-483/98-01 on 980118-0228.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support IR 05000483/19970211998-01-27027 January 1998 Insp Rept 50-483/97-21 on 971207-980117.No Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980251998-01-12012 January 1998 Insp Rept 50-483/98-25 on 981115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support,Including Health Physics & Security IR 05000483/19970191997-12-18018 December 1997 Insp Rept 50-483/97-19 on 971117-1211.No Violations Noted. Major Areas Inspected:Engineering IR 05000483/19970201997-12-16016 December 1997 Insp Rept 50-483/97-20 on 971026-1206.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19970181997-11-12012 November 1997 Insp Rept 50-483/97-18 on 971027-31.No Violations Noted. Major Areas Inspected:Access Authorization,Alarm Stations, Communications,Access Control of Personnel,Packages & Vehicles,Assessment Aids & Security Plans IR 05000483/19970171997-11-12012 November 1997 Insp Rept 50-483/97-17 on 970914-1025.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970161997-10-0707 October 1997 Insp Rept 50-483/97-16 on 970915-19.No Violations Noted. Major Areas Inspected:External & Internal Exposure Controls, Dose Assessment & Records,Controls of Radioactive Matl & Contamination & Surveying & Monitoring IR 05000483/19970151997-09-22022 September 1997 Insp Rept 50-483/97-15 on 970802-0913.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970131997-09-0404 September 1997 Insp Rept 50-483/97-13 on 970811-15.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000483/19970141997-08-0606 August 1997 Insp Rept 50-483/97-14 on 970622-0802.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering ML20141E4791997-06-26026 June 1997 Insp Rept 50-483/97-05 on 970210-14 & 24-28.Violations Noted.Major Areas Inspected:Engineering IR 05000483/19970061997-06-20020 June 1997 Insp Rept 50-483/97-06 on 970519-23.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program IR 05000483/19970081997-05-20020 May 1997 Insp Rept 50-483/97-08 on 970317-0404.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970101997-05-19019 May 1997 Insp Rept 50-483/97-10 on 970330-0510.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000483/19970091997-05-0909 May 1997 Partially Withheld Insp Rept 50-483/97-09 on 970422-25.No Violations Noted.Major Areas Inspected:Licensee Implementation of Land Vehicle Control Measures Implemented IAW 10CFR73, Physical Protection of Plants & Matl IR 05000483/19970071997-04-0808 April 1997 Insp Rept 50-483/97-07 on 970216-0329.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970011997-03-26026 March 1997 Insp Rept 50-483/97-01 on 970224-28.No Violations Noted. Major Areas Inspected:Competency of Six SRO and Five RO Applicants for Issuance of Operating Licenses IR 05000483/19970041997-02-28028 February 1997 Insp Rept 50-483/97-04 on 970127-31.No Violations Noted. Major Areas Inspected:Routine Insp Reviewed Program to Maintain Occupational Exposures Alara,Training & Qualifications of Radiation Protection Organizations 1999-09-22
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000483/19990101999-10-14014 October 1999 Insp Rept 50-483/99-10 on 990913-16.No Violations Noted. Major Areas Inspected:Plant Support Re Biennial Exercise of Emergency Plan & Procedures IR 05000483/19990111999-09-22022 September 1999 Insp Rept 50-483/99-11 on 990812-20.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19990081999-09-13013 September 1999 Insp Rept 50-483/99-08 on 990725-0904.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19990071999-09-10010 September 1999 Insp Rept 50-483/99-07 on 990809-13.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluating Operators IR 05000483/19990061999-08-13013 August 1999 Insp Rept 50-483/99-06 on 990613-0724.One Severity Level 4 Violation Noted & Being Treated as Ncv.Major Areas Inspected:Operations,Maint & Plant Support IR 05000483/19990051999-06-25025 June 1999 Insp Rept 50-483/99-05 on 990502-0612.Two Violations Noted & Being Treated as Noncited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19990031999-05-19019 May 1999 Insp Rept 50-483/99-03 on 990321-0501.Noncited Violation Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19990011999-04-0505 April 1999 Insp Rept 50-483/99-01 on 990207-0320.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19980181998-12-0404 December 1998 Insp Rept 50-483/98-18 on 980914-1002.Violations Noted. Major Areas Inspected:Review of Design & Licensing Basis for Essential Service Water Sys,Associated Electrical Support Sys & Review of Program Implement 10CFR50.59 IR 05000483/19980221998-11-25025 November 1998 Insp Rept 50-483/98-22 on 980927-1114.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000483/19980241998-11-25025 November 1998 Insp Rept 50-483/98-24 on 981026-30.Violation Noted.Major Areas Inspected:Licensee Implementation of NRC Approved Fire Protection Program IR 05000483/19980231998-10-28028 October 1998 Insp Rept 50-483/98-23 on 981013-15.No Violations Noted. Major Areas Inspected:Operational Status of License Emergency Preparedness Program Was Conducted IR 05000483/19980151998-10-26026 October 1998 Insp Rept 50-483/98-15 on 980706-10.No Violations Noted. Major Areas Inspected:Guidance of Temporary Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers IR 05000483/19980201998-10-15015 October 1998 Insp Rept 50-483/98-20 on 980817-0904.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000483/19980211998-10-0909 October 1998 Insp Rept 50-483/98-21 on 980816-0926.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19980191998-09-29029 September 1998 Insp Rept 50-483/98-19 on 980914-18.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980121998-08-21021 August 1998 Insp Rept 50-483/98-12 on 980705-0815.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 05000483/19980171998-08-14014 August 1998 Insp Rept 50-483/98-17 on 980803-07.Violations Noted.Major Areas Inspected:Implementation of Solid Radioactive Waste Mgt & Radioactive Matls Transportation Program IR 05000483/19980161998-08-0606 August 1998 Insp Rept 50-483/98-16 on 980713-17.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980131998-07-29029 July 1998 Insp Rept 50-483/98-13 on 980714-17.Violation Noted.Major Areas Inspected:Engineering & Plant Support IR 05000483/19980141998-07-17017 July 1998 Insp Rept 50-483/98-14 on 980629-0702.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000483/19980111998-07-0808 July 1998 Insp Rept 50-483/98-11 on 980524-0704.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19980081998-06-0808 June 1998 Insp Rept 50-483/98-08 on 980412-0523.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980091998-05-19019 May 1998 Insp Rept 50-483/98-09 on 980428-30.No Violations Noted. Major Areas Inspected:Maint & Plant Support IR 05000483/19980071998-05-19019 May 1998 Insp Rept 50-483/98-07 on 980427-0501.Violations Noted.Major Areas Inspected:Radiation Protection Program Focussing on Refueling Outage Activities ML20247M2241998-05-19019 May 1998 Insp Rept 50-483/98-10 on 980428-30.No Violations Noted. Major Areas Inspected:Contingency Plan Developed in Response to Insp Findings in NRC Insp Rept 50-483/98-06 W/Special Emphasis on Training Process Used to Qualify People for Er IR 05000483/19980051998-05-0808 May 1998 Insp Rept 50-483/98-05 on 980413-0501.No Violations Noted. Major Areas Inspected:Maintenance,Engineering & Plant Support ML20217F4881998-04-22022 April 1998 Insp Rept 50-483/98-06 on 980324-26.Violations Noted.Major Areas Inspected:Plant Support IR 05000483/19980031998-04-17017 April 1998 Insp Rept 50-483/98-03 on 980301-0411.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19980041998-04-17017 April 1998 Insp Rept 50-483/98-04 on 980406-10.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000483/19980021998-03-26026 March 1998 Insp Rept 50-483/98-02 on 980202-06.Violation Noted.Major Areas Inspected:Maint,Engineering Re Bldg Emergency Filter Sys Adsorber IR 05000483/19980011998-03-0909 March 1998 Insp Rept 50-483/98-01 on 980118-0228.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support IR 05000483/19970211998-01-27027 January 1998 Insp Rept 50-483/97-21 on 971207-980117.No Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980251998-01-12012 January 1998 Insp Rept 50-483/98-25 on 981115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support,Including Health Physics & Security IR 05000483/19970191997-12-18018 December 1997 Insp Rept 50-483/97-19 on 971117-1211.No Violations Noted. Major Areas Inspected:Engineering IR 05000483/19970201997-12-16016 December 1997 Insp Rept 50-483/97-20 on 971026-1206.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19970181997-11-12012 November 1997 Insp Rept 50-483/97-18 on 971027-31.No Violations Noted. Major Areas Inspected:Access Authorization,Alarm Stations, Communications,Access Control of Personnel,Packages & Vehicles,Assessment Aids & Security Plans IR 05000483/19970171997-11-12012 November 1997 Insp Rept 50-483/97-17 on 970914-1025.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970161997-10-0707 October 1997 Insp Rept 50-483/97-16 on 970915-19.No Violations Noted. Major Areas Inspected:External & Internal Exposure Controls, Dose Assessment & Records,Controls of Radioactive Matl & Contamination & Surveying & Monitoring IR 05000483/19970151997-09-22022 September 1997 Insp Rept 50-483/97-15 on 970802-0913.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970131997-09-0404 September 1997 Insp Rept 50-483/97-13 on 970811-15.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000483/19970141997-08-0606 August 1997 Insp Rept 50-483/97-14 on 970622-0802.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering ML20141E4791997-06-26026 June 1997 Insp Rept 50-483/97-05 on 970210-14 & 24-28.Violations Noted.Major Areas Inspected:Engineering IR 05000483/19970061997-06-20020 June 1997 Insp Rept 50-483/97-06 on 970519-23.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program IR 05000483/19970081997-05-20020 May 1997 Insp Rept 50-483/97-08 on 970317-0404.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970101997-05-19019 May 1997 Insp Rept 50-483/97-10 on 970330-0510.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000483/19970091997-05-0909 May 1997 Partially Withheld Insp Rept 50-483/97-09 on 970422-25.No Violations Noted.Major Areas Inspected:Licensee Implementation of Land Vehicle Control Measures Implemented IAW 10CFR73, Physical Protection of Plants & Matl IR 05000483/19970071997-04-0808 April 1997 Insp Rept 50-483/97-07 on 970216-0329.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970011997-03-26026 March 1997 Insp Rept 50-483/97-01 on 970224-28.No Violations Noted. Major Areas Inspected:Competency of Six SRO and Five RO Applicants for Issuance of Operating Licenses IR 05000483/19970041997-02-28028 February 1997 Insp Rept 50-483/97-04 on 970127-31.No Violations Noted. Major Areas Inspected:Routine Insp Reviewed Program to Maintain Occupational Exposures Alara,Training & Qualifications of Radiation Protection Organizations 1999-09-22
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000483/19990101999-10-14014 October 1999 Insp Rept 50-483/99-10 on 990913-16.No Violations Noted. Major Areas Inspected:Plant Support Re Biennial Exercise of Emergency Plan & Procedures IR 05000483/19990111999-09-22022 September 1999 Insp Rept 50-483/99-11 on 990812-20.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19990081999-09-13013 September 1999 Insp Rept 50-483/99-08 on 990725-0904.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19990071999-09-10010 September 1999 Insp Rept 50-483/99-07 on 990809-13.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluating Operators IR 05000483/19990061999-08-13013 August 1999 Insp Rept 50-483/99-06 on 990613-0724.One Severity Level 4 Violation Noted & Being Treated as Ncv.Major Areas Inspected:Operations,Maint & Plant Support IR 05000483/19990051999-06-25025 June 1999 Insp Rept 50-483/99-05 on 990502-0612.Two Violations Noted & Being Treated as Noncited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19990031999-05-19019 May 1999 Insp Rept 50-483/99-03 on 990321-0501.Noncited Violation Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19990011999-04-0505 April 1999 Insp Rept 50-483/99-01 on 990207-0320.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19980181998-12-0404 December 1998 Insp Rept 50-483/98-18 on 980914-1002.Violations Noted. Major Areas Inspected:Review of Design & Licensing Basis for Essential Service Water Sys,Associated Electrical Support Sys & Review of Program Implement 10CFR50.59 IR 05000483/19980221998-11-25025 November 1998 Insp Rept 50-483/98-22 on 980927-1114.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000483/19980241998-11-25025 November 1998 Insp Rept 50-483/98-24 on 981026-30.Violation Noted.Major Areas Inspected:Licensee Implementation of NRC Approved Fire Protection Program IR 05000483/19980231998-10-28028 October 1998 Insp Rept 50-483/98-23 on 981013-15.No Violations Noted. Major Areas Inspected:Operational Status of License Emergency Preparedness Program Was Conducted IR 05000483/19980151998-10-26026 October 1998 Insp Rept 50-483/98-15 on 980706-10.No Violations Noted. Major Areas Inspected:Guidance of Temporary Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers IR 05000483/19980201998-10-15015 October 1998 Insp Rept 50-483/98-20 on 980817-0904.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000483/19980211998-10-0909 October 1998 Insp Rept 50-483/98-21 on 980816-0926.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19980191998-09-29029 September 1998 Insp Rept 50-483/98-19 on 980914-18.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980121998-08-21021 August 1998 Insp Rept 50-483/98-12 on 980705-0815.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 05000483/19980171998-08-14014 August 1998 Insp Rept 50-483/98-17 on 980803-07.Violations Noted.Major Areas Inspected:Implementation of Solid Radioactive Waste Mgt & Radioactive Matls Transportation Program IR 05000483/19980161998-08-0606 August 1998 Insp Rept 50-483/98-16 on 980713-17.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980131998-07-29029 July 1998 Insp Rept 50-483/98-13 on 980714-17.Violation Noted.Major Areas Inspected:Engineering & Plant Support IR 05000483/19980141998-07-17017 July 1998 Insp Rept 50-483/98-14 on 980629-0702.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000483/19980111998-07-0808 July 1998 Insp Rept 50-483/98-11 on 980524-0704.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19980081998-06-0808 June 1998 Insp Rept 50-483/98-08 on 980412-0523.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980091998-05-19019 May 1998 Insp Rept 50-483/98-09 on 980428-30.No Violations Noted. Major Areas Inspected:Maint & Plant Support IR 05000483/19980071998-05-19019 May 1998 Insp Rept 50-483/98-07 on 980427-0501.Violations Noted.Major Areas Inspected:Radiation Protection Program Focussing on Refueling Outage Activities ML20247M2241998-05-19019 May 1998 Insp Rept 50-483/98-10 on 980428-30.No Violations Noted. Major Areas Inspected:Contingency Plan Developed in Response to Insp Findings in NRC Insp Rept 50-483/98-06 W/Special Emphasis on Training Process Used to Qualify People for Er IR 05000483/19980051998-05-0808 May 1998 Insp Rept 50-483/98-05 on 980413-0501.No Violations Noted. Major Areas Inspected:Maintenance,Engineering & Plant Support ML20217F4881998-04-22022 April 1998 Insp Rept 50-483/98-06 on 980324-26.Violations Noted.Major Areas Inspected:Plant Support IR 05000483/19980031998-04-17017 April 1998 Insp Rept 50-483/98-03 on 980301-0411.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19980041998-04-17017 April 1998 Insp Rept 50-483/98-04 on 980406-10.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000483/19980021998-03-26026 March 1998 Insp Rept 50-483/98-02 on 980202-06.Violation Noted.Major Areas Inspected:Maint,Engineering Re Bldg Emergency Filter Sys Adsorber IR 05000483/19980011998-03-0909 March 1998 Insp Rept 50-483/98-01 on 980118-0228.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support IR 05000483/19970211998-01-27027 January 1998 Insp Rept 50-483/97-21 on 971207-980117.No Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980251998-01-12012 January 1998 Insp Rept 50-483/98-25 on 981115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support,Including Health Physics & Security IR 05000483/19970191997-12-18018 December 1997 Insp Rept 50-483/97-19 on 971117-1211.No Violations Noted. Major Areas Inspected:Engineering IR 05000483/19970201997-12-16016 December 1997 Insp Rept 50-483/97-20 on 971026-1206.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19970181997-11-12012 November 1997 Insp Rept 50-483/97-18 on 971027-31.No Violations Noted. Major Areas Inspected:Access Authorization,Alarm Stations, Communications,Access Control of Personnel,Packages & Vehicles,Assessment Aids & Security Plans IR 05000483/19970171997-11-12012 November 1997 Insp Rept 50-483/97-17 on 970914-1025.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970161997-10-0707 October 1997 Insp Rept 50-483/97-16 on 970915-19.No Violations Noted. Major Areas Inspected:External & Internal Exposure Controls, Dose Assessment & Records,Controls of Radioactive Matl & Contamination & Surveying & Monitoring IR 05000483/19970151997-09-22022 September 1997 Insp Rept 50-483/97-15 on 970802-0913.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970131997-09-0404 September 1997 Insp Rept 50-483/97-13 on 970811-15.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000483/19970141997-08-0606 August 1997 Insp Rept 50-483/97-14 on 970622-0802.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering ML20141E4791997-06-26026 June 1997 Insp Rept 50-483/97-05 on 970210-14 & 24-28.Violations Noted.Major Areas Inspected:Engineering IR 05000483/19970061997-06-20020 June 1997 Insp Rept 50-483/97-06 on 970519-23.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program IR 05000483/19970081997-05-20020 May 1997 Insp Rept 50-483/97-08 on 970317-0404.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970101997-05-19019 May 1997 Insp Rept 50-483/97-10 on 970330-0510.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000483/19970091997-05-0909 May 1997 Partially Withheld Insp Rept 50-483/97-09 on 970422-25.No Violations Noted.Major Areas Inspected:Licensee Implementation of Land Vehicle Control Measures Implemented IAW 10CFR73, Physical Protection of Plants & Matl IR 05000483/19970071997-04-0808 April 1997 Insp Rept 50-483/97-07 on 970216-0329.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970011997-03-26026 March 1997 Insp Rept 50-483/97-01 on 970224-28.No Violations Noted. Major Areas Inspected:Competency of Six SRO and Five RO Applicants for Issuance of Operating Licenses IR 05000483/19970041997-02-28028 February 1997 Insp Rept 50-483/97-04 on 970127-31.No Violations Noted. Major Areas Inspected:Routine Insp Reviewed Program to Maintain Occupational Exposures Alara,Training & Qualifications of Radiation Protection Organizations 1999-09-22
[Table view] Category:UTILITY
MONTHYEARIR 05000483/19900181990-11-14014 November 1990 Insp Rept 50-483/90-18 on 901001-03 & 1105.No Violations Noted.Major Areas Inspected:Inservice Insp Activities Including Review of Program Procedures,Observation of Work Activities & Data Review IR 05000483/19900161990-10-22022 October 1990 Insp Rept 50-483/90-16 on 901001-05.No Violations Noted. Major Areas Inspected:Insp of Licensee Corrective Actions Initiated for Issues Identified in self-initiated Safety Sys Assessment of ESW Sys IR 05000483/19900151990-10-18018 October 1990 Insp Rept 50-483/90-15 on 900816-0930.No Violations Noted IR 05000483/19900141990-08-31031 August 1990 Insp Rept 50-483/90-14 on 900724-27.No Violations Noted. Major Areas Inspected:Licensee fitness-for-duty Program,Drug & Alcohol Abuse Policies,Testing Program & Randon Testing Program IR 05000483/19900131990-08-28028 August 1990 Insp Rept 50-483/90-13 on 900701-0815.Violations Noted. Major Areas Inspected:Lers,Followup on Previous Insp Findings,Followup on Generic Ltrs,Plant Operations,Maint/ Surveillance & Regional Requests IR 05000483/19900121990-07-13013 July 1990 Insp Rept 50-483/90-12 on 900516-0630.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations, ESF Walkdown & Maint & Surveillance Performed IR 05000483/19900031990-02-13013 February 1990 Insp Rept 50-483/90-03 on 900124-25 & 900131 Telcon.No Violations Noted.Major Areas Inspected:Radiochemistry & Radiological Environ Monitoring Programs,Including Qa/Qc Program in Counting Room,Procedures,Organization & Training IR 05000483/19890171989-09-22022 September 1989 Insp Rept 50-483/89-17 on 890821-25.No Violations or Deviations Noted.Major Areas Inspected:Chemistry Program, Including Procedures,Organization,Training,Primary & Secondary Sys Water QC Programs & Qa/Qc Program in Lab IR 05000483/19890161989-09-0707 September 1989 Insp Rept 50-483/89-16 on 890821-25.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection & Radwaste Mgt Programs Including Changes Since Last Insp, Audits & Appraisals,External Exposure Control & ALARA IR 05000483/19890141989-08-28028 August 1989 Insp Rept 50-483/89-14 on 890717-0803.No Violations or Deviations Noted.Major Areas Inspected:Design Changes & Mod & Dedication of Commercial Grade Equipment for safety- Related Applications IR 05000483/19890111989-07-27027 July 1989 Insp Rept 50-483/89-11 on 890601-0715.No Violations Noted. Major Areas Inspected:Nonroutine Events,Plant Operations & Maint/Surveillance IR 05000483/19880081989-07-21021 July 1989 Addendum to Insp Rept 50-483/88-08 Comparing Results of Analyses Performed on Liquid Spike & Monitor Tank Sample IR 05000483/19890121989-07-18018 July 1989 Partially Withheld Safeguards Insp Rept 50-483/89-12 on 890626-0707 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Protected Area Assessment Aids,Power Supply, Training & Qualification IR 05000483/19890091989-06-22022 June 1989 Safety Insp Rept 50-483/89-09 on 890401-0531.No Violations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance & Onsite Followup of Nonroutine Events IR 05000483/19890081989-06-0101 June 1989 Insp Rept 50-483/89-08 on 890328-0515.No Violations Noted. Major Areas Inspected:Inservice Insp Activities,Including Review of Procedures,Observation of Work Activities & Review of Data IR 05000483/19890101989-05-30030 May 1989 Insp Rept 50-483/89-10 on 890501-05 & 11.No Violations Noted.Major Areas Inspected:Radiation Protection Program During Refueling/Maint Outage Including,Changes in Organization,Audits & Appraisals IR 05000483/19890071989-04-14014 April 1989 Insp Rept 50-483/89-07 on 890403-06.No Violations Noted. Major Areas Inspected:Emergency Preparedness Program, Including Emergency Plan Activations,Licensee Actions on Previously Identified Items & Operational Status of Program IR 05000483/19890041989-04-13013 April 1989 Safety Insp Rept 50-483/89-04 on 890216-0331.No Violations Noted.Major Areas Inspected:Plant Operations,Radiological Controls,Maint/Surveillance,Emergency Preparedness,Security & Safety Assessment/Quality Verification IR 05000483/19890031989-03-21021 March 1989 Partially Withheld Physical Security Insp Rept 50-483/89-03 on 890213-23 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Mgt Support,Protected & Vital Area Barriers,Access Control,Personnel,Packages,Vehicles & Alarm Stations IR 05000483/19890011989-03-0606 March 1989 Safety Insp Rept 50-483/89-01 on 890101-0215.Weaknesses Noted.Major Areas Inspected:Previous Insp Findings,Lers, Plant Operations,Radiological Controls,Maint Surveillance, Emergency Preparedness & Security IR 05000483/19890021989-03-0202 March 1989 Insp Rept 50-483/89-02 on 890124-0215.Violations Noted. Major Areas Inspected:Environ Qualification of Electrical Equipment within Scope of 10CFR50.49 (Modules 30703 & 92701) IR 05000483/19880151988-09-22022 September 1988 Insp Rept 50-483/88-15 on 880731-0831.Violations Noted.Major Areas Inspected:Ler,Plant Operations,Radiological Controls, Maint/Surveillance,Emergency Preparedness,Security, Engineering & Technical Support & Safety Assessment IR 05000483/19880171988-09-16016 September 1988 Insp Rept 50-483/88-17 on 880822-26.No Violations Noted. Major Areas Inspected:Chemistry Program,Including Procedures,Organization & Training,Reactor Sys Water QC Programs & Qa/Qc Programs in Labs IR 05000483/19880161988-09-16016 September 1988 Insp Rept 50-483/88-16 on 880815-19.No Violations Noted. Major Areas Inspected:Maint Activities Using Selected Portions of Insp Modules 62700,62702,62705 & 62720 IR 05000483/19880141988-08-11011 August 1988 Insp Rept 50-483/88-14 on 880703-30.No Violations or Deviations Noted.Major Areas Inspected:Lers,Plant Operations,Radiological Controls,Maint/Surveillance, Emergency Preparedness,Security & Technical Support IR 05000483/19880091988-07-12012 July 1988 Insp Rept 50-483/88-09 on 880606-09.No Violations, Deficiencies or Deviations Noted.Major Areas Inspected: Emergency Preparedness Program,Emergency Response Facility Appraisal & Review of Radioactive Release Assessment IR 05000483/19880111988-06-17017 June 1988 Partially Withheld Physical Security Insp Rept 50-483/88-11 on 880523-27 (Ref 10CFR73.21).Noncompliance Noted:Four Licensee Designated Vehicles Failed to Meet Security Plan Criteria for Such Designation IR 05000483/19880101988-06-16016 June 1988 Insp Rept 50-483/88-10 on 880606-07.No Violations, Deficiencies,Deviations or Exercise Weaknesses Noted.Major Areas Inspected:Plant Emergency Exercise.Objectives of Exercise Encl IR 05000483/19880131988-06-16016 June 1988 Insp Rept 50-483/88-13 on 880525.Allegations Not Substantiated.Major Areas Inspected:Allegation Re Aberrant Behavior by Named Individual W/Unescorted Access to Plant IR 05000483/19880071988-06-0707 June 1988 Insp Rept 50-483/88-07 on 880403-0521.No Violations Noted. Major Areas Inspected:Plant Operations,Esf Sys Walkdown,Qa, Administrative Controls Affecting Quality,Surveillance, Maint,Fire Protection Radiological Controls & Security ML20155D4101988-05-31031 May 1988 Insp Rept 50-483/88-08 on 880502-06.No Violations or Deviations Noted.Major Areas Inspected:Confirmatory Measurements & Radiological Environ Monitoring Programs, Including Plant Chemistry,Organization & Mgt Control IR 05000483/19880041988-04-25025 April 1988 Insp Rept 50-483/88-04 on 880207-0402.Violations Noted. Major Areas inspected:LERs,inspector-identified Problems, Plant Operations,Esf Walkdown,Radiological Controls,Maint, Fire Protection,Emergency Preparedness & Security ML20150C8181988-03-17017 March 1988 Partially Withheld Insp Rept 50-483/88-05 on 880218,0222-26 & 0303 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Mgt Effectiveness - Security Program,Records, Protected Area Barriers & Alarms & Lighting Assessment Aids IR 05000483/19870361988-02-23023 February 1988 Insp Rept 50-483/87-36 on 871205-880206.No Violations Noted. Major Areas inspected:LER,inspector-identified Problems, Plant Operations,Esf Sys Walkdown,Radiological Controls, Maint,Surveillance,Fire Protection & Security IR 05000483/19880031988-02-19019 February 1988 Insp Rept 50-483/88-03 on 880125-0202.Violations Noted. Major Areas Inspected:Emergency Preparedness Program Including,Emergency Plan Activations,Licensee Actions on Previously Identified Items & Required Drills IR 05000483/19880021988-02-0404 February 1988 Safety Insp Rept 50-483/88-02 on 880105-14.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings,Control Rod Testing,Core Power Distribution Limits & Calibr of Nuclear Instrumentation Sys IR 05000483/19870321987-12-31031 December 1987 Safety Insp Rept 50-483/87-32 on 871004-1204.Violations Noted But No Notice Issued.Major Areas Inspected:Lers,Plant Operations,Esf Sys,Radiological Controls,Maint,Surveillance, Fire Protection,Emergency Preparedness & Security IR 05000483/19870291987-12-16016 December 1987 Insp Rept 50-483/87-29 on 870921-1203.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp Work Activities,Training & Qualification Effectiveness & Facility Mods (73501,73057,73753,73755,41400,37701,55700 & 57700) IR 05000483/19870311987-11-19019 November 1987 Insp Rept 50-483/87-31 on 871006-09.Violations Noted.Major Areas Inspected:Radiation Protection Program,Including Changes in Organization,Personnel,Facilities,Equipment, Programs & Procedures IR 05000483/19870351987-11-19019 November 1987 Enforcement Conference Rept 50-483/87-35 on 871110. Violations Noted.Major Areas Discussed:Condition in Which Mispositioned Flow Balancing Damper Affected Performance of One Train of Control Room Emergency Ventilation Sys IR 05000483/19870331987-11-0404 November 1987 Safety Insp Rept 50-483/87-33 on 871007-17.Violations Noted: Failure to Perform Adequate Preoperational Test & Failure to Promptly Rept Condition Adverse to Quality.Major Areas Inspected:Mispositioned Balancing Damper IR 05000483/19870341987-10-27027 October 1987 Enforcement Conference Rept 50-483/87-34 on 871002 Re Events in Which Mispositioned Valve Resulted in Reduced Flow Capability of One Essential Svc Water Train & Breached Seals Resulted in Emergency Ventilaton Sys Inoperability IR 05000483/19870301987-09-29029 September 1987 Safety Insp Rept 50-483/87-30 on 870922-24.No Violations or Deviations Noted.Major Areas Inspected:Snubber Surveillance & Functional Testing Program & Training IR 05000483/19870201987-09-29029 September 1987 Insp Rept 50-483/87-20 on 870601-0801.No Violations or Deviations Noted.Major Areas Inspected:Previous Insp Findings,Operational Safety,Esf Sys Walkdown,Radiological Control,Maint,Fire Protection,Security & Quality Programs ML20235J7981987-09-25025 September 1987 Insp Rept 50-483/87-23 on 870908-11.Violations Noted.Major Areas Inspected:Licensee Action Following 870709 Surveillance Test Which Indicated That Both Independent Control Room Emergency Ventilation Sys Inoperable IR 05000483/19870281987-09-25025 September 1987 Insp Rept 50-483/87-28 on 870824-0911.Violation Noted Re Failure to Identify & Correct Incorrect Essential Svc Water Valve Position.Major Areas Inspected:Essential Svc Water Sys Operability IR 05000483/19870251987-09-17017 September 1987 Safety Insp Rept 50-483/87-25 on 870812-21.Violation Noted. Major Areas Inspected:Isolation of Safety Injection Sys Combined Recirculation Valve BN-HV-8813 IR 05000483/19870241987-09-0303 September 1987 Insp Rept 50-483/87-24 on 870730 & 0804-07.Violations Noted. Major Areas Inspected:Nonconservative Setting of Overtemp delta-temp Reactor Trip Setpoint & Adequacy of Corrective Actions Specified in LER 87-012-01 IR 05000483/19870271987-09-0101 September 1987 Partially Withheld Insp Rept 50-483/87-27 on 870811-18. Violation Noted.Major Areas Inspected:Circumstances Re Event Involving Safeguards Info Documents Not Adequately Protected at Offsite Location IR 05000483/19870221987-08-20020 August 1987 Insp Rept 50-483/87-22 on 870714-17.No Violations Noted. Major Areas Inspected:Ie Bulletin 85-003, Motor-Operated Valve Failures During Plant Transients Due to Improper Switch Settings 1990-08-31
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000483/19990101999-10-14014 October 1999 Insp Rept 50-483/99-10 on 990913-16.No Violations Noted. Major Areas Inspected:Plant Support Re Biennial Exercise of Emergency Plan & Procedures IR 05000483/19990111999-09-22022 September 1999 Insp Rept 50-483/99-11 on 990812-20.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19990081999-09-13013 September 1999 Insp Rept 50-483/99-08 on 990725-0904.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19990071999-09-10010 September 1999 Insp Rept 50-483/99-07 on 990809-13.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluating Operators PNO-IV-99-035A, on 990810,heater Drain Line Pipe Rupture Occurred.Caused by Flow Accelerated Corrosion in Conjunction with Moisture Impingement.Licensee Has Completed Replacement of Damage Heater Drain Piping & Conducted Insps of Piping1999-08-18018 August 1999 PNO-IV-99-035A:on 990810,heater Drain Line Pipe Rupture Occurred.Caused by Flow Accelerated Corrosion in Conjunction with Moisture Impingement.Licensee Has Completed Replacement of Damage Heater Drain Piping & Conducted Insps of Piping IR 05000483/19990061999-08-13013 August 1999 Insp Rept 50-483/99-06 on 990613-0724.One Severity Level 4 Violation Noted & Being Treated as Ncv.Major Areas Inspected:Operations,Maint & Plant Support PNO-IV-99-035, on 990810,operators Initiated Manual Rt When High Pressure Heater Drain Line Ruptured in Turbine Bldg. Licensee Is Evaluating Options for Facilitating Repair & Restarting Plant.Region IV Will Conduct Special Insp1999-08-11011 August 1999 PNO-IV-99-035:on 990810,operators Initiated Manual Rt When High Pressure Heater Drain Line Ruptured in Turbine Bldg. Licensee Is Evaluating Options for Facilitating Repair & Restarting Plant.Region IV Will Conduct Special Insp IR 05000483/19990051999-06-25025 June 1999 Insp Rept 50-483/99-05 on 990502-0612.Two Violations Noted & Being Treated as Noncited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19990031999-05-19019 May 1999 Insp Rept 50-483/99-03 on 990321-0501.Noncited Violation Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19993021999-05-0303 May 1999 Exam Rept 50-483/99-302 on 990416.Exam Results:Ro License Applicant Passed Retake Written Exam & Test Matl Adequate IR 05000483/19990011999-04-0505 April 1999 Insp Rept 50-483/99-01 on 990207-0320.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19993011999-02-0202 February 1999 NRC Operator Licensing Exam Rept 50-483/99-301 for Exams Administered on 990111-15 ML20199D9261999-01-12012 January 1999 Notice of Violation from Insp on 981115-1226.Violation Noted:Licensee Failed to Perform Written Safety Evaluation, from 840611-980505 IR 05000483/19980181998-12-0404 December 1998 Insp Rept 50-483/98-18 on 980914-1002.Violations Noted. Major Areas Inspected:Review of Design & Licensing Basis for Essential Service Water Sys,Associated Electrical Support Sys & Review of Program Implement 10CFR50.59 ML20198A1231998-12-0404 December 1998 Notice of Violation from Insp on 980914-1002.Violation Noted:Listed Activities Affecting Quality Either Not Prescribed by Documented Instructions Appropriate to Circumstances or Not Accomplished with Procedures PNO-IV-98-059, on 981129,licensee Commenced Plant Shutdown from 100% Power to Mode 3 to Replace Fan Motor.Resident Inspector Monitored Portion of Plant Shutdown from Cr.Info Has Been Discussed with Licensee1998-11-30030 November 1998 PNO-IV-98-059:on 981129,licensee Commenced Plant Shutdown from 100% Power to Mode 3 to Replace Fan Motor.Resident Inspector Monitored Portion of Plant Shutdown from Cr.Info Has Been Discussed with Licensee IR 05000483/19980241998-11-25025 November 1998 Insp Rept 50-483/98-24 on 981026-30.Violation Noted.Major Areas Inspected:Licensee Implementation of NRC Approved Fire Protection Program ML20196G3471998-11-25025 November 1998 Notice of Violation from Insp on 981026-30.Violation Noted: on 981030,control Room Pantry Fire Door,Identified as Being Nonfunctional Without Fire Barrier Impairment Permit or Conpensatory Actions,As Required by Procedure APA-ZZ-00701 IR 05000483/19980221998-11-25025 November 1998 Insp Rept 50-483/98-22 on 980927-1114.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000483/19980231998-10-28028 October 1998 Insp Rept 50-483/98-23 on 981013-15.No Violations Noted. Major Areas Inspected:Operational Status of License Emergency Preparedness Program Was Conducted IR 05000483/19980151998-10-26026 October 1998 Insp Rept 50-483/98-15 on 980706-10.No Violations Noted. Major Areas Inspected:Guidance of Temporary Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers IR 05000483/19980201998-10-15015 October 1998 Insp Rept 50-483/98-20 on 980817-0904.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000483/19980211998-10-0909 October 1998 Insp Rept 50-483/98-21 on 980816-0926.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19980191998-09-29029 September 1998 Insp Rept 50-483/98-19 on 980914-18.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980121998-08-21021 August 1998 Insp Rept 50-483/98-12 on 980705-0815.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support ML20237B8931998-08-14014 August 1998 Notice of Violation from Insp on 980803-07.Violation Noted: on 980804,inspector Noted Three Containers of Dry Active Waste Stored within 10 Feet of Permanent Structure IR 05000483/19980171998-08-14014 August 1998 Insp Rept 50-483/98-17 on 980803-07.Violations Noted.Major Areas Inspected:Implementation of Solid Radioactive Waste Mgt & Radioactive Matls Transportation Program IR 05000483/19980161998-08-0606 August 1998 Insp Rept 50-483/98-16 on 980713-17.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980131998-07-29029 July 1998 Insp Rept 50-483/98-13 on 980714-17.Violation Noted.Major Areas Inspected:Engineering & Plant Support ML20236V3251998-07-29029 July 1998 Notice of Violation from Insp on 980714-17.Violation Noted: Grinding Needle Gun Work Performed on 2,000 Ft Elevation of Cb Liner Floor Plate W/O Performing Surveys to Evaluate Concentration or Quantities of Radioactive Matl IR 05000483/19980141998-07-17017 July 1998 Insp Rept 50-483/98-14 on 980629-0702.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000483/19980111998-07-0808 July 1998 Insp Rept 50-483/98-11 on 980524-0704.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20248L2621998-06-0808 June 1998 Notice of Violation from Insp on 980412-0523.Violation Noted:On 980419,workman Protection Assurance 26226 Was Inadequate to Ensure Safety During Work on Valve EJHV8804A IR 05000483/19980081998-06-0808 June 1998 Insp Rept 50-483/98-08 on 980412-0523.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980071998-05-19019 May 1998 Insp Rept 50-483/98-07 on 980427-0501.Violations Noted.Major Areas Inspected:Radiation Protection Program Focussing on Refueling Outage Activities ML20247M2241998-05-19019 May 1998 Insp Rept 50-483/98-10 on 980428-30.No Violations Noted. Major Areas Inspected:Contingency Plan Developed in Response to Insp Findings in NRC Insp Rept 50-483/98-06 W/Special Emphasis on Training Process Used to Qualify People for Er IR 05000483/19980091998-05-19019 May 1998 Insp Rept 50-483/98-09 on 980428-30.No Violations Noted. Major Areas Inspected:Maint & Plant Support IR 05000483/19980051998-05-0808 May 1998 Insp Rept 50-483/98-05 on 980413-0501.No Violations Noted. Major Areas Inspected:Maintenance,Engineering & Plant Support ML20217F4491998-04-22022 April 1998 Notice of Violation from Insp on 980324-26.Violations Noted: on 970529,licensee Made Changes to Emergency Plan W/O Commission Approval,That Decreased Effectiveness of Plan & Did Not Continue to Meet Planning Standard 50.47(b)(2) ML20217F4881998-04-22022 April 1998 Insp Rept 50-483/98-06 on 980324-26.Violations Noted.Major Areas Inspected:Plant Support IR 05000483/19980041998-04-17017 April 1998 Insp Rept 50-483/98-04 on 980406-10.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000483/19980031998-04-17017 April 1998 Insp Rept 50-483/98-03 on 980301-0411.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering ML20217F1921998-03-26026 March 1998 Notice of Violation from Insp on 980202-06.Violation Noted: Licensee Did Not Demonstrate That Either Train of Auxiliary Fuel Bldg Emergency Filter Sys Adsorbers Could Comply W/Ts 4.7.7.b.2 Until Charcoal from Each Train Was Replaced IR 05000483/19980021998-03-26026 March 1998 Insp Rept 50-483/98-02 on 980202-06.Violation Noted.Major Areas Inspected:Maint,Engineering Re Bldg Emergency Filter Sys Adsorber IR 05000483/19980011998-03-0909 March 1998 Insp Rept 50-483/98-01 on 980118-0228.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support ML20216A7971998-03-0909 March 1998 Notice of Violation from Insp on 980118-0228.Violation Noted:On 980216,instructions to Work Authorization C612323 Did Not Provide Adequate Guidance for Concrete Core Drilling Work,As Result,Licensee Personnel Drilled Into Power Cable IR 05000483/19970211998-01-27027 January 1998 Insp Rept 50-483/97-21 on 971207-980117.No Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980251998-01-12012 January 1998 Insp Rept 50-483/98-25 on 981115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support,Including Health Physics & Security IR 05000483/19970191997-12-18018 December 1997 Insp Rept 50-483/97-19 on 971117-1211.No Violations Noted. Major Areas Inspected:Engineering IR 07100026/20120061997-12-16016 December 1997 Notice of Violation from Insp on 971026-1206.Violation Noted:Licensee Personnel Failed to Follow Documented Instructions During Preventive Maint Task to Record Differential Pressure Across Essential Svc Water Supply 1999-09-22
[Table view] |
Text
. .
!
!
U. S. NUCLEAR REGULATORY CO MISSION l
REGION III
Report No. 50-483/86004(DRSS)
Docket No. 50-483 License No. NPF-30 ;
Licensee: -Union Electric Company i Post Office Box 149 i St. Louis, MO 63166 l Facility Name: Callaway County Nuclear Station !
!
Inspection At: Callaway Site, Callaway County, M0 l
Inspection Conducted: March 17-21, 1986 kl. 0 Yufby Inspectors: C. F. Gill V'/# ' 4 gg Date W. B. Grant o
,
[. 8. bb[p Approved By: L. R. Greger, Chief 9'-/0-f6 Facilities Radiation Protection Date Section Inspection Summary Inspection on March 17-21, 1986 (Report No. 50-483/86004(DRSS))
Areas Inspected: Routine, unannounced inspection of the radiation protection program during a maintenance outage, including: changes in organization, personnel, facilities, equipment, programs, and procedures; audits and I appraisals; planning and preparation; training and qualifications of new personnel; internal and external exposure control; control of radioactive materials, contamination, surveys, and monitoring; and the ALARA progra Also reviewed were open items and licensee's response to IE Information Notice 1-No. 85-8 Results: No violations or deviations were identifie I I
l )
p* a'= o'
8'J' _ l
_
.. .
DETAILS 1. Persons Contacted
- Bledsoe, Jr. , Compliance Engineer
- Gearhart, QA Superintendent
- C. Graham, Health Physics Technical Supervisor
- S. Growcock, QA Scientist J. Kerrigan, Chemistry Foreman S. Merciel, Assistant Compliance Engineer
- J. Peevy, Assistant Manager, Technical Services
- J. Polchow, Health Physics Operations Supervisor
- G. Randolph, Plant Manager
- J. Ridgel, Radwaste Superintendent C. Riggs, Supervisor, Primary Chemistry
- R. Roselius, Health Physics Superintendent R. Seylar, Engineer, Nuclear Projects D. Shafer, Supervising Engineer, Licensing
- N. Slaten, Supervising Engineer, Nuclear G. Spires, Health Physics Foreman
- B. Stanfield, QA Assistant Engineer
- T. Stotlar, QA Supervising Engineer
- B. Little, NRC Senior Resident Inspector The inspectors also contacted other licensee employees including radiation protection technicians and members of the engineering staf * Denotes those present at the exit meetin . General This inspection, which began at 1:00 p.m. on March 17, 1986, was conducted to review the radiation protection program during a refueling-and maintenance outage,-including organization and management controls, qualifications and training, audits and appraisals, planning and prepara-tion, internal and external exposure controls, ALARA program, control of radioactive material and contamination, open items, and IE Information Notice No. 85-81. During plant tours, the inspectors noted that area postings, access controls, and housekeeping were good; no apparent procedure adherence problems were identifie . Licensee Actions oni P revious Inspection Findings (Closed) Open Item (483/84016-04): Install area monitor on manipulator crane and correct FShR inconsistency regarding monitor locations. The physical installatiois of the monitor was verified by the NRC Senior Resident Inspector; the licensee's analysis indicates that the new monitoring configuration satisfies the recommendation of ANSI /ANS 6.8.1-1981; and the licensee plans to correct FSAR inconsistencies concerning monitor location in the next scheduled amendment submitta . 2
. .
(0 pen) Open Item (483/84035-01): Determine post-accident effluent sampling system iodine line loss correction factor The licensee stated that NRR has.not responded to the licensee's May 14, 1985, request for deviation from this portion of NUREG-0737, Item II.F.1, Attachment 2. This matter will be reviewed further during a future inspectio (0 pen) Open Item (483/84035-02): Procedurally control filter housing deluge systems to preclude flooding of adjacent ducting. The use of fire hoses to supply the filter housing water deluge systems has been found acceptable by Region III Fire Protection Specialists and the NRR Fire Protection Reviewer (0 pen Item 483/84035-03 was closed in Inspection Report No. 50-483/85024); the fire pre plans have been revised to warn against overfilling the filter housings with water; and work requests have been issued to install swivel adapters to the 1-1/2 inch hose connection on the water deluge fire protection systems for the charcoal filter unit However, deluge water filter housing drainage has not been addressed by the fire pre plan This matter will be reviewed further during a future inspectio (0 pen) Open Item (483/85006-01): Calibrate liquid and gaseous effluent monitors. All monitors except the radwaste exhaust wide range gas monitor (WRGM) have been calibrated. The low range noble gas detector has been calibrated for this WRGM; however, detector inoperability precluded the calibration of the mid and high range noble gas channel The licensee plans to complete the calibration as soon as replacement detectors arrive onsite. This matter will be reviewed during a future inspectio (Closed) Open Item (483/85006-03): Seal concrete surfaces that could become contaminate As of March 21, 1986, nearly all of the needed painting-had been completed; the licensee expects to complete this task during the current outag (0 pen) Open Item (483/85006-04): Prepare documents which identify the required compliance activities for NUREG-0737, Items II.B.3 and II.F.1, Attachment 1, 2, and The licensee completed an internal document titled, "NUREG-0737 Compliance Review Report," dated February 25, 198 This document supercedes an earlier report dated June 25, 1985, which Region III inspectors found too superficial to justify the licensee's claim of full compliance with the commitments to these four NUREG-0737 items (Inspection Report No. 50-483/85017, Section 3). In general, the current document seems adequate to provide a detailed (line-by-line)
identification of each commitment associated with the previously listed NUREG-0737 items, ascertain compliance, identify any corrective measures needed or variance requests required, and identify activities needed to document complianc In addition to a previously generated variance request (0 pen Item 483/84035-01), the licensee identified the following commitments from which they intend to request variances from NRR: (1)
capability to take a grab sample for hydrogen in the containment atmosphere and (2) capability to measure noble gas concentrations as equivalent Xe-133 or microcuries/cc of actual noble gas. The licensee has also identified the need for modification of two systems, corrections to the FSAR, ;
procedural changes, and recalibration. The licensee has begun an action l plan tracking system for actions needed to comply with NUREG-0737 and to
.. .
I document compliance; however, this system is in the preliminary stage Because the licensee apparently misinterpreted several of the NUREG-0737 commitments, the licensee plans to revise portions of the compliance review report and add numerous action plan items to the compliance tracking system. This matter will be reviewed further during a future inspectio ,
(0 pen) Unresolved Item (483/85016-01): Correction of a wide range gas monitoring system design deficiency. This item remains open pending completion of Callaway Modification Request No.83-312 (Closed) Violation (483/85017-01): . Violation of Technical Specification 4.7.9.2. Licensee corrective actions outlined in the licensee's response dated September 20, 1985, were reviewe No problems were note (Closed) Violation (483/85017-02): Violation of Technical Specification 3.3.3.6 and 3.3.3.10. Licensee corrective actions outlined in the licensee's response dated September 20, 1985, were reviewed. No problems were note . Changes The inspectors reviewed changes in organization, personnel, facilities, equipment, programs, and procedures that could affect the outage radiation protection progra Effective January 15, 1986, the following personnel changes were made:
- The Manager, Callaway Plant, was promoted to the new position of General Manager - Nuclear Operation * The Assistant Manager, Technical Services, was promoted to Manager -
Callaway Plan * The Superintendent, Health Physics, was promoted to Assistant Manager -
Technical Service * The Supervisor, Health Physics, Technical Support, was promoted to Superintendent - Health Physic * A Staff Health Physicist, was promoted to Supervisor - Health Physics, Technical Suppor The licensee plans to fill the vacant staff health physicist position in April 1986. Also, the number of radiation protection foremen have been increased from seven to eigh No violations or deviations were identifie . Organization and Management Controls The inspectors reviewed the licensee's radiation protection organization and management controls for the radiation protection program, including effectiveness of procedures and other management techniques used to implement the program and experience concerning self-identification and correction of program implementation weaknesse .. .
The new' Superintendent - Health Physics (SHP) was appointed Radiation Protection Manager (RPM). The SHP's qualifications for RPM were reviewe The designated RPM appears to meet or exceed the ANSI /ANS 3.1-1978 quali-fications required by Technical Specification 6.3.1. There remains one level of management between the RPM and the Plant Manager; no problems with the RPM's access to the Plant Manager were noted. Except for career path promotions, the staff remains stabl No violations or deviations were identifie . Planning and Preparation The inspectors reviewed the outage planning and preparation performed by the licensee, including: additional staffing, special training, increased equipment and supplies, and job related health physics consideration The licensee's radiation protection group was augmented with 50 contracted radiation protection technicians (RPTs). The inspectors selectively verified the contract technicians' qualifications through a review of their resumes. All 50 RPTs are ANSI 3.1-1978 qualified as senior techni-cians. Contract technicians are required to pass all Union Electric qualification card requirement Special pre-outage training provided to station and contract workers include pre-job ALARA briefings for each work group, and RWP program trainin No problems were noted in this are The supply of portable survey instruments, portable ventilation equipment, protective clothing, and respiratory protection equipment appears adequate for the outag Radiation protection is represented at, and participates in, all planning and outage meeting No problems were note The licensee has designed and installed lead shielding under the reactor head, while it was in its stored position, to reduce radiation from the inside of the reactor head while reactor head gaskets were replaced. The shielding reduced radiation levels from the reactor head by about a factor of 10 (3-4 R/hr down to 300-400 mR/hr).
An inspector observed part of the installation of the reactor head gasket Workers appeared to follow procedures and used good health physics practice No problems were note In an effort to reduce radioactive waste, the licensee is limiting the amount of disposable materials that are brought into the radiation controlled area (RCA).
No violations or deviations were note ~ ~ _ - . - _ _ - _ _ _ _ _ - _ _ . _ _ - _ _ _ - _ _ _ _ _ - - - - _ _ _ _ _ _ _ _ _ - - _ - _ - - _ _ _ _ _ _ - _ - - _ _ _ _ _ - - _ _ _ - - _ _ - . _ _ _ - _ _ _ _ _ _ - - _ _ . - - _ _ _ _ - - _ _ -
.. .
7. Training and Qualifications of New Personnel The inspectors reviewed the education and training qualifications of new plant and contractor radiation protection and chemistry personnel, and training provided to them. Also reviewed was radiation protection training provided to other contractor personne Selection of contracted radiation protection technicians includes a review of the technicians' resumes, an entrance examination, and a personal interview if the examination grade is marginal. After selection, the contract technicians are given three days of training including 18-20 hours of classroom instruction on general rad worker training, Union Electric radiation protection procedures, radiation work permit usage, detector theory, shielding calculations, and about 1/2 day of practical health physics evaluations. A 50 question examination is given; a passing grade of 70 percent is require The examination is followed by individual interviews with foremen on qualification card questions. In addition, radiation protection staff members interview groups of 3 or 4 technicians to assess their qualifications, training records, resumes, and course outlines. Examination results were selectively reviewe No problems were note The inspectors selectively reviewed contractor personnel training record It appears that contractors have received training commensurate with their
"
job requirements. An inspector attended portions of contractor general employee rad worker training. The classroom was of adequate size and well equipped. The class size was small which allowed for individual attentio In general, the presentation was of good quality and students participate No problems were note The licensee has started an apprenticeship program which will enable
, licensee personnel to becone qualified as Assistant Radiation-Chemical Technicians. Completion of the 36 month, 6000 training-hour apprenticeship program will result in promotion of the employee to an Assistant Radiation-Chemical Technician classification in health physics, radwaste, or chemistry. Currently, two Plant Helpers are enrolled in each of the three apprenticeship classification programs. This training should prove very useful to those receiving it and also augment the licensee's radiation protection staf No violations or deviations were identifie . Audits and Appraisals The inspectors reviewed reports of audits and appraisals conducted for or by the licensee including audits required by the technical specification Also reviewed were management techniques used to implement the audit program, and experience concerning identification and correction of programmatic weaknesse . .
A station Quality Assurance (QA) audit of Radiation Protection was conducted October 21-29, 198 Areas audited included respiratory protection, use of RWPs, and compliance with Technical Specificatio .2.2c and 6.12. The audit identified two concerns, both in the area of computer software. The licensee appears to be responsive to these Concern The first station QA audit of Radwaste was conducted July 15-19, 198 Areas audited included radwaste solidification, determination of curie content of waste containers, storage of radwaste, radwaste personnel training, gaseous radwaste, drumming operations, radwaste night orders and standing orders, radwaste trending, and technical specification requirement No problems were note No violations or deviations were identifie . External Exposure Control The inspectors reviewed the licensee's external exposure control and personal. dosimetry programs, including: changes in program to meet outage needs; use of dosimetry; planning and preparation for maintenance and refueling tasks including ALARA considerations; and required records, reports, and notification Exposure records of plant and contractor personnel for 1985 and 1986 to date were selectively reviewed. No exposures greater than 10 CFR 20.101 or administrative limits were noted. Total exposure for 1985 was about 36 person-rems. The total exposure for 1986 through March 19, 1986, which includes 19 days of the outage, is about 116 person-rem An inspector selectively reviewed current RWPs on file at Access Control for compl 'aness, approval, ALARA review, and survey data. Current radiation and contamination survey maps are displayed in a catalog type display file on the desk in Access Control and are available for referenc Survey records are reviewed by a foreman. No problems were note Posting and labeling in the radiation controlled area (RCA) were observed during plant tour No problem areas were note Housekeeping appeared to be goo No violations or deviations were identifie . Internal Exposure Control The inspectors reviewed the licensee's internal exposure control and assessment programs, including: changes to procedures affecting internal exposure control and personal exposure assessment; determination whether engineering controls, respiratory equipment, and assessment of individual intakes meet regulatory requirements; planning and preparation for maintenance and refueling tasks including ALARA considerations; and required records, reports, and notification _ _ _ _ . _ _ _ _ - _ _ _ _ . _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ - _ _ - - _ - _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _
__
. .
Whole body counting data, respiratory protection records, and air sample data for 1985 and 1986 to date were selectively reviewed. No problems were note An inspector toured the respirator issue facility located at Access Control. The facility appeared to be adequately equipped and supplied to accommodate respirator users. A "Respro" book in the facility lists employees and contractors by name and date of their medical evalua-
' tion, mask fit test, and training. A worker's data must be current before a respirator will be issue The licensee is using a vendor supplied respirator cleaning facilit Equipment for a permanent facility has been purchased; however, a location for this facility has not been designate During a plant tour, an inspector noted auxiliary filtering ventilation systems in use in the pressurizer enclosure during valve repair, and in the steam generators during eddy current testin No problems were note No violations or deviations were identifie . Control of Radioactive Materials and Contamination The inspectors reviewed the licensee's program for control of radioactive materials and contamination, including: adequacy of supply, maintenance, and calibration of contamination survey and monitoring equipment; effec-tiveness of survey methods, practices, equipment, and procedures; adequacy of review and dissemination of survey data; and effectiveness of methods of control of radioactive and contaminated material Inspector observations at access control points indicate that workers are properly using step-off pads and following frisking and portal monitor procedure No problems were note The licensee has essentially completed the program for sealing of concrete surfaces in the plant. The inspectors observed several newly painted areas; no problems were note The licensee records and trends personal and clothing contamination event There were 70 such events recorded in 1985, and 66 recorded to date in 1986. The inspectors selectively reviewed records of personal contamina-tion events for 1985 and 1986. Records reviewed did not indicate the presence of significant contamination levels or poor work practice No violations or deviations were identified.
t 12. Maintaining Occupational Exposures ALARA The inspectors reviewed the licensee's program for maintaining occupational exposure ALARA, including: changes in ALARA policy and procedures; ALARA considerations for maintenance and refueling outage; worker awareness and involvement in the ALARA program; establishment of goals and objectives, and effectiveness in meeting them. Also reviewed was management techniques used to implement the program and experience concerning self-identification ,
and correction of implementation weaknesse l l
- _ _ _ _ _ _ - - _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -
_ .
. .
The licensee established ALARA goals for 1985, including overall station goals for total dose and contaminated areas, and individual working group goals for total dose. The licensee's station goal for total dose in 1985 was originally 160 person-rems; as the licensee gained operating experi-ence, the goal _was gredually reduced to 50 person-rems. The estimated total dose for'1985 was 36 person-rems, due in part to an apparently effective ALARA program and to relatively low dose rates during the first full year of operation. The 1986 total dose goals of 450, 350, and 250 person rems have been designated by the licensee as " acceptable,"
" commendable," and " excellent," respectivel In addition to the exposure goals outlined above, it is a station goal that no individual receive more than 5 rems during 198 This goal was met in 1985 and to date in 198 The station's ALARA program includes provisions for dose reduction by minimizing contaminated areas. The licensee's goal for 1985 was to keep the total contaminated areas of the auxiliary, radwaste, and fuel buildings below 10,000 square feet. This 1985 goal was met; however, the trend has been upwards since June of 1985. Partly because of this upward trend, the 1985 goal was increased to 12,500 square feet. Because both the contami-nated area trend and goal increase appear contrary to good radiation protection practices, the inspectors reviewed station documentation and interviewed licensee personnel in an attempt to ascertain the root cause of the increase in contaminated areas. The increase appears partly due to a chronic lack of adequate maintenance and repair of minor contaminated system leaks, and a somewhat understaffed and inexperienced decontamination staf The minor leaks from pipe fittir.gs and valves in potentially radioactive systems, and their negative effect on the health physics staff's ability to maintain the amount of plant contaminated areas ALARA, were discussed with the licensee during a previous inspection (50-483/
85006). Upon review, the inspectors noted that the backlog of leak repair work requests has continued to increase during the past year. The licensee plans to implement a Decontamination Request Form program in the near future which should facilitate obtaining proper priority for future leak i repair work orders. The decontamination staff is discussed in the next paragraph. The reduction of contamination areas is highly desirable and should be vigorously supported by managemen The Radwaste Superintendent is responsible for general housekeeping and decontamination in Radiologically Controlled Areas (RCAs). During plant operation, one foreman is assigned full time (day shift) to these activities; he may draw from a work force of 20 helpers. The training and qualifications of the helpers is described in Inspection Report No. 50-483/8501 The number of helpers has been reduced to 20 from 26; more than half of the current helpers were recently hired. The increase in contaminated areas appears to be due, in part, to a relatively inexperienced and understaffed decontamination staff. During the outage, the regular decontamination staff was augmented by 40 additional contracted workers who, together with the house staff, provided around the clock coverage with 20 helpers and decontamination technicians on each shift to operate the respirator cleaning and laundry facilities, collect and sort radioactive waste, frisk and decontaminate tools, maintain general house-
,
. .
keeping, and decontaminate equipment and floors. Each shift crew is divided into four work groups that are supervised by foremen. These fore-men are supervised by a Ra maste Outage Foreman 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> per da The licensee is consicering increasing the number of contracted workers in the above areas to 60 for the next refueling outage due, in part, to the noted increase in contaminated areas which has occurred during this outag The station's ALARA program also established 1985 goals for solid waste generation, gaseous effluents released, liquid effluents released, airborne contamination area, and personnel contamination incidents. Upon review, the inspectors found that the goals appeared reasonable and were met. The 1986 goals were modified to reflect the licensee's 1985 experience; all of the revised goals appear reasonable with the possible exception of personnel contamination incidents, which increased from 80 in 1985 to 150 in 198 The inspectors reviewed the ALARA organization, the qualification and experience of its members, and the effectiveness of the organization in instituting dose savings programs during outages. The outage ALARA staff consists of five health physics foremer each shift, of which one is an RWP coordinator and ALARA reviewer. The ALARA reviewer's duties include attending all pre-job planning meetings, conducting pre-job ALARA brief-ings, reviewing daily RWP dose and man-hour reports, preparing job history files, reviewing completed ALARA suggestion forms, attending post-job ALARA review meetings, and maintaining ALARA record The AL. ARA oversight of work-in progress is mainly the concern of the other health physics shif t foremen. The outage ALARA staff provides 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day coverage under the direction of the chairman of the Plant ALARA Committee (PAC), who is also the Health Physics Operations Supervisor. In addition to the chairman, the PAC consists of 11 members, one from each plant major disciplinary are The PAC meets at least quarterly to set ALARA goals, evaluate the effectiveness of the ALARA program, resolve ALARA concerns, respond to completed ALARA suggestion forms, review job history files, and implement the lessons learned from each task performed to develop dose saving techniques for future jobs. The ALARA staff members appear to have the proper qualifications, experience, expertise, and dedication to establish and maintain an effective ALARA progra The location of the ALARA group in the station organization, consideration of ALARA principles by other station groups and departments and their working relationship with the ALARA group, management involvement, and the types and number of workers assigned to meet ALARA goals also seem conducive to the establishment of an effective ALARA program. The ALARA staff is compiling what appears to be extensive, thorough, and comprehensive job history files. These files contain all relevant pre-job planning and preparation work records and post-job review records (which discuss dose savings lessons learned). The proper use of these files in pre-job planning and preparation should result in an overall reduction in personnel exposure for future similar task No violations or deviations were identifie . .
k 1 Facilities and Equipment The inspectors toured radiation protection facilities, observed radiation protection equipment in use, and discussed plans for improving access control facilities and equipment with the health physics staf Newly acquired facilities and procured equipment which should enhance the radiation protection program include: (1) three new PCM-1A portal moni-tors, which increases the total to seven; (2) two drycleaning units are expected to be purchased in the near future; (3) a Freon tool cleaning unit; (4) a second whole body counter for use in the central processing facility; (5) the health physics, chemistry, and radwaste some staff offices have been relucated from temporary onsite trailers to the renovated startup building; (6) new, more effective microphones and headsets, which may be used in boom, throat, or respirator mike modes, have replaced less effective throat microphones and headsets (these may significantly reduce dose by cutting stay times and number of personnel in high radiation tasks areas).
1 Radiological Work Routine Violations (RWRV)
There were 23 RWRVs in 1985 and 11 in 1986 to date. The inspectors selectively reviewed RWRV reports for 1985 and 1986. No significant problem areas were noted and no disciplinary action was taken by the license No violations or deviations were identifie . IE Information Notice No. 85-81 The inspectors reviewed licensee action taken in response to IE Information Notice No. 85-81, " Problems Resulting in Erroneously High Readings with Panasonic 800 Series Thermoluminescent Dosimeters (TLDs)." The licensee has purchased and is using this type of TLD. Approximately 1000 suspect lead filters were replaced by Panasonic in 198 The abnormal response of TLDs to such agents as chemical contaminants, ultraviolet light, and humidity is well known by the license Procedures require investigation of abnormal or unusual responses, as appropriat . Main Steam PORV Plume Radiation Monitors During the review of the post-accident noble gas effluent monitoring system for the main steam safety relief valves / power operated relief valve (PORV) pathway, the inspectors noted that the technical adequacy of the licensee's installed radiation monitors was questionabl The radiation monitors are located on the auxiliary building roof and oriented, shielded, and collimated to detect the plume from the PORV If the PORVs are blocked, the radiation monitors appear incapable of responding to post-accident main steam release via the safety relief valves. The PORV are not code safety valves and are presently not governed by the technical specifications; thus, the licensee may operate the plant with blocked PORVs without restriction. Also, in accident circumstances the licensee may elect to block leaky PORVs to prevent the release of radioactive effluents and/or the loss of secondary system
c -
, .
coolant. The licensee is reviewing the technical adequacy of these radiation monitors as part of their internal commitment and compliance analysis report regarding NUREG-0737, Item II.F.1, Attachment 1, (0 pen Item No. 483/85006-04). The inspector informed the licensee that the acceptable location for externally mounted monitors specified by NUREG-0737 is on the main steam line upsteam of the safety valves and PORV and that NRR is presently evaluating a similar technical issue at the D. C. Cook Nuclear Power Plant (Inspection Reports No. 50-315/85011; 50-316/85011, Unresolved Item No. 315/85011-05; 316/85011-04). Inspector concerns with the present locations were discussed during the exit meeting and the licensee was informed that concurrence on the acceptability of the monitor locations must be obtained by the licensee from NRR. Pending resolution of this issue by NRR, this matter is considered an unresolved item (483/86004-01).
17. Technical Specifications 3.3.3.6 and 4.3. During the review of the licensee's commitments to NUREG-0737, Item II.F.1, Attachment 1, the inspectors noted that the installed post-accident noble gas effluent radiation monitors were apparently those described in Appendix 7A and Subsection 18.2.12.2 of the FSA The post-accident noble gas effluent radiation monitors identified in the FSAR are used to monitor effluents from the plant unit vent, the radwaste building, the main steam PORVs, and steam discharge from the turbine-driven auxiliary feedwater pump. Generic Letter 83-37, "PWR NUREG-0737 Technical Specification," dated November 1, 1983, specifies that all of the licensee identified post-accident noble gas effluent radiation monitors should be included in the accident monitoring technical specifications; however, Callaway Technical Specifications 3.3.3.6,
'% cident Monitoring Instrumentation Limiting Condition for Operation,"
and 4.2 3.6, " Accident Monitoring Instrumentation Surveillance Requirements," include only the plant unit vent high range noble gas monitor. Inspector concerns with the present technical specifications were discussed during the exit meeting and the licensee was informed that concurrence on the acceptability of Technical Specifications 3.3. and 4.3.3.6 must be obtained from NRR. Pending resolution of this issue by NRR, this matter is considered an unresolved item (483/86004-02).
18. Exit Meeting The inspectors met with licensee representatives (denoted in Section 1)
at the conclusion of the inspection on March 21, 198 The inspectors summarized the scope and results of the inspection and discussed the likely informational content of the inspection report with regard to documents or processes reviewed by the inspectors during the inspectio The licensee did not identify any such documents / processes as proprietar