IR 05000483/1980027
| ML19341D227 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 02/09/1981 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Bryan J UNION ELECTRIC CO. |
| Shared Package | |
| ML19341D228 | List: |
| References | |
| NUDOCS 8103050179 | |
| Download: ML19341D227 (1) | |
Text
TIO
/,..g'o e
UNITED STATES C
~
NUCLEAR REGULATORY COMMISSION
'
REGION lli y
e e
'#
g 799 ROOSEVELT ROAD
.~'
'
GLEN ELLYN, ILLINOIS 6o137
/g FEB 9 mm oiS, s
,.
Docket No. 50-483 j
9j U_ f[b L
kg8% '**r /7d 8 gg Union Electric Company a
u.4
/
"
ATTN:
Mr. John K. Bryan
{
Vice President - Nuclear d@*
Post Office Box 149
/
St. Louis, MO 63166
%
gafe Gentlemen:
Thank you for your letter dated February 2,1981, informing us of the steps you have taken to correct the noncompliance which we brought to your attention in Inspection Report No. 50-483/80-27 forwarded by our letter dated January 6, 1981. We will examine these matters during a subsequent inspection.
Your cooperation with us is appreciated.
Sincerely, G. Fiorelli, Chief Reactor Construction and Engineering Support Branch cc:
W. H. Weber, Manager Nuclear Construction cc w/1tr dtd 2/2/81:
Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Regions I & IV K. Drey Ronald Fluegge, Utility Divison, Missouri Public Service Commission
,
8103050l11 q