r

.,...

O U.S. NUCLEAR REGULATORY CO)D:ISSION '

0FFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-483/80-31 Docket No. 50-483-Licensee: Union Electric Company P. O. Box 149 St. Louis, MO 63166 Facility: Callaway, Unit 1 Inspection At: Callaway Site, Callaway County, MO Inspection Conducted: December 1-31, 1980 Inspector:

f 6N

/- [-

/

.

Approved By: -R.C.q,nopT' c -

'

Frojects Section 1

/- 7-8/

Inspection' Summary Inspection on December 1-31, 1980 (Report No. 50-483/80-31)

Areas Inspected: Routine inspection by the IE Regional Resident Inspector (RI) of safety-related construction activities including protection of the reactor vessel and other components of the nuclear steam system supplier (NSSS); material lay down and storage areas and electrical work. This inspection involved 25 inspetor hours by one NRC Inspector.

Results: No items of noncompliance or deviation were identified.

01*3050 Of-l@

-

..

r

.

.

s DETAILS Persons Contacted Union Electric Company (UE)

W. 11. Weber, Manager Nuclear Construction

  • M. E. Doyne, General Superintendent, Callaway Construction
  • R. L. Powers, Superintendent of Site Quality Assurance
  • J. Laux, Supervisory Engineer Quality Assurance Construction 11. 11. Iless, Quality Assurance Consultant Daniel International Corporation (Daniel)

11. J. Starr, Project Manager

  • G. M. Warblow, Services Manager The inspector also contacted and interviewed other licensee and con-tractor personnel, including craftsmen, QA/AC, technical and engineering s taff members.
  • Denotes those attending at least one of the exit meetings.

Functional or Program Areas Inspected 1.

Plant Tours one or more plant areas were toured several times durirg the re-porting period to observe general construction practices; area cleanliness and storage condition of equipment, pipir.g, and elec-trical cable.

One tour was mode on the back shift.

l

.

-2-

- - _ - - _ _ _ _ _

.

r i

2.

Electrical Cable Installation During the reporting period, the inspector observed work including a.

installation, handling, and protection of electrical cables.

Specifically, work associated with these cable terminations was observed:

IBBI15AH IBBI15BB 1BBI15CB 1BBY31AA 1EJC05BJ The following conditions were observed:

(1) the cables were identified, (2) a work assignment sheet was in use, (3) crimping tools were calibrated, (4) the person assigned was certified qualified to perform terminations.

The inspector also observed electrical cable puli:

Cable Pull 0892 Cables 45 AZO 2EA 45 AZO 2FA Cable pull cards were in use, the cables were identified and Quality Control inspections were being performed.

No items of noncompliance or deviations were identified.

3.

Nuclear Steam System Supplier (NSSS) Equipment The inspector observed the inplace storage and protection of a.

NSSS components and piping. The piping assemblics, reactor vessel internals, and reactor vessel head was properly stored and protected.

No items of noncompliance or deviations were identified.

-3-l

.

f

-

.

%

Other Activities The resident inspector participated in an inspection of imperfections in the concrete of the containment building dome. The inspection was conducted by inspectors of Region III.

The results of the inspection are contained in Report No. 50-483/80-30.

. The resident inspector participated in the appraisal of Licensee performance. NRC Report No. 50-483/80-29 contains the results of the review and the subsequent meeting with Licensee officials.

The inspector met with Licensee representatives (denoted under Persons Contacted) on December 4, 1980, and on other occasions throughout the month. The inspector summarized the scope and findings of the in-spections performed. The Licensee representatives acknowledged the findings reported in previous paragraphs.

Attachment: Preliminary Inspection Findings-4-

-

-

7~

OFT 3CE OF INSPECTION AND ENTORCE::E:::

o

' PRELIMINARY INSPECTION FINDINGS o-1.

L10!NSEE 2.

REGIONAL OFFICE

'J-i:r,E;e:tric Conpany Nuclear Regulatory Commission, Region III

'

T. Orntio Street

. office of Inspection and Enforcement E. I.tuis, .issouri 799 Roosevelt Road Glen Ellyn, Illinois 60137 3.

D D'T N'.M IEP.S 4.

LICENSE NLHBERS 5.

DATE OF INSPECTION j

5"-;S2 CPPR-139

/2-/ M /1-k

[] 6.

-

Vithin the scope of the inspection, no ite=s of nonco=pliance or deviation were fcund.

7.

~he f ollering stters are preliminary inspection findings:

.-

i

.

-lE.

~hese prel1=inary inspection findings will be reviewed by NRC Supervision /

hanagenent at the Region III Office and they will orrespond with you

c :ing any enforcenent action.

/

E dt w

Nuc1' ear Regulatory W==isWoi) Inspector