IR 05000483/1980023
| ML19338G416 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 09/25/1980 |
| From: | Danielson D, Lee E K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML19338G415 | List: |
| References | |
| 50-483-80-23, NUDOCS 8010290262 | |
| Download: ML19338G416 (5) | |
Text
-
.
O l
U.S. NUC. EAR REGULATORY COMMISSION
'
0FFICE OF INSPECTION AND ENFORCEMENT
REGION III
Report No. 50-483/80-23 Docket No. 50-483 License No. CPPR-139 Licensee: Union Electric Company P. O. Box 149 St. Louis, MO 63166 Facility Name: Callaway, Unit 1 Inspection At:
Callaway Site, Callaway County, M0 Inspection Conducted:
September 9-11, 1980 7b%
M
,
Inspector:
E. W. K. Lee f M d'd
.orawL 7!M C
Approved By:
D. H. Danielson, Chief Engineering Support Section 2 Inspection Summary:
Inspection on September 9-11, 1980 (Report No. 50-483/80-23)
Areas Inspected: Reactor Coolant Pressure Boundary and Safety Related
,
Piping work and welding activities, procedures, records, previously identified unresolved and noncompliance items, and IE Bulletin. The inspection involved a total-of 19 inspector-hours onsite by one NRC inspector.
Results: No items of noncompliance or deviations were identified.
80102go
. -.
.
0-
'
DETAILS Persons Contacted Union Electric Company (UE)
- F. D. Field, QA Manager
- C. J. Plows, QA Consultant
- R. L. Powers, Superintendent, Site QA
- W. H. Weber, Manager Nuclear Construction
- R. Veatch, QA Assistant Engineer Daniels International Corporation (DIC)
- J. R. Cook, QC Manager
- J. A. Holland, Engineering Manager
- W. L. Petrie, Project QA Manager
- M.
K. Smith, Audit Responsibility Coordinator
- H. H. Starr, Project Manager The inspector also talked with and interviewed several other contractor employees, including members of the quality, craftsmen, and foremen.
- Denotes those attending the exit interview.
Licensee Action on Previous Inspection Findings (Closed) Unresolved Item (483/79-12-01) - Code classification of welds:
The inspector reviewed the ASME Code committee interpretation regarding this unresolved matter and determined them to be acceptable and have no further questions on this matter at this time.
(Closed) Noncompliance Item (483/80-02-01) - Weld material control:
The inspector reviewed the revised procedures and the monitoring records.
It was determined that they are acceptable.
(Closed) Unresolved Item (483/80-02-02) - Indication on inside surface of weld: The inspector reviewed Westinghouse Electric Corporation and the licensee's disposition of this unresolved matter and has no further ques-tions at this time.
(Closed) Unresolved Item (483/80-04-01) - SD Radius bend in excess of 90 degrees: The inspector reviewed the nonconformance report which was initiated after it was determined that the misalignment exceeded the specification tolerances. The inspector determined that the corrective action taken appeared to be adequate; however, no action was indicated to prevent recurrence. The inspector stated that some form of corrective action to prevent recurrence should have been taken and emphasized that more attention be given in closing future NCR's.
-2-
e
.
..
Licensee Action on IE Bulletin'
IE Bulletin 79-04 The inspector reviewed the licensee's response to the subject bulletin and the supporting documents. It appeared that correct weights were used. The bulletin is closed.
Functional or Program Areas Inspected 1. Reactor Coolant Pressure Boundary and Safety Related Piping - Observation of Work and Work Activities lhe inspector toured the piping laydown area.
It was determined that:
(1) spools sere identified; (2) spools are resting on dunnage; and (3)
ends are covered.
No items of noncompliance were ident * fied.
2.
Reactor Coolant Pressure Boundary Piping - Welding Material Coctrol a.
Review of Documentation The inspector reviewed the following documents:
(1) Daniel International Corporation (DIC) Procedure No. AP-VIII-02, Revision 9, " Requisitioning Materials, Equipment, and Services".
(2) DIC Procedure No. AP-VIII-05, Revision 5, " Issuing Purchase Orders and Change Orders".
(3) DIC Procedure No. AP-VII-03, Revision 4, " Material and Equipment Receiving and Inspection".
(4) DIC Procedure No. WP-503, Revision 11, " Control of Welding Consumables".
(5) Purchase Order, Receiving Inspection Report, and material certification for ER308 welding rod with heats No. 481771, No. 482584, and No. 464176 and E308-16 electrodes with heat No. 760377 and lot No. 54920; heat No. 782812 and lot No. 55631.
It was determined that the above documents met the SAR, 10 CFR 50, Appendix B and the applicable code requirements.
b.
Control of Materials The inspector toured the weld rod issuing station located East of the Turbine Room.
It was determined that (1) the welding materials are properly identified and segregated; (2) the temperature of the i-3-i l
j
,
.
rod ovens is maintained; (3) records are properly kept and (4)
issuance and return of welding materials are centro 11ed in accordance with the approved procedure.
No items of noncompliance or deviations were identified.
3.
Reactor Coolant Pressure Boundary Piping - Observation of Welding Activities The inspector observed the following welding activities:
a.
Reactor Coolant System weld No. 2BB-01-F306 on drawing No.
M-03BB-01.
b.
Accumulator Safety Injection System weld No. 2EP-02-F018 on drawing No. M-03EP-02.
It was determined that (1) work was conducted in accordance with traveler; (2) proper welding materials were used; (3) welding pro-cedure requirements were met; (4) work area was free of weld rod-stubs; and (5) physical appearance was acceptable.
No items of noncompliance or deviations were identified.
4.
Reactor Coolant Pressure Boundary Piping - Observation of NDE Activities The inspector observed liquid penetrant examination of the Reactor Coolant System weld No. 2BB-01-F208 on drawing No. M-03BB-01.
It was determined that (1) surface condition was acceptable; (2) pro-cedure requirementr met; and (3) personnel wer
,roperly qualified.
No items of noncompliance or deviations were identified.
5.
Reactor Coolant Pressure Boundary and Safety Related Welder Qualification The inspector reviewed the following documents:
DIC Procedure No. WP-502, Revision 10, " Qualification of Welders".
a.
b.
Randomly selected qualification records of seven welders who performed welding on welds stated in paragraphs 3 and 6 of this report.
It was determined that ASME B&PV Code Section IX requirements were met.
No items of' noncompliance or deviations were identified.
l
- 4-
.
.
-_
-
-
..-
.
'
6.
Safety Related Piping - Observation of Welding Activities The inspector observed welding of the Main Steam System Weld No.
2AB-01-F026 on drawing No. M-03AB-01.
It was determined that (1)
work was conducted in accordance with traveler; (2) proper welding
,
materials were used; (3) welding procedure requirements were met; (4) work area was free of weld rod-stubs; and (5) physical appearance
"
was acceptable.
No items of noncompliance or deviations were identified.
Exit Interview The inspector met with licensee representatives (denoted under Persons Contacted) at the conclusion of the inspecti~on on Septem.ber 11, 1980.
The inspector summarized the purpose and findings of the inspection.
The licensee acknowledged the findings reported herein.
l
P
a
-5-
.
-
-
_
_
.. _.